Hydrocarbon resources are typically located below the earth's surface in subterranean porous frock formations, often called reservoirs. These hydrocarbon bearing reservoirs can be found in depths of tens of thousands of feet below the surface. In order to extract the hydrocarbon fluids, also referred to as oil and/or gas, wells may be drilled to gain access to the reservoirs. Wells may be drilled vertically from surface, deviated from vertical, or vertical to horizontal in order to most effectively and efficiently access the subsurface hydrocarbon reservoirs. Wells may be cased to protect the integrity of the Well. This is achieved by cementing tubulars in place isolating the internal conduit or well from the surrounding formations, which may be prone to collapse.
Wellbore logging is an important operation that may be conducted at any point throughout the life of a well and is primarily used to acquire important data about formation, integrity of the wellbore, or production characteristics. Wellbore logging is performed by a logging tool that is deployed into the wellbore and may have a variety of sensors to measure a plurality of parameters including, but not limited to, depth, wear, resistivity, water content, porosity, and permeability. During the drilling phase, logging operations are typically completed after each new segment of well is drilled and are primarily focused on formation evaluation. During the production phase, logging operations may be conducted at any time and are typically focused on integrity and production.
This summary is provided to introduce a selection of concepts that are further described below in the detailed description. This summary is not intended to identify key or essential features of the claimed subject matter, nor is it intended to be used as an aid in limiting the scope of the claimed subject matter.
In one aspect, embodiments disclosed herein relate to.
In one or more embodiments, the present invention relates to a logging system for a tubular, comprising: a rail system comprising a plurality of rails and mounted to a surface of the tubular; a logging tool carrier connected to the rail system; and a logging tool disposed on the logging tool carrier; wherein the logging tool is deployed on the logging tool carrier connected to the rail system along the tubular to a targeted position along the tubular and then retrieved from the wellbore; wherein, during deployment of the logging tool, the logging tool acquires a plurality of logging data.
In one or more embodiments, the present invention relates to a method of logging a tubular, comprising: mounting a rail system within an inside diameter surface of a tubular integrated into the tubular; disposing a logging tool onto a logging tool carrier, connecting the logging tool carrier to the rail system; deploying the logging tool carrier from a deployment position on the rail system inside the tubular, wherein the rail system guides the logging tool carrier to a targeted point along the tubular; retrieving the logging tool carrier via the rail system along the tubular, wherein rail system guides the return of the logging tool carrier to the deployment position; and acquiring, via the logging tool while deployed, a plurality of logging data.
Other aspects and advantages of the claimed subject matter will be apparent from the following description and the appended claims.
In the following detailed description of embodiments of the disclosure, numerous specific details are set forth in order to provide a more thorough understanding of the disclosure. However, it will be apparent to one of ordinary skill in the art that the disclosure may be practiced without these specific details. In other instances, well-known features have not been described in detail to avoid unnecessarily complicating the description.
Throughout the application, ordinal numbers (e.g., first, second, third, etc.) may be used as an adjective for an element (i.e., any noun in the application). The use of ordinal numbers is not to imply or create any particular ordering of the elements nor to limit any element to being only a single element unless expressly disclosed, such as using the terms “before”, “after”, “single”, and other such terminology. Rather, the use of ordinal numbers is to distinguish between the elements. By way of an example, a first element is distinct from a second element, and the first element may encompass more than one element and succeed (or precede) the second element in an ordering of elements.
The drill string (112) may be suspended in wellbore (102) by a derrick structure (101). A crown block (106) may be mounted at the top of the derrick structure (101), and a traveling block (108) may hang down from the crown block (106) by means of a cable or drilling line (103). One end of the drill line (103) may be connected to a drawworks (104), which is a reeling device that can be used to adjust the length of the cable (103) so that the traveling block (108) may move up or down the derrick structure (101). The traveling block (108) may include a hook (109) on which a top drive (110) is supported. The top drive (110) is coupled to the top of the drill string (112) and is operable to rotate the drill string (112). Alternatively, the drill string (112) may be rotated by means of a rotary table (not shown) at the surface (114). Drilling fluid (commonly called mud) (130) may pump the mud from the mud pit (not shown) into the drill string (112). The mud may flow into the drill string (112) through appropriate flow paths in the top drive (110) (or a rotary swivel if a rotary table is used instead of a top drive to rotate the drill string (not shown)).
During a drilling operation at the well site (100), the drill string (112) is rotated relative to the wellbore (102), and weight is applied to the drill bit (128) to enable the drill bit (128) to break rock as the drill string (112) is rotated. In some cases, the drill bit (128) may be rotated independently with a drilling motor (not shown). In further embodiments, the drill bit (128) may be rotated using a combination of the drilling motor (not shown) and the top drive (110) (or a rotary swivel if a rotary table is used instead of a top drive to rotate the drill string (112)). While cutting rock with the drill bit (128), mud is pumped into the drill string (112). The mud flows down the drill string (112) and exits into the bottom of the wellbore (102) through nozzles in the drill bit (128). The mud in the wellbore (102) then flows back up to the surface in an annular space between the drill string (112) and the wellbore (102) with entrained cuttings. The mud with the cuttings is returned to the pit (130) to be circulated back again into the drill string (112). Typically, the cuttings are removed from the mud, and the mud is reconditioned as necessary, before pumping the mud again into the drill string (112).
