The present invention relates an air conditioning system.
For example, there is a proposed air conditioning system that predicts or senses abnormality of an air conditioner by performing a test run on the air conditioner in the time of year (hereinafter, referred to as an intermediate period), such as in spring or autumn, in which an operation of the air conditioner is not frequently performed. In this air conditioning system, it is possible to perform a maintenance work in advance by predicting or sensing abnormality of the air conditioner in the intermediate period, so that it is possible to avoid a situation in which an air conditioning operation is not able to be performed due to the maintenance work in an operating season in which the air conditioning operation is frequently performed.
Patent Literature 1: Japanese Laid-open Patent Publication No. 2011-89751
However, in the conventional air conditioning system, if a test run is performed all at once on all of the air conditioners that are installed in an area handled by a maintenance worker in a certain period included in the intermediate period, such as in the same period in, for example, May, it is conceivable that the maintenance works may be concentrated in a certain period in the case where abnormality of some air conditioners has been sensed. As a result, a work load applied on the maintenance worker side is increased.
Accordingly, the present invention has been conceived in light of the circumstances described above and an object thereof is to provide an air conditioning system that is able to distribute and reduce the work load applied to the maintenance worker exerted in the intermediate period by performing the test run of each of the air conditioners in a distributed manner.
According to an aspect of an embodiment, an air conditioning system includes a plurality of air conditioners, a server and a terminal. The server is connected to each of the air conditioners via a communication network and stores device information on each of the air conditioners. The terminal is connected to each of the air conditioners via the server. The server includes a classification unit and a notification unit. The classification unit classifies the plurality of air conditioners into a plurality of groups based on the device information. The notification unit notifies the terminals of information related to a test run of each of the air conditioners that are classified into the groups.
As an aspect of an embodiment, it is possible to reduce the work load applied to the maintenance worker exerted in, for example, an intermediate period by performing a test run in a distributed manner.
Preferred embodiments of an air conditioning system disclosed in the present invention will be explained in detail with reference to accompanying drawings. Furthermore, the disclosed technology is not limited to the embodiments. Furthermore, the embodiments described below may also be appropriately modified as long as the embodiments do not conflict with each other.
The adapter 13 includes a first communication unit 13A, a second communication unit 13B, a storage unit 13C, and a control unit 13D. The first communication unit 13A is a communication interface (IF), such as a universal asynchronous receiver transmitter (UART), that performs a communication connection between the adapter 13 and the control unit 12C included in the indoor unit 12. The second communication unit 13B is an interface (IF) for connecting the adapter 13 and the communication network 5 in communication. The control unit 13D controls the indoor unit 12 by using Artificial Intelligence (AI). The adapter 13 is arranged in each of the indoor units 12. The storage unit 13C includes an operation history memory 131C, a failure estimation model 132C, and a refrigerant estimation model 133C.
The operation history memory 131C periodically collects various kinds of operation state data that are collected from the main body 11A included in the outdoor unit 11 and the main body 12A included in the indoor unit 12 by using the first communication unit 13A, and stores the collected operation state data. The second communication unit 13B sends operation state data that is being stored in the operation history memory 131C to the server 3. Furthermore, as will be described later, the server 3 uses the operation state data on the air conditioner 2 as teacher data, and generates a refrigerant estimation model and a failure estimation model on the basis of the teacher data. In addition, the server 3 sends the generated refrigerant estimation model and the failure estimation model to the adapter 13 via the communication network 5. The adapter 13 receives the refrigerant estimation model 133C and the failure estimation model 132C from the server 3 by using the second communication unit 13B, and stores the received refrigerant estimation model 133C and the failure estimation model 132C in the storage unit 13C.
The failure estimation model 132C predicts or senses, that is, estimates a failure occurred in each of the main body 11A included in the outdoor unit 11 and the main body 12A included in the indoor unit 12 by inputting some of the operation state data collected from the main body 11A included in the outdoor unit 11 and the main body 12A included in the indoor unit 12. The failure estimation model 132C estimates a failure of the air conditioner 2 including, for example, a stain of the outdoor heat exchanger, a lock of the expansion valve, abnormality related to degradation of the compressor, or the like.
