GS0371: Inspection services in the course of construction of oil and gas exploration and production assets
GS0451: Safety consultation in the field of construction site inspection and assessment
GS0421: Inspection of oil fields; Inspection of oil and gas drilling equipment and platforms for quality control purposes; Inspection services, namely, detection of leaks in oil and gas blow out protectors; Design and inspection of fire alarm, detection and suppression systems; Environmental engineering, testing and inspection services; Monitoring operations of oil and gas exploration and production equipment for quality control purposes; Pipeline inspection services; Technology supervision and inspection in the field of oil and gas exploration and production; Underwater structural inspection services
Case File Event Statements
8/18/2022 - 2 years ago
17 - ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPONDType:MAB2
8/18/2022 - 2 years ago
16 - ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEType:ABN2
2/4/2022 - 2 years ago
15 - NOTIFICATION OF NON-FINAL ACTION E-MAILEDType:GNRN
2/4/2022 - 2 years ago
14 - NON-FINAL ACTION E-MAILEDType:GNRT
2/4/2022 - 2 years ago
13 - NON-FINAL ACTION WRITTENType:CNRT
1/12/2022 - 3 years ago
12 - TEAS/EMAIL CORRESPONDENCE ENTEREDType:TEME
1/11/2022 - 3 years ago
11 - CORRESPONDENCE RECEIVED IN LAW OFFICEType:CRFA
1/11/2022 - 3 years ago
10 - TEAS RESPONSE TO OFFICE ACTION RECEIVEDType:TROA
1/12/2022 - 3 years ago
9 - AMENDMENT TO USE PROCESSING COMPLETEType:AUPC
1/12/2022 - 3 years ago
8 - USE AMENDMENT FILEDType:IUAF
1/11/2022 - 3 years ago
7 - TEAS AMENDMENT OF USE RECEIVEDType:EAAU
7/12/2021 - 3 years ago
6 - NOTIFICATION OF NON-FINAL ACTION E-MAILEDType:GNRN
7/12/2021 - 3 years ago
5 - NON-FINAL ACTION E-MAILEDType:GNRT
7/12/2021 - 3 years ago
4 - NON-FINAL ACTION WRITTENType:CNRT
7/12/2021 - 3 years ago
3 - ASSIGNED TO EXAMINERType:DOCK
4/1/2021 - 3 years ago
2 - NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAMType:NWOS