Embodiments according to the present invention relate to an air-conditioning controller, an air-conditioning control method, and an air-conditioning control program.
Conventional air-conditioning apparatuses are manually controlled to be turned on and off and to set a temperature by means of a remote controller individually installed in each room of a building. If a central monitoring system such as a BEMS (Building Energy Management System) is used, the central monitoring system performs centralized control of the air-conditioning of each room.
Users of a room having an air-conditioning apparatus that controls air-conditioning may desire that the air-conditioning in the room be already in an appropriate state when the users start using the room. Therefore, the air-conditioning apparatus may sometimes be controlled to perform a pre-cooling operation or pre-heating operation (hereinafter they may be collectively called “preliminary operation”) that is adjusted to be appropriate for the usage start time. Conventionally, a scheduling function of the air-conditioning apparatus is used in the preliminary operation to start air-conditioning at a preset time in order to have an appropriate air-conditioning state by the time the room is used.
However, the preliminary operation utilizing the conventional scheduling function only controls the air-conditioning so that the temperature of the room may be appropriately adjusted by the time the room starts to be used, and no attention has been paid to the air-conditioning control in consideration of the electricity expenses.
An air-conditioning controller according to an embodiment controls an air-conditioning unit, and includes a schedule generator unit and a memory unit. The schedule generator unit generates an operation schedule defining a start time of a preliminary operation and a load of the air-conditioning unit in the preliminary operation. The preliminary operation causes a room temperature of room adjusted by the air-conditioning unit to be substantially equal to a predetermined set temperature. The start time and the load are set to lower electricity expenses incurred by the preliminary operation based on an amount of energy consumed in the preliminary operation and electricity unit price information. The memory unit is configured to store the operation schedule.
Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. The present invention is not limited by the embodiments.
The air-conditioning controller 1 controls the air-conditioning units 20 installed in rooms 10 of a structure such as a building or a factory. The air-conditioning unit 20 includes a blower (indoor unit) 22 and a compressor (outdoor unit) 24.
The air-conditioning controller 1 includes an air-conditioning operation control apparatus 25 and an air-conditioning operation control apparatus 30.
The air-conditioning operation control apparatus 25 and the air-conditioning operation control apparatus 30 are capable of communicating with each other, and are connected to each other with a physically disconnectable communication line. The air-conditioning operation control apparatus 30 is a server or a computer capable of creating an operation schedule and transmitting the operation schedule to the air-conditioning operation control apparatus 25. The air-conditioning operation control apparatus 25 controls the air-conditioning unit 20 based on the operation schedule received from the air-conditioning operation control apparatus 30. Furthermore, the air-conditioning operation control apparatus 25 transmits to the air-conditioning operation control apparatus 30 the operation status and the setting information of the air-conditioning unit 20 received from the air-conditioning unit 20 and the usage start time set by the user. The air-conditioning operation control apparatus 25 is, for example, a computer or a server used for the building energy management in a BEMS. The operation status of the air-conditioning unit 20 is an actual operation status (operation load) of the air-conditioning unit 20. The setting information of the air-conditioning unit 20 concerns information of the operation load of the air-conditioning unit 20 including the set temperature, the air-conditioning intensity, and the set air volume.
As shown in
The schedule generator unit 32 may be, for example, a processing unit such as a CPU. The schedule generator unit 32 defines the start time of the preliminary operation and the load of the air-conditioning unit 20 in the preliminary operation based on the amount of energy consumed in the preliminary operation and the electricity unit price information such that the electricity expenses for the preliminary operation is lowered, and generates an operation schedule based on them. In this embodiment, the operation schedule is generated in such a manner that a target low value of the electricity expenses calculated based on the amount of energy consumed in the preliminary operation and the electricity unit price information is minimized. However, if other factors that have an influence on the electricity expenses need to be considered, the operation schedule is generated in a manner that the electricity expenses as a whole is lowered or minimized. The memory unit 34 stores the operation schedule generated by the schedule generator unit 32. The memory unit 34 may also store previously generated operation schedules as past information. The memory unit 34 also stores a program needed to generate the operation schedule (such as an air-conditioning control program). The memory unit 34 may be a storage device such as an HDD (Hard Disk Drive), or an SSD (Solid State Drive).