The refrigerant estimation model 133C estimates an amount of refrigerant that is currently remaining in a refrigerant circuit that is not illustrated and that is provided in each of the main body 11A included in the outdoor unit 11 and the main body 12A included in the indoor unit 12 by inputting some of the operation state data collected from the main body 11A included in the outdoor unit 11 and the main body 12A included in the indoor unit 12. For example, the refrigerant estimation model 133C estimates the amount of refrigerant that is currently remaining in the refrigerant circuit by using at least a rotation rate of the compressor, temperature of the refrigerant discharged from the compressor, temperature of the heat exchanger, the degree of opening of the expansion valve, and temperature of outside air included in the operation state data that indicates the operation state at the time of operation. As a result, the refrigerant estimation model 133C estimates abnormality caused by an insufficient amount of refrigerant.
The control unit 35 includes a generation unit 35A, a classification unit 35B, a notification unit 35C, and a management unit 35D. The generation unit 35A generates a failure estimation model and a refrigerant estimation model by using the operation state data received from each of the air conditioners 2 as teacher data. The classification unit 35B classifies, on the basis of the device information included in the device management table 341, the plurality of air conditioners 2 that are managed by the server 3 into a plurality of groups in accordance with a predetermined rule that will be described later. The notification unit 35C attempts to request a test run by shifting a period of the test run in an intermediate period for each group and notifies the smartphone terminals 4 carried by the users of the air conditioners 2 included in the associated groups of information that is related to the test run to be performed on each of the air conditioners 2 included in the associated groups and that corresponds to a test run request. Furthermore, the test run request is a notification that requests each of the air conditioners 2 to perform the test run. The management unit 35D manages the device management table 341, the test run management table 342, and the maintenance management table 343.
The maintenance reservation screen 43C is a screen that is used for the customer to input the maintenance reservation content of the air conditioner 2. The maintenance reservation screen 43C includes a name entry field 431C, a postal code entry field 432C, an address entry field 433C, an email address entry field 434C, a telephone number entry field 435C, and a desired date and time entry field 436C. Furthermore, the maintenance reservation screen 43C includes a check button 437C, a cancel button 438C, and a device model name 439C. The name entry field 431C is a field for inputting a user name of the air conditioner 2 that is targeted for the maintenance. The postal code entry field 432C is a field for inputting a postal code used for identifying the region of the arrangement place of the air conditioner 2 targeted for the maintenance. The address entry field 433C is a field for inputting the address of the arrangement place of the air conditioner 2 targeted for the maintenance. The email address entry field 434C is a field for inputting the email address that is the contact details of the user of the air conditioner 2 targeted for the maintenance. The telephone number entry field 435C is a field for inputting the telephone number that is the contact detail of the user of the air conditioner 2 targeted for the maintenance. The desired date and time entry field 436C is a field for inputting the desired date and time of the maintenance work to be performed on the air conditioner 2 targeted for the maintenance. The device model name 439C is information for identifying the device model of the air conditioner 2 targeted for the maintenance. If the smartphone terminal 4 detects the check button 437C displayed on the maintenance reservation screen 43C, the smartphone terminal 4 sends the maintenance content to the server 3 and deletes the maintenance reservation screen 43C. If the smartphone terminal 4 detects a cancel button 438C displayed on the maintenance reservation screen 43C, the smartphone terminal 4 deletes the maintenance reservation screen 43C.
In the following, an operation of the air conditioning system 1 according to the present embodiment will be described.
In the case where the smartphone terminal 4 receives the test run request, the smartphone terminal 4 displays the test run request screen 43A illustrated in
In the case where the server 3 receives the test run result from the air conditioner 2 and the received content indicates an estimation of abnormality of the air conditioner 2, the server 3 notifies the smartphone terminal 4 of a maintenance recommendation (Step S4). In the case where the smartphone terminal 4 receives the maintenance recommendation from the server 3, the smartphone terminal 4 displays the maintenance recommendation screen 43B illustrated in
The smartphone terminal 4 sends the maintenance reservation request to the server 3 in accordance with the maintenance reservation operation displayed on the maintenance reservation screen 43C (Step S5). In the case where the server 3 receives the maintenance reservation request from the smartphone terminal 4, the server 3 notifies the maintenance worker 6 of a desire for the maintenance in accordance with the maintenance reservation content (Step S6) Furthermore, the desire for the maintenance is generated as a result of a request for the test run only on the smartphone terminals 4 associated with the air conditioners 2 that have been grouped in accordance with the predetermined rule at the predetermined timing as described above, so that it is possible to distribute concentration of the maintenance recommendations received in the same period included in the intermediate period, that is, it is possible to distribute the desires for the maintenance received on the basis of the test run results by distributing the period in which the test run is performed on each of the air conditioners 2. Then, the maintenance worker 6 performs the maintenance work on the air conditioner 2 that is targeted for the maintenance (Step S7).
