87102832

Information

  • Trademark
  • 87102832
  • Serial Number
    87102832
  • Registration Number
    6205938
  • Filing Date
    July 13, 2016
    8 years ago
  • Registration Date
    November 24, 2020
    4 years ago
  • Transaction Date
    November 24, 2020
    4 years ago
  • Status Date
    November 24, 2020
    4 years ago
  • Published for Opposition Date
    November 20, 2018
    6 years ago
  • Location Date
    October 19, 2020
    4 years ago
  • First Use Anywhere Date
    May 08, 2018
    6 years ago
  • First Use In Commerce Date
    May 08, 2018
    6 years ago
  • Status Code
    700
  • Current Location
    PUBLICATION AND ISSUE SECTION
    Employee Name
    LEE, YAT SYE I
  • Attorney Docket Number
    PRSN T081
    Attorney Name
    Chris Monahan
    Law Office Assigned Location Code
    L70
  • Owners
Mark Drawing Code
2000
Case File Statements
  • CC0000: Color is not claimed as a feature of the mark.
  • DM0000: The mark consists of a plus sign where the center and each of the four arms are square shaped.
  • GS0091: Electricity router for managing and optimizing energy loads within a building; Computer hardware and software system for remotely monitoring environmental conditions and controlling devices within a building, facility, grounds, or designated spatial area; Environmental monitoring system comprised of meters and sensors that measure pressure, humidity, temperature and includes alarm and reporting functions; computer software for engineering design, project estimating, construction project management, facility operations, facility operations, and building information modeling; Computer aided design (CAD) software for construction; Computer software for water management in the field of water quality monitoring and assessment, watershed-based storm water planning and design, storm water utility development and implementation, combined sewer overflow analysis, flood control, sedimentation, river engineering, FEMA flood insurance studies, hydraulic modeling and design, ecosystem restoration and geomorphic assessment, dam safety analysis, and ground water development and management; Computer software for water management in the field of aquifer storage and recovery conjunctive management planning, water rights and water availability modeling, reservoir operations analysis, in-stream flow assessments, and wetlands mitigation banking; Computer software for management of capital improvement programs, construction projects, and related project documentation; Computer software for use in energy assessment and capital planning; Computer software for use in energy assessment planning for collection, recording and analysis of data regarding current energy conditions, adequacy, inventory and usage in a building for the purpose of justifying funding, developing energy-specific construction plans, executing construction projects, determining energy utilization index, determining carbon footprint, and determining compliance with energy and environmental design standards
  • GS0351: Business consultation services; Business management; Business management services in the nature of facilities management in the field of transportation; Consultation in the field of energy efficiency; Energy usage management information services; Providing an internet accessible database in the field of scheduling and cost analysis data for design and construction programs; and business management and operation of transportation facilities for others; Business services, namely, business management relating to water management and reservoir operations analysis; Business risk management, consultation, and assessment services; providing online business risk management service for use in project management
