The present invention relates to an aggregator system.
In received power adjustment performed in a power transmission/distribution network, a power demand/supply adjustment instruction, called a demand response (DR), for causing a consumer consuming electric power to temporarily control received electric power (purchased electric power), in accordance with variations of an amount of generated power of a power supply company side, is known. In addition, a company called an aggregator that mediates between a power supply company and a plurality of consumers and formulates and adjusts a power demand/supply plan using this DR instruction is known.
When a request (a large-scale DR request) for increasing or decreasing an amount of electric power is received from a power supply company, the aggregator divides the amount into smaller amounts and requests a plurality of consumers to perform power adjustment (a small-amount DR request). In accordance with an increase/decrease result (a small-amount DR result) of an amount of electric power of each consumer, an incentive (rebate) such as power charge reduction or the like is given from a power supply company to each consumer. In addition, in accordance with a total of success ratios of DRs of consumers (a small-amount DR result/a small-amount DR request), a predetermined incentive is paid from a power supply company to an aggregator. Here, for a party unable to respond to a request of a DR instruction, payment of a penalty is imposed on the aggregator (a deviation between a power supply planned value and a result value is compensated for), and thus, in order to avoid this, conventionally, for example, load control of decreasing an amount of power consumption by a device has been performed in power demand/supply adjustment.
However, the load control reduces comfort of consumers, and thus, in place thereof, for example, a method of performing power demand/supply adjustment by installing a storage battery at a consumer and decreasing received power in accordance with discharge of the storage battery and the like have been reviewed. Regarding this, for example, for the purpose of generating a DR plan reducing a total power cost in consideration of other events including a DR, as a background technology of the present invention, the following PTL 1 is known.
In PTL 1, a structure is disclosed in which an aggregator managing a plurality of bases performs power management of a storage battery and loads installed at a consumer by collecting a load control cost equation, in which comfortability is also reflected, in accordance with a small-amount demand/response request amount distributed from each base to a consumer and calculating and distributing a DR request amount on the basis of this load control cost equation has been disclosed.
In recent years, in order to meet greater customer demand, an aggregator has been required to improve a response capability for a DR request from a power supply company. An object of the present invention is to provide an aggregator system of which a response capability for a DR request is improved.
The present invention provides an aggregator system outputting a control instruction relating to electric power to a consumer consuming electric power, in accordance with a variation of a power generation amount of a power supply company, the aggregator system predicting an adjustment power that is an adjustable amount of received power according to each of facilities of the consumer and outputting a control instruction for adjusting a received power to each of the facilities on the basis of the predicted adjustment power of each of the facilities and a DR instruction that is a demand/supply adjustment instruction for electric power from the power supply company.
According to the present invention, an aggregator system of which a response capability for a DR request is improved can be provided.
Hereinafter, an embodiment of the present invention will be described. The following descriptions and drawings are examples for describing the present invention, and, for clarification of the descriptions, omissions and simplifications are appropriately performed. The present invention can be performed in various forms. Unless described as being particularly limited, a single constituent element or a plurality of constituent elements may be provided.
There are cases in which a position, a size, a shape, a range, and the like of each constituent element illustrated in the drawings do not represent an actual position, an actual size, an actual shape, an actual range, and the like for easy understanding of the invention. For this reason, the present invention is not necessarily limited to positions, sizes, shapes, ranges, and the like disclosed in the drawings.
In an electric power market, roles of each company and a system in a Virtual power plant (VPP) including an aggregator company will be described on the basis of
First, a transmission system operator (TSO) that is a general power transmission and distribution company or an electric power retail company (electric power company) performs a direct power transaction with a plurality of aggregation coordinators (AC1) for securing a stable power source accompanying a reduction of a nuclear power generation ratio and an increase in a renewable energy power source when electric power is distributed to consumers of electric power. The TSO (a higher rank of the AC1; not illustrated) determines a contract volume of electric power supplied from the AC1 from adjustment power of each time and a delivery unit price for a bid from the AC1. For example, a method of determining that adjustment power of 3000 kw is supplied from the AC1 at 10 Yen/kw between a.m. 9:00 to 12:00 can be used. In addition, adjustment power represents a difference of a power increase/decrease value used for responding to a DR instruction from a planned value of power reception that is an original reference, that is, an adjustable amount used for demand/supply adjustment of electric power. In addition, a consumer is a company that receives and uses supply of power and mainly represents a factory, a building facility, or the like.
