A semiconductor device, one or more of which are included in an integrated circuit (IC), includes a number of electronic devices. One way in which to represent a semiconductor device is with a plan view diagram referred to as a layout diagram (hereinafter, layout). A layout is hierarchical and is decomposed into modules which carry out higher-level functions as required by the semiconductor device's design specifications. In some circumstances, a semi-custom design (SCD) project decomposes the modules into macro cells, standard cells and custom cells.
For a given SCD project, a custom cell is designed with an arrangement that is specific to the given SCD project in order to provide (in operation) a higher-level logic function that is specific to the SCD project. By contrast, a library of standard cells is designed with no particular project in mind and includes standard cells which provide (in operation) common, lower-level logic functions. In terms of a footprint within a layout (from the perspective of a plan view), custom cells are larger (typically much larger) than standard cells. Moreover, for a given library, all of the standard cells have at least one dimension which is the same size (typically, the size being a multiple of a library-specific fixed dimension) in order to facilitate placement of the standard cells into a layout. Typically, the direction of the fixed dimension is parallel to the vertical direction or Y-axis such that the fixed dimension is referred to as the height of the standard cell. As such, standard cells are described as being predefined with respect to a given SCD project. Custom cells may or may not have at least one dimension that is the same size as the corresponding dimension of the standard cells.
As technology improves, the density of a semiconductor device (in terms of the number of electronic devices per unit area or per unit volume) increases. One way in which to increase semiconductor device density is to reduce the size of the fixed dimension of all standard cells in a given library.
One or more embodiments are illustrated by way of example, and not by limitation, in the figures of the accompanying drawings, wherein elements having the same reference numeral designations represent like elements throughout. The drawings are not to scale, unless otherwise disclosed.
The following disclosure provides many different embodiments, or examples, for implementing different features of the provided subject matter. Specific examples of components, materials, values, steps, operations, materials, arrangements, or the like, are described below to simplify the present disclosure. These are, of course, merely examples and are not intended to be limiting. Other components, values, operations, materials, arrangements, or the like, are contemplated. For example, the formation of a first feature over or on a second feature in the description that follows may include embodiments in which the first and second features are formed in direct contact, and may also include embodiments in which additional features may be formed between the first and second features, such that the first and second features may not be in direct contact. In addition, the present disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.
Further, spatially relative terms, such as “beneath,” “below,” “lower,” “above,” “upper” or the like, may be used herein for ease of description to describe one element or feature's relationship to another element(s) or feature(s) as illustrated in the figures. The spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. The apparatus may be otherwise oriented (rotated 90 degrees or at other orientations) and the spatially relative descriptors used herein may likewise be interpreted accordingly.
In some embodiments, a layout of a standard cell typically includes: a plurality of active area patterns distributed on opposite sides of a line of symmetry (which is imaginary and typically parallel to the horizontal direction or X-axis); overlying parallel conductive structures (which serve, e.g., as gates, sources or drains of a transistor) oriented substantially perpendicularly to the line of symmetry; and an overlying metallization layer, some segments of which supply operational voltages, e.g., VDD and VSS, and are referred to as rails. Under a first metal layer, e.g., metal layer one (M(i), where i is a non-negative integer, e.g., i=0 or i=1), of a semiconductor device, a first type of inter-layer connection structure known as a metal-zero-over-poly (M0PO or MP) contact connects an underlying conductive structure, such as a gate, to a second inter-layer connection structure known as a via. The via is connected to a corresponding overlying segment of M(i).
In some embodiments, to reduce the height of standard cells, some instances of a variation of the M0PO contact are used. The variation of the M0PO contact is increased in size (from the perspective of a plan view, in the vertical and/or horizontal direction) relative to a typical instance of the M0PO contact. The variation of the M0PO contact is referred to herein as a ‘tolerance contact’ because the variation of the M0PO contact provides an increased tolerance (alignment-tolerance) in the degree of precision with which a given via (which overlies a given tolerance contact) is to be aligned with respect to the corresponding underlying conductive structure. A given tolerance contact is extended in size so that one or more portions of the tolerance contact extends beyond the corresponding underlying conductive structure. As a result, the location of the given via is no longer constrained by the location of the corresponding underlying conductive structure. As a further result, the given metallization segment can be proportionately reduced in size in the corresponding direction(s). Assuming that the long axes of the metallization segments are parallel to the horizontal axis, when the metallization segments are reduced in the vertical direction, the overall height of the standard cell is reduced and the density of a semiconductor device built using standard cells (which include tolerance contacts) increases.
From the perspective of a plan view, and for purposes of reducing electrical resistance, instances of the M0PO contact as well as instances of a similar type of inter-layer connection structure known as a metal-zero-over-oxide (M0OD or MD) contact are sized to fit within the footprint of the corresponding underlying conductive structures, the footprints of vias are no larger than the footprints of the tolerance contacts on which the vias are disposed, and/or vias are completely overlapped by the corresponding overlying metallization segments. Typically, the vias are shaped (from the perspective of a plan view) as squares, are sized (in the horizontal direction) to match the horizontal size of the tolerance contacts, and the horizontal size of the tolerance contacts is no larger than the horizontal size of the corresponding underlying conductive structures. Also, typically, tolerance contacts and the vias are aligned with the corresponding underlying conductive structures in the horizontal direction. Consequently, the location of a given via has been constrained by the location of the corresponding underlying conductive structure.
To facilitate complete overlap of a given via and the corresponding overlying segment in the metal layer (the “given metallization segment”), other approaches have sized the given metallization segment (in the vertical direction and/or horizontal direction) to be greater than the size (in the corresponding direction) of the given via. As a result, one or more portions of the given metallization segment extend (in the vertical and/or horizontal direction) beyond the given via. Oversizing the given metallization segment (in the vertical and/or horizontal direction) reduces the precision with which the given metallization segment must be aligned (in the corresponding direction) over the given via, which is an advantage. A disadvantage of oversizing the given metallization segment (in the vertical direction) is that the overall height (in the vertical direction) of the standard cell is increased.
