98338625 - X-VAULT

Information

  • Trademark
  • 98338625
  • Serial Number
    98338625
  • Filing Date
    January 02, 2024
    2 years ago
  • Transaction Date
    April 23, 2025
    10 months ago
  • Status Date
    April 22, 2025
    10 months ago
  • Published for Opposition Date
    February 25, 2025
    a year ago
  • Location Date
    April 22, 2025
    10 months ago
  • Status Code
    688
  • Current Location
    INTENT TO USE SECTION
    Employee Name
    MAROTTA, GABRIELLE
  • Attorney Docket Number
    516634.00129
    Attorney Name
    Howard S. Michael
    Law Office Assigned Location Code
    L30
  • Owners
Mark Drawing Code
4
Mark Identification
X-VAULT
Case File Statements
  • GS0091: Rechargeable batteries; energy storage systems optimized for industrial and utility-scale deployments comprising lithium-ion based batteries and related hardware components thereof, namely inverters, electrical power supplies, computer hardware, and HVAC systems being HVAC units; high energy density storage systems optimized for industrial and utility-scale deployments for use by independent power producers, utility providers, and large industrial power users comprising battery energy storage devices being chemical batteries stored in a fixed frame, multi-level structure; downloadable software for operating large scale sized energy storage systems used by utility providers, independent power producers, and large industrial power users; downloadable cloud-based software application software for allowing customer to manage energy storage assets;
  • GS0191: Energy storage systems optimized for industrial and utility-scale deployments for use by independent power producers, utility providers, and large industrial power users, in the nature of gravity energy storage systems for electricity in the form of gravitational potential energy comprising a concrete foundation being concrete floors, fixed metal frame shelter structures, elevator shafts in the nature of chutes being parts of elevator machines, motor electricity generators, beam trolleys for attaching hoists, and mobile masses being metal throw weights for commercial or industrial use
  • GS0071: Energy storage systems for power grids and power plants, consisting of cranes, electricity generators, and concrete blocks; Electricity storage systems for power grids and power plants consisting of cranes that raise and lower concrete blocks, motor electricity generators, and downloadable computer software for managing the flow of energy; electricity production and generation systems for power grids and power plants consisting of cranes that raise and lower concrete blocks, motor electricity generators, and downloadable computer software for managing the flow of energy; Electricity storage systems for power grids and power plants consisting of cranes, electricity generators, and concrete blocks; energy storage systems for power grids and power plants consisting of cranes that raise and lower concrete blocks, motor electricity generators, and downloadable computer software for managing the flow of energy; energy production and generation systems for power grids and power plants consisting of cranes that raise and lower concrete blocks, motor electricity generators, and downloadable computer software for managing the flow of energy
  • GS0391: Storage and distribution of electricity to large industrial power users, utility providers, and independent power producers
  • GS0371: Consulting services in the field of construction of custom energy storage facilities for power grids and power plants
  • GS0011: Energy storage systems optimized for large demand, long duration deployments, in the nature of a hybrid systems comprising liquid hydrogen for long duration energy storage, and lithium-ion battery storage systems being batteries to support fast frequency response power demand
  • GS0111: Energy storage plants for power grids, featuring gravity-based utility-scale power storage facilities consisting of cranes, generators, and cement blocks; Energy storage plants for power grids, featuring gravity-based utility-scale power storage facilities consisting of cranes that raise and lower concrete blocks and motor electricity generators; Electricity storage facilities being energy storage plants for power grids and power plants, featuring gravity-based utility-scale power storage facilities consisting of cranes, generators, and cement blocks
  • GS0421: Consulting services in the product design of custom energy storage devices for power grids and power plants; providing temporary use of online non-downloadable software for operating large scale sized energy storage systems for use by utility providers, independent power producers, and large industrial power users; providing temporary use of non- downloadable cloud-based application software for allowing customer to manage energy storage assets; providing temporary use of online non-downloadable software for optimizing energy storage asset operations and performance by providing detailed visibility into key performance indicators and analytics to improve site and portfolio returns and analyze augmentation, expansion, and maintenance decisions; providing temporary use of online non- downloadable software for optimizing dispatch and new revenue associated with energy storage deployments by using artificial intelligence to leverage live data from directly monitored assets and external sources in order to inform bidding strategy
Case File Event Statements
  • 1/2/2024 - 2 years ago
    1 - NEW APPLICATION ENTERED Type: NWAP
  • 4/17/2024 - a year ago
    2 - NEW APPLICATION OFFICE SUPPLIED DATA ENTERED Type: NWOS
  • 7/22/2024 - a year ago
    5 - NON-FINAL ACTION E-MAILED Type: GNRT
  • 10/22/2024 - a year ago
    7 - APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED Type: XELR
  • 1/22/2025 - a year ago
    10 - CORRESPONDENCE RECEIVED IN LAW OFFICE Type: CRFA
  • 1/22/2025 - a year ago
    11 - TEAS/EMAIL CORRESPONDENCE ENTERED Type: TEME
  • 1/22/2025 - a year ago
    9 - TEAS RESPONSE TO OFFICE ACTION RECEIVED Type: TROA
  • 1/31/2025 - a year ago
    14 - NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED Type: GNEN
  • 1/31/2025 - a year ago
    15 - EXAMINER'S AMENDMENT ENTERED Type: XAEC
  • 7/11/2024 - a year ago
    3 - ASSIGNED TO EXAMINER Type: DOCK
  • 7/22/2024 - a year ago
    6 - NOTIFICATION OF NON-FINAL ACTION E-MAILED Type: GNRN
  • 7/22/2024 - a year ago
    4 - NON-FINAL ACTION WRITTEN Type: CNRT
  • 10/22/2024 - a year ago
    8 - APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED Type: XELG
  • 1/31/2025 - a year ago
    13 - EXAMINERS AMENDMENT E-MAILED Type: GNEA
  • 1/31/2025 - a year ago
    12 - EXAMINERS AMENDMENT -WRITTEN Type: CNEA
  • 1/31/2025 - a year ago
    16 - APPROVED FOR PUB - PRINCIPAL REGISTER Type: CNSA
  • 2/19/2025 - a year ago
    17 - NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED Type: NONP
  • 2/25/2025 - a year ago
    18 - PUBLISHED FOR OPPOSITION Type: PUBO
  • 2/25/2025 - a year ago
    19 - OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED Type: NPUB
  • 4/22/2025 - 10 months ago
    20 - NOA E-MAILED - SOU REQUIRED FROM APPLICANT Type: NOAM