Post drilling operations, when the drill string (112), the BHA (124), and the drill bit (128) have been removed from the wellbore (102), in some embodiments of wellbore (102) construction, the casing operations may commence. A casing string (116), which is made up of one or more lager diameter tubulars that have a larger outer diameter than the drill string (112) but a smaller outer diameter than the wellbore (102), are lowered into the wellbore (102) on the drill string (112). In some embodiments, the casing string (116) is designed to isolate the internal diameter of the wellbore (102) from the adjacent formation (126). Once the casing string (116) is in position, it is set and cement is pumped down through the internal space of the casing string (116), out of the bottom of the casing shoe (120), and fills the annular space between the wellbore (102) and the outer diameter of the casing string (116). This secures the casing string in place and creates the desired isolation between the wellbore (102) and the formation (126). At this point, drilling of the next section of the wellbore (102) may commence.
Similarly,
In one or more embodiments, in a multi-lateral wellbore (400), or a wellbore (102) with a complex trajectory, there may be at least one permanently installed logging tool (not shown) and logging tool carrier (not shown) permanently installed on each of the first lateral (408) and the second lateral (410). As a non-limiting example, during logging operations, the logging tool (302) may be deployed from surface (114) and logs the wellbore (401) from the surface (114) to the wellbore junction (401). When the logging tool (302) reaches the wellbore junction (401) and is in close proximity to the permanently installed logging tool (not shown), the logging tool (302) activates the permanently installed logging tool (not shown). The permanently installed logging tool (not shown) will log the entire lateral section and return to the position at the wellbore junction (401). At this point, the permanently installed logging tool (not shown) will transfer the logging data back to the logging tool (302) while receiving a recharge of the power supply. Once this is complete, the logging tool (302) returns to the surface (114) and is removed from the wellbore (401).
Upon completing the logging of the wellbore (102) section between the production tubing (500) and the open section (502), the single rail logging tool carrier (300) will be pulled back to the interface between the single track rail system (200) and the electric line (not shown). The single rail logging tool carrier (300) will align with the single rail system (200), via a physical alignment guide or magnetic alignment guide, and transfer onto the single rail system (200) where the single rail logging tool carrier (300) will continue to be pulled out of the wellbore (102) and retrieved at surface (114).
Similar to
While the above embodiments are described with reference to a traditional “wellbore” drilled vertically from the earth's surface, deviated from vertical, or vertical to horizontal, in one or more embodiments, the same elements may be employed in other environments defined by a tubular without departing from the spirit of the invention. For instance, as shown in
In Step 700, in one or more embodiments, the logging tool (302) is attached to the single rail logging tool carrier (300). This operation is completed at surface (114) before deploying the logging tool carrier (300) into the wellbore.
In Step 702, in one or more embodiments, the single rail logging tool carrier (300), with the attached logging tool (302), is mounted at surface (114) to the single rail system (200) that is connected to the internal surface of the casing (116). At this stage, all final inspections and electronics communications checks are completed, and the single rail logging tool carrier (300) is ready for deployment into the wellbore (102).
In Step 704, in one or more embodiments, the single rail logging tool carrier (300) is deployed into the wellbore (102) on the single rail system (200) inside the casing (116). The logging tool (302) is active and continuously measures the desired subsurface parameters as the single rail logging tool carrier (300) traversing downhole in the wellbore (102). In Step 706, in one or more embodiments, the wellbore (104) may consist of a multi-lateral wellbore (400). This is part of the wellbore (104) design, and the single rail system (200) may only extend into the first lateral (408) or the single rail system (200) may split creating a single rail junction (402), in which the single rail system (200) extends the length of the first lateral (408) and the second lateral (410). If a multi-lateral wellbore (400) is present the operation sequence would proceed to Step 714. Otherwise, the operation sequence would continue to Step 708.
In Step 708, in one or more embodiments, the is only one lateral in the wellbore (102) and the single rail logging tool carrier (300) continues to traverse the wellbore (102) collecting the desired subsurface data until the single rail logging tool carrier (300) reaches the distal end of the wellbore (102).
In Step 710, in one or more embodiments, the single rail logging tool carrier (300) has reached the bottom most point of the wellbore (102). However, in order to capture all the desired logging data, the logging tool (302) and single rail logging tool carrier (300) may need to perform multiple passes across specific portion of the wellbore (102). A non-limiting example might be that a specific section of the reservoir/formation (126) may be of interest. In this case the logging tool (302) and single rail logging tool carrier (300) may need to physically pass this section multiple times to acquire sufficiently accurate data.