Each RA2 (resource aggregator) contracted with the AC1 clusters resources of a plurality of bases (consumers). In other words, the RA2 receives adjustment power and a reference value of predicted received electric power of each time frame, result data required for predicting adjustment power, a facility operating schedule, and the like from a consumer, predicts a reference value and adjustment power of each consumer, and notifies the AC1 of them. The RA2 drafts a facility plan for responding to a DR instruction from the AC1 to be described below on the basis of the reference value and the adjustment power of this received electric power and, on the basis of this, outputs a control instruction to a facility monitoring control system of each base.
The AC1 collects the reference value and the adjustment force of the received powers that have been notified and makes a bid to the TSO. In a case in which an amount of electric power is contracted in this bid, the AC1 distributes the contract amount (in units of kw) to RA2 thereunder. RA2 directly makes a VPP service contract with consumers 3a and 3b of a lower rank, thereby performing resource control of facilities 5 of the consumers 3a and 3b.
A flow in a case in which a DR instruction is notified from TSO to the AC1 will be described. In a case in which a request for demand/supply adjustment (a notification of a DR instruction) comes from TSO, AC1 notifies the DR instruction to RA2. In a case in which a DR instruction is notified from AC1, RA2 outputs a control instruction to a facility monitoring control system (xEMS: Energy Management System) of the consumers 3a and 3b. In addition, xEMS, for example, includes a Building and Energy Management System (BEMS), a Factory and Energy Management System (FEMS), a Distributed Control System (DCS), and the like.
xEMS receives a control instruction from RA2 and performs feedback control (resource control) for each of managed facilities using real-time result data such that the control instruction value is satisfied. In addition, a company having xEMS is assumed to have its own electric power resources or have an adjustment width of used electric power.
The aggregator system illustrated in
In the aggregator system illustrated in
The AC1 and RA2 include a CPU, a memory, an input unit, a display unit, and an input/output interface. Such devices are connected through a system bus.
The memory, for example, is configured using volatile and non-volatile memories (storage media) including memories such as a RAM and a ROM and a storage device such as a hard disk. In the memory, a program causing a computer to function as the AC1 and the RA2 is stored. In addition, by reading a storage medium such as a CD-ROM, a DVD, or the like in which this program is stored, the computer may be caused to function as the AC1 and the RA2. Furthermore, in the case of the RA2, a database in which response results for DR instructions from the AC1 are recorded may be configured in the memory.
A plurality of functional units are built into the CPU in accordance with execution of programs stored in a memory and storage media such as a CD-ROM, a DVD, and the like. For example, the functional units are a functional unit collecting information of consumers, an arithmetic operation unit, a functional unit for adjusting a DR request amount, and a functional unit outputting a DR request amount.
The input unit, for example, is composed of a keyboard, a mouse, and the like. The display unit, for example, is composed of an LCD and the like and configures arithmetic operation processing results of the CPU and stored details of various databases stored in the memory to be displayable.