When a test run is requested to each of the air conditioners 2, for example, the test run of the 30000 air conditioners 2 in the region handled by a certain service base location is started all at once, the test run result indicating that maintenance of the 200 air conditioner 2 is needed is obtained, and it is assumed that the number of the air conditioners 2 that are able to receive a maintenance service from the maintenance worker 6 per day is 100. In this case, the maintenance worker 6 needs two days in this region because the number of air conditioners 2 subjected to the maintenance work performed by the maintenance worker 6 is 200.
In the air conditioning system 1 according to the present embodiment, on the basis of the assumption result described above, the predetermined timing included in the intermediate period is set to five times a day, and the predetermined rule is set such that the 6000 air conditioners 2 are grouped as a single group from among the 30000 air conditioners 2 included in the same region. In this case, the server 3 sends a test run request to the smartphone terminals 4 carried by the users of the 6000 air conditioners 2 per day in the same region, and sends a request for the test run to the smartphone terminals 4 of the users of all of the air conditioners 2 included in the same region in five days. As a result, the number of maintenance recommendations obtained as a result of the test run results per day is reduced, in other words, the number of maintenance recommendations is accordingly distributed to five days. Then, by distributing the period of the test run of the air conditioners 2 included in the region, the number of desires for the maintenance (maintenance reservations) obtained as a result of the test run result is distributed. As a result of the number of desires for the maintenance (maintenance reservations) being distributed, the work performed by the maintenance worker 6 is distributed and it is thus possible to reduce the work load applied to the maintenance worker 6.
The control unit 45 determines whether or not the control unit 45 has detected the test run start operation (button operation of the button 432A) on the test run request screen 43A (Step S13). If the control unit 45 has detected the test run start operation (Yes at Step S13), the control unit 45 performs the test run of the air conditioner 2 and ends the processing operation illustrated in
If the control unit 45 has not detected the test run start operation (No at Step S13), the control unit 45 determines whether or not the control unit 45 has detected a test run unnecessary operation (button operation of the button 433A) (Step S14). If the control unit 45 has detected the test run unnecessary operation (Yes at Step S14), the control unit 45 ends the processing operation illustrated in
If the control unit 45 has not received the test run request (No at Step S11), the control unit 45 ends the processing operation illustrated in
The control unit 45 determines whether or not the control unit 45 has detected a maintenance recommendation start operation (button operation of the button 434B) displayed on the maintenance recommendation screen 43B (Step S23). If the control unit 45 has detected the maintenance recommendation start operation (Yes at Step S23), the control unit 45 causes the display unit 43 to display the maintenance reservation screen 43C (Step S24). As a result, the user of the smartphone terminal 4 is able to recognize the input content of the maintenance reservation for the air conditioner 2 by looking at the maintenance reservation screen 43C. The control unit 45 determines whether or not the control unit 45 has detected a maintenance reservation start operation (button operation of the check button 437C) displayed on the maintenance reservation screen 43C (Step S25).
If the control unit 45 has detected the maintenance reservation start operation displayed on the maintenance reservation screen 43C (Yes at Step S25), the control unit 45 sends the maintenance reservation request to the server 3 (Step S26), and ends the processing operation illustrated in
If the control unit 45 has not detected the maintenance recommendation start operation (No at Step S23), the control unit 45 determines whether or not the control unit 45 has detected a maintenance recommendation unnecessary operation (button operation of the button 435B) (Step S27). If the control unit 45 has detected the maintenance recommendation unnecessary operation (Yes at Step S27), the control unit 45 deletes the maintenance recommendation screen 43B (Step S28), and ends the processing operation illustrated in
If the control unit 45 has not detected the maintenance recommendation unnecessary operation (No at Step S27), the control unit 45 proceeds to Step S23 in order to determine whether or not the control unit 45 has detected the maintenance recommendation start operation.
