Information
-
Trademark
-
79388441
-
International Classifications
-
Filing Date
November 10, 2023
a year ago
-
Transaction Date
October 30, 2024
2 months ago
-
Status Date
October 29, 2024
2 months ago
-
Location Date
October 29, 2024
2 months ago
-
Status Code
645
-
Current Location
TMEG LAW OFFICE 108
Employee Name
MANCA, ALBERTO
-
Attorney Docket Number
46422.000040
Attorney Name
John Mueller
Law Office Assigned Location Code
L80
-
Owners
Mark Drawing Code
3
Mark Identification
W.
Case File Statements
- DM0000: The mark consists of the yellow stylized wording "W.", with the right leg of the letter "W" in the mark comprised of a design of four rhomboids. All of the above is placed within a black square carrier.
- GS0191: Working platforms being scaffolding, not of metal; scaffold towers, namely, prefabricated working platforms, not of metal; scaffolds being scaffoldings made of non-metal materials; mobile stands being scaffolding not of metal
- GS0061: Ladders of metal; mobile metal stairs; steps being ladders of metal; metal stepladders with prefabricated platforms of metal; ladder supports of metal, namely, metal stabilizers for ladders; double sided steps being ladders of metal; trestles of metal, other than furniture, for use as a work bench other than furniture; metal work trestles for use as a workbench and work pallets of metal, other than furniture; material trestles of metal for use as a workbench; single ladders of metal; extension ladders of metal; combi ladders made of metal; telescopic ladders of metal; wall supports of metal, namely, metal stabilizers for ladders; top supports for metal concrete elements, namely, metal stabilizers for ladders for working on concrete; pole supports of metal being supports specially adapted for poles of metal; fence stays of metal; scaffolding of metal; prefabricated work platforms of metal; prefabricated mobile platforms of metal; prefabricated platform stage of metal being metal platforms for use with scaffolding; foldable metal craft stands being metal scaffolding tool boxes of metal; tool bags of metal; scaffolds, namely, trade scaffolding of metal; mobile steps being step stools of metal; rolling scaffolding tower of metal; bridge ladders of metal; railings of metal; extension legs for trestles being extenders specially adapted for prefabricated metal platforms for the purpose of increasing platform height and stairs of metal; studs and skid guards, namely, metal stabilizers for ladders of metal; step for metal rungs; step for metal rungs being extenders specially adapted for metal ladders for the purpose of expanding the foot support of the ladder rung to which they are attached; holders and hooks of metal, namely, metal hooks for hanging ladders; safety hooks of metal; risers specially adapted for ladders of metal for the purpose of increasing ladder height; leveling legs of metal being metal stabilizers for ladders; safety legs and support legs of metal being metal stabilizers for ladders; hand railing of metal for ladders of metal; cab ladders of metal; metal roof stands being stands placed on roofs for holding sectional ladders of metal
- CC0000: The color(s) black and yellow is/are claimed as a feature of the mark.
- GS0201: Ladders and mobile steps stools, not of metal; ladders, not of metal; ladders of wood and plastic; toolboxes not of metal; mobiles step stools, not of metal; bridge ladders, not of metal
Case File Event Statements
-
2/1/2024 - 11 months ago
1 - SN ASSIGNED FOR SECT 66A APPL FROM IB
Type: REPR
-
2/2/2024 - 11 months ago
2 - NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Type: NWOS
-
2/6/2024 - 11 months ago
3 - APPLICATION FILING RECEIPT MAILED
Type: MAFR
-
3/13/2024 - 9 months ago
4 - ASSIGNED TO EXAMINER
Type: DOCK
-
3/16/2024 - 9 months ago
6 - NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Type: RFCR
-
4/4/2024 - 9 months ago
8 - NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Type: RFCS
-
4/24/2024 - 8 months ago
9 - REFUSAL PROCESSED BY IB
Type: RFNT
-
10/4/2024 - 2 months ago
12 - TEAS/EMAIL CORRESPONDENCE ENTERED
Type: TEME
-
10/4/2024 - 2 months ago
11 - CORRESPONDENCE RECEIVED IN LAW OFFICE
Type: CRFA
-
10/4/2024 - 2 months ago
10 - TEAS RESPONSE TO OFFICE ACTION RECEIVED
Type: TROA
-
3/15/2024 - 9 months ago
5 - NON-FINAL ACTION WRITTEN
Type: CNRT
-
4/4/2024 - 9 months ago
7 - REFUSAL PROCESSED BY MPU
Type: RFRR
-
10/29/2024 - 2 months ago
13 - FINAL REFUSAL WRITTEN
Type: CNFR
-
10/29/2024 - 2 months ago
14 - FINAL REFUSAL E-MAILED
Type: GNFR
-
10/29/2024 - 2 months ago
15 - NOTIFICATION OF FINAL REFUSAL EMAILED
Type: GNFN