Conventionally, it is complicated to predict and control behaviors of facilities of consumers such as a power generator, a freezer, and the like, and, basically, a concept in which a request of a DR instruction from a TSO may be responded on the basis of adjustment information transmitted up from an EMS or a child RA has been employed for the operation. In addition, types of facilities held for each consumer is different, and an operation cost thereof is also different for each facility. For this reason, there is concern that an instruction may not be obeyed depending on situation of an electric power demand at the time when the RA receives a notification of a DR instruction from an AC of a higher rank, and a penalty is generated in the AC. However, in the present invention, by performing the process represented in the flowchart of
The flowchart of
First, the parent RA2a selects one of a plurality of consumers holding a facility 5 that is a target for resource control and determines whether or not the facility 5 of this consumer is under management of the child RA2b (Step S1). As a result, when it is checked that the facility is under management of the child RA2b (Step S1: Yes), adjustment power of each facility 5 is acquired from the child RA2b (Step S2). By using the adjustment power of each facility 5 received from the child RA2b in this way, the adjustment power of the child RA2b is replied to the AC1 of the higher rank. At this time, in a case in which the child RA2b cannot exhibit adjustment power as predicted, a penalty according to DR non-attainment is formed, and thus, by using an attainment rate that is arbitrarily set, the adjustment power of the child Ra2b is corrected (adjustment power before correction×attainment rate=adjustment power after correction) (Step S3). On the other hand, in a case in which the facility 5 of this consumer is not under management of the child RA2b, in other words, in the case of a facility 5 that is directly managed by the parent RA2a (Step S1: No), the processes of Steps S2 and S3 are not performed. By repeated performing this for contracted consumers (Step S4), for a facility 5 of a consumer that can be directly managed, processes of Steps S5 to S13 are further performed.
First, in a case in which a consumer has a private power generation facility as the facility 5, an upper limit value of adjustment power of the private power generation facility is calculated (Step S5). Hereinafter, a specific example of process details of Step S5 will be described with reference to
An upper limit value of adjustment power of the private power generation facility is calculated using the following Equation (1) or Equation (2). Equation (1) is a calculation equation of a case in which the private power generation facility is a power generator that can output constant generated electric power regardless of a surrounding environment, for example, an engine-type power generator, a gas turbine power generator, or the like, and Equation (2) is a calculation equation of a case in which a facility other than a private power generation facility has a solar photovoltaic power generator. In addition, rated generated electric power is electric power that can be stably output by the power generator. A power generation planned value is a power generation planned value based on power generation results. A power demand predicted value is a predicted value of an electric power demand of a consumer perceived by the RA2. A solar photovoltaic power generation prediction is a prediction of generated electric power according to solar photovoltaic power generation among private power generation facilities. A minimum received electric power is a minimal electric power among electric powers received from TSO.
For example, in the case of Equation (1), as illustrated in
As described above, in a case in which a consumer has a private power generation facility as the facility 5, adjustment power acquired by increasing or decreasing the supplied electric power is added. In accordance with this, adjustment power of the private power generation facility can be exhibited.
Subsequently, in a case in which a freezer is included in the facility 5 of a consumer, an adjustment power upper limit value of the freezer is calculated (Step S6). For example, in a case in which an electrically-driven freezer (a turbo freezer or the like) is not being operated when a notification of a DR instruction is received, the power consumption of the electrically-driven freezer is 0 and cannot be further decreased, and thus adjustment power cannot be exhibited. In addition, for example, in a case in which an absorptive freezer in place of the electrically-driven freezer is being operated at a rated operation, the absorptive freezer cannot produce an amount of heat larger than that. Thus, in order to produce a necessary amount of heat, the electrically-driven freezer needs to be continuously operated with a current operating load, and thus, similarly, adjustment power cannot be exhibited. Thus, similar to a case of a consumer having a private power generation facility, in accordance with an operating plan at the time of the notification of a DR instruction, an adjustment power upper limit value of the freezer is different. For example, as illustrated in
The calculation of this case is as represented in the following equations, Equation (3) is used when a rated freezer capacity of a gas-driven freezer—a production heat amount planned value of the gas-driven freezer≥a production heat amount of an electrically-driven freezer, and Equation (4) is used when a rated freezer capacity of a gas-driven freezer—a production heat amount planned value of the gas-driven freezer<a production heat amount of an electrically-driven freezer. In addition, in Equations (3) and (4), in the power consumption of the electrically-driven freezer and the gas-driven freezer, electric power for driving auxiliary power of a pump or the like is included.
In this way, it can be understood that, in an amount of heat acquired through addition of an electrically-driven freezer and a gas-driven freezer, when a result of the addition is within a load rate of 100%, the adjustment power upper limit value of the freezer corresponds to power consumption of the electrically-driven freezer.