Assuming that the long axes of the metallization segments are parallel to the horizontal axis, a way to reduce the overall height (in the vertical direction) of the standard cell is to reduce the vertical size of a given metallization segment. The vertical size of the given metallization segment is reduced where the location of the given via is less constrained with respect to the location of the corresponding underlying conductive structure. In some embodiments, an arrangement which makes the location of the given via less constrained accordingly can tolerate a lesser amount of oversizing of the given metallization segment. Such an arrangement increases the size (in the vertical and/or horizontal direction) of the tolerance contact which is disposed between the given via and the corresponding underlying conductive structure. Increasing the size (in the vertical and/or horizontal direction) of the tolerance contact has a benefit of making the location of the given via less constrained with respect to the location of the corresponding underlying conductive structure. The tolerance contact is increased in size (in the vertical and/or horizontal direction) so that one or more portions of the tolerance contact extend beyond the given via and similarly beyond the corresponding underlying conductive structure. As a result, the amount of oversize of the given metallization segment can be proportionately reduced in the corresponding direction(s). When the metallization segments are reduced in the vertical direction, the overall height of the standard cell is reduced and the density of a semiconductor device built using such standard cells increases. In some embodiments, the density improves by a range of about 13% to about 20%.
There are two types of standard cells, standard functional cells and standard spare cells, the latter being referred to as engineering change order (ECO) cells. Standard functional cells are defined with specific internal arrangements of components to provide (in operation) corresponding common, lower-level functions, e.g., logic functions including an inverter, NAND, NOR, XOR, D-latch, decoupling capacitor (DeCap), and-or-invert (AOI), or-and-invert (OAI), multiplexer, flip-flop, or the like.
ECO cells include ECO base cells and ECO programmed cells. An ECO programmed cell refers to an ECO base cell which has been programmed. Similar to a functional cell, an ECO base cell is defined with a specific internal arrangement of components. Unlike a functional cell, an ECO base cell is not arranged to provide a specific function. In contrast to standard cells which operate (are operational), an ECO base cell (which has not yet been programmed) does not operate (is not operational).
Recalling that ECO base cells are spare cells, the arrangement of an ECO base cell is sufficient that, if needed, the ECO base cell is able to be ‘programed’ (transformed) to operate and provide one of the same, common, low-level functions provided by a corresponding standard functional cell. In some embodiments, the arrangement of each ECO base cell is sufficient so that a given ECO base cell is able to be ‘programed’ (transformed) to operate and provide one of the logic functions including an inverter, NAND, NOR, XOR, D-latch, decoupling capacitor (DeCap), and-or-invert (AOI), or-and-invert (OAI), multiplexer, flip-flop, or the like. In some embodiments, an ECO base cell is programmed (transformed) into an ECO programmed cell by altering one or more connections within at least one ECO base cell (intra-ECO-base-cell connections) such as metal to silicon contacts and metal to polysilicon contacts, or making other metal layer changes with corresponding vias or contacts.
During an SCD project, electronic design automation (EDA) tools are used to select standard functional cells from standard cell libraries and place the standard functional cells into an initial layout along with non-standard cells (if any). EDA tools are also used to perform routing by which the standard functional cells and the non-standard cells are connected using one or more metal layers and corresponding vias and contacts. EDA tools are further used to test the routing. Depending upon the test results, the selection, placement and routing of the standard and non-standard cells is revised. In at least some embodiments, the overall selection, placement, routing and testing (SPRT) process is iterative. Eventually, the SPRT process iterations converge to a finalized layout.
For a variety of reasons (e.g., a design change, an unacceptable timing issue, an unacceptable electromigration issue, or the like), it is common for a nearly finalized layout (or a layout that otherwise would have been regarded as a final layout) to be required to undergo revision. In anticipation of circumstances in which the revision would be relatively minor in scope, and as a safeguard (or hedge) against having to restart (begin anew) the iterative SPRT process, EDA tools are also used to place one or more ECO base cells into the initial layout.
Because the ECO base cells do not operate, the ECO base cells are not connected to functional cells. When the nearly finalized layout is to be revised, one or more ECO base cells undergo ‘programming,’ which converts the one or more ECO base cells into one or more ECO ‘programmed’ cells. Then, the ECO programmed cell is routed to be operatively connected to one or more standard functional cells. In some embodiments, ECO base cells correspond to ECO base cells disclosed in U.S. Pat. No. 7,137,094, granted Nov. 14, 2006, the entirety of which is hereby incorporated by reference. In some embodiments, ECO base cells correspond to ECO base cells disclosed in U.S. Pat. No. 7,458,051, granted Nov. 25, 2008, the entirety of which is hereby incorporated by reference.
There are at least two types of layout diagrams. A first (or ‘pre-cut’) type of layout diagram represents inchoate structures and corresponding ‘cut’ regions. A second (or ‘post-cut’) type of layout diagram represents the structures resulting from the corresponding pre-cut layout diagram. Regarding the pre-cut layout diagram, an inchoate version refers to a version which is not yet completed or fully developed. A cut region indicates that a portion of a corresponding structure underlying the cut region will be removed (or cut). Here, because a portion of a given structure which underlies a corresponding cut region will be removed (or cut), the given structure is not yet completed or fully developed, and so the given structure is referred to herein as an inchoate structure.
In
As noted, for a given library, all of the standard cells have at least one dimension which is fixed at the same size in order to facilitate placement of the standard cells into a layout. In some embodiments, the fixed size is a multiple of a library-specific fixed dimension. In some embodiments, the fixed size is a multiple of the minimum pitch between polysilicon features, PPOLY.
In some embodiments, the standard cells (including functional cells and ECO cells) are polygons. In some embodiments, the standard cells are rectangular polygons. In some embodiments, from the perspective of a plan view, the X-axis is horizontal and the Y-axis is vertical such that the horizontal and vertical dimensions of a rectangular standard cell are described as the corresponding width and height of the cell. In some embodiments, the layout is arranged in rows, and the height of all the standard cells is the same to facilitate placing the standard cells into the rows of the layout.
Returning to
To facilitate inter-cell connections, a layout comprises a stack of planar ‘metallization’ layers interspersed with planar inter-layer dielectric (ILD) structures. A given ‘metallization’ layer includes parallel conductive line segments. In some embodiments, the conductive line segments are metal. In some embodiments, the parallel line segments in successive metallization layers are orthogonal to each other. In some embodiments, the parallel line segments in an ith metallization layer (M(i)) extend in a first direction, the parallel line segments in an (i+1)th metallization layer (M(i+1)) extend in a second direction which is orthogonal to the first direction, the parallel line segments in an (i+2)th metallization layer (M(i+2)) extend in the first direction, the parallel line segments in an (i+3)th metallization layer (M(i+3)) extend in the second direction, and so on. In some embodiments, the first direction is parallel to the X-axis, and the second direction is parallel to the Y-axis.
