This invention addresses a problem encountered with the implementation of the process disclosed in PCT/EP/2013/065074, the disclosures of which are incorporated herein by reference. In this process, the adsorption of CO2 occurs in atmospheric ambient conditions, and takes a certain amount of exposure time to air. The desorption takes place under such vacuum to allow dry steam to displace the air remaining from the adsorption stage. The desorption stage generally takes much longer than the adsorption stage. For example, adsorption can be configured such that it takes 22 hours, desorption can be configured to take place in 2 hours, for a combined 24 hr cycle.
When using fixed, non moving beds, each vessel performs both the function of adsorber and desorber, and must thus be able to withstand evacuation and be heated. However, these functions are only needed a fraction of the time (during desorption), during adsorption the vessels are ambient pressure and temperature.
It may for this reason be economical to construct a system where the adsorbent travels from the stage/vessel/location where it adsorbs CO2 at ambient pressure and temperature, to a stage/vessel/location where it is desorbed under vacuum and higher temperature conditions. In this way, the vessel that is used for desorption is in continuous use and the capital expenditure for the construction of this desorption vessel more efficiently employed.
As examples of this concept the following to embodiments are included:
In the small particles, contact with air during transport concept, the particles are transported by the air that is to act as a CO2 source from a buffer vessel to an air-particle separator. The air from which CO2 is adsorbed thus acts as a transport medium for the particles. After separation from the air, the particles are temporarily stored in a buffer vessel before being regenerated batch wise.
Alternate forms of particle transport may be used, such as conveyor systems, pneumatic transport, spouted bed reactors, risers as used in fluid catalytic cracking, and the like.
An additional embodiment may be the addition of water vapor adsorbing particles (desiccant) either as a separate contacting/regenerating step, or mixed in directly with the CO2 adsorbing particles, to shift the equilibrium towards more CO2 adsorbed. In the
Small particles, contact with air during transport, pre-drying particles and CO2 adsorbing particles in series (buffer vessels and regenerating vacuum pump not shown) is illustrated in
In an alternate embodiment, the “fixed bed air contact”, two vessel types filled with solid particles, for example pill size are employed. In the first vessel type, CO2 is adsorbed from ambient air. When the sorbent is saturated, it is conveyed to a separate vessel, where it is regenerated. After regeneration is complete, the sorbent is conveyed back to the adsorbing vessel. When more adsorbing vessels are present than desorbing vessels (for example, 10 adsorbing vessels for every one desorbing vessel), the difference in cycle time for the two stages can be compensated for.
Again, there is the option of adding a desiccant to the adsorbing material, or having a separate drying step prior to CO2 adsorption.
Fixed bed air contact is illustrated in
Fixed bed air contact, with pre-drying bed is illustrated in
The invention optimizes the use of the equipment, and confines the need for a vacuum resistant construction to only a relatively small portion of the equipment, being the desorber and its associated conduits. This significantly reduces the capital investment costs.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2015/072761 | 10/1/2015 | WO | 00 |
Number | Date | Country | |
---|---|---|---|
62058117 | Oct 2014 | US |