As described above, in a case in which a consumer has an electrically-driven freezer and an absorptive-type freezer as facilities 5, by decreasing production cold heat according to the electrically-driven freezer while increasing production cold heat according to the absorptive-type freezer, adjustment can be performed such that the received electric power is decreased by exhibiting adjustment power according to the freezer. In accordance with the RA, which manages a plurality of bases, maintaining information of result values and facility schedule adjustment power upper limits for main devices such as individual freezers and the like, more detailed adjustment power can be exhibited.
Subsequently, adjustment power acquired by using electric power charged in an accumulation battery instead is added (Step S7). In accordance with this, in a case in which a consumer has a storage battery as a facility 5, adjustment power acquired by increasing the supplied electric power thereof is added. In accordance with this, the adjustment power of the storage battery can be exhibited.
As described above, when adjustment power that is an adjustable amount of received power according to each facility 5 can be predicted for various facilities 5 held by a consumer, next, a loss cost is calculated (Step S8). The loss cost represents a unit price of power generation according to a private power generation facility required for complementing a difference between a demand/supply plan of electric power and received power after adjustment according to a DR instruction and is different in accordance with a configuration of the private power generation facility and a type of power generator to be operated. There are cases in which energy costs of a cogeneration system and various freezers increase at the time of delivering adjustment power, and an additional cost thereof is changed in accordance with a facility load rate and an electric-heat demand balance before adjustment power delivery. For this reason, it is necessary to automatically calculate an additional cost accompanying adjustment power delivery using performance characteristics of each facility and draft an operating plan with priority levels of facility operating and profitability according to adjustment power delivery based on the additional cost taken into account. The calculation of the loss cost of each facility will be described with reference to
In power generation unit price calculation of a private power generation facility that can perform heat collection of power generator discharged heat illustrated in
In
In this way, by embedding characteristics of a device of each facility, a loss cost accompanying adjustment of received power can be calculated for each consumer. In addition, each of the models illustrated in
In this way, for example, in the case of the CGS, by calculating a loss cost according to exhibition of adjustment power with a waste collection effect taken into account, a cost that additionally occurs in a case in which a DR instruction is responded can be visualized. Thus, comparison with an incentive acquired by responding to the DR instruction can be easily performed. In addition, in accordance with an RA, which manages a plurality of bases, maintaining model information of main devices such as these individual freezers and the like and information of loss costs thereof or information for the arithmetic operation, adjustment power calculation having higher accuracy can be performed.
When the loss cost is calculated in Step S8, by using the calculation result, a loss cost corresponding to the adjustment power is calculated (Step S9 of
When it is checked that Steps S5 to S9 have been repeated in correspondence with a time frame (according to a planned value same-time and same-amount system for every 30 minutes) (Step S10), adjustment power of each time frame is calculated for each consumer (Step S11).
Hereinafter, a method of calculating adjustment power of each time frame in Step S11 will be described with reference to
As illustrated in
After adjustment power for each consumer is calculated in Step S11 illustrated in
Thereafter, when a notification of a DR instruction is received from an AC1, on the basis of the adjustment power of each time frame calculated for each consumer in the processing flow illustrated in
Next, ratio distribution of received power adjustment amounts of respective facilities 5 that is performed in the child RA2b will be described. As described above, the parent RA2a that has received a notification of a DR instruction from the AC1 does not perform adjustment of received power according to the control instruction for each facility 5 under management of the child RA2b, that is, each facility 5 other than adjustment targets of received power according to the parent RA2a, and directly outputs the DR instruction notified from the AC1 to the child RA2b managing this facility 5. The child RA2b that has received this DR instruction performs ratio distribution of adjustment amounts of received power for each consumer. The ratio distribution is to distribute adjustment amounts of received power instructed using the DR instruction at a ratio corresponding to a ratio of adjustment power of each consumer predicted in advance for a plurality of consumers holding this facility 5. In accordance with this, the child RA2b performs an adjustment instruction for received power for each facility 5 thereunder. Hereinafter, an example of the ratio distribution performed by the child RA2b will be described with reference to
In the ratio distribution, while a ratio of adjustment power at the time of bidding of each consumer that is predicted in advance is maintained, an adjustment amount of received power instructed in accordance with a DR instruction is distributed to each consumer. In
When the child RA2b receives a notification of a DR instruction through the parent RA2a, by multiplying a contract amount (instruction value) X′ instructed in the DR instruction by a ratio of each consumer calculated in Equation (6) (see distribution details), adjustment power to be delivered by each consumer, that is, X′i (i=1, 2, 3) that is an adjustment amount of received power with which each consumer is instructed is calculated. In addition, such ratio distribution can be applied not only to the child RA2b but also the parent RA2a or RA2 that directly manages facilities of consumers.
