The present invention relates to a storage battery management apparatus and a storage battery management method for adjusting the quantity of electricity stored in a storage battery.
When five storage batteries each having a rated voltage of 1.2V are connected in series, the total voltage of the storage battery as a whole (hereinafter referred to as “storage battery group”) is 6V and the storage battery group in this condition can cause a device of 6V to operate through discharge. Meanwhile, when five storage batteries, each having a rated voltage of 1.2V are connected in parallel, the voltage of this storage battery group is 1.2V. At this time, the respective storage batteries making up this storage battery group are simultaneously charged at a voltage obtained by adding an applied voltage necessary for charging to 1.2V which is the rated voltage of the storage battery.
PTL 1 discloses a technique (hereinafter referred to as “related art”) that controls a switch to thereby perform discharging at a voltage different from a voltage used during charging. The related art switches a connection mode of a plurality of capacitors (or a plurality of storage batteries) between series and parallel connections through switch control, and thereby freely changes the overall voltage according to a voltage of a power generation apparatus or a voltage required by a loading apparatus.
For example, when the voltage of the capacitors is equal to the voltage of the power generation apparatus, the plurality of capacitors are charged in their connection mode switched to parallel. However, when the voltage of the power generation apparatus is higher than the voltage of the capacitors, the plurality of capacitors are charged in the connection mode switched to series. The same applies to a case where the plurality of capacitors are discharged. That is, the connection mode of the plurality of capacitors is switched between series, parallel or a combination thereof according to the voltage required by the loading apparatus.
According to the related art, for example, when the voltage of the power generation apparatus is higher than the voltage of the capacitors and the voltage required by the loading apparatus is lower, storage batteries connected in series are charged at a high voltage supplied from the power generation apparatus. Furthermore, according to the related art, the storage batteries are switched to parallel connection at the time of discharging, allowing the voltage to be changed to a low voltage required by the loading apparatus.
The capacitors described in the related art have an electric characteristic in that the quantity of electricity is proportional to a voltage. For this reason, when a plurality of capacitors connected in series are applied to the related art, it is possible to calculate the quantity of chargeable electricity of each capacitor by measuring a voltage of each capacitor. The quantity of chargeable electricity refers to the quantity of electricity indicating how much electricity can be charged from a current charging state to a fully charged state.
However, when a plurality of serially connected storage batteries are applied, the related art cannot accurately calculate the quantity of chargeable electricity of each storage battery by only measuring the voltage of each storage battery. Examples of the reason for this include (1) reduction of chargeable battery capacity due to deterioration of storage batteries with time, (2) calculation error of the quantity of electricity accompanying a voltage measurement error caused by the fact that the relationship between the quantity of electricity and a voltage has a non-linear electric characteristic curve, (3) individual differences due to differences in material or manufacturing process of storage batteries and (4) variation in electric characteristics due to operating environment (e.g., temperature) of storage batteries.
Since the related art is unable to accurately calculate the quantity of chargeable electricity of each storage battery, each storage battery is not fully charged. For example, according to the related art, during charging of serially connected storage batteries, when a storage battery having a least quantity of chargeable electricity reaches an overcharged state, other storage batteries are no longer charged even if the other storage batteries are chargeable. As a result, the related art has a problem in that electricity that should originally be supplied from the power generation apparatus to each storage battery is wasted and that it cannot fully charge the storage battery group to a chargeable capacity.
An object of the present invention is to provide a storage battery management apparatus and a storage battery management method capable of fully charging, in other words, efficiently charging a serially connected storage battery group up to a chargeable battery capacity of the storage battery group.
A storage battery management apparatus according to an aspect of the present invention is an apparatus that switches a number of storage batteries used or a number of storage batteries connected in series or in parallel as a connection mode of the plurality of storage batteries and that discharges or charges the storage batteries, the apparatus including: a chargeable electricity quantity management section that calculates and manages a quantity of chargeable electricity which is a quantity of electricity chargeable for each of the plurality of storage batteries to be charged from a current charging state to a fully charged state; and a chargeable electricity quantity adjusting section that controls discharging or charging of the plurality of storage batteries so that part or whole of the quantities of chargeable electricity of the plurality of storage batteries reaches a common target quantity of electricity.
A storage battery management method according to an aspect of the present invention is a method of switching a number of storage batteries used or a number of storage batteries connected in series or in parallel as a connection mode of the plurality of storage batteries and discharging or charging the storage batteries, the method including: calculating and managing a quantity of chargeable electricity which is a quantity of electricity chargeable for each of the plurality of storage batteries to be charged from a current charging state to a fully charged state; and controlling discharging or charging of the plurality of storage batteries so that part or whole of the quantities of chargeable electricity of the plurality of storage batteries reaches a common target quantity of electricity.
According to the present invention, it is possible to perform efficient charging even when storage batteries are connected in series and charged.
Embodiment 1 of the present invention is an example of a basic mode of the present invention.
First, a configuration example of a storage battery management apparatus according to the present embodiment will be described.