Furthermore, if the control unit 45 has not detected the maintenance reservation start operation (No at Step S25), the control unit 45 determines whether or not the control unit 45 has detected a maintenance reservation unnecessary operation (button operation of the cancel button 438C) (Step S29). If the control unit 45 has detected the maintenance reservation unnecessary operation (Yes at Step S29), the control unit 45 deletes the maintenance reservation screen 43C (Step S30), and ends the processing operation illustrated in
The control unit 35 refers to the device management table 341, and specifies the terminal IDs that are associated with the assigned air conditioner IDs (Step S33). The control unit 35 sends the test run request to each of the smartphone terminals 4 based on the specified terminal IDs (Step S34). As a result, the server 3 sends a request for the test run only to the smartphone terminals 4 that are included in the air conditioner 2 and that are associated with the air conditioner IDs assigned on the basis of the predetermined rule at the predetermined timing. The control unit 35 sets the test run request completion flag 342C associated with each of the terminal IDs of the smartphone terminals 4, to which the test run request has already been sent, to “1”, and updates the content of the test run management table 342 (Step S35). The server 3 is able to recognize the air conditioner ID in which the test run request has been made and the terminal ID by referring to the test run request completion flag 342C included in the test run management table 342.
In addition, after the control unit 35 has updated the test run request completion flag 342C to “1”, the control unit 35 determines whether or not an unassigned air conditioner ID is present (Step S36). If an unassigned air conditioner ID is present (Yes Step S36), the control unit 35 proceeds to Step S31 in order to determine whether or not the control unit 35 has detected the predetermined timing. In other words, the server 3 is able to assign the unassigned air conditioner ID suitable for the predetermined rule at each predetermined timing. If an unassigned air conditioner ID is not present (No at Step S36), the control unit 35 ends the processing operation illustrated in
The control unit 35 refers to the test run management table 342, specifies the terminal ID associated with the extracted air conditioner ID (Step S43), sends the maintenance recommendation to the smartphone terminal 4 on the basis of the specified terminal ID (Step S44), and ends the processing operation illustrated in
The control unit 35 registers, in the maintenance management table 343, the maintenance work date and time, the maintenance content, the customer information, the terminal ID, and the air conditioner ID that are included in the reservation information (Step S53). The server 3 is able to check the reservation information on each of the maintenance IDs by referring to the maintenance management table 343. The control unit 35 selects the maintenance worker 6 that is associated with the maintenance content (Step S54), notifies the maintenance worker 6 of the maintenance content (Step S55), and ends the processing operation illustrated in
As described above, the server 3 according to the present embodiment divides the plurality of air conditioners 2 into the groups in accordance with the predetermined rule, and notifies the smartphone terminals 4 carried by the users of the air conditioners 2 included in the associated groups of the test run request to be performed on the air conditioners 2 included in the associated groups in order to request the test run by shifting, for each group, the period of the test run included in the intermediate period. As a result, it is possible to distribute the period in which the test run is to be performed on each of the air conditioners 2, so that it is possible to suppress concentration of the maintenance work in a certain period included in the intermediate period, and it is thus possible to reduce the work load applied to the maintenance worker 6. In addition, it is possible to avoid a situation in which the air conditioner 2 is not able to be operated caused by the maintenance work that is performed in an operation period of the air conditioner 2 as a result of the maintenance work being performed in the intermediate period.
If the smartphone terminal 4 has received the test run request, the smartphone terminal 4 requests the air conditioner 2 associated with the user of the smartphone terminal 4 to start the test run in accordance with a predetermined operation. Furthermore, the air conditioner 2 performs the test run in accordance with the request for a start of the test run, and, if the air conditioner 2 has detected the result of the test run indicating that maintenance of the air conditioner 2 is needed, the air conditioner 2 notifies the server 3 of the result of the test run. Then, if the server 3 receives the result of the test run from the air conditioner 2, the server 3 notifies the smartphone terminal 4 carried by the user of the air conditioner 2 of a recommendation for the maintenance of the air conditioner 2. As a result, the user of each of the smartphone terminals 4 is able to promptly receive the maintenance work as a result of obtaining the recommendation for the maintenance on the basis of the test run result of the test run of the air conditioner 2 performed by shifting the period of the test run, and is able to avoid the situation in which the air conditioner 2 is not able to be operated caused by the maintenance work that is performed in an operation period of the air conditioner 2.