In some embodiments, the M(i) layer is the first metallization layer overlying inter-layer connection structures such as vias, e.g., the vias corresponding to patterns 130A-130H, via 220, the vias corresponding to patterns 142A-142H, via 330, or the like. According to some metallization-layer numbering schemes, i is the non-negative integer zero (i=0) such that M(i)=M(0). According to some other metallization-layer numbering schemes, i is the non-negative integer one (i=1) such that M(i)=M(1). The present disclosure assumes a metallization-layer numbering scheme in which i is the non-negative integer one (i=1) such that, in
Pre-cut layout 100A shows a horizontal first axis 105 of symmetry, which is common to each of ECO base cells 108A-108H. Layout 100A further shows a vertical second axis 106 of symmetry. As will become more apparent in the following discussion of
In
In
ECO base cells 108A-108H further include patterns 116A-116H and 118A-118H representing inchoate drain/source structures. In some embodiments, the inchoate drain/source structures corresponding to patterns 116A-116H and 118A-118H are formed of doped semiconductor material, or the like. In some embodiments, the inchoate drain/source structures corresponding to patterns 116A-116H and 118A-118H are formed doped polysilicon.
Patterns 116A-116H and 118A-118H are disposed symmetrically about and away from corresponding internal axes of symmetry 107A-107H. In ECO base cells 100A-100D, patterns 116A-116D are disposed to the left and patterns 118A-118D are disposed to the right of corresponding internal axes of symmetry 107A-107D. In ECO base cells 100E-100H, patterns 118E-118H are disposed to the left and patterns 116E-116H are disposed to the right of corresponding internal axes of symmetry 107E-107H.
Relative to vertical axis 106, the following pairs of conductive patterns are mirror symmetric: 118D and 118E; 116D and 116E; 118C and 118F; 116C and 116F; 118B and 118G; 116B and 116G; 118A and 118H; and 116A and 116H. ECO base cell 108H is mirror symmetric to ECO base cell 108A, ECO base cell 108G is mirror symmetric to ECO base cell 108B, ECO base cell 108F is mirror symmetric to ECO base cell 108C, and ECO base cell 108E is mirror symmetric to ECO base cell 108D.
In some embodiments, the conductive patterns in any given ECO base cell are regularly spaced apart. Taking ECO base cell 108A as an example, patterns 114A, 116A and 118A are regularly spaced apart. In some embodiments, taking ECO base cell 108A as an example, a horizontal distance between a midline (extending in the vertical direction) of pattern 116A and a midline (extending in the vertical direction) of pattern 118A is a multiple of the minimum pitch between polysilicon features, PPOLY, and represents a width of base cell 108A. In some embodiments, taking ECO base cell 108A as exemplary, the multiple of PPOLY representing the width of ECO base cell 108A is one such that the width of ECO base cell 108A equals PPOLY.
In
In
For example, consider base cell 108A, to which has been added: a cut-pattern 122A representing a second cut region affecting an underlying portion of pattern 114A (see
Relative to horizontal axis 105, the following pairs of cut-patterns are mirror symmetric: 122A & 124A; 122B & 124B; 122C &124C; 122D & 124D; 122E & 124E; 122F & 124F; 122G & 124G; and 122H & 124H. More generally, though cut-patterns 122A-122H and 124A-124H overlie corresponding patterns 116A′-116H′, 116A″-116H″, 118A′-118H′ and 118A″-118H″ (representing drain/source structures), cut-patterns 122A-122H and 124A-124H do not indicate that the corresponding underlying portions of patterns 116A′-116H′, 116A″-116H″, 118A′-118H′ and 118A″-118H″ will be cut.
Cut-patterns 126A-126D indicate that underlying portions of corresponding gate structures (corresponding to patterns 114C-114F) will be cut. Cut-patterns 126A-126D are located over areas bounded by corresponding patterns 120C-120F. Relative to the vertical direction: patterns 126A and 126D are correspondingly disposed above horizontal axis 105; and patterns 126B-126C are correspondingly disposed below horizontal axis 105. Relative to vertical axis 106, the following pairs of cut-patterns are mirror symmetric: 126A and 126D; and 126B and 126C. For example, consider base cell 108C, to which has been added cut-pattern 126A representing a fourth cut region affecting an underlying portion of pattern 114 (see
Similarly, in layout 100G, the end portions of the gate structures (corresponding to former patterns 114B-114H) have been cut/removed according to corresponding cut-patterns 122B-122H (of
Below axis 105 in the vertical direction, and as a result of the cuts made according to cut-patterns 124A-124H, gaps 114A″″-114H″″ now appear at corresponding ends of ECO base cells 108A-108H. More particularly, gaps 114A″″-114A″″ now appear at ends of the gate structures (corresponding to patterns 114A′, 114B′, 114C″, 114D″, 114E″, 114F″, 114G′ and 114H′) located below axis 105 in the vertical direction. Above axis 105 in the vertical direction, and as a result of the cuts made according to cut-patterns 122A-122H, gaps 114A′″-114H′″ now appear at corresponding ends of ECO base cells 108A-108H. More particularly, gaps 114A′″-114H′″ now appear at ends of the gate structures (corresponding to patterns 114A′-114H′) located above axis 105 in the vertical direction.