In
In
Storage battery group 10 is constructed of two or more storage batteries. Storage battery group 10 is constructed of a series or parallel connection or a combination of series and parallel connections of a plurality of storage batteries. Examples of the storage battery include lithium ion (polymer) battery, lead storage battery, nickel hydrogen battery, nickel-cadmium battery, and sodium sulfur battery.
Power generation apparatus 20 is an apparatus that generates electricity for charging storage battery group 10. Examples of power generation apparatus 20 include a motor-driven power generator whose power source is an electric motor, alternator, dynamo, generator, photovoltaic power generator, thermoelectric power generator, vibration power generator.
Loading apparatus 30 is an apparatus that operates using electricity discharged from storage battery group 10. Alternatively, loading apparatus 30 is an apparatus that stores electricity discharged from storage battery group 10. Examples of loading apparatus 30 include not only general electric devices such as a motor, LED (Light Emitting Diode) lighting fixture, but also electric automobiles or power assisted bicycles that move using stored electricity.
In
Storage battery management apparatus 100 includes a CPU (Central Processing Unit), a storage medium such as a ROM (Read Only Memory) that stores a control program and a working memory such as a RAM (Random Access Memory), for example. In this case, the respective functions of storage battery circuit section 110, chargeable electricity quantity management section 120 and chargeable electricity quantity adjusting section 130 are implemented by the CPU executing the control program.
Storage battery circuit section 110 charges storage battery group 10 with electricity outputted from power generation apparatus 20 and discharges electricity stored in storage battery group 10 into loading apparatus 30.
In
Electric circuit 50 includes storage batteries 11, 12 and 13, current shunt resistors R11, R12 and R13 and relay switches (hereinafter referred to as “relay”) SW11, SW12 and SW13. Storage batteries 11, 12 and 13 correspond to storage battery group 10. Current shunt resistors R11, R12 and R13 are resistors for measuring currents flowing through storage batteries 11, 12 and 13. By measuring a potential difference due to a voltage drop of a current shunt resistor and dividing the potential difference by a resistance value of the current shunt resistor, the value of a current flowing through the storage battery is calculated. Relays SW11, SW12 and SW13 are relay switches for opening/closing an electrical path, namely switches for switching (turning ON/OFF) between connection states of storage batteries 11, 12 and 13. For example, when the connection state of relay SW11 is turned ON, that is, when the terminal is connected, a current flows through storage battery 11 connected in series. Meanwhile, when the connection state of relay SW11 is turned OFF, that is, when the terminal is not connected, no current flows through storage battery 11 connected in series.
Control apparatus 40 calculates an integrated value of the currents flowing through storage batteries 11, 12 and 13, respectively. Control apparatus 40 opens/closes (turns ON/OFF) relay SW11, SW12 and SW13 for controlling the currents flowing through storage batteries 11, 12 and 13, respectively.
In
The circuit configuration of storage battery circuit section 110 has been described thus far.
Chargeable electricity quantity management section 120 calculates (measures) the current quantities of chargeable electricity of the respective storage batteries making up storage battery group 10 and manages (stores) the quantities. Note that chargeable electricity quantity management section 120 forms a part of control apparatus 40 in
Here, how the quantity of chargeable electricity is calculated will be described. As described above, the quantity of chargeable electricity indicates how much electricity can be charted in a storage battery when the storage battery is charged from the current charging state to a fully charged state. More specifically, if the quantity of electricity stored in the storage battery is defined as the remaining capacity, the quantity of chargeable electricity is obtained by subtracting the remaining capacity from the rated electric capacity of the storage battery and further subtracting the electric capacity corresponding to deterioration of the storage battery (e.g., deterioration with time or deterioration in manufacturing processes) from the result of subtraction.
Chargeable electricity quantity management section 120 calculates the quantity of chargeable electricity fn (where “n” is the number of the storage battery, unit: [Ah](ampere hour)) using following equation a. The first term of equation a, fn_remaining denotes the current quantity of chargeable electricity of an n-th storage battery. The second term of equation a denotes an integrated value of the current (hereinafter referred to as “current integrated value”). That is, chargeable electricity quantity management section 120 calculates the quantity of chargeable electricity fn by adding the current integrated value (second term of equation a) to the current quantity of chargeable electricity fn_remaining. Chargeable electricity quantity management section 120 calculates fn at the next point in time by successively substituting the value of fn at the last point in time into fn_remaining.
Rn of the second term of equation a is a resistance value (unit: [Ω](ohm)) of the current shunt resistor connected in series to the n-th storage battery. As described above, in
The method whereby chargeable electricity quantity management section 120 calculates the second term of equation a will be described. Chargeable electricity quantity management section 120 measures the potential difference value caused by the voltage drop of current shunt resistor Rn connected in series to the n-th storage battery from time t1 to time t2 first. Chargeable electricity quantity management section 120 performs A/D (Analog/Digital) conversion on the measured value and divides resultant voltage value Vn(t) by current shunt resistance value Rn, and multiplies the resultant current value by time (elapsed time from t1 to t2, unit: [h](hour)) to calculate the second term of equation a.
