GS0371: Building construction; Building construction services; Building construction supervision; Construction and renovation of buildings; Construction consultancy; Construction consultation; Construction management; Construction of buildings; Construction planning; Construction project management services; Consultation services in the field of construction of environmentally-conscious buildings; Consulting in the field of building construction; Custom construction and building renovation; General construction contracting; Leasing of construction equipment; Marine construction; Renovation and restoration of buildings; Repair and maintenance of building scaffolds, working and building platforms; Repair work on buildings; Technical consultation in the field of building construction
GS0421: Architectural consultancy; Architectural consultancy services; Architectural consultation; Architectural design; Architectural services; Civil engineering; Construction drafting; Consulting in the field of engineering; Consulting in the field of structural engineering; Consulting in the field of mechanical, electrical, fire protection, and civil engineering; Consulting in the fields of engineering and architecture; Consulting services in the field of architectural design; Engineering; Engineering design services; Engineering drawing services; Engineering services in the field of energy efficiency; Mechanical engineering; Electrical, fire protection, and structural engineering
Case File Event Statements
6/12/2015 - 9 years ago
13 - ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDType:MAB2
6/12/2015 - 9 years ago
12 - ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEType:ABN2
6/11/2015 - 9 years ago
11 - PREVIOUS ALLOWANCE COUNT WITHDRAWNType:ZZZX
5/26/2015 - 9 years ago
10 - WITHDRAWN FROM PUB - OG REVIEW QUERYType:PBCR
5/9/2015 - 9 years ago
9 - LAW OFFICE PUBLICATION REVIEW COMPLETEDType:PREV
5/5/2015 - 9 years ago
8 - ASSIGNED TO LIEType:ALIE
4/13/2015 - 9 years ago
7 - APPROVED FOR PUB - PRINCIPAL REGISTERType:CNSA
9/11/2014 - 10 years ago
6 - NOTIFICATION OF NON-FINAL ACTION E-MAILEDType:GNRN
9/11/2014 - 10 years ago
5 - NON-FINAL ACTION E-MAILEDType:GNRT
9/11/2014 - 10 years ago
4 - NON-FINAL ACTION WRITTENType:CNRT
9/9/2014 - 10 years ago
3 - ASSIGNED TO EXAMINERType:DOCK
6/9/2014 - 10 years ago
2 - NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAMType:NWOS