  • GS0371: Construction management; Building construction, remodeling and repair; Construction consultation, planning, and supervision; building construction information; Providing an on-line interactive database in the field of building construction and repair and commercial building construction via the Internet; Providing information via the Internet for managing construction and consulting projects in the field of construction; Construction of airports, roads, manufacturing facilities, data centers, water facilities, electricity facilities, telecommunications facilities, energy generation and transmission facilities, chemical process plants, transportation infrastructure, dams, landfills, housing, educational facilities, hotels, theme parks, buildings, facilities for disposal of weapons, healthcare facilities, vehicle inspection and compliance facilities, military installations, oil and gas facilities, pipelines, pipeline terminals, electricity generation and transmission and distribution facilities, petrochemical facilities, manufacturing plants, biomass generation facilities, and alternative energy production facilities; Providing information services relating to the construction, repair, and rebuilding of schools, retail stores, hotels, theme parks, dams, water systems, waste water treatment plants, water treatment plants, environmental remediation facilities, pharmaceutical production facilities, biotech production facilities, chemical destruction facilities, sewer systems, environmental designs, transportation facilities, building construction management, construction planning and inspection, oil and gas facilities, pipelines, pipeline terminals, electricity generation and transmission and distribution facilities, petrochemical facilities, manufacturing plants, biomass generation facilities, and alternative energy production facilities; construction project management and building inspection of facilities for environmental activities, transportation, process activities, power generation, oil and gas production, industrial activities, space exploration, defense, municipal services, recreation, oil and gas facilities, pipelines, pipeline terminals, electricity generation and transmission and distribution facilities, petrochemical facilities, manufacturing plants, biomass generation facilities, and alternative energy production facilities; consulting services for the construction of facilities for environmental activities, transportation, process activities, power generation, oil and gas production, industrial activities, space exploration, defense, municipal services, recreation, oil and gas facilities, pipelines, pipeline terminals, electricity generation and transmission and distribution facilities, petrochemical facilities, manufacturing plants, biomass generation facilities, and alternative energy production facilities
  • GS0401: Bioremediation services
  • GS0421: Engineering; Consulting in the field of engineering and architecture; Consulting in the field of architecture; Design of engineering products; Computer security consultancy; Design services in the fields of construction and renovation of energy generation and transmission facilities, chemical process plants, oil and gas facilities, pipelines, pipeline terminals, petrochemical facilities, manufacturing plants, biomass generation facilities, alternative energy production facilities, transportation infrastructure, dams, landfills, housing, educational facilities, hotels, theme parks, buildings, facilities for disposal of weapons, healthcare facilities, vehicle inspection and compliance facilities, and military installations; Design and development of electronic data security systems; Development of security systems and contingency planning for information systems; Testing of security systems; Drafting of plans and engineering drawings for others; Computer modeling services; Computer simulation based on computer programs for others; Computer monitoring service which tracks application software performance, performs periodic maintenance and provides reports and alerts concerning such performance; Computer technology support services namely, help desk services; Computer services, namely, acting as an application service provider in the field of knowledge management to host computer application software for the purpose of contract documentation, team collaboration and communication, and reporting; Computer aided design for others; Graphic design; Graphic illustration services; Providing an Internet website portal offering information in the field of computer aided design; Providing a website featuring non-downloadable software tools for engineering design, project