79348070 - T.EN TECHNIP ENERGIES

Information

  • Trademark
  • 79348070
  • Serial Number
    79348070
  • Registration Number
    7226989
  • Filing Date
    June 23, 2021
    3 years ago
  • Registration Date
    November 28, 2023
    a year ago
  • Transaction Date
    March 26, 2024
    a year ago
  • Status Date
    November 28, 2023
    a year ago
  • Published for Opposition Date
    September 12, 2023
    a year ago
  • Location Date
    November 28, 2023
    a year ago
  • Status Code
    700
  • Current Location
    PUBLICATION AND ISSUE SECTION
    Employee Name
    ALLEN, BIANCA LEIGH
  • Attorney Docket Number
    62219.28
    Attorney Name
    Jeffrey M. Becker
    Law Office Assigned Location Code
    N50
  • Owners
Mark Drawing Code
3000
Mark Identification
T.EN TECHNIP ENERGIES
Case File Statements
  • GS0411: Training services for industrial installations, namely, providing specialized professional training to employees in the fields of in process operations, factory maintenance, analytical control of process and product flows, environmental protection and safety, project management and factory construction, customized training solutions integrating an interface design and advanced learning methods, dynamic simulation of operator training (OTS), coordinating the procurement and improvement of process control skills and solving operator problems
  • DM0000: The mark consists of the stylized wording "T.EN" in white above the stylized wording "TECHNIP ENERGIES" in white, all within a stylized blue and green circle.
  • GS0371: Construction services, namely, building construction; construction of public works and rural works, namely, offshore oil and gas facility constructions, pipeline construction, concrete pouring and forming for building and other commercial or public concrete structures, construction of underground utilities and housing pads, construction of oil and gas facilities, petrochemical and energy refineries and plants; construction work supervision being construction management; information with respect to construction; construction, maintenance and repair of industrial installations
  • PM0001: TEN TECH NIP ENERGIES
  • CC0000: The color(s) blue, green, and white is/are claimed as a feature of the mark.
  • D10000: "ENERGIES"
  • GS0421: Industrial plant design services, namely, conceptual process studies, consolidation of process assemblies, basic studies required to support a set of technical design all containing the data necessary to a competent contractor for carrying out detailed engineering in the nature of engineering design services; detailed engineering services for industrial plants, namely, online non-downloadable software for purchasing material, developing diagrams for pipework and instruments published for the construction, developing detailed pipework drawings, including measuring and stress calculations, drafting detailed drawings relating to instrumentation, to electrical installations and to civil engineering works, managing supplier designs, controlling costs and bill books, start-up procedures, developing diagrams for pipework and process instruments and public services published for the detailed engineering, drafting detailed maps of hazardous areas and plots, drafting the main diagrams for pipework, instrumentation, electricity and civil engineering; maintenance engineering services for industrial plants; converting existing printed courses to digital media formats, namely, conversion of data or documents from physical to electronic media; commissioning of industrial installations, namely, online non-downloadable software for construction management, 3D construction systems, subdivision of the system via the 3D model enabling 3D viewing of the systems and improving pre-commissioning and commissioning studies during the engineering phase, tracking the progress of construction, precommissioning, and commissioning up to the delivery of quality assurance and quality control statistics and reports, interface management between different phases of the project lifecycle, with the phases being engineering, construction, pre-commissioning, and commissioning; industrial design; architecture, namely, architectural services; research and development of industrial systems and equipment; technical research in the fields of engineering, design, construction, project management and processing technologies
Case File Event Statements
  • 3/26/2024 - a year ago
    36 - FINAL DECISION TRANSACTION PROCESSED BY IB Type: FINO
  • 2/29/2024 - a year ago
    35 - FINAL DISPOSITION NOTICE SENT TO IB Type: FICS
  • 2/29/2024 - a year ago
    34 - FINAL DISPOSITION PROCESSED Type: FIMP
  • 2/28/2024 - a year ago
    33 - FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB Type: FICR
  • 11/28/2023 - a year ago
    32 - NOTICE OF REGISTRATION CONFIRMATION EMAILED Type: NRCC
  • 11/28/2023 - a year ago
    31 - REGISTERED-PRINCIPAL REGISTER Type: R.PR
  • 11/3/2023 - a year ago
    30 - CHANGE OF NAME/ADDRESS REC'D FROM IB Type: ADCH
  • 10/29/2023 - a year ago
    29 - NEW REPRESENTATIVE AT IB RECEIVED Type: NREP
  • 9/12/2023 - a year ago
    28 - NOTIFICATION PROCESSED BY IB Type: GPNX
  • 9/12/2023 - a year ago
    27 - OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED Type: NPUB
  • 9/12/2023 - a year ago
    26 - PUBLISHED FOR OPPOSITION Type: PUBO
  • 8/23/2023 - a year ago
    25 - NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB Type: OPNS
  • 8/23/2023 - a year ago
    24 - NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB Type: OP2R
  • 8/23/2023 - a year ago
    23 - NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED Type: NONP
  • 8/9/2023 - a year ago
    22 - APPROVED FOR PUB - PRINCIPAL REGISTER Type: CNSA
  • 8/8/2023 - a year ago
    21 - TEAS/EMAIL CORRESPONDENCE ENTERED Type: TEME
  • 8/7/2023 - a year ago
    20 - CORRESPONDENCE RECEIVED IN LAW OFFICE Type: CRFA
  • 8/7/2023 - a year ago
    19 - TEAS REQUEST FOR RECONSIDERATION RECEIVED Type: ERFR
  • 8/2/2023 - a year ago
    18 - TEAS CHANGE OF CORRESPONDENCE RECEIVED Type: TCCA
  • 8/2/2023 - a year ago
    17 - ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED Type: ARAA
  • 8/2/2023 - a year ago
    16 - TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED Type: REAP
  • 6/5/2023 - a year ago
    15 - NOTIFICATION OF FINAL REFUSAL EMAILED Type: GNFN
  • 6/5/2023 - a year ago
    14 - FINAL REFUSAL E-MAILED Type: GNFR
  • 6/5/2023 - a year ago
    13 - FINAL REFUSAL WRITTEN Type: CNFR
  • 5/3/2023 - a year ago
    12 - TEAS/EMAIL CORRESPONDENCE ENTERED Type: TEME
  • 4/27/2023 - a year ago
    11 - CORRESPONDENCE RECEIVED IN LAW OFFICE Type: CRFA
  • 4/27/2023 - a year ago
    10 - TEAS RESPONSE TO OFFICE ACTION RECEIVED Type: TROA
  • 11/21/2022 - 2 years ago
    9 - REFUSAL PROCESSED BY IB Type: RFNP
  • 10/28/2022 - 2 years ago
    8 - NON-FINAL ACTION MAILED - REFUSAL SENT TO IB Type: RFCS
  • 10/27/2022 - 2 years ago
    7 - REFUSAL PROCESSED BY MPU Type: RFRR
  • 9/2/2022 - 2 years ago
    6 - NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW Type: RFCR
  • 9/1/2022 - 2 years ago
    5 - NON-FINAL ACTION WRITTEN Type: CNRT
  • 8/30/2022 - 2 years ago
    4 - APPLICATION FILING RECEIPT MAILED Type: MAFR
  • 8/26/2022 - 2 years ago
    3 - ASSIGNED TO EXAMINER Type: DOCK
  • 8/26/2022 - 2 years ago
    2 - NEW APPLICATION OFFICE SUPPLIED DATA ENTERED Type: NWOS
  • 8/25/2022 - 2 years ago
    1 - SN ASSIGNED FOR SECT 66A APPL FROM IB Type: REPR