The calculation of the quantity of chargeable electricity has been described thus far.
Chargeable electricity quantity adjusting section 130 controls a current flowing through storage battery circuit section 110. Chargeable electricity quantity adjusting section 130 forms a part of control apparatus 40 in
Here, the control of a current flowing through storage battery circuit section 110 will be described. More specifically, chargeable electricity quantity adjusting section 130 individually controls the discharging of each storage battery making up storage battery group 10. This allows chargeable electricity quantity adjusting section 130 to equalize the quantities of chargeable electricity among storage batteries. Examples of such a current control method of chargeable electricity quantity adjusting section 130 include (1) a method using a relay and (2) a method using a variable resistor.
First, (1) the method using a relay will be described. In this method, chargeable electricity quantity adjusting section 130 turns ON/OFF relays connected in series to each storage battery making up storage battery group 10. That is, chargeable electricity quantity adjusting section 130 passes a current through each storage battery by turning ON (connecting between terminals) the relays. Meanwhile, chargeable electricity quantity adjusting section 130 does not pass the current through each storage battery by turning OFF the relays (disconnecting between terminals). Thus, chargeable electricity quantity adjusting section 130 controls the currents flowing through the storage batteries, by turning ON/OFF the relays. In the case of the example in
Next, (2) the method using a variable resistor will be described. In this method, chargeable electricity quantity adjusting section 130 changes the value of a variable resistor connected in series to each storage battery making up storage battery group 10 and thereby changes the current flowing through each storage battery. That is, chargeable electricity quantity adjusting section 130 decreases the current flowing through each storage battery by increasing the value of the variable resistor. Meanwhile, chargeable electricity quantity adjusting section 130 increases the current flowing through each storage battery by decreasing the value of the variable resistor. Thus, chargeable electricity quantity adjusting section 130 controls the current flowing through each storage battery.
It should be noted that the current control method applied in the present embodiment is not limited to aforementioned methods (1) and (2). In the present embodiment, when the current flowing through each storage battery is small, an FET (Field Effect Transistor) may also be used instead of a relay.
Next, an example of operation of the storage battery management apparatus according to the present embodiment will be described.
As an initial state of storage battery group 10, an assumption is made that all the storage batteries have the same quantity of chargeable electricity. This assumption applies to a case where all the storage batteries are unused batteries, for example. Chargeable electricity quantity management section 120 successively calculates and stores the current quantities of chargeable electricity of the respective storage batteries.
In step S101, chargeable electricity quantity adjusting section 130 acquires the current quantities of chargeable electricity of the respective storage batteries making up storage battery group 10 from chargeable electricity quantity management section 120. Chargeable electricity quantity adjusting section 130 then sets a target quantity of electricity. The target quantity of electricity is a target value of the quantity of chargeable electricity for each storage battery.
Various methods can be used to set the target quantity of electricity. Here, the method of setting the target quantity of electricity will be described below.
For example, chargeable electricity quantity adjusting section 130 sets the target quantity of electricity to a value between a minimum battery capacity and a maximum battery capacity of each storage battery making up storage battery group 10. With such setting, chargeable electricity quantity adjusting section 130 can equalize the quantities of chargeable electricity among the storage batteries.
For example, chargeable electricity quantity adjusting section 130 identifies a given storage battery from among the storage batteries making up storage battery group 10 and sets a target quantity of electricity to the quantity of chargeable electricity of the identified storage battery. With such setting, chargeable electricity quantity adjusting section 130 discharges some storage batteries of storage battery group 10 whose quantity of chargeable electricity is equal to or below the target quantity of electricity. In this way, storage battery management apparatus 100 can equalize the quantities of chargeable electricity among some storage batteries of storage battery group 10. Thus, when storage batteries having the same quantity of chargeable electricity are connected in series and charged, storage battery management apparatus 100 can efficiently charge the serially connected storage batteries with electricity outputted from the power generation apparatus.
Moreover, chargeable electricity quantity adjusting section 130 identifies, for example, a storage battery having the largest quantity of chargeable electricity among the storage batteries making up storage battery group 10 and sets the target quantity of electricity to the quantity of chargeable electricity of the identified storage battery. With such setting, chargeable electricity quantity adjusting section 130 discharges the storage batteries of storage battery group 10 other than the identified storage battery. In this way, storage battery management apparatus 100 can equalize the quantities of chargeable electricity among all the storage batteries of storage battery group 10. Thus, when charging all the serially connected storage batteries, storage battery management apparatus 100 can more efficiently charge the storage batteries with electricity outputted from the power generation apparatus.
For example, chargeable electricity quantity adjusting section 130 identifies a storage battery having the largest quantity of chargeable electricity among the storage batteries making up storage battery group 10 and sets the target quantity of electricity to a value even larger than the quantity of chargeable electricity of the identified storage battery. With such setting, chargeable electricity quantity adjusting section 130 discharges all the storage batteries. By so doing, storage battery management apparatus 100 can equalize the quantities of chargeable electricity among all the storage batteries of storage battery group 10. Thus, chargeable electricity quantity adjusting section 130 can further increase the quantity of chargeable electricity of each storage battery, and when charging a plurality of storage batteries connected in series, storage battery management apparatus 100 can charge each storage battery with more electricity outputted from the power generation apparatus.