estimating, construction project management, facility operations, asset management, and building information modeling; Providing information via the Internet for construction engineering projects; Providing an on-line interactive database accessible in the field of engineering and architectural design via the Internet; Providing temporary use of non-downloadable software for database management in the fields of construction, engineering, and consulting; Integration of computer systems, software, and networks for others in the fields of construction and engineering; Computer services, namely, acting as an application service provider in the field of knowledge management to host computer application software of others for the collection, editing, organizing, modifying, book marking, transmission, storage and sharing of data and information in the fields of construction management, repair and reliability management, planning, and inspection; Planning, design, architecture, and consulting related thereto, of facilities for environmental activities, transportation, process activities, power generation, oil and gas production, industrial activities, space exploration, defense, municipal services, recreation, oil and gas facilities, pipelines, pipeline terminals, electricity generation and transmission and distribution facilities, petrochemical facilities, manufacturing plants, biomass generation facilities, and alternative energy production facilities; energy auditing; and updating of computer software relating to computer security and prevention of computer risks
  • GS0451: Security services, namely, providing security assessments for physical locations, information systems, working environments, and businesses and governmental agencies; Security consultancy; permit acquisition, namely, obtaining environmental, design, zoning and other governmental permits for development projects for facilities for environmental activities, transportation, process activities, power generation, oil and gas production, industrial activities, space exploration, defense, municipal services, recreation, oil and gas facilities, pipelines, pipeline terminals, electricity generation and transmission and distribution facilities, petrochemical facilities, manufacturing plants, biomass generation facilities, and alternative energy production facilities; Reviewing standards and practices to assure compliance with environmental and safety laws and regulations, namely, program evaluation for compliance and recommendations for others, legal administration of environmental vendor contracts for others, and implementation of compliance programs for others
Case File Event Statements
  • 11/24/2020 - 4 years ago
    67 - REGISTERED-PRINCIPAL REGISTER Type: R.PR
  • 10/20/2020 - 4 years ago
    66 - NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED Type: SUNA
  • 10/19/2020 - 4 years ago
    65 - ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED Type: CNPR
  • 9/24/2020 - 4 years ago
    64 - EXAMINER'S AMENDMENT ENTERED Type: XAEC
  • 9/24/2020 - 4 years ago
    63 - NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED Type: GNEN
  • 9/24/2020 - 4 years ago
    62 - EXAMINERS AMENDMENT E-MAILED Type: GNEA
  • 9/24/2020 - 4 years ago
    61 - SU-EXAMINER'S AMENDMENT WRITTEN Type: SNEA
  • 9/11/2020 - 4 years ago
    60 - TEAS CHANGE OF CORRESPONDENCE RECEIVED Type: TCCA
  • 9/11/2020 - 4 years ago
    59 - TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS Type: EWAF
  • 9/11/2020 - 4 years ago
    58 - ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED Type: ARAA
  • 9/11/2020 - 4 years ago
    57 - TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED Type: REAP
  • 4/23/2020 - 4 years ago
    56 - APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED Type: CHAN
  • 4/23/2020 - 4 years ago
    55 - TEAS CHANGE OF CORRESPONDENCE RECEIVED Type: TCCA
  • 4/23/2020 - 4 years ago
    54 - ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED Type: ARAA
  • 4/23/2020 - 4 years ago
    53 - TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED Type: REAP
  • 4/23/2020 - 4 years ago
    52 - TEAS CHANGE OF OWNER ADDRESS RECEIVED Type: COAR
  • 2/26/2020 - 5 years ago