The air-conditioning operation control apparatus 30 and the air-conditioning operation control apparatus 25 may be separate computers as shown in
The air-conditioning operation control apparatus 25 is capable of controlling the air-conditioning units 20 or receiving signals indicating the operation status (ON/OFF, air-conditioning intensity, etc.) from each air-conditioning unit 20 via a network (not shown).
Furthermore, the air-conditioning operation control apparatus 30 is capable of being connected to a wide area network, which is not shown, to communicate with, for example, an electric power company 40, a weather service company 50, a thermometer, or a solar radiation meter 60. This allows the air-conditioning operation control apparatus 30 to obtain electricity unit price information from the electric power company 40, weather forecast information from weather service company 50, outside temperature from the thermometer, and the amount of solar radiation from the solar radiation meter 60. The weather forecast information, the outside temperature, and the solar radiation amount is taken into account into the amount of energy loss, which will be described later.
The amount of energy loss is the amount of energy diffused from the room 10 to the outside through the outer wall during the preliminary operation. The amount of energy loss is calculated in advance, using the difference in temperature between the room 10 and the outside air, the actual weather, the forecast weather, the solar radiation amount, and the like. The difference in temperature between the room 10 and the outside air, the actual weather, the forecast weather, the solar radiation amount, and the like are converted to an energy amount based on past information or statistics, and added to the amount of energy loss. For example, if the difference in temperature between the room 10 and the outside air is considerably large, the air-conditioning operation control apparatus 30 increases the amount of energy loss. Furthermore, if the actual weather or forecast weather indicates a sunny day in summer, or if the solar radiation amount is great in summer, the air-conditioning operation control apparatus 30 increases the amount of energy loss. If the actual weather or forecast weather indicates a cloudy or snowy day in winter, or if the solar radiation amount is low in winter, the air-conditioning operation control apparatus 30 increases the amount of energy loss. In the cases opposite to the above, the air-conditioning operation control apparatus 30 may decrease the amount of energy loss. The degree of increase or decrease of the amount of energy loss may be appropriately set statistically by referring to the past information.
The electricity expenses incurred during the preliminary operation may be calculated in the following manner. For example, the capacity of the room 10 is assumed to be V10, the actual room temperature of the room 10 is assumed to be t10, the set temperature is assumed to be ts, and the amount of energy loss is assumed to be Eloss. Also, the amount of energy needed to change the temperature of air in a unit volume by a unit temperature is assumed to be E0, and the preliminary operation time is assumed to be T. In this case, the preliminary air-conditioning energy Ep may be substantially expressed by Formula 1. Of course, the preliminary air-conditioning energy Ep may be calculated more accurately by adding other factors to Formula 1.
Ep=(E0×V10×(|ts−t0|)+Eloss)×T (Formula 1)
On the other hand, the electricity unit price information is provided by the electric power company 40, and stored in the memory unit 34 in advance. Alternatively, the air-conditioning operation control apparatus 30 may obtain the electricity unit price information from the electric power company 40 via a wide area network as shown in
The schedule generator unit 32 calculates the electricity expenses incurred by the preliminary operation by multiplying the preliminary air-conditioning energy Ep by the electricity unit price.
If a time zone charge calculation system or a real-time pricing system is introduced to the electricity expenses calculation system, the electricity unit price changes depending on the electric power demand or the electricity supply-demand balance. Therefore, the electricity unit price may change on a time zone basis. In this case, if a preliminary operation is performed in a time zone with a high electricity unit price, the electricity expenses incurred by the preliminary operation increase. The air-conditioning unit 20 consumes a large amount of energy when the air-conditioning operation starts. Furthermore, people's lifestyles overlap to some extent with respect to time. Therefore, preliminary operations performed in rooms 10 in time zones in which the demand for electric power is high, i.e., time zone of high electricity unit prices, may naturally overlap in time.