Next, a transmission schedule of a control instruction from the RA2 to each facility 5 will be described. When a notification of a DR instruction is received from the AC1, by performing a process to be described below, the RA2 determines an adjustment amount of received power instructed for each facility and outputs a control instruction corresponding to the adjustment amount to each facility. At this time, in consideration of an operating time of each facility, an output timing of the control instruction is determined. Hereinafter, an example of the output timing of a control instruction will be described with reference to
First, after a DR instruction is received from a higher-rank AC1, on the basis of adjustment power for each time frame slot of each consumer determined in the process illustrated in the flowchart of
In addition, in
Next, a method of determining an operating plan of the facility 5 will be described with reference to
By using a transition graph of a loss cost with respect to adjustment power generated for each time frame, the RA2 determines an operating plan of each facility 5 for each consumer and outputs a control instruction to each facility 5 on the basis of the operating plan. For example, in a case in which a lowering DR instruction (an instruction for a consumer to suppress use of electric power) instructing an adjustment amount 30 of received power corresponding between adjustment power 5X to 6X for a time frame in which the relation between the adjustment power and the loss cost as illustrated in
In a case in which a lowering DR instruction instructing an adjustment amount of received power that is further larger than the adjustment amount 30 is notified, the RA2 determines a facility 5 to be operated by outputting a control instruction in order of the lowest to highest cost represented in the graph illustrated in
By using the processes as described above, for an adjustment amount of received power instructed using a lowering DR instruction value, the RA2 can determine an operating plane of each facility on the basis of adjustment power and a loss cost of each facility and draft a control schedule of each facility. For example, as described above, in a case in which a consumer 5 has an electrically-driven freezer and an absorptive-type freezer as facilities, as illustrated in
In this way, when a control schedule of each facility can be drafted, the RA2 outputs a control instruction value to each facility m2 [minutes] before a control instruction time with a control schedule thereof and an operating time of each facility being taken into account (see
Next, correction of a control instruction will be described. As described in
Although the RA2 outputs a control instruction to each facility of the consumer in accordance with the drafted control schedule, in a case in which there is a possibility of an occurrence of a deviation of a result value from received electric power after adjustment planned for all the consumers, correction of control instruction values is performed. For example, the RA2 collects received electric power amount [kWh] in a collection period of m3 [minutes] (see
In a case in which the received electric power predicted value calculated in Equation (7) deviates from the received electric power upper limit value or lower limit value respectively acquired in the following Equations (8) and (9), the RA2 performs correction of the control instruction value. Here, a dead zone time m4 is set other than a target for control instruction value correction. Here, a time until a changed instruction is applied after reception of a DR change notification, both instruction values before and after change are provided.
A method of acquiring received electric power upper/lower limit values until start of application of changed value after reception of a DR instruction change notification will be illustrated below. In addition, in the case of DR instruction value after change>DR instruction value before change, an upper limit value and a lower limit value of the received electric power are respectively acquired using Equations (10) and (11), and in the case of DR instruction value after change<DR instruction value before change, an upper limit value and a lower limit value of the received electric power are respectively acquired using Equations (12) and (13). Furthermore, an initial setting value α=0.1 and can be changed in accordance with an internal setting value.