If the smartphone terminal 4 has received the recommendation for the maintenance from the server 3, the smartphone terminal 4 notifies the server 3 of the information on a reservation for the maintenance work to be performed on the air conditioner 2 in accordance with a predetermined reservation operation. As a result, a customer is able to easily reserve the maintenance work.
In the case where air conditioner 2 estimates a failure of the air conditioner 2 by using the failure estimation model 132C in accordance with a start of the test run, the air conditioner 2 notifies the server 3 of the obtained estimation as the result of the test run. As a result, each of the air conditioners 2 is able to notify the server 3 of the result of the test run by using the failure estimation model 132C.
In the case where the air conditioner 2 uses the refrigerant estimation model 133C and estimates, in accordance with a start of the test run of the air conditioner 2, an insufficient amount of currently remaining refrigerant flowing inside the air conditioner, the air conditioner 2 notifies the server 3 of the obtained estimation as the result of the test run. As a result, each of the air conditioners 2 is able to notify the server 3 of the result of the test run by using the refrigerant estimation model 133C.
As the test run request process according to the present embodiment, a case has been described as an example in which an unassigned air conditioner ID is assigned in accordance with the predetermined rule illustrated in
The control unit 35 refers to the device management table 341, assigns unassigned air conditioner IDs included in the assigned region (Step S63). The control unit 35 refers to the device management table 341, and specifies the terminal IDs associated with the assigned air conditioner IDs (Step S64). The control unit 35 sends the test run request to each of the smartphone terminals 4 on the basis of the specified terminal IDs (Step S65). The control unit 35 sets the test run request completion flag 342C associated with each of the terminal IDs of the smartphone terminals 4, to which the test run request has already been sent, to “1”, and updates the content of the test run management table 342 (Step S66).
Furthermore, after having set the test run request completion flag 342C to “1”, the control unit 35 determines whether or not an unassigned region is present (Step S67). If the unassigned region is present (Yes at Step S67), the control unit 35 proceeds to Step S61 in order to determine whether or not the predetermined timing has been detected. If the unassigned region is not present (No at Step S67), the control unit 35 ends the processing operation illustrated in
The control unit 35 that performs the first test run request process assigns the region associated with the unassigned postal code from the plurality of postal codes as the predetermined rule for identifying the arrangement places of the air conditioners 2 at each predetermined timing, and assigns the unassigned air conditioner IDs included in the assigned region. Furthermore, the control unit 35 requests the smartphone terminals 4 carried by the users of the assigned air conditioners 2 to perform the test run on the basis of the terminal IDs of the assigned air conditioners 2. As a result, it is possible to distribute a maintenance reservation period as a result of distributing an acquisition period of the test run results by distributing the test run requests to be sent to the smartphone terminals 4 carried by the users of the air conditioners 2 in each of the assigned regions. As a result of the maintenance reservation period being distributed, the work of the maintenance worker 6 is accordingly distributed, and it is thus possible to reduce the work load applied to the maintenance worker 6. In addition, the test run requests have been distributed in units of regions, so that it is possible to reduce the work load applied to the maintenance worker 6 by decreasing a moving distance of the maintenance worker 6 at the time of maintenance work performed by the maintenance worker 6.
The control unit 35 refers to the device management table 341, and specifies the terminal IDs associated with the assigned air conditioner IDs (Step S73). The control unit 35 sends the test run requests to the smartphone terminals 4 based on the specified terminal IDs (Step S74). The control unit 35 sets the test run request completion flag 342C associated with each of the terminal IDs of the smartphone terminals 4, to which the test run request has been sent, to “1”, and updates the content of the test run management table 342 (Step S75).
