CC0000: The color(s) yellow, black and gray is/are claimed as a feature of the mark.
D10000: "HOUSE"
DM0000: The mark consists of a design of a yellow chevron with four yellow vertical lines underneath and to the right of the chevron. Underneath the chevron are the words "ISOVER" and "MULTI-COMFORT HOUSE". The word "ISOVER" is in a black stylized font with the letter "O" shown as a design of black crescent shapes with a yellow center. The words "MULTI-COMFORT HOUSE" are in a gray stylized font. The color white represents background and is not part of the mark.
GS0171: Packing, stopping and insulating materials, insulating materials made of mineral wool or mineral fibres in the form of loose wool, tapes, webs, felts, batts, plates, slabs, rolls, wraps, pipes, cylindrical and moulded sections designed for thermal and acoustic insulation and for waterproofing; faced insulating materials made of mineral wool or mineral fibres
GS0191: Bituminous materials, namely, bitumen, bitumen asphalt, bitumen sealants for driveways, roofing and asphalt, bitumen roof coatings; non-metallic supporting structures for construction purposes, namely, supports, shores, braces and trestles; non-metallic panels, non-metallic sheets, non-metallic rolls, faced or not, for thermal and acoustic insulation and for protection against humidity and fire and used in the construction of walls, partitions, ceilings, false ceilings, floors, roofs, false roofs, cladding and waterproof insulating modular units
GS0201: Non-metallic hardware in the nature of plastic fastening devices for construction materials made of mineral wool or mineral fibres, namely, bolts, nails, rivets, screws and threaded fasteners; non-metallic hardware in the nature of fastening devices for construction purposes, namely, bolts, nails, rivets, screws and threaded fasteners; non-metallic hardware in the nature of plastic fastening devices for insulation and waterproofing products made of mineral wool or mineral fibres, namely, bolts, nails rivets, screws and threaded fasteners
GS0371: Building construction information; installation and repair services in the field of insulation
Case File Event Statements
4/20/2013 - 12 years ago
31 - FINAL DECISION TRANSACTION PROCESSED BY IBType:FINO
10/30/2012 - 13 years ago
30 - NOTIFICATION PROCESSED BY IBType:GPNX
7/31/2012 - 13 years ago
29 - FINAL DISPOSITION NOTICE SENT TO IBType:FICS
7/31/2012 - 13 years ago
28 - FINAL DISPOSITION PROCESSEDType:FIMP
7/10/2012 - 13 years ago
27 - FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IBType:FICR
4/10/2012 - 13 years ago
26 - REGISTERED-PRINCIPAL REGISTERType:R.PR
1/24/2012 - 13 years ago
25 - OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILEDType:NPUB
1/24/2012 - 13 years ago
24 - PUBLISHED FOR OPPOSITIONType:PUBO
1/6/2012 - 13 years ago
23 - NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IBType:OPNS
1/4/2012 - 13 years ago
22 - NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IBType:OP2R
1/4/2012 - 13 years ago
21 - NOTIFICATION OF NOTICE OF PUBLICATION E-MAILEDType:NONP
12/19/2011 - 13 years ago
20 - LAW OFFICE PUBLICATION REVIEW COMPLETEDType:PREV
12/14/2011 - 13 years ago
19 - APPROVED FOR PUB - PRINCIPAL REGISTERType:CNSA
12/14/2011 - 13 years ago
18 - EXAMINER'S AMENDMENT ENTEREDType:XAEC
12/14/2011 - 13 years ago
17 - NOTIFICATION OF EXAMINERS AMENDMENT E-MAILEDType:GNEN
12/14/2011 - 13 years ago
16 - EXAMINERS AMENDMENT E-MAILEDType:GNEA
12/14/2011 - 13 years ago
15 - EXAMINERS AMENDMENT -WRITTENType:CNEA
11/23/2011 - 14 years ago
14 - TEAS/EMAIL CORRESPONDENCE ENTEREDType:TEME
11/23/2011 - 14 years ago
13 - CORRESPONDENCE RECEIVED IN LAW OFFICEType:CRFA
11/14/2011 - 14 years ago
12 - ASSIGNED TO LIEType:ALIE
10/31/2011 - 14 years ago
11 - TEAS CHANGE OF CORRESPONDENCE RECEIVEDType:TCCA
10/31/2011 - 14 years ago
10 - TEAS RESPONSE TO OFFICE ACTION RECEIVEDType:TROA
5/28/2011 - 14 years ago
9 - REFUSAL PROCESSED BY IBType:RFNT
5/6/2011 - 14 years ago
8 - NON-FINAL ACTION MAILED - REFUSAL SENT TO IBType:RFCS
5/6/2011 - 14 years ago
7 - REFUSAL PROCESSED BY MPUType:RFRR
5/6/2011 - 14 years ago
6 - NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEWType:RFCR
5/5/2011 - 14 years ago
5 - NON-FINAL ACTION WRITTENType:CNRT
5/4/2011 - 14 years ago
4 - ASSIGNED TO EXAMINERType:DOCK
4/14/2011 - 14 years ago
3 - APPLICATION FILING RECEIPT MAILEDType:MAFR
4/10/2011 - 14 years ago
2 - NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAMType:NWOS
4/7/2011 - 14 years ago
1 - SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IBType:SDRC