CC0000: The color(s) blue, green, orange, violet, red and yellow, black, white and gray is/are claimed as a feature of the mark.
D10000: "DATACENTER INFRASTRUCTURE"
DM0000: The mark consists of the colors blue, green, orange, violet, red and yellow appear arranged around the central KNURR logo in a clockwise fashion beginning with blue at 12 o'clock. The KNURR logo consists of a gray circle with a white fanciful design in the center. The words of the mark, namely "DATACENTER INFRASTRUCTURE" are placed to the right, adjacent and below the colors and logo
GS0091: Electrical power supplies for use in connection with electronic data processing rooms, electronic data processing racks, electronic data processing servers, and computers; Power cables; Electric wires and cables; Electrical connection boxes; Battery packs; Access control and alarm monitoring systems; Wireless remote temperature and humidity monitors for building maintenance; Gateway routers in the nature of computer control hardware
GS0111: Components for air conditioning and cooling systems, namely air supply cables and supply cables for cooling mediums for use in air conditioning and cooling systems; Air conditioning units for computer centers, control centers, measuring rooms and server rooms; Air conditioning units for electronic data processing racks and server racks, and parts and subassemblies therefor; Air conditioning systems; Ceiling-mounted air conditioning systems; Humidifiers
GS0371: Installation of power supply systems in electronic data processing rooms, electronic data processing racks, electronic data processing servers, and computers; Installation of data lines, connection units, standby battery supply equipment, and electronically based monitoring systems for rooms, temperature, humidity and access control; Installation of control systems for computer centers; Installation of cooling systems for computer centers, control centers, measuring rooms and server rooms; Installation of cooling systems for electronic data processing racks and server racks; Installation of air conditioning systems, ceiling-mounted cooling installations, and humidifiers
GS0421: Technical consultancy and technical planning relating to power supply systems for electronic data processing rooms, electronic data processing racks, electronic data processing servers, and computers; Technical consultancy and technical planning in relation to the installation of power supply cables, air supply cables, supply cables for cooling mediums, data lines, connection units, and standby battery supply equipment; Technical consultancy and technical planning in relation to electronically based monitoring systems for rooms, temperatures, humidity and access control, control systems for computer centers, cooling systems for computer centers, control centers, measuring rooms and server rooms; Technical consultancy and technical planning in relation to cooling systems for electronic data processing racks, server racks, air conditioning systems, ceiling-mounted cooling installations, and humidifiers
PM0000: DATA CENTER INFRASTRUCTURE
Case File Event Statements
7/31/2015 - 9 years ago
33 - TOTAL INVALIDATION PROCESSED BY THE IBType:INNT
7/15/2015 - 9 years ago
32 - GENERIC MADRID TRANSACTION SENT TO IBType:XXSS
7/15/2015 - 9 years ago
31 - GENERIC MADRID TRANSACTION CREATEDType:XXCR
3/25/2015 - 9 years ago
30 - TOTAL INVALIDATION OF REG EXT PROTECTION CREATEDType:INTR
7/25/2014 - 10 years ago
29 - CANCELLED SECTION 71Type:C71T
4/3/2009 - 15 years ago
28 - FINAL DECISION TRANSACTION PROCESSED BY IBType:FINO
4/8/2008 - 16 years ago
27 - FINAL DISPOSITION NOTICE SENT TO IBType:FICS
4/8/2008 - 16 years ago
26 - FINAL DISPOSITION PROCESSEDType:FIMP
3/24/2008 - 16 years ago
25 - FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IBType:FICR
12/18/2007 - 17 years ago
24 - REGISTERED-PRINCIPAL REGISTERType:R.PR
10/2/2007 - 17 years ago
23 - PUBLISHED FOR OPPOSITIONType:PUBO
9/12/2007 - 17 years ago
22 - NOTICE OF PUBLICATIONType:NPUB
8/30/2007 - 17 years ago
21 - LAW OFFICE PUBLICATION REVIEW COMPLETEDType:PREV
8/24/2007 - 17 years ago
20 - ASSIGNED TO LIEType:ALIE
7/13/2007 - 17 years ago
19 - EXAMINERS AMENDMENT MAILEDType:CNEA
7/13/2007 - 17 years ago
18 - APPROVED FOR PUB - PRINCIPAL REGISTERType:CNSA
7/13/2007 - 17 years ago
17 - EXAMINER'S AMENDMENT ENTEREDType:XAEC
7/13/2007 - 17 years ago
16 - EXAMINERS AMENDMENT -WRITTENType:CNEA
7/13/2007 - 17 years ago
15 - EXAMINERS AMENDMENT MAILEDType:CNEA
7/12/2007 - 17 years ago
14 - EXAMINER'S AMENDMENT ENTEREDType:XAEC
7/12/2007 - 17 years ago
13 - EXAMINERS AMENDMENT -WRITTENType:CNEA
6/18/2007 - 17 years ago
12 - TEAS CHANGE OF CORRESPONDENCE RECEIVEDType:TCCA
6/18/2007 - 17 years ago
11 - TEAS/EMAIL CORRESPONDENCE ENTEREDType:TEME
6/18/2007 - 17 years ago
10 - CORRESPONDENCE RECEIVED IN LAW OFFICEType:CRFA
6/18/2007 - 17 years ago
9 - TEAS RESPONSE TO OFFICE ACTION RECEIVEDType:TROA
1/5/2007 - 17 years ago
8 - REFUSAL PROCESSED BY IBType:RFNT
12/18/2006 - 18 years ago
7 - NON-FINAL ACTION MAILED - REFUSAL SENT TO IBType:RFCS
12/18/2006 - 18 years ago
6 - REFUSAL PROCESSED BY MPUType:RFRR
12/13/2006 - 18 years ago
5 - NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEWType:RFCR
12/12/2006 - 18 years ago
4 - NON-FINAL ACTION WRITTENType:CNRT
12/1/2006 - 18 years ago
3 - ASSIGNED TO EXAMINERType:DOCK
12/1/2006 - 18 years ago
2 - NEW APPLICATION ENTERED IN TRAMType:NWAP
11/30/2006 - 18 years ago
1 - SN ASSIGNED FOR SECT 66A APPL FROM IBType:REPR