Accordingly, the air-conditioning operation control apparatus 30 generates a preliminary operation schedule based on the electricity unit price information in this embodiment.
As shown in
When the preliminary operation is started at 7 AM, the air-conditioning operation control apparatus 30 operates the air-conditioning unit 20 with a relatively high load in order to cause the temperature of the room 10 to reach the set temperature, 25° C., by the usage start time, 9 AM. As shown in
If the preliminary operation is started at 6 AM, the air-conditioning operation control apparatus 30 operates the air-conditioning unit 20 with a relatively low load to cause the temperature of the room 10 to reach the set temperature, 25° C., by the usage start time, 9 AM. Furthermore, the electricity unit price from 6 AM to 7 AM is lower than that after 7 AM, as shown in
The total electricity expenses for the preliminary operation can be obtained by integrating the electricity expenses from the preliminary operation start time to the usage start time. Therefore, the total electricity expenses for the preliminary operation started at 7 AM correspond to the area S0, and the total electricity expenses for the preliminary operation started at 6 AM correspond to the area S1. The area S1 is obviously smaller than the area S0. Therefore, it can be understood that the electricity expenses for the preliminary operation are lower in the case where the preliminary operation is started at 6 AM than in the case where the preliminary operation is started at 7 AM. The length of the preliminary operation started from 6 AM is longer than that of the preliminary operation started at 7 AM. However, the preliminary operation is preferably started at 6 AM rather than 7 AM to keep low the electricity expenses.
After 9 AM, which is the usage start time, the air-conditioning operation control apparatus 30 controls the air-conditioning unit 20 in a regular manner. Therefore, there is substantially no difference between Ep0 and Ep1 in
In
As shown in
Comparison among the lowest values of L2 to L4 indicates that the lowest value of L3 is the lowest. Therefore, the schedule generator unit 32 generates an operation schedule in which the air-conditioning unit 20 is operated with the operation load corresponding to L3, and the preliminary operation start time is set to be 6 AM. Thus, the schedule generator unit 32 is capable of generating an operation schedule setting the preliminary operation start time and the operation load of the air-conditioning unit 20 to minimize the electricity expenses incurred by the preliminary operation. The above example should be considered to an example only. The embodiment is not limited to the above example.
The capacity V10 of the room 10, the amount of energy loss Eloss, and the amount of energy E0 needed for changing the temperature of air with a unit volume by a unit degree are set in advance, and stored in the memory unit 20.
First, the air-conditioning operation control apparatus 30 obtains information needed to generate an operation schedule, including the room usage start time, the electricity unit price information, the actual room temperature t10 of the room 10, the set temperature ts, and the like (S10). The room usage start time and the set temperature ts may be set by a user. The electricity unit price information may be obtained from an electric power company, and the actual room temperature t10 may be obtained from a thermometer.
Then, the schedule generator unit 32 generates an operation schedule with the above-described information to minimize the electricity expenses incurred by the preliminary operation (S20). At this time, the schedule generator unit 32 calculates the preliminary operation start time and the operation load of the air-conditioning unit 20 in the preliminary operation so that the electricity expenses incurred by the preliminary operation is minimized based on the amount of preliminary air-conditioning energy consumed in the preliminary operation and the electricity unit price information, as has been described with reference to
Thereafter, the air-conditioning operation control apparatus 30 transmits the operation schedule to the air-conditioning operation control apparatus 25. The air-conditioning operation control apparatus 25 controls the air-conditioning unit 20 in accordance with the operation schedule (S30). Thus, the air-conditioning unit 20 can bring the room temperature to the set temperature by the usage start time of the room 10 with the electricity expenses incurred by the preliminary operation being minimum. As a result, the electricity costs incurred by the preliminary operation may be minimized, and the user may use the room 10 without feeling discomfort when entering the room 10.