For example, consider base cell 108C, in which the central portion of the gate structure has been cut/removed according to cut pattern 126A (see
In
In some embodiments, patterns 128A-128H are shaped as squares. For example, pattern 128A is shaped as a square. Relative to the horizontal direction, the first tolerance contact (corresponding to pattern 128A) occupies an area which substantially overlaps a portions of the gate structure corresponding to pattern 114A′. Also relative to the horizontal direction, the first tolerance contact (corresponding to pattern 128A) extends so as to substantially overlap a portion of corresponding gap 116A′″ (see
In layout 100H of
ECO base cells 108A-108H further include corresponding patterns 129A-129H representing second tolerance contacts. In some embodiments, the second tolerance contacts (corresponding to patterns 129A-129H) overlap outward corners of corresponding ends 136A, 132B, 136C, 132D, 134E, 138F, 134G and 128H of drain/source structures corresponding to patterns 116A, 118B, 116C, 118D, 118E, 116F, 118G and 116H. Other and/or additional locations of second tolerance contacts (corresponding to patterns 129A-129H) are contemplated. In some embodiments, a given ECO base cell has multiple outward corners overlapped by patterns representing second contacts. For example, in some embodiments, in addition to pattern 129A representing a first instance of a second tolerance contact overlapping outward corner of end 136A, ECO base cell 102A includes at least one additional instance of pattern 129A (not shown) overlapping a corresponding at least one outward corner or corresponding ends 132A, 134A and 138A.
In some embodiments, patterns 129A-129H are shaped as squares. Other shapes for patterns 129A-129H are contemplated. In some embodiments, patterns 129A-129H are centered over the outward corners of corresponding ends 136A, 132B, 136C, 132D, 134E, 138F, 134G and 138H of drain/source structures corresponding to patterns 116A, 118B, 116C, 118D, 118E, 116F, 118G and 116H. In some embodiments, the widths of patterns 129A-129H are substantially the same as the widths of corresponding patterns 116A, 118B, 116C, 118D, 118E, 116F, 118G and 116H.
In
The first vias (corresponding to patterns 130A-130H) are located over, and within, areas bounded by the first tolerance contacts (corresponding patterns 128A-128H). The second vias (corresponding to patterns 142A-142H) are located over, and within, areas bounded by the second tolerance contacts (corresponding to patterns 129A-129H). Each of the first vias (corresponding to patterns 128A-128H) overlaps axis 105. Relative to the vertical direction, however, a majority of the area of each of patterns 130A, 130C, 130F and 130H is disposed below axis 105, while a majority of the area of each of patterns 130B, 130D, 130E and 130G is disposed above axis 105. As such, the first vias (corresponding to patterns 130A-130H) are located asymmetrically about axis 105.
Because the areas of the tolerance contacts (corresponding to patterns 128A-128H) are larger than the areas of the first vias (corresponding to patterns 130A-130H), the precision with which the first vias must be aligned with respect to the underlying gate structures (corresponding to patterns 114A-114H) is reduced. For example, in ECO base cell 108A, the precision to align the first via (corresponding to pattern 130A) with respect to the underlying gate structure (corresponding to pattern 114A) is referred to as alignment-tolerance. Because the tolerance contact (corresponding to pattern 128A) is larger than the first via (corresponding to pattern 130A), the alignment-tolerance is increased, which confers an advantage, e.g., in terms of manufacturability. As a result, first metallization segment 144A (see
ECO base cells 108A-108H further include corresponding patterns 142A-142H representing the second vias. In some embodiments, the second vias (corresponding to patterns 142A-142H) are connected to corresponding segments in the immediately overlying metallization layer, M(i).
In
In some embodiments, because additional second tolerance contacts (not shown) are contemplated, then consequentially additional corresponding second vias (not shown) are contemplated. Because the additional second vias are contemplated, then additional corresponding second metallization segments (not shown) in M(i) are contemplated as being overlaid onto a first set of additional second vias (again, not shown). Also, because the additional second vias are contemplated, then additional corresponding third metallization segments (not shown) in M(i) are contemplated as being overlaid onto an additional second set of second vias (again, not shown).
In some embodiments, some segments of metallization layer M(i) supply operational voltages, e.g., VDD and VSS, and are referred to as rails. In some embodiments, the second metallization segments in M(i) (corresponding to patterns 146A, 146C, 146F and 146H) are rails that supply VDD. In some embodiments, the third metallization segments in M(i) (corresponding to patterns 148B, 148D, 148E and 148G) are rails that supply VDD. In some embodiments, the first metallization segments in M(i) (corresponding to patterns 144A-144H) are rails that supply VSS.
The pair of
Similarly, in
The pair of
The pair of
The pair of
In
Regarding the pair of
In
Regarding the pair of
It is to be recalled that tolerance contacts are a variation an M0PO contact. Additional details regarding the structure and manufacture of M0PO contacts, as well as the similar type of inter-layer connection structure known as a metal-zero-over-oxide (M0OD or MD) contact, are disclosed in commonly assigned U.S. patent application Ser. No. 13/965,648, filed Aug. 13, 2013, having Pre-Grant Publication No. US20150048424, and in commonly assigned U.S. patent application Ser. No. 13/939,201, filed Jul. 11, 2013, having Pre-Grant Publication No. US20150015335, the entireties of each of which are hereby incorporated by reference.
Together,
In
A second tolerance contact 510 is formed on source/drain structures 506LU and 506RU such that source/drain structures 506LU and 506RU share second tolerance contact 510. An ILD structure 512 is formed around second tolerance contact 510 and on ILD 512. A second via 520 is formed on second tolerance contact 510 such that source/drain structures 506LU and 506RU share second via 520 indirectly through second tolerance contact 510. An ILD structure 522 is formed around second via 520 and on ILD 512. A segment 536 of metallization layer M(i) is formed on second via 520 and on ILD 522.
In
At block 610, the first conductive pattern is located, e.g., centered, between the second and third conductive patterns. From block 610, flow proceeds to a block 612. At block 612, a first cut-pattern which overlaps corresponding central regions of the second, and third conductive patterns is generated. The first cut pattern corresponds, e.g., to pattern 120A of
At block 616, a fourth conductive pattern is generated. The fourth conductive pattern corresponds, e.g., to pattern 128A of
In
In
In
In
In
The method of flowcharts 600A-600B of
In some embodiments, EDA system 700 is a general purpose computing device including a hardware processor 702 and a non-transitory, computer-readable storage medium 704. Storage medium 704, amongst other things, is encoded with, i.e., stores, computer program code 706, i.e., a set of executable instructions. Execution of instructions 706 by hardware processor 702 represents (at least in part) an EDA tool which implements a portion or all of, e.g., the method of generating a layout of an ECO base cell, e.g., in the method of
Processor 702 is electrically coupled to computer-readable storage medium 704 via a bus 708. Processor 702 is also electrically coupled to an I/O interface 710 by bus 708. A network interface 712 is also electrically connected to processor 702 via bus 708. Network interface 712 is connected to a network 714, so that processor 702 and computer-readable storage medium 704 are capable of connecting to external elements via network 714. Processor 702 is configured to execute computer program code 706 encoded in computer-readable storage medium 704 in order to cause system 700 to be usable for performing a portion or all of the noted processes and/or methods. In one or more embodiments, processor 702 is a central processing unit (CPU), a multi-processor, a distributed processing system, an application specific integrated circuit (ASIC), and/or a suitable processing unit.