Note that the method of setting a target quantity of electricity is not limited to the aforementioned setting methods. Any value may be set as a target quantity of electricity as long as it is a value within a range from a minimum battery capacity to a maximum battery capacity of the storage batteries making up storage battery group 10.
Examples of the method of setting a target quantity of electricity have been described thus far. Now, a case will be described as an example below where a target quantity of electricity is set to a quantity of chargeable electricity of a storage battery having the largest quantity of chargeable electricity among the storage batteries making up storage battery group 10.
In step S102, chargeable electricity quantity adjusting section 130 compares the current quantity of chargeable electricity of each storage battery acquired from chargeable electricity quantity management section 120 with a set target quantity of electricity and thereby determines whether there is any storage battery whose quantity of chargeable electricity is equal to or below the target quantity of electricity.
When the above-described determination result shows that there is no storage battery whose quantity of chargeable electricity is equal to or below the target quantity of electricity (S102: NO), the processing flow ends. However, when the above-described determination result shows that there is a storage battery whose quantity of chargeable electricity is equal to or below the target quantity of electricity (S102: YES), the processing flow proceeds to step S103.
In step S103, chargeable electricity quantity adjusting section 130 selects (identifies) a storage battery whose quantity of chargeable electricity is equal to or below the target quantity of electricity and performs control so as to discharge the selected storage battery. At this time, chargeable electricity quantity adjusting section 130 turns ON relays connected in series to the selected storage battery and turns OFF relays connected in series to storage batteries other than the selected storage battery. This causes only the selected storage battery to be discharged.
For example, in
In step S104, chargeable electricity quantity adjusting section 130 determines whether or not the quantity of chargeable electricity of the selected storage battery has reached the target quantity of electricity through discharge.
When the above-described determination result shows that the quantity of chargeable electricity of the selected storage battery has reached the target quantity of electricity (S104: YES), the processing flow proceeds to step S107. However, when the above-described determination result shows that the quantity of chargeable electricity of the selected storage battery has not reached the target quantity of electricity (S104: NO), the processing flow proceeds to step S105.
In step S107, chargeable electricity quantity adjusting section 130 turns OFF relays connected in series to the selected storage battery in order to prevent any current from flowing from the selected storage battery. After that, the flow returns to step S102.
In step S105, chargeable electricity quantity management section 120 calculates an integrated value of the current discharged from the selected storage battery (current integrated value).
Aforementioned equation a is used to calculate the current integrated value. The first term in equation a, fn_remaining is the value of the current quantity of chargeable electricity managed by chargeable electricity quantity management section 120. Regarding the second term in equation a, chargeable electricity quantity adjusting section 130 measures the value of a potential difference caused by a voltage drop of the current shunt resistor connected in series to the storage battery selected in step S103 and performs A/D-conversion on the measured value to calculate a voltage value. Chargeable electricity quantity adjusting section 130 divides the calculated voltage value by the resistance value of the current shunt resistor and multiplies the resultant value (current value) by time to calculate a current integrated value.
Here, the second term in equation a will be described using
In step S106, when there is any change in the calculated current integrated value, chargeable electricity quantity management section 120 updates the current quantity of chargeable electricity of each storage battery under its management. After that, the flow returns to step S104. That is, chargeable electricity quantity management section 120 repeats steps S104, S105 and S106 until the quantities of chargeable electricity of all the storage batteries reach the target quantity of electricity.
Through the above-described operation in
In the operation in
In the operation in
Thus, when the storage battery group is charged in another system or even when it is replaced by a new storage battery group, chargeable electricity quantity management section 120 can manage the quantity of chargeable electricity of each storage battery with a correct value, and can thereby equalize the quantities of chargeable electricity among storage batteries.
As described above, the storage battery management apparatus of the present embodiment calculates a current quantity of chargeable electricity for each storage battery making up the storage battery group. The storage battery management apparatus then compares each calculated quantity of chargeable electricity with a predetermined target quantity of electricity and selects a storage battery equal to or below the target quantity of electricity. The storage battery management apparatus controls the storage battery equal to or below the target quantity of electricity so as to discharge until the current quantity of chargeable electricity reaches the target quantity of electricity. The storage battery management apparatus repeats the discharge control until all the selected storage batteries reach the target quantity of electricity. In this way, the quantities of chargeable electricity of storage batteries connected to the storage battery management apparatus of the present embodiment are equalized. Therefore, the storage batteries whose discharging is controlled by the storage battery management apparatus of the present embodiment can be efficiently charged even when they are connected in series.
