Air Cloud Particle Suspension Dredge

Information

  • Patent Application
  • 20140326679
  • Publication Number
    20140326679
  • Date Filed
    May 06, 2013
    11 years ago
  • Date Published
    November 06, 2014
    10 years ago
Abstract
The present invention diffuses air through a sea floor-mounted grid, raises particle clouds in four to twenty percent solutions to a height of one to four feet, and transports the particle cloud by favorable currents to designated locations upstream and downstream while releasing dissolved oxygen throughout the water column. The process is used in shallow depths, less that thirty-three feet (2 bars) with minimum favorable water currents of one-half to one knot. The sea floor-mounted grid is used for diffusion of air to alleviate hypoxic environments in depths less than sixty-six feet (5 bars.)
Description
CROSS-REFERENCE TO RELATED APPLICATIONS

Not Applicable


STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT

Not Applicable


REFERENCES CITED

The following are examples of prior art that were found to be relevant to this invention.


The USPTO parent classification 37 was found to be the most relevant to the invention. The patents are listed below in approximate order of importance.


The core of the invention appears to be a system that agitates the bottom sediment of a waterway using compressed air pumped through a grid placed on the bottom of the waterway, causing the particles of sediment to be suspended in the water column where they can be carried away by favorable currents.












U.S. Patent Documents

















8,083,437
December 2011
Antill, Sr.


4,600,338
July 1986
VanBruaene et al.


6,125,560
October 2000
Taplin


7,526,884
May 2009
Langejan


4,307,525
December 1981
Beaumont


5,970,635
October 1999
Wilmoth


5,659,983
August 1977
Coutarel et al.


4,889,391
December 1989
Cornelius









Dak Steiert, Intelligent Patent Services, Palo Alto, Calif.


BACKGROUND OF THE INVENTION

The present invention is in the technical field of dredging. More particularly, the present invention is in the technical field of air-suspended particle removal by a sea floor-mounted grid.


Conventional air-suspended particle removal dredges, such as air-lift suction dredges, cutter-suction dredges with air injection, jet-lift dredges and air-lift dredges remove large quantities of material by creating a slurry and pumping the slurry into a hopper or onto a spoil area. The difficulties of these devices are their size and in their initial and operating expenses. The size and complexity of dredging machinery makes these methods of dredging out of reach of the general public. The expense of operating these dredges is beyond the reach of individuals and small businesses.


A second method of particle suspension, the water injection or agitation dredge, creates a particle slurry with water jets and allows currents to carry the slurry to another area. This dredging method is effective only so long as the induced particle slurry remains suspended in the water. Therefore, large amounts of water must be used to suspend the slurry, causing visual and ecological problems.


SUMMARY OF THE INVENTION

The sea floor-mounted air cloud dredge has a surface power source and instrumentation with a power connector running to an air compressor, storage tank and instrumentation, with a compressed air distribution line on which is installed air valves and gauges and an additive injection port. A tether line and current sensor conduit are fastened to the air distribution line which enters the water and runs to the air grid injection port entering the sea floor-mounted air grid. Attached to the air grid is a water current sensor and outrigger ballast struts. On the underside of the sea floor-mounted air grid are air nozzles for delivering compressed air to the target area.


The power source is a diesel engine or electric motor with sufficient power to operate the air compressor, producing a minimum 150 psig through a minimum 30 gallon storage tank according to signals from the current sensor. The air distribution line is of varying pipe size and length sufficient to deliver the required air from the air compressor through the valves and gauges installed on the air distribution line. The valves and gauges are sufficient to halt air flow, prevent backflow, and deliver air as measured psi. The additive injection port enables the addition of polymers and other additives to enhance air distribution efficiency. The tether line and current sensor conduit are attached to the air distribution line which enters the water and attaches to the air injection port allowing pressurized flow through the sea floor-mounted air grid. Air flow through the air grid commences when the current sensor signals the air compressor that minimum current speed is available. Fastened to the sea floor-mounted air grid are outrigger and ballast struts to offset flotation and to prevent grid burial. The air nozzles attached to the air grid are of sufficient size to deliver the compressed air a minimum of 6 inches below the nozzle openings. The nozzles are typically spaced 6 to 12 inches apart on the undersides of the sections of the air grid.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a side view of an air cloud dredge of the present invention;



FIG. 2 is a top view of an air cloud dredge of the present invention





DESCRIPTION OF THE PREFERRED EMBODIMENT

Referring now to the invention in more detail, in FIG. 1 there is shown a sea floor-mounted air cloud dredge 10 having a surface power source and instrumentation 12 with a power connector 14 running to an air compressor, storage tank and instrumentation 16 with a compressed air distribution line 18 on which is installed air valve's and gauges 20 and an additive injection port 22. A tether line and current sensor conduit 24 are fastened to the air distribution line 18 which enters the water and runs to the air grid injection port 26 entering the sea floor-mounted air grid 28. Attached to the air grid 28 is a water current sensor 30 and outrigger ballast struts 32 and 34. On the underside of the air grid 28 are air nozzles 36, 38, 40, 42, 44, and 46.


In further detail, still referring to the invention as shown in FIG. 1, the power source 12 is a diesel engine or electric motor with sufficient power to operate the air compressor 16, producing a minimum 150 psig through a 30 gallon storage tank according to signals from the current sensor 30. The air distribution line 18 is of varying pipe size and length sufficient to deliver the required air from the air compressor 16 through the valves and gauges 20 installed on the air distribution line 18. The valves and gauges 20 are sufficient to halt air flow, prevent backflow, and deliver air as measured psi. The additive injection port 22 enables the addition of polymers and other additives to enhance air distribution efficiency.