In one or more embodiments, computer-readable storage medium 704 is an electronic, magnetic, optical, electromagnetic, infrared, and/or a semiconductor system (or apparatus or device). For example, computer-readable storage medium 704 includes a semiconductor or solid-state memory, a magnetic tape, a removable computer diskette, a random access memory (RAM), a read-only memory (ROM), a rigid magnetic disk, and/or an optical disk. In one or more embodiments using optical disks, computer-readable storage medium 704 includes a compact disk-read only memory (CD-ROM), a compact disk-read/write (CD-R/W), and/or a digital video disc (DVD).
In one or more embodiments, storage medium 704 stores computer program code 706 configured to cause system 700 (where such execution represents (at least in part) the EDA tool) to be usable for performing a portion or all of the noted processes and/or methods. In one or more embodiments, storage medium 704 also stores information which facilitates performing a portion or all of the noted processes and/or methods. In one or more embodiments, storage medium 704 stores library 707 of standard cells including standard functional cells and standard ECO base cells.
EDA system 700 includes I/O interface 710. I/O interface 710 is coupled to external circuitry. In one or more embodiments, I/O interface 620 includes a keyboard, keypad, mouse, trackball, trackpad, touchscreen, and/or cursor direction keys for communicating information and commands to processor 702.
EDA system 700 also includes network interface 712 coupled to processor 702. Network interface 712 allows system 700 to communicate with network 714, to which one or more other computer systems are connected. Network interface 712 includes wireless network interfaces such as BLUETOOTH, WIFI, WIMAX, GPRS, or WCDMA; or wired network interfaces such as ETHERNET, USB, or IEEE-1364. In one or more embodiments, a portion or all of noted processes and/or methods, is implemented in two or more systems 700.
System 700 is configured to receive information through I/O interface 710. The information received through I/O interface 710 includes one or more of instructions, data, design rules, libraries of standard cells, and/or other parameters for processing by processor 702. The information is transferred to processor 702 via bus 708. EDA system 700 is configured to receive information related to a UI through I/O interface 710. The information is stored in computer-readable medium 704 as user interface (UI) 742.
In some embodiments, a portion or all of the noted processes and/or methods is implemented as a standalone software application for execution by a processor. In some embodiments, a portion or all of the noted processes and/or methods is implemented as a software application that is a part of an additional software application. In some embodiments, a portion or all of the noted processes and/or methods is implemented as a plug-in to a software application. In some embodiments, at least one of the noted processes and/or methods is implemented as a software application that is a portion of an EDA tool. In some embodiments, a portion or all of the noted processes and/or methods is implemented as a software application that is used by EDA system 700. In some embodiments, a layout which includes standard cells plus ECO base cells and/or ECO programmed cells is generated using a tool such as VIRTUOSO® available from CADENCE DESIGN SYSTEMS, Inc., or another suitable layout generating tool.
In some embodiments, the processes are realized as functions of a program stored in a non-transitory computer readable recording medium. Examples of a non-transitory computer readable recording medium include, but are not limited to, external/removable and/or internal/built-in storage or memory unit, e.g., one or more of an optical disk, such as a DVD, a magnetic disk, such as a hard disk, a semiconductor memory, such as a ROM, a RAM, a memory card, or the like.
In general, system 800 generates a layout (e.g., any one of layouts 100A-100L of corresponding
In
Design house (or design team) 820 generates an IC design layout 822. IC design layout 822 includes various geometrical patterns designed for an IC device 860. The geometrical patterns correspond to patterns of metal, oxide, or semiconductor layers that make up the various components of IC device 860 to be fabricated. The various layers combine to form various IC features. For example, a portion of IC design layout 822 includes various IC features, such as an active region, gate electrode, source and drain, metal lines or vias of an interlayer interconnection, and openings for bonding pads, to be formed in a semiconductor substrate (such as a silicon wafer) and various material layers disposed on the semiconductor substrate. Design house 820 implements a proper design procedure to form IC design layout 822. The design procedure includes one or more of logic design, physical design or place and route. IC design layout 822 is presented in one or more data files having information of the geometrical patterns. For example, IC design layout 822 can be expressed in a GDSII file format or DFII file format.
Mask house 830 includes data preparation 832 and mask fabrication 844. Mask house 830 uses IC design layout 822 to manufacture one or more masks to be used for fabricating the various layers of IC device 860 according to IC design layout 822. Mask house 830 performs mask data preparation 832, where IC design layout 822 is translated into a representative data file (“RDF”). Mask data preparation 832 provides the RDF to mask fabrication 844. Mask fabrication 844 includes a mask writer. A mask writer converts the RDF to an image on a substrate, such as a mask (reticle) or a semiconductor wafer. The design layout is manipulated by mask data preparation 832 to comply with particular characteristics of the mask writer and/or requirements of IC fab 850. In
In some embodiments, mask data preparation 832 includes optical proximity correction (OPC) which uses lithography enhancement techniques to compensate for image errors, such as those that can arise from diffraction, interference, other process effects or the like. OPC adjusts IC design layout 822. In some embodiments, mask data preparation 832 includes further resolution enhancement techniques (RET), such as off-axis illumination, sub-resolution assist features, phase-shifting masks, other suitable techniques, or the like or combinations thereof. In some embodiments, inverse lithography technology (ILT) is also used, which treats OPC as an inverse imaging problem.
In some embodiments, mask data preparation 832 includes a mask rule checker (MRC) that checks the IC design layout that has undergone processes in OPC with a set of mask creation rules which contain certain geometric and/or connectivity restrictions to ensure sufficient margins, to account for variability in semiconductor manufacturing processes, or the like. In some embodiments, the MRC modifies the IC design layout to compensate for limitations during mask fabrication 844, which may undo part of the modifications performed by OPC in order to meet mask creation rules.
