79248299 - SENVION WE MAKE WIND PERFORM.

Information

  • Trademark
  • 79248299
  • Serial Number
    79248299
  • Registration Number
    5940617
  • Filing Date
    September 17, 2018
    6 years ago
  • Registration Date
    December 24, 2019
    5 years ago
  • Transaction Date
    May 21, 2022
    2 years ago
  • Status Date
    December 24, 2019
    5 years ago
  • Published for Opposition Date
    October 08, 2019
    5 years ago
  • Location Date
    December 24, 2019
    5 years ago
  • Status Code
    700
  • Current Location
    PUBLICATION AND ISSUE SECTION
    Employee Name
    SABAGH, LAILA TAREK
  • Law Office Assigned Location Code
    N90
  • Owners
Mark Drawing Code
5000
Mark Identification
SENVION WE MAKE WIND PERFORM.
Case File Statements
  • GS0401: Production of energy using wind power; production of electricity using wind power
  • GS0091: Electric installation material, namely, switch cabinets in the nature of switch boxes designed to house electric switches; electric and electronic instruments and apparatus for recording, processing, storage and transmission of data, namely, computer hardware, electronic data processing apparatus; voltage regulators for electric power, apparatus for regulating electric current, electricity limiters; electrical and electronic regulating, checking, control and monitoring apparatus and instruments, namely, electric or electronic monitors, meter and sensors for measuring turbine performance and power generation in wind power plants; data processing equipment; computers; computer software for acquisition of wind turbine data, data management of wind power plants, operating, regulating and controlling wind turbines and data transmission with wind turbines; computer network interface devices; voltage surge protectors; vibration sensors; watt-hour meter; electric converters, namely, inverter units; electric transformers; all afore-mentioned goods for wind power plants and wind farms
  • GS0071: Wind-powered machines, namely, wind-powered electricity generators, and wind-powered machines for generating electrical and mechanical energy; turbines, in particular wind turbines, except for land vehicles; structural parts and accessories for wind-powered electricity generators and wind-powered machines for generating electrical and mechanical energy, in particular rotor blades, rotor consoles, blade hubs, machine housings, yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears, gear boxes, couplings, motors, mechanical rotor adjusters, electric generator, emergency power generators
  • GS0371: Building construction in the field of wind power plants; installation of wind power plants; installation services for wind farms, namely, installation of wind turbines; maintenance services in the nature of repairing wind power plants, rebuilding machines that have been worn or partially destroyed, namely, wind power plants; maintenance and repair of wind power plants; assembly services as a part of the installation of rotor blades for others
  • CC0000: Color is not claimed as a feature of the mark.
  • GS0351: Professional business consultancy with regard to wind power plants and wind farms
  • GS0421: Remote control and monitoring services, namely, remote maintenance through computerised retrieval of wind power plants and wind farms, in particular via the Internet; conducting technical measurements, inspections and calculations in the range of wind power plants and wind farms; electronic data storage; surveying within the scope of data analysis in the field of wind power plants and wind farms; design and development of computer software in the field of wind power plants and wind farms; engineering services in the nature of technical planning and development, as well as engineering technical project management and consultancy therefor in the field of wind power plants; engineering services for calculation, dimensioning and design of rotor blades; technical research for wind power plants and wind farms; providing technical information about the development of wind power plants and wind farms; quality control, namely, technical condition monitoring of rotor blades
Case File Event Statements
  • 5/21/2022 - 2 years ago
    30 - NEW REPRESENTATIVE AT IB RECEIVED Type: NREP
  • 4/24/2020 - 4 years ago
    29 - FINAL DECISION TRANSACTION PROCESSED BY IB Type: FINO
  • 4/2/2020 - 4 years ago
    28 - FINAL DISPOSITION NOTICE SENT TO IB Type: FICS
  • 4/2/2020 - 4 years ago
    27 - FINAL DISPOSITION PROCESSED Type: FIMP
  • 3/24/2020 - 4 years ago
    26 - FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB Type: FICR
  • 12/24/2019 - 5 years ago
    25 - REGISTERED-PRINCIPAL REGISTER Type: R.PR
  • 10/8/2019 - 5 years ago
    24 - PUBLISHED FOR OPPOSITION Type: PUBO
  • 10/5/2019 - 5 years ago
    23 - NOTIFICATION PROCESSED BY IB Type: GPNX
  • 9/18/2019 - 5 years ago
    22 - NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB Type: OPNS
  • 9/18/2019 - 5 years ago
    21 - NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB Type: OP2R
  • 9/18/2019 - 5 years ago
    20 - NOTICE OF PUBLICATION Type: NPUB
  • 9/5/2019 - 5 years ago
    19 - ASSIGNED TO LIE Type: ALIE
  • 9/4/2019 - 5 years ago
    18 - APPROVED FOR PUB - PRINCIPAL REGISTER Type: CNSA
  • 9/3/2019 - 5 years ago
    17 - EXAMINERS AMENDMENT MAILED Type: CNEA
  • 9/3/2019 - 5 years ago
    16 - EXAMINER'S AMENDMENT ENTERED Type: XAEC
  • 9/3/2019 - 5 years ago
    15 - EXAMINERS AMENDMENT -WRITTEN Type: CNEA
  • 8/22/2019 - 5 years ago
    14 - ASSIGNED TO EXAMINER Type: DOCK
  • 7/13/2019 - 5 years ago
    13 - TEAS/EMAIL CORRESPONDENCE ENTERED Type: TEME
  • 7/12/2019 - 5 years ago
    12 - CORRESPONDENCE RECEIVED IN LAW OFFICE Type: CRFA
  • 7/12/2019 - 5 years ago
    11 - TEAS RESPONSE TO OFFICE ACTION RECEIVED Type: TROA
  • 4/19/2019 - 5 years ago
    10 - NEW REPRESENTATIVE AT IB RECEIVED Type: NREP
  • 2/2/2019 - 6 years ago
    9 - REFUSAL PROCESSED BY IB Type: RFNT
  • 1/17/2019 - 6 years ago
    8 - NON-FINAL ACTION MAILED - REFUSAL SENT TO IB Type: RFCS
  • 1/17/2019 - 6 years ago
    7 - REFUSAL PROCESSED BY MPU Type: RFRR
  • 1/8/2019 - 6 years ago
    6 - APPLICATION FILING RECEIPT MAILED Type: MAFR
  • 1/5/2019 - 6 years ago
    5 - NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW Type: RFCR
  • 1/4/2019 - 6 years ago
    4 - NON-FINAL ACTION WRITTEN Type: CNRT
  • 1/4/2019 - 6 years ago
    3 - ASSIGNED TO EXAMINER Type: DOCK
  • 1/4/2019 - 6 years ago
    2 - NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM Type: NWOS
  • 12/27/2018 - 6 years ago
    1 - SN ASSIGNED FOR SECT 66A APPL FROM IB Type: REPR