GS0371: Installation and maintenance of chemical and biological installations for the purification of flue gases and process gases; installation and maintenance of installations for waste water purification; installation and maintenance of installations for the incineration of gaseous and liquid residues
GS0111: Mass transfer columns of plastic, metal or ceramics or combinations of the aforesaid materials; heat exchanger columns of plastic, metal or ceramics or combinations of the aforesaid materials; column internals of plastic, metal or ceramics or combinations of the aforesaid materials, in particular being gas and liquid distributors, support grids, demisters, liquid collectors, grids; structured packings of plastic, metal or ceramics or combinations of the aforesaid materials; tower packings of plastic, metal, glass or ceramics or combinations of the aforesaid materials in particular for process engineering; all of the aforesaid goods for use for the separation of substances in gases or liquids, in particular by distillation, and for the purification of gases and liquids
GS0421: Technical calculation, design and planning of tower packings, structured packings, column internals and columns, in particular for process engineering
Case File Event Statements
6/6/2023 - a year ago
18 - FINAL DECISION TRANSACTION PROCESSED BY IBType:FINT
5/12/2023 - a year ago
17 - FINAL DISPOSITION NOTICE SENT TO IBType:FICS
5/12/2023 - a year ago
16 - FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IBType:FICR
10/17/2022 - 2 years ago
15 - NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IBType:OPNX
9/28/2022 - 2 years ago
14 - NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IBType:OPNS
9/28/2022 - 2 years ago
13 - NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IBType:OPNR
5/12/2022 - 2 years ago
12 - ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDType:MAB2
5/12/2022 - 2 years ago
11 - ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEType:ABN2
1/7/2022 - 3 years ago
10 - CHANGE OF NAME/ADDRESS REC'D FROM IBType:ADCH
11/15/2021 - 3 years ago
9 - REFUSAL PROCESSED BY IBType:RFNT
10/26/2021 - 3 years ago
8 - NON-FINAL ACTION MAILED - REFUSAL SENT TO IBType:RFCS
10/26/2021 - 3 years ago
7 - REFUSAL PROCESSED BY MPUType:RFRR
10/1/2021 - 3 years ago
6 - NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEWType:RFCR
9/30/2021 - 3 years ago
5 - NON-FINAL ACTION WRITTENType:CNRT
9/29/2021 - 3 years ago
4 - ASSIGNED TO EXAMINERType:DOCK
4/27/2021 - 3 years ago
3 - APPLICATION FILING RECEIPT MAILEDType:MAFR
4/23/2021 - 3 years ago
2 - NEW APPLICATION OFFICE SUPPLIED DATA ENTEREDType:NWOS
4/22/2021 - 3 years ago
1 - SN ASSIGNED FOR SECT 66A APPL FROM IBType:REPR