In some embodiments, mask data preparation 832 includes lithography process checking (LPC) that simulates processing that will be implemented by IC fab 850 to fabricate IC device 860. LPC simulates this processing based on IC design layout 822 to create a simulated manufactured device, such as IC device 860. The processing parameters in LPC simulation can include parameters associated with various processes of the IC manufacturing cycle, parameters associated with tools used for manufacturing the IC, and/or other aspects of the manufacturing process. LPC takes into account various factors, such as aerial image contrast, depth of focus (“DOF”), mask error enhancement factor (“MEEF”), other suitable factors, or the like or combinations thereof. In some embodiments, after a simulated manufactured device has been created by LPC, if the simulated device is not close enough in shape to satisfy design rules, OPC and/or MRC are be repeated to further refine IC design layout 822.
It should be understood that the above description of mask data preparation 832 has been simplified for the purposes of clarity. In some embodiments, data preparation 832 includes additional features such as a logic operation (LOP) to modify the IC design layout according to manufacturing rules. Additionally, the processes applied to IC design layout 822 during data preparation 832 may be executed in a variety of different orders.
After mask data preparation 832 and during mask fabrication 844, a mask or a group of masks are fabricated based on the modified IC design layout. In some embodiments, an electron-beam (e-beam) or a mechanism of multiple e-beams is used to form a pattern on a mask (photomask or reticle) based on the modified IC design layout. The mask can be formed in various technologies. In some embodiments, the mask is formed using binary technology. In some embodiments, a mask pattern includes opaque regions and transparent regions. A radiation beam, such as an ultraviolet (UV) beam, used to expose the image sensitive material layer (e.g., photoresist) which has been coated on a wafer, is blocked by the opaque region and transmits through the transparent regions. In one example, a binary mask includes a transparent substrate (e.g., fused quartz) and an opaque material (e.g., chromium) coated in the opaque regions of the mask. In another example, the mask is formed using a phase shift technology. In the phase shift mask (PSM), various features in the pattern formed on the mask are configured to have proper phase difference to enhance the resolution and imaging quality. In various examples, the phase shift mask can be attenuated PSM or alternating PSM. The mask(s) generated by mask fabrication 844 is used in a variety of processes. For example, such a mask(s) is used in an ion implantation process to form various doped regions in the semiconductor wafer, in an etching process to form various etching regions in the semiconductor wafer, and/or in other suitable processes.
IC fab 850 is an IC fabrication business that includes one or more manufacturing facilities for the fabrication of a variety of different IC products. In some embodiments, IC Fab 850 is a semiconductor foundry. For example, there may be a manufacturing facility for the front end fabrication of a plurality of IC products (front-end-of-line (FEOL) fabrication), while a second manufacturing facility may provide the back end fabrication for the interconnection and packaging of the IC products (back-end-of-line (BEOL) fabrication), and a third manufacturing facility may provide other services for the foundry business.
IC fab 850 uses the mask (or masks) fabricated by mask house 830 to fabricate IC device 860. Thus, IC fab 850 at least indirectly uses IC design layout 822 to fabricate IC device 860. In some embodiments, a semiconductor wafer 852 is fabricated by IC fab 850 using the mask (or masks) to form IC device 860. Semiconductor wafer 852 includes a silicon substrate or other proper substrate having material layers formed thereon. Semiconductor wafer further includes one or more of various doped regions, dielectric features, multilevel interconnects, or the like (formed at subsequent manufacturing steps).
Details regarding an integrated circuit (IC) manufacturing system (e.g., system 800 of
In general, assuming (again) that the long axes of the metallization segments are parallel to the horizontal axis, a way to reduce the overall height (in the vertical direction) of the standard cell is to reduce the vertical size of metallization segments. In some embodiments, cell-height reduction is achieved with one or more instances of a first tolerance contact (e.g., 210). In some embodiments, cell-height reduction is achieved with one or more instances of a second tolerance contact (e.g., 310). In some embodiments, cell-height reduction is achieved with one or more instances of the first tolerance contact and one or more instances of the second tolerance contact. When the metallization segments are reduced in the vertical direction, the overall height of the standard cell is reduced and the density of a semiconductor device built using such standard cells increases. In some embodiments, the density improves by a range of about 13% to about 20%.
More particularly, the first tolerance contact is inserted between a first conductive structure (e.g., gate structure 204) and a first via (e.g., via 220). For a situation in which the first via would be formed directly on the first conductive structure, the alignment-tolerance between the first via and the first conductive structure is disadvantageously reduced. In contrast, by inserting the first tolerance contact between the first conductive structure and the first via, alignment-tolerance is increased. By using the first tolerance contact as an agent by which alignment-tolerance is advantageously increased, it is not necessary to rely on increases in the vertical size of the metallization segment (which overlies the first contact) as an agent by which alignment-tolerance is increased. Instead, the vertical size of the metallization segment (which overlies the first contact) can be reduced, which consequently (and beneficially) reduces the vertical size of metallization segments (where, again, it is assumed that the long axes of the metallization segments are parallel to the horizontal axis).
Also more particularly, the second tolerance contact is inserted between a second conductive structure (e.g., drain/source structure 306) and a second via (e.g., via 320). For a situation in which the second via would be formed directly on the second conductive structure, the alignment-tolerance between the second via and the second conductive structure is disadvantageously reduced. In contrast, by inserting the second tolerance contact between the second conductive structure and the second via, alignment-tolerance is advantageously increased. By using the second tolerance contact as an agent by which alignment-tolerance is increased, it is not necessary to rely on increases in the vertical size of the metallization segment (which overlies the second contact) as an agent by which alignment-tolerance is increased. Instead, the vertical size of the metallization segment (which overlies the second contact) can be reduced, which consequently (and beneficially) reduces the vertical size of metallization segments (where, again, it is assumed that the long axes of the metallization segments are parallel to the horizontal axis).