If the electricity unit price changes in accordance with the actual electricity supply-demand status as in a real-time pricing system, etc., the air-conditioning operation control apparatus 30 may predict the electricity unit price based on archived electricity unit price information data when generating the operation schedule. For example, the electric power demand may be predicted to some extent from conditions such as weather forecasts and outdoor temperatures. Accordingly, the air-conditioning operation control apparatus 30 may predict the electricity unit price based on the predicted electric power demand. The air-conditioning operation control apparatus 30 may generate the operation schedule to minimize the electricity expenses incurred by the preliminary operation using the predicted electricity unit price.
In more detail, the air-conditioning operation control apparatus 30 refers to the past information such as the past weather data, the past outdoor temperatures, the past electricity unit price information, and the amount of energy consumed in past preliminary operations, stored in the memory unit 34 as a database, to predict the electricity unit price and the amount of energy consumed in the preliminary operation from the current weather data and the current outdoor temperature. For example, if past information corresponding to the current weather data and outer temperature are stored in the memory unit 34, the schedule generator unit 32 generates an operation schedule using the electricity unit price and the energy consumed in the preliminary operation corresponding to the past information. Of course, no past information corresponding to the current weather data and outdoor temperatures may be stored in the memory unit 34. In such a case, the air-conditioning operation control apparatus 30 retrieves past information that is the closest to the current weather and outdoor temperature data, and uses the electricity unit price and the amount of energy consumed in the preliminary operation corresponding to such past information. Thus, the air-conditioning operation control apparatus 30 may use the electricity unit price and the amount of energy consumed in the preliminary operation predicted from the past information in generating an operation schedule to minimize the electricity expenses incurred by the preliminary operation.
In the second embodiment as well, the room 10 is assumed to be used from 9 AM as shown in
As shown in
The air-conditioning operation control apparatus 30 integrates the sum of the electricity expenses of the air-conditioning units 20a to 20c from the preliminary operation start time to the usage start time. The air-conditioning operation control apparatus 30 may obtain the total electricity expenses incurred by the preliminary operation in this manner. The total electricity expenses incurred by the preliminary operation started at 7 AM are represented by the area S0 in
As has been described with reference to
After calculating the electricity expenses of each of the air-conditioning units 20a to 20c, the air-conditioning operation control apparatus 30 may calculate the preliminary operation start time and the load of each air-conditioning units 20 to minimize the electricity expenses incurred by the preliminary operation for each of the air-conditioning units 20a to 20c. Thus, the air-conditioning operation control apparatus 30 is capable of generating a different operation schedule for each of the air-conditioning units 20a to 20c to minimize the electricity expenses incurred by the preliminary operation. In this case, the preliminary operation start times of the air-conditioning units 20a to 20c may differ.
The other features and the operation of the second embodiment may be the same as those of the first embodiment. As a result, the second embodiment may have the same effect as the first embodiment.
In the third embodiment, the air-conditioning operation control apparatus 30 generates an operation schedule corresponding to each of the air-conditioning units 20a to 20c so that the electric power load peaks of the air-conditioning units 20a to 20c do not overlap.
First, the air-conditioning controller 1 obtains information needed to generate an operation schedule. For example, the air-conditioning controller 1 receives an electric power demand suppression request apart from the room usage start time, the electricity unit price information, the actual room temperature t10 of the room 10, and the set temperature is (S11).
Next, the air-conditioning operation control apparatus 30 sets the time interval tab between the preliminary operation start time of the air-conditioning unit 20a and the preliminary operation start time of the air-conditioning unit 20b, and the time interval tbc between the preliminary operation start time of the air-conditioning unit 20b and the preliminary operation start time of the air-conditioning unit 20c so that the total electric power demand does not exceed the upper limit of the electric power demand (S21). As a result, the electric power demand peaks at the preliminary operation start time of the air-conditioning units 20a to 20c do not coincide as shown in
Furthermore, the air-conditioning operation control apparatus 30 shifts, in various manners, the preliminary operation start times of the air-conditioning units 20a to 20c with the time interval tab between the preliminary operation start times of the air-conditioning units 20a and 20b and the time interval tbc between the preliminary operation start times of the air-conditioning units 20b and 20c being maintained, and determines the preliminary operation start time for each of the air-conditioning units 20a to 20c in order to minimize the electricity expenses incurred by the preliminary operation (S31). As a result, the air-conditioning operation control apparatus 30 is able to generate operation schedules corresponding to the respective air-conditioning units 20a to 20c.