Embodiment 2 of the present invention is an example where the number of storage batteries connected in series (hereinafter referred to as “the number of serially connected batteries”) is changed upon detecting a situation of connection with a loading apparatus (connection or no connection, voltage value or the like), and the storage batteries are discharged so as to equalize the quantities of chargeable electricity among all the storage batteries and the loading apparatus is operated. Changing the number of serially connected batteries at this time means, more specifically, switching the connection mode of the storage batteries to parallel connection. Furthermore, Embodiment 2 of the present invention is an example where the number of serially connected batteries is changed according to a situation of connection with the power generation apparatus and the storage batteries are charged. Changing the number of serially connected storage batteries at this time means, more specifically, switching the connection mode of the storage batteries to serial connection.
A configuration example of a storage battery management apparatus according to the present embodiment will be described first.
In
As in the case of Embodiment 1, storage battery management apparatus 100 in
As in the case of storage battery circuit section 110 in
In
In addition to the components of electric circuit 50 in
Note that the number of storage batteries is assumed to be 3 in
Row (a) in
Row (b) in
Row (c) in
Control apparatus 41 calculates an integrated value of the currents flowing through storage batteries 11, 12 and 13, respectively. In order to control the currents flowing through storage batteries 11, 12 and 13, control apparatus 41 opens/closes (turns ON/OFF) relay SW11, SW12, SW13, SWa1, SWa2, SWa3, SWa4, SWb1 and SWb2 by switching to (a), (b) or (c) in
The circuit configuration of storage battery circuit section 111 has been described thus far.
Signal detection section 140 is a sensor that detects signal 60 and sends the detection result of signal 60 to circuit control section 150. Signal 60 detected by signal detection section 140 is a signal indicating, for example, a voltage value or a current value of power generation apparatus 20, a conduction state with loading apparatus 30 or a chargeable or non-chargeable state of loading apparatus 30. Examples of the detection result sent by signal detection section 140 to circuit control section 150 include a power supply signal and load connection signal. The power supply signal is a signal indicating the presence or absence of a power supply from power generation apparatus 20 or a voltage value or current value of power generation apparatus 20. The load connection signal is a signal indicating conduction or no conduction to (operation or no operation of) loading apparatus 30 or chargeable or non-chargeable. Signal detection section 140 is, for example, a voltage detection sensor, current detection sensor or conduction detection sensor. Note that signal detection section 140 may be constructed of not only one sensor but also two or more sensors.
Circuit control section 150 changes the number of serially connected storage batteries in storage battery circuit section 111 according to the detection result of signal 60 from signal detection section 140. More specifically, in
Next, as an example of changing the number of serially connected storage batteries according to the detection result of signal 60, processing of charging electricity from power generation apparatus 20 into storage battery group 10 and processing of discharging electricity of storage battery group 10 into loading apparatus 30 will be described. The circuit configuration shown in
For more specific description, in
<During Charging>
When signal detection section 140 detects a power supply signal, storage battery management apparatus 100 charges the electricity outputted from power generation apparatus 20 into storage battery group 10. A more specific processing flow is as follows.
Signal detection section 140 that has detected the power supply signal sends a power supply signal to circuit control section 150. Circuit control section 150 connects relay SW14 in
<During Discharging>
When signal detection section 140 detects a load connection signal, storage battery management apparatus 100 discharges the electricity stored in storage battery group 10 into loading apparatus 30. A specific processing flow is as follows.
First, signal detection section 140 that has detected a load connection signal sends the load connection signal to circuit control section 150. Circuit control section 150 connects relay SW14 in
During discharge, as shown in the processing flow in
Thus, even when the voltage required by the loading apparatus is lower than the voltage of the power generation apparatus, the storage battery management apparatus of the present embodiment detects a power generation apparatus that supplies power or a connected loading apparatus and changes the number of serially connected storage batteries according to the voltage of the detected apparatus. For example, when a connection of the loading apparatus is detected, the storage battery management apparatus sets the number of serially connected storage batteries to the number of serially connected batteries or below during charging and discharges electricity from the storage batteries according to the voltage required by the loading apparatus. At this time, the storage battery management apparatus uniformly discharges the quantity of chargeable electricity of the storage batteries. When it is detected that power is supplied from the power generation apparatus, the storage battery management apparatus changes the number of serially connected storage batteries to the number of serially connected batteries or above during discharging according to the voltage of the power generation apparatus and charges the storage batteries. Thus, the storage battery management apparatus of the present embodiment can charge the storage batteries at the voltage of the power generation apparatus and discharge the storage batteries at a voltage stepped down to the voltage required by the loading apparatus (a voltage lower than the voltage of the power generation apparatus). As described in Embodiment 1, when the storage batteries are discharging electricity into the loading apparatus, the discharging is performed while equalizing the quantities of chargeable electricity among the storage batteries, and therefore when charging the electricity to be outputted into the storage batteries, the power generation apparatus can efficiently charge electricity outputted therefrom into the storage batteries. As a result, when the loading apparatus is connected to the storage battery management apparatus, the loading apparatus can operate for a long time.