Furthermore, after the control unit 35 has set the test run request completion flag 342C to “1”, the control unit 35 determines whether or not an unassigned air conditioner ID is present (Step S76). If an unassigned air conditioner ID is present (Yes at Step S76), the control unit 35 proceeds to Step S71 in order to determine whether or not the control unit 35 has detected the predetermined timing. If an unassigned air conditioner ID is not present (No at Step S76), the control unit 35 ends the processing operation illustrated in
The control unit 35 that performs the second test run request process assigns, as the predetermined rule, the same number of air conditioner IDs as the predetermined number of unassigned air conditioners from among the plurality of air conditioner IDs at each of the predetermined timings, and sends a request to each of the smartphone terminals 4 carried by the users of the assigned air conditioners 2 to perform the test run on the basis of the terminal IDs of the assigned air conditioners 2. As a result, a collection period of the test run results is distributed by distributing the test run requests to be sent to the smartphone terminals 4 carried by the users of the air conditioners 2 on the basis of the predetermined number of air conditioners, so that it is also possible to distribute a period of maintenance reservation. As a result of the period of maintenance reservation being distributed, an amount of work of the maintenance worker 6 is also distributed, and it is thus possible to distribute a work load applied to the maintenance worker 6. For example, it is possible to reduce the work load applied to the maintenance worker 6 by decreasing the number of maintenance work tasks by levelling the number of test runs of the air conditioners 2.
In addition, a case has been described as an example in which, as the predetermined rule, the same number of air conditioner IDs as the predetermined number of unassigned air conditioners are assigned from among the plurality of air conditioner IDs at each of the predetermined timings. However, as a predetermined rule that is different from the above described predetermined rule, it may be possible to assign a region, such as municipalities, that is used to identify the arrangement places of the air conditioners 2 at each predetermined timing, and assign the same number of air conditioner IDs as the predetermined number of unassigned air conditioners included in the assigned region.
The control unit 25 assigns the number of air conditioners associated with the unassigned device models (Step S83). The control unit 35 refers to the device management table 341, and assigns the same number of unassigned air conditioner IDs as the assigned number of air conditioners from among the air conditioner IDs associated with the unassigned device models (Step S84).
The control unit 35 refers to the device management table 341, and specifies the terminal IDs associated with the assigned air conditioner IDs (Step S85). The control unit 35 sends a test run request to each of the smartphone terminals 4 based on the specified terminal IDs (Step S86). The control unit 35 sets the test run request completion flag 342C associated with each of the terminal IDs of the smartphone terminals 4, to which the test run request has already been sent, to “1”, and updates the content of the test run management table 342 (Step S87).
Furthermore, after the control unit 35 has set the test run request completion flag 342C to “1”, the control unit 35 determines whether or not an unassigned air conditioner ID is present from among the unassigned air conditioner IDs associated with the assigned device models (Step S88). If an unassigned air conditioner ID is present (Yes at Step S88), the control unit 35 determines whether or not the control unit 35 has detected the predetermined timing (Step S89).
If the control unit 35 has detected the predetermined timing (Yes at Step S89), the control unit 35 proceeds to Step S83 in order to assign the number of assigned air conditioners associated with the assigned device model. Furthermore, if the control unit 35 has not detected the predetermined timing (No at Step S89), the control unit 35 proceeds to Step S89 in order to determine whether or not the control unit 35 has detected the predetermined timing.
If an unassigned air conditioner ID is not present from among the unassigned air conditioner IDs associated with the assigned device model (No at Step S88), the control unit 35 determines whether or not an unassigned device model is present (Step S90). If the unassigned device model is present (Yes at Step S90), the control unit 35 proceeds to Step S82 in order to assign the unassigned device model. Furthermore, if an unassigned device model is not present (No at Step S90), the control unit 35 ends the processing operation illustrated in
In addition, if the control unit 35 has not detected the predetermined timing (No at Step S81), the control unit 35 ends the processing operation illustrated in
The control unit 35 that performs the third test run request process assigns an unassigned device model from among the plurality of device models as the predetermined rule at each predetermined timing, and assigns the same number of unassigned air conditioner IDs as the predetermined number of air conditioners from among the unassigned air conditioner IDs associated with the assigned device model. Furthermore, the control unit 35 sends a request to the smartphone terminals 4 carried by the users of the assigned air conditioners 2 for the test run on the basis of the terminals ID of the assigned air conditioners 2. As a result, an acquisition period of the test run results is distributed by distributing the test run requests to be sent to the smartphone terminals 4 carried by the users of the air conditioners 2 for each of the predetermined number of air conditioners associated with the assigned device models, so that it is possible to distribute a period of the maintenance reservation. As a result of the period of the maintenance reservation being distributed, the work of the maintenance worker 6 is distributed and it is thus possible to reduce the work load applied to the maintenance worker 6. For example, by reducing the number of air conditioners that is targeted for the test run per day and that is associated with the device model in which a failure rate is high, it is possible to reduce the work load applied to the maintenance worker 6.
