Claims
- 1. A method of balancing coal flow, without disturbing an existing primary air flow, in pulverized coal boiler systems with splitter junctions having a single inlet coal pipe and a plurality of outlet coal pipes, comprising the steps of:passing a combined coal/primary air flow over a plurality of first stage flow control elements in order to convert said combined flow into a plurality of approximately equal coal/primary air flows; directing each of said plurality of approximately equal coal/primary air flows preferentially into a plurality of first stage discrete channels of a riffler assembly; passing the plurality of approximately equal coal/primary air flows over a plurality of second stage flow control elements located within said plurality of first discrete channels in order to convert said plurality of approximately equal second stage coal/primary air flows into a plurality of approximately equal third stage coal/primary flows; directing each of said plurality of approximately equal third stage coal/primary flows preferentially into a plurality of second discrete channels of a riffler assembly.
- 2. The method of balancing coal flow, without disturbing an existing primary air flow, in pulverized coal boiler systems with splitter junctions having a single inlet coal pipe and a plurality of outlet coal pipes according to claim 1, wherein the positions of said pluralities of first stage and second stage flow control elements are adjusted in order to further refine/enhance the balancing effect.
- 3. The method of balancing coal flow, without disturbing an existing primary air flow, in pulverized coal boiler systems with splitter junctions having a single inlet coal pipe and a plurality of outlet coal pipes according to claim 2, wherein the positions of said pluralities of first stage and second stage flow control elements are adjusted “on-line”, or in other words, while the boiler system is in operation to further refine/enhance the balancing effect.
- 4. In combination with a slotted plate riffler having flow channels for directing coal flow and balancing coal flow rates among a plurality of outlet pipes from a splitter junction in a pulverized coal boiler system,a flow control assembly including a plurality of flow control elements each positioned upstream of a corresponding flow channel in said riffler for creating a particle wake and thereby preferentially directing coal flow to one of said plurality of outlet pipes from the splitter junction, said plurality of flow control elements of the flow control assembly each further comprising a streamlined shape including a rounded convex edge leading to straight tapered sides.
- 5. The combination slotted plate riffler and flow control assembly according to claim 4, wherein said slotted plate riffler further comprises an orifice in each of said plurality of outlet pipes for balancing primary air flow rates.
- 6. The combination slotted plate riffler and flow control assembly according to claim 4, wherein the straight tapered sides of said plurality of flow control elements each further comprise a roughened surface for promoting turbulent boundary layers.
- 7. The combination slotted plate riffler and flow control assembly according to claim 4, wherein said plurality of flow control elements are mounted on means to adjust the positions of said flow control elements relative to said riffler flow channels.
- 8. A system for balancing pulverized coal flow, without disturbing primary air flow in pulverized coal boiler systems of the type having a splitter junction with a single inlet coal pipe and a plurality of outlet coal pipes, said balancing system comprising:a plurality of first stage flow control elements located upstream of said splitter junction for converting a combined coal/primary air flow into a plurality of substantially equal secondary stage air and coal flows; a plurality of discrete first channels for intake of the plurality of respective secondary stage coal and air flows; a plurality of second stage flow control elements located within said plurality of discrete first channels for converting said plurality of secondary stage air and coal flows into a plurality of approximately equal, third stage air and coal flows; and a plurality of discrete second channels located downstream of said plurality of second stage flow control elements for intake of the plurality of third stage air and coal flows.
- 9. The system for balancing coal flow according to claim 8, wherein said pluralities of first stage and second stage flow control elements each further comprise a streamlined shape including a rounded convex edge leading to straight tapered sides.
- 10. The system for balancing coal flow according to claim 9, wherein the straight tapered sides of said pluralities of first stage and second stage flow control elements each further comprise a roughened surface for promoting turbulent boundary layers.
- 11. The system for balancing coal flow according to claim 8, further comprising a means to adjust the positions of said pluralities of first stage and second stage flow control elements.
- 12. The system for balancing coal according to claim 11, further comprising a means to adjust the positions of said pluralities of first stage and second stage flow control elements “on-line”, or in other words, while the boiler system is in operation.
Parent Case Info
This application claims the benefit of provisional application 60/199,300 filed Apr. 24, 2000 and 60/265,206 filed Feb. 1, 2001.
PCT Information
Filing Document |
Filing Date |
Country |
Kind |
PCT/US01/12842 |
|
WO |
00 |
Publishing Document |
Publishing Date |
Country |
Kind |
WO01/81830 |
11/1/2001 |
WO |
A |
US Referenced Citations (18)
Foreign Referenced Citations (1)
Number |
Date |
Country |
311872 |
May 1929 |
GB |
Provisional Applications (2)
|
Number |
Date |
Country |
|
60/199300 |
Apr 2000 |
US |
|
60/265206 |
Feb 2001 |
US |