Claims
- 1. A method of predicting failure in a process having associated metrics and a plurality of operational variables, the method comprising the steps of:
using non-linear regression to predict values for a first set of operational variables based on two or more prior values thereof; using non-linear regression to predict a plurality of process metric values based on the first set of predicted values and prior values of two or more operational variables; and determining a likelihood of a process failure based on one or more of the predicted process metric values.
- 2. The method of claim 1, wherein the first set of predicted values is predicted by applying a separate non-linear regression model to each of the process operational variables, wherein each of the separate non-linear regression models has been trained in the relationship between a single process operational variable and prior values of two or more process operational variables.
- 3. The method of claim 2, further comprising repeating the steps of the method for at least one sub-process of the process.
- 4. The method of claim 2, further comprising repeating the steps of the method for a higher-level process comprising the process.
- 5. A method of predicting failure in a process having a plurality of operational variables associated therewith, the method comprising the steps of:
using non-linear regression to predict values at a first time for a first set of operational variables based on two or more prior values thereof; using non-linear regression to predict values at a second time for a second set of operational variables based on two or more prior values thereof; and determining a likelihood of a process failure based on one or more of the predicted values for the process operational variables at the first time and the second time.
- 6. The method of claim 5, wherein the second set of process operational variables are at least a subset of the first set of process operational variables.
- 7. The method of claim 5 further comprising using non-linear regression to predict values at a third time for a third set of operational variables based on two or more prior values thereof.
- 8. The method of claim 7 further comprising using non-linear regression to predict values at a fourth time for a fourth set of operational variables based on two or more prior values thereof.
- 9. A method of predicting the need for maintenance activities for a process having a plurality of operational variables associated therewith, the method comprising the steps of:
using non-linear regression to predict values at a first time for a first set of operational variables based on two or more prior values thereof; using non-linear regression to predict values at a second time for a second set of operational variables based on two or more prior values thereof; and determining the need for a maintenance action based at least in part on a comparison of the first set of predicted values with the second set of predicted values.
- 10. The method of claim 9 wherein the determining step is also based on process yield metrics.
- 11. The method of claim 9 wherein the step of predicting the second set of values at the second time is also based on process yield metrics.
- 12. The method of claim 9 wherein the first set of predicted values at the first time is constrained by cost data.
- 13. The method of claim 9 wherein the second set of predicted values at the second time is constrained by cost data.
- 14. A system for predicting events of a process having associated operational variables, the system comprising:
(a) a process monitor for monitoring operational variables; and (b) a data processing device for receiving, from the process monitor, data indicative of values of the operational variables, and predicting events based on (i) a relationship between a first set of predicted values for a first set of process operational variables and two or more prior process operational variable values thereof, (ii) a relationship between a second set of predicted values for a second set of process operational variables and two or more prior process operational variable values thereof, and (iii) a relationship between a predicted process event, the first set of predicted values, and the second set of predicted values.
- 15. The system of claim 14 wherein the process event is a process failure.
- 16. The system of claim 14 wherein the process event is a maintenance activity.
- 17. A system for predicting failure in a process having associated operational variables, the system comprising:
(a) a process monitor for monitoring operational variables; and (b) a data processing device for receiving, from the process monitor, data indicative of values of the operational variables, and predicting process failure based on (i) a relationship between a first set of predicted values at a first time for a first set of process operational variables and two or more prior process operational variable values thereof, (ii) a relationship between a second set of predicted values at a second time for a second set of process operational variables and two or more prior process operational variable values thereof, and (iii) a relationship between a process failure, the first set of predicted values at a first time, and the second set of predicted values at a second time.
- 18. A system for predicting the need for maintenance activities in a process having associated operational variables and process metrics, the system comprising:
(a) a process monitor for monitoring operational variables; and (b) a data processing device for receiving, from the process monitor, data indicative of values of the operational variables, and predicting process failure based on (i) a relationship between a first set of predicted values at a first time for a first set of process operational variables and two or more prior process operational variable values thereof, (ii) a relationship between a second set of predicted values at a second time for a second set of process operational variables and two or more prior process operational variable values thereof, and (iii) a relationship between a need for a maintenance activity, the first set of predicted values at a first time, and the second set of predicted values at a second time.
- 19. The system of claim 18 further comprising a process controller, responsive to the data processing device, for performing maintenance activities based on the predicted process event.
- 20. The system of claim 18 further comprising a data storage device for storing one or more of maintenance activity records and maintenance activity costs.
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] The present application claims the benefit of and priority to U.S. provisional application Serial No. 60/405,164, filed Aug. 22, 2002, the entire disclosure of which is herein incorporated by reference.
Provisional Applications (1)
|
Number |
Date |
Country |
|
60405164 |
Aug 2002 |
US |