In addition, for convenience of description, a case has been described as an example in which the server 3 sends a request to the smartphone terminals 4 carried by the users of the air conditioners 2 for the test run, and generates the refrigerant estimation model or the failure estimation model for each of the air conditioners 2 on the basis of the operation state data collected by the air conditioner 2. However, it may be possible to perform the function for generating the refrigerant estimation model or the failure estimation model by using another server, and modifications are possible as needed.
Furthermore, a case has been described as an example in which the server 3 notifies the smartphone terminal 4 of a recommendation for maintenance of the air conditioner 2 in the case where the server 3 estimates a failure of the air conditioner 2. However, the example is not limited to the case where the server 3 estimates the failure of the air conditioner 2. The server 3 may also notify the smartphone terminal 4 of the recommendation of the maintenance air conditioner 2 even in a case in which, for example, the failure rate of the air conditioner 2 is equal to or larger than a predetermined threshold, a frequency of the maintenance work of the air conditioner 2 is equal to or larger than a predetermined number of times, or accumulated operation time of the air conditioner 2 is equal to or larger than a predetermined period of time. In addition, the server 3 may also notify the smartphone terminal 4 of the recommendation of the maintenance air conditioner 2 even in a case in which the commodity product release date of the air conditioner 2 is after an elapse of a predetermined period of time, or a commodity product guarantee period of the air conditioner 2 is after an elapse of a predetermined period of time.
In addition, a case has been described as an example in which the air conditioner 2 estimates a failure of the air conditioner 2 by using the failure estimation model 132C and the refrigerant estimation model 133C. However, the control unit 13D included in the air conditioner 2 may detect a failure of, for example, a bad power supply of the air conditioner 2, a malfunction of the remote controller, unavailability of a cooling operation, unavailability of a heating operation, a malfunction of a vent deflector, abnormality of discharge temperature, or the like in accordance with a start of the test run by way of various sensors included in the air conditioner 2.
A case has been described as an example in which the air conditioner 2 performs a test run in the case where the air conditioner 2 has detected the test run start operation that is output from the smartphone terminal 4. Instead of this, in the case where the air conditioner 2 detects a person in an air-conditioned space by a human detection sensor (not illustrated) included in the indoor unit 12 when the air conditioner 2 has detected the test run start operation, the air conditioner 2 may hold the operation of the test run and perform the test run after the person is not detected in the air-conditioned space. In addition, after having obtained an approval in advance from the user of the air conditioner 2, the air conditioner 2 may perform the test run in the case where an operation of the test run is requested from the server 3 to the air conditioner 2 even if the air conditioner 2 does not detect the test run operation that is output from the smartphone terminal 4.
In addition, a case has been described as an example in which the air conditioner 2 performs the test run in the case where the air conditioner 2 has detected the test run start operation that is output from the smartphone terminal 4. However, the example is not limited to the test run start operation that is output from the smartphone terminal 4. The user may perform the test run start operation by using the remote controller 14 or the like of the air conditioner 2 by looking at the display screen indicating the information related to the test run with respect to the smartphone terminal 4, and modifications are possible as needed.
Furthermore, the components of each unit illustrated in the drawings are not always physically configured as illustrated in the drawings. In other words, the specific shape of a separate or integrated device is not limited to the drawings. Specifically, all or part of the device can be configured by functionally or physically separating or integrating any of the units depending on various loads or use conditions.
Furthermore, all or any part of various processing functions performed by each unit may also be executed by a central processing unit (CPU) (or a microcomputer, such as a micro processing unit (MPU), a micro controller unit (MCU), or the like). Furthermore, all or any part of various processing functions may also be, of course, executed by programs analyzed and executed by the CPU (or the microcomputer, such as the MPU or the MCU), or executed by hardware by wired logic.
Number | Date | Country | Kind |
---|---|---|---|
2020-179169 | Oct 2020 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2021/038643 | 10/19/2021 | WO |