Thus, if an electric power demand suppression request is transmitted from the electric power company, the air-conditioning operation control apparatus 30 according to the third embodiment appropriately deals with the electric power demand suppression request and generates an operation schedule to minimize the electricity expenses incurred by the preliminary operation without loss of comfort.
The air-conditioning operation control apparatus 30 is shared by the buildings B1 to B3, and controlled by, for example, an energy supply-demand management company. The other features of the air-conditioning operation control apparatus 30 are the same as the corresponding ones of the air-conditioning operation control apparatus 30 according to the first embodiment.
The air-conditioning operation control apparatus 30 according to the fourth embodiment generates an operation schedule to minimize the electricity expenses incurred by the preliminary operation of the air-conditioning units of the buildings B1 to B3 based on the amount of energy consumed in the preliminary operation of the air-conditioning units of the buildings B1 to B3 and the electricity unit price information. In this case, replacing the air-conditioning units 20a to 20c according to the second embodiment with the buildings B1 to B3, the air-conditioning operation control apparatus 30 may generate an operation schedule for the buildings B1 to B3. Thus, with respect to the preliminary operation for the buildings B1 to B3, the fourth embodiment has the same effect as the effect obtained in the second embodiment.
When an electric power demand suppression request is sent from the electric power company, the air-conditioning operation control apparatus 30 may generate an operation schedule for the buildings B1 to B3, which appropriately deals with the electric power demand suppression request, by replacing the air-conditioning units 20a to 20c in the third embodiment with the buildings B1 to B3. Thus, with respect to the preliminary operation for the buildings B1 to B3, the fourth embodiment has the same effect as the effect obtained in the third embodiment.
The fourth embodiment enables electric power consumers to use electric power at relatively low prices. Furthermore, peaks of electricity consumed by the electric power consumers may be shifted, which may reduce the electric power demand peaks. As a result of the reduction of electric power demand peaks, the electric power companies may decrease the investments in facilities.
At least part of an operation control method using the air-conditioning controller 1 according to this embodiment may be carried out by hardware resources, or software resources. In the case of software resources, a program for carrying out at least part of the functions of the data processing method may be stored in a recording medium such as a flexible disk or CD-ROM, and read by a computer to be executed. The recording medium is not limited to a detachable one such as a magnetic disk or an optical disk, but may be a fixed type recording medium such as a hard disk drive or a memory. Furthermore, a program for carrying out at least part of the functions of the data processing method may be distributed over communication lines (including wireless communications) such as the Internet. The program may be encrypted, modulated, or compressed, and distributed via wired or wireless communication lines such as the Internet, or as a recorded medium.
While certain embodiments have been described, these embodiments have been presented by way of example only, and are not intended to limit the scope of the inventions. Indeed, the novel methods and systems described herein may be embodied in a variety of other forms; furthermore, various omissions, substitutions and changes in the form of the methods and systems described herein may be made without departing from the spirit of the inventions. The accompanying claims and their equivalents are intended to cover such forms or modifications as would fall within the scope and spirit of the inventions.
Number | Date | Country | Kind |
---|---|---|---|
2014-168346 | Aug 2014 | JP | national |
This application is based upon and claims the benefit of priority from the prior Japanese Patent Application No. 2014-168346, filed on Aug. 21, 2014 and PCT Application No. PCT/JP2015/072972, filed on Aug. 14, 2015 and the entire contents of which are incorporated herein by reference.
Number | Date | Country | |
---|---|---|---|
Parent | PCT/JP2015/072972 | Aug 2015 | US |
Child | 15435477 | US |