In an embodiment, a system for manufacturing a semiconductor device, the system comprising at least one processor and at least one memory having computer program code for one or more programs which (for a layout diagram of an engineering change order (ECO) base cell that is stored on a non-transitory computer-readable medium) are configured to execute a method which includes generating the layout diagram including: generating first and second active area patterns having corresponding long axes arranged in a first direction parallel to a first axis of symmetry; arranging the first and second active area patterns on opposite sides of the first axis of symmetry; generating non-overlapping first, second and third conductive patterns having corresponding long axes in a second direction perpendicular to the first direction and parallel to a second axis of symmetry; arranging each of the first, second and third conductive patterns to correspondingly overlap the first and second active area patterns; centering the first conductive pattern between the second and third conductive patterns; generating a first cut-pattern which overlaps corresponding central regions of the second and third conductive patterns and which is indicative that the central regions will be removed subsequently; centering the first cut-pattern relative to the first axis of symmetry; generating a fourth conductive pattern; locating the fourth conductive pattern over an area bounded by the first cut-pattern; and expanding the fourth conductive pattern to occupy an area which substantially overlaps a first segment of the first conductive pattern and a first segment of one of the second and third conductive patterns. In an embodiment, the generating the layout diagram further includes: generating a first via pattern; locating the first via pattern over and within a region bounded by the fourth conductive pattern; generating a fifth conductive pattern; locating the fifth conductive pattern over the first via pattern; and sizing the fifth conductive pattern so that the fifth conductive pattern substantially completely overlaps the first via pattern; and wherein the fifth conductive pattern is a segment within a first metallization layer. In an embodiment, the generating the layout diagram further includes: extending ends of each of the first, second and third conductive patterns in the second direction correspondingly beyond the first and second active area patterns away from the first axis of symmetry; and generating second and third cut-patterns which correspondingly overlap end regions of the first conductive pattern, and which are indicative that the end regions will be removed subsequently. In an embodiment, the generating the layout diagram further includes: extending ends of each of the first, second and third conductive patterns in the second direction correspondingly beyond the first and second active area patterns away from the first axis of symmetry; generating at least one instance of a fifth conductive pattern; and locating the at least one instance of the fifth conductive pattern so as to partially overlap a corresponding corner of the corresponding end of a corresponding one of the second and third conductive patterns. In an embodiment, the generating the layout diagram further includes: locating the fourth conductive pattern asymmetrically about the first axis of symmetry. In an embodiment, the generating the layout diagram further includes: generating a second cut-pattern which correspondingly overlaps a second segment of the first conductive pattern, and which is indicative that the second segment of the first conductive pattern will be removed subsequently; and locating the second cut-pattern asymmetrically relative to the first axis of symmetry. In an embodiment, a long axis of the first conductive pattern represents a second axis of symmetry; and the generating the layout diagram further includes locating the fourth conductive pattern asymmetrically about the second axis of symmetry. In an embodiment, the system further includes: a masking facility configured to fabricate one or more semiconductor masks based on based on the layout diagram; or a fabricating facility configured to fabricate at least one component in a layer of a semiconductor integrated circuit based on the layout diagram.
In an embodiment, a system for manufacturing a semiconductor device, the system comprising at least one processor and at least one memory having computer program code for one or more programs which (for a layout diagram of an engineering change order (ECO) base cell that is stored on a non-transitory computer-readable medium) are configured to execute a method which includes generating the layout diagram including: generating first and second active area patterns having corresponding long axes arranged in a first direction parallel to a first axis of symmetry; arranging the first and second active area patterns on opposite sides of the first axis of symmetry; generating non-overlapping first, second and third conductive patterns having corresponding long axes in a second direction perpendicular to the first direction and parallel to a second axis of symmetry; arranging each of the first, second and third conductive patterns to correspondingly overlap the first and second active area patterns; aligning the first conductive pattern between the second and third conductive patterns; generating a first cut-pattern which overlaps corresponding central regions of the second and third conductive patterns and which is indicative that the central regions will be removed subsequently; aligning the first cut-pattern relative to the first axis of symmetry; generating a fourth conductive pattern; locating the fourth conductive pattern over an area bounded by the first cut-pattern and asymmetrically about the first axis of symmetry; and expanding the fourth conductive pattern to occupy an area which substantially overlaps a first segment of the first conductive pattern and a first segment of one of the second and third conductive patterns. In an embodiment, the generating the layout diagram further includes: generating a first via pattern; locating the first via pattern over and within a region bounded by the fourth conductive pattern; generating a fifth conductive pattern; locating the fifth conductive pattern over the first via pattern; and sizing the fifth conductive pattern so that the fifth conductive pattern substantially completely overlaps the first via pattern; and wherein the fifth conductive pattern is a segment within a first metallization layer. In an embodiment, wherein the generating the layout diagram further includes: extending ends of each of the first, second and third conductive patterns in the second direction correspondingly beyond the first and second active area patterns away from the first axis of symmetry; generating at least one instance of a fifth conductive pattern; and locating the at least one instance of the fifth conductive pattern so as to partially overlap a corresponding corner of the corresponding end of a corresponding one of the second and third conductive patterns. In an embodiment, wherein the generating the layout diagram further includes: generating a second cut-pattern which correspondingly overlaps a second segment of the first conductive pattern, and which is indicative that the second segment of the first conductive pattern will be removed subsequently; and locating the second cut-pattern asymmetrically relative to the first axis of symmetry. In an embodiment, a long axis of the first conductive pattern represents a second axis of symmetry; and the generating the layout diagram further includes: locating the fourth conductive pattern asymmetrically about the second axis of symmetry. In an embodiment, the system further includes at least one of: a masking facility configured to fabricate one or more semiconductor masks based on based on the layout diagram; or a fabricating facility configured to fabricate at least one component in a layer of a semiconductor integrated circuit based on the layout diagram.