A mechanism of voltage conversion in the storage battery management apparatus will be described more specifically. When discharging electricity into a loading apparatus having a voltage of 32V, the storage battery management apparatus of the present embodiment sets the number of serially connected storage batteries having a voltage of 32V to one. When charging electricity from the power generation apparatus having a voltage of 96V into the storage battery, the storage battery management apparatus of the present embodiment sets the number of serially connected storage batteries having a voltage of 32V to three. By changing the number of serially connected storage batteries in this way, the storage battery management apparatus of the present embodiment can perform downward transformation from a high voltage to a low voltage from a power generation apparatus which is the supply source of electricity on the loading apparatus which is the supply destination, making it possible to increase voltage conversion efficiency without thermal loss in a coil or the like.
Signal 60 detected by signal detection section 140 has been described above as a signal indicating a voltage value or current value of power generation apparatus 20, a conduction state with loading apparatus 30 (operating state) or chargeable or non-chargeable state of loading apparatus 30, but signal 60 is not limited to this. For example, signal 60 may also be a signal for detecting water leakage for storage battery management apparatus 100 or storage battery group 10. Upon detecting water leakage, signal detection section 140 sends a water leakage detection signal to circuit control section 150. Circuit control section 150 that has acquired the water leakage detection signal changes the number of serially connected batteries of storage batteries 11, 12 and 13 in
As described above, in addition to the configuration of Embodiment 1, the storage battery management apparatus of the present embodiment includes the signal detection section that detects a physical event change and the circuit control section that changes the number of serially connected batteries of the storage battery group according to the detection and switches the electricity supply source or electricity supply destination, and can increase the number of serially connected batteries of the storage battery group at the time of charging more than the number of serially connected batteries during discharging. In this way, the storage battery management apparatus of the present embodiment can realize downward transformation from a high-voltage power generation apparatus into a loading apparatus requiring a low voltage. Therefore, when operating the loading apparatus requiring a lower voltage than the voltage of the power generation apparatus, using the storage battery management apparatus of the present embodiment can achieve high voltage conversion efficiency without thermal loss at a coil or the like. Moreover, since the storage battery management apparatus can efficiently charge the electricity outputted from the power generation apparatus into the storage battery, the loading apparatus connected to the storage battery management apparatus can operate for a long time.
Embodiment 3 of the present invention is an example where the charging of a storage battery is controlled by changing the number of serially connected storage batteries according to a voltage of a power generation apparatus and by switching a combination of serially connected storage batteries so as to equalize the quantities of chargeable electricity among all storage batteries.
A configuration example of a storage battery management apparatus according to the present embodiment will be described.
In
As in the case of Embodiment 1, storage battery management apparatus 100 in
As in the case of storage battery circuit section 110 in
In
Electricity circuit 52 includes storage batteries 11, 12 and 13, current shunt resistors R11, R12 and R13, relay SW21, SW22 and SW23. Relays SW21, SW22 and SW23 are relay switches for switching an electrical path, namely, switches for switching the number of serially connected batteries and combinations of serially connected storage batteries of storage batteries 11, 12 and 13. When relay SW21 is connected to the terminal a side, no electricity flows through storage battery 11 and current shunt resistor R11. However, when relay SW21 is connected to the terminal b side, electricity flows through storage battery 11 and current shunt resistor R11. Relay SW22 and SW23 perform switching of the electrical path based on the same mechanism as that of relay SW21.
Control apparatus 42 calculates an integrated value of the currents flowing through storage batteries 11, 12 and 13, respectively. Control apparatus 42 switches relay SW21, SW22 and SW23 according to a voltage of an external apparatus connected to terminals T1 and T2. The following description assumes that the external apparatus connected to terminals T1 and T2 is power generation apparatus 20.
When two storage batteries are connected in series (2-series), control apparatus 42 performs one type of control shown below. For example, control apparatus 42 connects relay SW21 and relay SW22 to the terminal b side and connects relay SW23 to the terminal a side to make a 2-series connection of storage batteries 11 and 12. Alternatively, control apparatus 42 connects relay SW22 and relay SW23 to the terminal b side and connects relay SW21 to the terminal a side to make a 2-series connection of storage batteries 12 and 13. Alternatively, control apparatus 42 connects relay SW21 and relay SW23 to the terminal b side and connects relay SW22 to the terminal a side to make a 2-series connection of storage batteries 11 and 13.
In
The circuit configuration of storage battery circuit section 112 has been described thus far.
Since the method for chargeable electricity quantity management section 120 to calculate a quantity of chargeable electricity is similar to that of Embodiment 1, description thereof will be omitted. Note that chargeable electricity quantity management section 120 forms a part of control apparatus 42 in
Chargeable electricity quantity adjusting section 131 changes the number of serially connected storage batteries of storage battery group 10 according to the voltage of power generation apparatus 20 connected to terminals T1 and T2, and switches a combination of the serially connected storage batteries to thereby control a current flowing through storage battery circuit section 112. Chargeable electricity quantity adjusting section 131 forms a part of control apparatus 42 in
Here, control of the current flowing through storage battery circuit section 112 will be described. More specifically, chargeable electricity quantity adjusting section 131 individually controls the charging of each storage battery making up storage battery group 10. Thus, chargeable electricity quantity adjusting section 131 equalizes the quantities of chargeable electricity among the respective storage batteries. Such a method of controlling the quantity of electricity by chargeable electricity quantity adjusting section 131 is the same as that by chargeable electricity quantity adjusting section 130 in
Signal detection section 140 is a sensor that detects signal 60 and sends the detection result of signal 60 to chargeable electricity quantity adjusting section 131. Signal 60 detected by signal detection section 140 is a signal indicating, for example, a voltage value of power generation apparatus 20, a voltage value required by loading apparatus 30. Signal detection section 140 sends the signal to chargeable electricity quantity adjusting section 131. Signal detection section 140 is, for example, a voltage detection sensor or conduction detection sensor. Signal detection section 140 is not limited to one sensor but may be constructed of two or more sensors.