In this way, a system that can perform automatic distribution of adjustment power for each factory or each building facility and automatically correct a control instruction value such that it becomes target received electric power by detecting a deviation between an estimate and a result can be provided.
As above, in the present invention, adjustment power of each consumer can be collected, and a prediction operation can be performed, and thus, for example, a proposal indicating that this time frame has remaining power and thus is profitable can be performed, and calculation of loss costs of a CGS, a freezer, and the like and quantization of facility characteristics of a CGS, a freezer, and the like can be performed. In addition, a direct adjustment amount can be predicted and controlled with control parameters of each facility taken into account as well.
According to a first embodiment of the present invention described above, the following operations and effects can be acquired.
(1) An aggregator system outputting a control instruction relating to electric power to a consumer consuming electric power, in accordance with a variation of a power generation amount of a power supply company, the aggregator system predicting adjustment power that is an adjustable amount of received power according to each of facilities 5 of the consumer and outputting a control instruction for adjusting received power to each of the facilities 5 on the basis of the predicted adjustment power of each of the facilities 5 and a DR instruction that is a demand/supply adjustment instruction for the electric power from the power supply company. By configuring as such, an aggregator system of which responsiveness for a DR request is improved can be provided.
(2) The aggregator system collects the adjustment power of each of the facilities 5 that each of a plurality of consumers has and manages the facilities 5 of each of the consumers. By configuring as such, adjustment power of each facility 5 is estimated, and a control instruction for each facility 5 can be performed in accordance with an estimation result thereof.
(3) The aggregator system: calculates a loss cost accompanying adjustment of the received power by using operating models 10 to 13 of the facilities 5, determines an operating plan of each of the facilities 5 on the basis of the adjustment power and the loss cost, and outputs the control instruction on the basis of the determined operating plan. By configuring as such, after an additional cost that incurs in a case in which a DR instruction is responded, adjustment power of the system can be exhibited.
(4) The facilities 5 of the aggregator system include at least one of a CGS and a freezer. By configuring as such, by embedding characteristics of a device of each facility, a loss cost accompanying adjustment of received electric power is calculated for each consumer.
(5) The aggregator system determines an output timing of the control instruction on the basis of an adjustment start timing of the received power instructed using the DR instruction and an operating time of the facility 5. By configuring as such, an output timing of a control instruction can be determined by the RA2.
(6) In the aggregator system, the freezer includes an electrical driving-type freezer and an absorptive-type freezer, and the control instruction is output such that produced cold heat based on the absorptive-type freezer is increased, and produced cold heat based on the electrical driving-type freezer is decreased. By configuring as such, adjustment power according to a freezer is exhibited, and received electric power of a consumer can be adjusted in accordance with a DR instruction.
(7) In the aggregator system, the facilities 5 include a non-target facility, which is not a target of adjustment of the received power according to the control instruction, and the aggregator system performs an adjustment instruction for the received power for the non-target facility by distributing an adjustment amount of the received power instructed using the DR instruction to a plurality of consumers having the non-target facility at a ratio corresponding to a ratio of adjustment power of each consumer predicted in advance. By configuring as such, for each facility 5 that cannot be directly managed, a DR instruction is directly notified to a child RA2b managing each facility 5, and a response for requesting to take a role of DR distribution can be performed.
(8) In the aggregator system, a first consumer 2a, for which the aggregator system manages adjustment power in units of facilities 5, and a second consumer 2b, for which the aggregator system manages adjustment power in units of consumers, or a child aggregator system managing adjustment power in units of a plurality of consumers are present, and adjustment power of the first consumer 2a, and of the second consumer 2b or the child aggregator system, are collected and managed. By configuring as such, various power demand/supply adjustment patterns for a consumer can be responded.
In addition, the present invention is not limited to the embodiment described above, and various modifications and a combination with another configuration can be performed within a range not departing from the concept thereof. Furthermore, the present invention is not limited to include all the components described in the embodiment described above and includes an embodiment in which some of the components are eliminated.