    51 - NOTIFICATION OF NON-FINAL ACTION E-MAILED Type: GNRN
  • 2/26/2020 - 5 years ago
    50 - NON-FINAL ACTION E-MAILED Type: GNRT
  • 2/26/2020 - 5 years ago
    49 - SU - NON-FINAL ACTION - WRITTEN Type: CNRT
  • 1/30/2020 - 5 years ago
    48 - STATEMENT OF USE PROCESSING COMPLETE Type: SUPC
  • 1/13/2020 - 5 years ago
    47 - USE AMENDMENT FILED Type: IUAF
  • 1/30/2020 - 5 years ago
    46 - CASE ASSIGNED TO INTENT TO USE PARALEGAL Type: AITU
  • 1/13/2020 - 5 years ago
    45 - TEAS STATEMENT OF USE RECEIVED Type: EISU
  • 11/26/2019 - 5 years ago
    44 - APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED Type: CHAN
  • 11/26/2019 - 5 years ago
    43 - TEAS CHANGE OF OWNER ADDRESS RECEIVED Type: COAR
  • 7/17/2019 - 5 years ago
    42 - NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED Type: EXRA
  • 7/15/2019 - 5 years ago
    41 - EXTENSION 1 GRANTED Type: EX1G
  • 7/15/2019 - 5 years ago
    40 - EXTENSION 1 FILED Type: EXT1
  • 7/15/2019 - 5 years ago
    39 - TEAS EXTENSION RECEIVED Type: EEXT
  • 1/15/2019 - 6 years ago
    38 - NOA E-MAILED - SOU REQUIRED FROM APPLICANT Type: NOAM
  • 11/20/2018 - 6 years ago
    37 - OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED Type: NPUB
  • 11/20/2018 - 6 years ago
    36 - PUBLISHED FOR OPPOSITION Type: PUBO
  • 10/31/2018 - 6 years ago
    35 - NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED Type: NONP
  • 10/18/2018 - 6 years ago
    34 - LAW OFFICE PUBLICATION REVIEW COMPLETED Type: PREV
  • 10/15/2018 - 6 years ago
    33 - APPROVED FOR PUB - PRINCIPAL REGISTER Type: CNSA
  • 9/18/2018 - 6 years ago
    32 - TEAS/EMAIL CORRESPONDENCE ENTERED Type: TEME
  • 9/18/2018 - 6 years ago
    31 - CORRESPONDENCE RECEIVED IN LAW OFFICE Type: CRFA
  • 9/18/2018 - 6 years ago
    30 - ASSIGNED TO LIE Type: ALIE
  • 9/11/2018 - 6 years ago
    29 - TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED Type: ERSI
  • 7/12/2018 - 6 years ago
    28 - NOTIFICATION OF LETTER OF SUSPENSION E-MAILED Type: GNS3
  • 7/12/2018 - 6 years ago
    27 - LETTER OF SUSPENSION E-MAILED Type: GNSL
  • 7/12/2018 - 6 years ago
    26 - SUSPENSION LETTER WRITTEN Type: CNSL
  • 6/22/2018 - 6 years ago
    25 - TEAS/EMAIL CORRESPONDENCE ENTERED Type: TEME
  • 6/22/2018 - 6 years ago
    24 - CORRESPONDENCE RECEIVED IN LAW OFFICE Type: CRFA
  • 6/22/2018 - 6 years ago
    23 - TEAS REQUEST FOR RECONSIDERATION RECEIVED Type: ERFR
  • 12/22/2017 - 7 years ago
    22 - NOTIFICATION OF FINAL REFUSAL EMAILED Type: GNFN
  • 12/22/2017 - 7 years ago
    21 - FINAL REFUSAL E-MAILED Type: GNFR
  • 12/22/2017 - 7 years ago
    20 - FINAL REFUSAL WRITTEN Type: CNFR
  • 11/4/2017 - 7 years ago
    19 - TEAS/EMAIL CORRESPONDENCE ENTERED Type: TEME
  • 11/3/2017 - 7 years ago
    18 - CORRESPONDENCE RECEIVED IN LAW OFFICE Type: CRFA
  • 11/3/2017 - 7 years ago
    17 - TEAS RESPONSE TO OFFICE ACTION RECEIVED Type: TROA
  • 10/26/2017 - 7 years ago
    16 - ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED Type: ARAA
  • 10/26/2017 - 7 years ago
    15 - TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED Type: REAP
  • 10/9/2017 - 7 years ago
    14 - TEAS CHANGE OF CORRESPONDENCE RECEIVED Type: TCCA
  • 5/3/2017 - 7 years ago
    13 - NOTIFICATION OF NON-FINAL ACTION E-MAILED Type: GNRN
  • 5/3/2017 - 7 years ago
    12 - NON-FINAL ACTION E-MAILED Type: GNRT
  • 5/3/2017 - 7 years ago
    11 - NON-FINAL ACTION WRITTEN Type: CNRT
  • 4/7/2017 - 8 years ago
    10 - TEAS/EMAIL CORRESPONDENCE ENTERED Type: TEME
  • 4/7/2017 - 8 years ago
    9 - CORRESPONDENCE RECEIVED IN LAW OFFICE Type: CRFA
  • 4/7/2017 - 8 years ago
    8 - TEAS RESPONSE TO OFFICE ACTION RECEIVED Type: TROA
  • 10/26/2016 - 8 years ago
    7 - NOTIFICATION OF NON-FINAL ACTION E-MAILED Type: GNRN
  • 10/26/2016 - 8 years ago
    6 - NON-FINAL ACTION E-MAILED Type: GNRT
  • 10/26/2016 - 8 years ago
    5 - NON-FINAL ACTION WRITTEN Type: CNRT
  • 10/24/2016 - 8 years ago
    4 - ASSIGNED TO EXAMINER Type: DOCK
  • 7/20/2016 - 8 years ago
    3 - NOTICE OF DESIGN SEARCH CODE E-MAILED Type: MDSC
  • 7/19/2016 - 8 years ago
    2 - NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM Type: NWOS
  • 7/16/2016 - 8 years ago
    1 - NEW APPLICATION ENTERED IN TRAM Type: NWAP