In Step 712, in one or more embodiments, all required logging data has been collected and the logging tool (302) and single track logging tool carrier (300) reverse direction, are pulled out of the wellbore (102), and recovered at surface (114).
In Step 714, in one or more embodiments, the wellbore (102) is a multi-lateral wellbore (400). This means that the wellbore (102) splits into at least two lateral sections, a first lateral (408) and a second lateral (410). In some embodiments, the single rail system (200) is divided into two sections with each single rail system (200) extended to the distal end of both the first lateral (408) and the second later (410). In this scenario, the single rail logging tool carrier (300), when deployed inside the casing (116) with the logging tool (302), will navigate the single rail junction (402) and begin traversing the first lateral (408) of the multi-lateral wellbore (400).
In Step 716, in one or more embodiments, the single rail logging tool carrier (300) and logging tool (302) continue traversing the first lateral (408) while simultaneously collected the desired logging data. This operation continues until the single rail logging tool carrier (300) reaches the distal end of the first lateral (408) of the multi-lateral wellbore (400).
In Step 718, in one or more embodiments, the single rail logging tool carrier (300) has reached the bottom most point of the first lateral (408) of the multi-lateral wellbore (400). However, in order to capture all the desired logging data, the logging tool (302) and single rail logging tool carrier (300) may need to perform multiple passes across specific portion of the wellbore (102). A non-limiting example might be that a specific section of the reservoir/formation (126) may be of interest. In this case the logging tool (302) and single rail logging tool carrier (300) may need to physically pass this section multiple times to acquire sufficiently accurate data.
In Step 720, in one or more embodiments, the single rail logging tool carrier (300) and the logging tool (300) have completed the data acquisition operation and have been pulled out of hole to the single rail junction (402). In some embodiments, if the first lateral (408) was the extend of the required data collection, the single rail logging tool carrier (300) could be pulled out of hole to surface (114). However, if the data acquisition of the second lateral (410) is required, the single rail logging tool carrier (300) could navigate the single rail junction (402) and being traversing the second lateral (410) without first having to return to the surface (114).
In Step 722, in one or more embodiments, the single rail logging tool carrier (300) and logging tool (302) continue traversing the second lateral (410) while simultaneously collected the desired logging data. This operation continues until the single rail logging tool carrier (300) reaches the distal end of the second lateral (410) of the multi-lateral wellbore (400). At this stage, the operation moves to process Step 710 followed by Step 712, where the data acquisition is completed, and the single rail logging tool carrier (300) and the logging tool (300) is recovered at surface (114).
Although only a few example embodiments have been described in detail above, those skilled in the art will readily appreciate that many modifications are possible in the example embodiments without materially departing from this invention. Accordingly, all such modifications are intended to be included within the scope of this disclosure as defined in the following claims. In the claims, means-plus-function clauses are intended to cover the structures described herein as performing the recited function and not only structural equivalents, but also equivalent structures. Thus, although a nail and a screw may not be structural equivalents in that a nail employs a cylindrical surface to secure wooden parts together, whereas a screw employs a helical surface, in the environment of fastening wooden parts, a nail and a screw may be equivalent structures. It is the express intention of the applicant not to invoke 35 U.S.C. § 112, paragraph 6 for any limitations of any of the claims herein, except for those in which the claim expressly uses the words ‘means for’ together with an associated function.
Number | Name | Date | Kind |
---|---|---|---|
3404638 | Edwards | Oct 1968 | A |
3508497 | Matsukata | Apr 1970 | A |
4075948 | Minovitch | Feb 1978 | A |
5947213 | Angle et al. | Sep 1999 | A |
6378627 | Tubel | Apr 2002 | B1 |
6510898 | Buytaert | Jan 2003 | B1 |
20070231072 | Jennings et al. | Oct 2007 | A1 |
20100132955 | Storm, Jr | Jun 2010 | A1 |
20140262219 | Beddoes | Sep 2014 | A1 |
20140262340 | Beddoes | Sep 2014 | A1 |
20160230350 | Bambrogan et al. | Aug 2016 | A1 |
20180073560 | Karpetis et al. | Mar 2018 | A1 |
Number | Date | Country |
---|---|---|
108104878 | Jun 2018 | CN |
108661567 | Dec 2019 | CN |
111795255 | Oct 2020 | CN |
4114183 | Nov 1992 | DE |
102005032710 | Jan 2007 | DE |
Entry |
---|
“Modelling of pneumatic suspensions”, UCLouvain, Access Date: Mar. 10, 2021, URL: <https://uclouvain.be/en/research-institutes/immc/modelling-of-pneumatic-suspensions.html> (5 pages). |
“Vehicles—From the prototype to the modern suspension railway”, Schwebebahn, Access Date: Mar. 10, 2021, URL:<https://www.schwebebahn.de/en/history-technology/vehicles/> (7 pages). |
International Search Report and Written Opinion issued in Application No. PCT/US2022/020009, dated May 11, 2022 (12 pages). |
Number | Date | Country | |
---|---|---|---|
20220290534 A1 | Sep 2022 | US |