Claims
- 1. A method of determining the appropriate time-to-initiate a defrost cycle for effecting a change in operation of a refrigeration circuit to remove frost from a heat exchanger forming a part of the refrigeration circuit comprising the steps of
- detecting the period of elapsed time during the previous defrost cycle,
- selecting a time period for which the refrigeration circuit should be operated between defrost cycles based upon the elapsed time during the previous defrost cycle,
- monitoring the cumulative operating time of the refrigeration circuit between defrost cycles,
- comparing the cumulative operating time of the refrigeration circuit with the time period formulated by the step of selecting to ascertain the appropriate time-to-initiate the next defrost cycle, said appropriate time occuring when the cumulative operating time equals the preselected time,
- wherein the step of monitoring the cumulative operating time includes energizing a time-to-initiate clock which emits periodic pulses when the refrigeration circuit is operating and further includes counting the pulses emitted by the clock; and
- wherein the time-to-initiate clock has a variable pulse emission rate and wherein the step of selecting a time period includes controlling the rate at which pulses are emitted from the time-to-initiate clock.
- 2. The method as set forth in claim 1 wherein the step of comparing includes emitting a defrost initiation signal when the number of pulses counted by step of counting reach a preselected value.
- 3. The method as set forth in claim 1 and further including the steps of:
- sensing a temperature in the refrigeration circuit, and
- emitting a defrost initiation signal when the temperature sensed is within a predetermined range and when the step of comparing ascertains the appropriate elapse of cumulative operating time.
- 4. A method of determining when a defrost cycle should be initiated to remove frost from a heat transfer element associated with a refrigeration circuit which comprises the steps of:
- ascertaining the elapsed time period during the previous defrost cycle,
- creating a defrost initiation signal after the expiration of a time-to-initiate a time period, said time period commencing upon the termination of the preceding defrost cycle, and
- regulating the length of the time-to-initiate period as a function of the elapsed time period of the previous defrost cycle by adjusting the rate at which a clock emits pulses as a function of length of the previous defrost cycle, said defrost initiation signal being created upon a predetermined number of said clock pulses having been counted.
- 5. The method as set forth in claim 4 wherein the step of regulating includes comparing the length of the defrost cycle to a reference value and adjusting length of the time-to-initiate period in response thereto.
- 6. The method as set forth in claim 4 wherein the step of creating includes
- energizing the clock emitting periodic pulses at the termination of a defrost cycle, and
- counting the pulses such that the defrost initiation signal is generated after a selected number of pulses have been emitted by the clock.
Parent Case Info
This is a division of application Ser. No. 050,352 filed on June 20, 1979 now U.S. Pat. No. 4,680,940.
US Referenced Citations (4)
| Number |
Name |
Date |
Kind |
|
3890798 |
Fujimoto et al. |
Jun 1975 |
|
|
4156350 |
Elliott et al. |
May 1979 |
|
|
4251988 |
Allard et al. |
Feb 1981 |
|
|
4251999 |
Tanaka |
Feb 1981 |
|
Divisions (1)
|
Number |
Date |
Country |
| Parent |
50352 |
Jun 1979 |
|