In further detail, still referring to the invention as shown in FIG. 1, the tether line and current sensor conduit 24 are attached to the air distribution line 18 which enters the water and attaches to the air injection port 26 allowing pressurized flow through the sea floor-mounted air grid 28. Air flow through the air grid commences when the current sensor 30 signals the air compressor 16 that minimum current speed is available.


In further detail, still referring to the invention as shown in FIG. 1, fastened to the sea floor-mounted air grid 28 are outrigger and ballast struts 32 and 34 to offset flotation and to prevent grid burial. The air nozzles 36, 38, 40, 42, 44, and 46 attached to the air grid 28 are of sufficient size to deliver the compressed air a minimum of 6 inches below the nozzle openings. The nozzles 36, 38, 40, 42, 44, and 46 are typically spaced 6 to 12 inches apart on the undersides of the sections of the air grid 28.


The construction materials of the invention as shown in FIG. 1 are that the sea floor-mounted air cloud dredge 10 may be made of various materials supplied by various manufacturers. The sections of the air grid 28 may be made of metal, HDPE, PVC, CPVC and other materials with a minimum 200 psi rating. The air distribution line 18 may be rigid and/or flexible with a minimum 250 psi rating. All other components of the sea floor-mounted air cloud dredge 10 exist as manufactured items and may be purchased according to the minimum requirements for the specific operation of the air cloud dredge 10. Further, various components may be deleted from or added to the air cloud dredge 10 for specific operations. The additive injection port 22 may be deleted and the current sensor 28 may be substituted for a surface-mounted timer.


Referring now to FIG. 2, there is shown a sea floor-mounted air cloud dredge 50 having a surface power source and instrumentation 52 with a power connector 54 running to a surface air compressor, storage tank and instrumentation 56 with a compressed air distribution line 58 on which is installed air valves and gauges 60 and an additive injection port 62. A tether line and current sensor conduit 64 are fastened to the air distribution line 58 which enters the water and runs to the air grid injection port 66 on the sea floor-mounted air grid section 86. Attached to the air grid section 86 is a water current sensor 68.


In further detail, still referring to FIG. 2, outrigger and ballast struts 70 and 72 are fastened to sections 78, 80, and 82 of the sea floor-mounted air grid. Lifting devices 74 and 76 are fastened to the intersections of sections 80, 84, and 86 and are spaced every 10 to 20 feet along the sea floor-mounted unit according to its size and weight.


The construction materials of the invention as shown in FIG. 2 of the air cloud dredge 50 may be made of various materials supplied by various manufacturers. The sections 78, 80, 82, 84, and 86 of the sea floor-mounted grid may be made of metal, HDPE, PVC, CPVC and other materials with a minimum 200 psi rating. The air distribution line 58 may be rigid and/or flexible with a minimum 250 psi rating. All other components of the air cloud dredge 50 exist as manufactured items and may be purchased according to the minimum requirements for the specific operation of the air cloud dredge 50. Further, various components may be deleted from or added to the air cloud dredge 50 for specific operations. The additive injection port 62 may be deleted and the current sensor 68 may be substituted for a surface-mounted timer.


The advantages of the present invention include, without limitation, the position of its sea floor-mounted grid, its simplicity of design, its ease of fabrication and operation, and its low impact on the environment. The principles of design of the invention are position on the sea floor, air compression, particle suspension, and transport by natural or induced currents. All of the materials for the present invention may be easily purchased, and fabrication may be successful with a nominal skill set. The low environmental impact of the present invention is effected by its operation according to the availability of natural currents and its use of oxygen to cause particle suspension as well as to supply dissolved oxygen from the base of the water column.


In broad embodiment, the present invention is less impactive, easier to operate, more efficient, and less expensive than the typical dredges using cutter heads, air injection, suction piping, pressure pumping and spoil areas. It is a gentler process than typical dredging, allowing a less harmful impact on the environment. Further, the placement of its sea floor-mounted air grid allows maximum particle suspension as well as dissolved oxygen dispersal upward through the entire water column.


While the forgoing written description of the invention enables one of ordinary skill to make and use what is considered presently to be the best mode thereof, those of ordinary skill will understand and appreciate the existence of variations, combinations, and equivalents of the specific embodiment, method, and examples herein. The invention should therefore not be limited by the above described embodiment, method, and examples, but by all embodiments and methods within the scope and spirit of the invention as claimed

Claims
  • 1. A method of particle removal and oxygenation whereby a sea floor-mounted grid injects pressurized air into a slip, harbor, marina, or channel bottom. The bottom particles are suspended by the rising air cloud and are transported by natural and induced currents away from the grid site
  • 2. The method as set forth in claim 1 keeps the vertical profile of the suspended particles low by measured air feed, bubble size, and pressure.
  • 3. The method set forth in claim 1 moves particles away from unwanted areas while keeping them in the marine environment.
  • 4. The method set forth in claim 1 produces air clouds to aereate the water column while entraining particles.
  • 5. The method as set forth in claim 1 may be adjusted to mount the air grid unit above the sea floor in order to release fine bubbles of dissolved oxygen up through the water column.