In an embodiment, a system for manufacturing a semiconductor device, the system comprising at least one processor and at least one memory having computer program code for one or more programs which (for a layout diagram of an engineering change order (ECO) base cell that is stored on a non-transitory computer-readable medium) are configured to execute a method which includes generating the layout diagram including: generating first and second active area patterns having corresponding long axes arranged in a first direction parallel to a first axis of symmetry; arranging the first and second active area patterns on opposite sides of the first axis of symmetry; generating non-overlapping first, second and third conductive patterns having corresponding long axes in a second direction perpendicular to the first direction and parallel to a second axis of symmetry; a long axis of the first conductive pattern representing a second axis of symmetry; arranging each of the first, second and third conductive patterns to correspondingly overlap the first and second active area patterns; aligning the first conductive pattern between the second and third conductive patterns; generating a first cut-pattern which overlaps corresponding central regions of the second and third conductive patterns and which is indicative that the central regions will be removed subsequently; aligning the first cut-pattern relative to the first axis of symmetry; generating a fourth conductive pattern; locating the fourth conductive pattern over an area bounded by the first cut-pattern and asymmetrically about the second axis of symmetry; and expanding the fourth conductive pattern to occupy an area which substantially overlaps a first segment of the first conductive pattern and a first segment of one of the second and third conductive patterns. In an embodiment, the generating the layout diagram further includes: generating a first via pattern; locating the first via pattern over and within a region bounded by the fourth conductive pattern; generating a fifth conductive pattern; locating the fifth conductive pattern over the first via pattern; and sizing the fifth conductive pattern so that the fifth conductive pattern substantially completely overlaps the first via pattern; and wherein the fifth conductive pattern is a segment within a first metallization layer. In an embodiment, the generating the layout diagram further includes: extending ends of each of the first, second and third conductive patterns in the second direction correspondingly beyond the first and second active area patterns away from the first axis of symmetry; generating at least one instance of a fifth conductive pattern; and locating the at least one instance of the fifth conductive pattern so as to partially overlap a corresponding corner of the corresponding end of a corresponding one of the second and third conductive patterns. In an embodiment, the generating the layout diagram further includes: locating the fourth conductive pattern asymmetrically about the first axis of symmetry. the generating the layout diagram further includes: generating a second cut-pattern which correspondingly overlaps a second segment of the first conductive pattern, and which is indicative that the second segment of the first conductive pattern will be removed subsequently; and locating the second cut-pattern asymmetrically relative to the first axis of symmetry. In an embodiment, the system further includes: at least one of: a masking facility configured to fabricate one or more semiconductor masks based on based on the layout diagram; or a fabricating facility configured to fabricate at least one component in a layer of a semiconductor integrated circuit based on the layout diagram.
It will be readily seen by one of ordinary skill in the art that one or more of the disclosed embodiments fulfill one or more of the advantages set forth above. After reading the foregoing specification, one of ordinary skill will be able to affect various changes, substitutions of equivalents and various other embodiments as broadly disclosed herein. It is therefore intended that the protection granted hereon be limited only by the definition contained in the appended claims and equivalents thereof.
The present application is a continuation of U.S. application Ser. No. 16/206,881, filed Nov. 30, 2018, now U.S. Pat. No. 10,565,345, which is a divisional of U.S. application Ser. No. 15/474,460, filed Mar. 30, 2017, now U.S. Pat. No. 10,339,250, issued Jul. 2, 2019, which claims the priority of U.S. Provisional Application No. 62/427,609, filed Nov. 29, 2016, which are incorporated herein by reference in their entireties.
| Number | Name | Date | Kind |
|---|---|---|---|
| 8159013 | Nishimura et al. | Apr 2012 | B2 |
| 8421205 | Yang | Apr 2013 | B2 |
| 8446176 | Yang | May 2013 | B1 |
| 8661389 | Chern et al. | Feb 2014 | B2 |
| 8698205 | Tzeng et al. | Apr 2014 | B2 |
| 8791024 | Lu et al. | Jul 2014 | B1 |
| 8826212 | Yeh et al. | Sep 2014 | B2 |
| 8836141 | Chi et al. | Sep 2014 | B2 |
| 8875076 | Lin et al. | Oct 2014 | B2 |
| 9147029 | Ke et al. | Sep 2015 | B2 |
| 9899263 | Hsieh et al. | Feb 2018 | B2 |
| 20070235815 | Kim | Oct 2007 | A1 |
| 20090007051 | Chou | Jan 2009 | A1 |
| 20100164547 | Ciccarelli | Jul 2010 | A1 |
| 20110252392 | Saika | Oct 2011 | A1 |
| 20120304142 | Morimoto | Nov 2012 | A1 |
| 20140264924 | Yu et al. | Sep 2014 | A1 |
| 20140282289 | Hsu et al. | Sep 2014 | A1 |
| 20150015335 | Chen et al. | Jan 2015 | A1 |
| 20150048424 | Tien et al. | Feb 2015 | A1 |
| 20150140478 | Chen | May 2015 | A1 |
| 20150143309 | De Dood | May 2015 | A1 |
| 20150179648 | Lin et al. | Jun 2015 | A1 |
| 20150279453 | Fujiwara et al. | Oct 2015 | A1 |
| 20150302135 | Park | Oct 2015 | A1 |
| 20150318241 | Chang et al. | Nov 2015 | A1 |
| 20150347659 | Chiang et al. | Dec 2015 | A1 |
| 20150357279 | Fujiwara et al. | Dec 2015 | A1 |
| 20150370949 | Moroz | Dec 2015 | A1 |
| 20160012169 | Chiang et al. | Jan 2016 | A1 |
| 20160117431 | Kim | Apr 2016 | A1 |
| 20160283641 | Bou-Ghazale | Sep 2016 | A1 |
| 20160307882 | Chen et al. | Oct 2016 | A1 |
| 20170004244 | Paik | Jan 2017 | A1 |
| 20170116366 | Seo | Apr 2017 | A1 |
| 20170212977 | Bickford | Jul 2017 | A1 |
| 20170323030 | Datta | Nov 2017 | A1 |
| 20180090513 | Datta | Mar 2018 | A1 |
| 20190138682 | Correale, Jr. | May 2019 | A1 |
| Number | Date | Country |
|---|---|---|
| 2010-16258 | Jan 2010 | JP |
| 10-2016-0031401 | Mar 2016 | KR |
| Entry |
|---|
| Office Action dated Aug. 14, 2018 from corresponding application No. KR 10-2017-0124253. |
| Office Action dated Aug. 17, 2018 from corresponding application No. TW 106134059. |
| Office Action dated Oct. 29, 2018 from corresponding application No. TW 106134059. |
| Number | Date | Country | |
|---|---|---|---|
| 20200184138 A1 | Jun 2020 | US |
| Number | Date | Country | |
|---|---|---|---|
| 62427609 | Nov 2016 | US |
| Number | Date | Country | |
|---|---|---|---|
| Parent | 15474460 | Mar 2017 | US |
| Child | 16206881 | US |
| Number | Date | Country | |
|---|---|---|---|
| Parent | 16206881 | Nov 2018 | US |
| Child | 16791906 | US |