Next, an example of operation of the storage battery management apparatus according to the present embodiment will be described.
As an initial state of storage battery group 10, an assumption is made that the quantities of chargeable electricity of all the storage batteries have the same value. This assumption applies to, for example, a case where all the storage batteries are unused batteries. Chargeable electricity quantity management section 120 successively calculates and stores the current quantities of chargeable electricity of the respective storage batteries.
Step S101 is the same process as that in
In step S102a, chargeable electricity quantity adjusting section 131 compares each current quantity of chargeable electricity acquired from chargeable electricity quantity management section 120 with the set target quantity of electricity and thereby determines whether or not there is any storage battery whose quantity of chargeable electricity is equal to or above the target quantity of electricity.
When the above-described determination result shows that there is no storage battery whose quantity of chargeable electricity is equal to or above the target quantity of electricity (S102a: NO), the processing flow ends. However, when the above-described determination result shows that there is a storage battery whose quantity of chargeable electricity is equal to or above the target quantity of electricity (S102a: YES), the processing flow proceeds to step S103a.
In step S103a, chargeable electricity quantity adjusting section 131 calculates the number of serially connected storage batteries according to the voltage of power generation apparatus 20 connected to terminals T1 and T2 in
In step S103b, chargeable electricity quantity adjusting section 131 selects (identifies) a storage battery whose quantity of chargeable electricity is equal to or above the target quantity of electricity and charges the selected storage battery. At this time, chargeable electricity quantity adjusting section 131 switches relays so that only the selected storage battery is connected in series and switches relays so that storage batteries other than the selected storage battery are not connected in series. In this way, chargeable electricity quantity adjusting section 131 charges only the selected storage battery. In
The method for chargeable electricity quantity adjusting section 131 to select (identify) a storage battery in step S103b will be described. Chargeable electricity quantity adjusting section 131 compares the quantities of chargeable electricity of the respective storage batteries and sorts them in descending order of quantities of chargeable electricity. Chargeable electricity quantity adjusting section 131 selects storage batteries corresponding in number to the serially connected batteries calculated in step S103a in the sorted descending order of quantities of chargeable electricity.
Steps S104, S105, S106 and S107 are the same processes as those in
Through the above-described operation in
In step S103a in
Embodiments 1, 2 and 3 have been described thus far, but the description above is an example and various modifications can be made.
In foregoing Embodiments 1, 2 and 3, a case has been described as an example where the respective sections of storage battery management apparatus 100 are configured with hardware, but the respective sections of storage battery management apparatus 100 may also be provided by software in cooperation with hardware.
The rated battery capacities of the respective storage batteries making up storage battery group 10 in Embodiments 1, 2 and 3 may be the same or may be different. That is, Embodiments 1, 2 and 3 are independent of the rated battery capacities of the respective storage batteries used.
In above Embodiment 3, storage battery management apparatus 100 changes the number of serially connected storage batteries according to the voltage of power generation apparatus 20 connected to terminals T1 and T2 in
An example of operation of aforementioned storage battery management apparatus 100 will be described using
In
As described above, storage battery management apparatus 100 controls the discharging or charging of storage battery group 10, and can thereby equalize the quantities of chargeable electricity among the respective storage batteries making up storage battery group 10. In this way, when charging the storage batteries making up storage battery group 10 by changing the number of serially connected storage batteries, it is possible to charge all serially connected storage batteries of the storage battery group to an equally and fully charged state. Therefore, storage battery management apparatus 100 can efficiently charge electricity outputted from power generation apparatus 20 into each storage battery. As a result, loading apparatus 30 using the storage battery as a power source can operate for a long time.
As has been described above, a storage battery management apparatus according to the present disclosure is an apparatus that switches a number of storage batteries used or a number of storage batteries connected in series or in parallel as a connection mode of the plurality of storage batteries and that discharges or charges the storage batteries, the apparatus including: a chargeable electricity quantity management section that calculates and manages a quantity of chargeable electricity which is a quantity of electricity chargeable for each of the plurality of storage batteries to be charged from a current charging state to a fully charged state; and a chargeable electricity quantity adjusting section that controls discharging or charging of the plurality of storage batteries so that part or whole of the quantities of chargeable electricity of the plurality of storage batteries reaches a common target quantity of electricity.
In addition, in the storage battery management apparatus according to the present disclosure, the chargeable electricity quantity adjusting section starts discharging a storage battery whose quantity of chargeable electricity is equal to or below the target quantity of electricity, and the chargeable electricity quantity adjusting section ends discharging the storage battery when the quantity of chargeable electricity of the storage battery reaches the target quantity of electricity.
In the storage battery management apparatus according to the present disclosure, the chargeable electricity quantity adjusting section calculates an integrated value of a current flowing through the storage battery after starting discharging the storage battery whose quantity of chargeable electricity is equal to or below the target quantity of electricity until the quantity of chargeable electricity of the storage battery reaches the target quantity of electricity, and updates the quantity of chargeable electricity based on the integrated value of the current.
In the storage battery management apparatus according to the present disclosure, the chargeable electricity quantity adjusting section identifies a storage battery from among the plurality of storage batteries and sets the quantity of chargeable electricity of the identified storage battery as the target quantity of electricity.
In the storage battery management apparatus according to the present disclosure, the chargeable electricity quantity adjusting section identifies a storage battery having a largest quantity of chargeable electricity among the plurality of storage batteries and sets the quantity of chargeable electricity of the identified storage battery as the target quantity of electricity.
In the storage battery management apparatus according to the present disclosure, the chargeable electricity quantity adjusting section identifies a storage battery having a largest quantity of chargeable electricity among the plurality of storage batteries and sets a value even larger than the quantity of chargeable electricity of the identified storage battery as the target quantity of electricity.
The storage battery management apparatus according to the present disclosure, further includes: a signal detection section that detects a physical event change on the storage battery management apparatus; and a circuit control section that changes a number of serially connected batteries of the plurality of storage batteries through detection of the physical event change, in which when the signal detection section detects start of charging the plurality of storage batteries as the physical event change, the circuit control section increases the number of serially connected batteries of the plurality of storage batteries compared to a number of serially connected batteries thereof at the time of discharging.
In the storage battery management apparatus according to the present disclosure, the chargeable electricity quantity adjusting section starts charging a storage battery whose quantity of chargeable electricity is equal to or above the target quantity of electricity, and the chargeable electricity quantity adjusting section ends charging the storage battery when the quantity of chargeable electricity of the storage battery reaches the target quantity of electricity.
In the storage battery management apparatus according to the present disclosure, the chargeable electricity quantity adjusting section calculates an integrated value of a current flowing through the storage battery after starting discharging the storage battery whose quantity of chargeable electricity is equal to or above the target quantity of electricity until the quantity of chargeable electricity of the storage battery reaches the target quantity of electricity, and updates the quantity of chargeable electricity based on the integrated value of the current.
In the storage battery management apparatus according to the present disclosure, the chargeable electricity quantity adjusting section identifies a storage battery having a smallest quantity of chargeable electricity from among the plurality of storage batteries and sets the quantity of chargeable electricity of the identified storage battery as the target quantity of electricity.
In the storage battery management apparatus according to the present disclosure, the chargeable electricity quantity adjusting section identifies a storage battery having a smallest quantity of chargeable electricity among the plurality of storage batteries and sets a value even smaller than the quantity of chargeable electricity of the identified storage battery as the target quantity of electricity.
The storage battery management apparatus according to the present disclosure further includes a signal detection section that detects a physical event change occurring in the storage battery management apparatus, in which when the signal detection section detects a voltage change with respect to the plurality of storage batteries as the physical event change, the chargeable electricity quantity adjusting section changes a number of serially connected batteries of the plurality of storage batteries according to the changed voltage, switches a combination of serially connected storage batteries and thereby controls discharging or charging of the plurality of storage batteries so that part or whole of the quantities of chargeable electricity of the plurality of storage batteries reaches a common target quantity of electricity.
A storage battery management method according to the present disclosure is a method of switching a number of storage batteries used or a number of storage batteries connected in series or in parallel as a connection mode of the plurality of storage batteries and discharging or charging the storage batteries, the method including: calculating and managing a quantity of chargeable electricity which is a quantity of electricity chargeable for each of the plurality of storage batteries to be charged from a current charging state to a fully charged state; and controlling discharging or charging of the plurality of storage batteries so that part or whole of the quantities of chargeable electricity of the plurality of storage batteries reaches a common target quantity of electricity.
The disclosure of Japanese Patent Application No. 2012-199559, filed on Sep. 11, 2012, including the specification, drawings and abstract is incorporated herein by reference in its entirety.
The storage battery management apparatus and the storage battery management method according to the present invention are useful for an apparatus and a method for performing charging and discharging using a plurality of storage batteries. The present invention is suitable for use in, for example, a system that stores, in storage batteries, the power generated through elements of high-voltage power generation such as solar power generation or wind power generation, and charges the power in batteries of electric automobiles, electric scooters or electric-power-assisted bicycles or the like.
Number | Date | Country | Kind |
---|---|---|---|
2012-199559 | Sep 2012 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2013/004058 | 6/28/2013 | WO | 00 |