This application is a 371 of International Application No. PCT/IB2020/054159, filed Mar. 1, 2020, the entirety of which is incorporated herein by reference.
Unconsolidated sand may be found underground in certain formations. Such sand formations may have particular qualities, such as a high level of purity with silica content about 99% or more, which may be used in a wide variety of applications. The formations are generally found under layers of other types of rock. Accordingly, the removal of the sand may be carried out by mining for the sand and excavating the sand. For example, an open-pit mining technique may be used to remove the upper layer of rock so that the sand underneath may be recovered. The sand recovered may be used in a wide variety of applications. For example, the sand may be used as frac sand in the oil and gas industry for hydraulic fracturing to release oil and gas in a reservoir. Other uses for sand may include use for sand blasting, scouring cleansers, grinding media, grit for sanding and sawing, glass making, fiber optics manufacturing, foundry sand, silica metals, photovoltaic cells, and other applications.
Reference will now be made, by way of example only, to the accompanying drawings in which:
As used herein, any usage of terms that suggest an absolute orientation (e.g. “top”, “bottom”, “up”, “down”, “left”, “right”, etc.) may be for illustrative convenience and refer to the orientation shown in a particular figure. However, such terms are not to be construed in a limiting sense as it is contemplated that various components will, in practice, be utilized in orientations that are the same as, or different than those described or shown.
Sand from sources such as glacial deposits as well as most beach and riverbank sand is low purity and may include impurities and sharp angles that may make it not suitable for some uses, such as hydraulic fracturing. Therefore, to obtain sand or other unconsolidated materials having target properties for specific applications may involve searching for such materials in limited locations. For example, high purity sand with a high proportion of silica may be typically mined from sandstone formations located near the surface at some locations where such deposits exist. These sandstone formations may be accessed by removing top layers such as topsoil and rock layers to expose a sandstone formation. These examples of sandstone formations may be typically a hard formation which may be blasted apart with explosives and collected and crushed to a suitable size for use.
In some rock formations, sand having a specific property may be found in sandstone formations that are unconsolidated and deep underground in water reservoirs or aquifers. The reservoirs may be about 200 feet below the surface, about 325 feet, about 650 feet, or even deeper, which poses challenges to removing the sand. The sand may be excavated by removing the material above the reservoir; however, such an excavation is a significant undertaking requiring several different types of machinery to remove the material. In addition, exposing an aquifer by removing layers above is environmentally dangerous and involve significant costs to contain the water that will be released once the aquifer is exposed. Furthermore, the material removed from above the reservoir is to be transported away from the site. Overall, a large amount of equipment and energy is used to move the material above the reservoir away so that the sand may be brought to the surface. Therefore, using conventional sand mining techniques may become prohibitively expensive when the sand is located at such a distance from the surface.
An apparatus to remove sand from an unconsolidated underground sandstone formation in a water reservoir is provided. The apparatus includes a conduit and a gas injection line to generate an area of low pressure near the interface with the sandstone formation to draw in unconsolidated sand to bring to the surface. The sand is brought to the surface in the form of a slurry with grains of sand and water.
Referring to
The conduit 55 is to engage a sandstone formation at a lower end of the well. The conduit 55 is not particularly limited and may be constructed from one of several different structures, shapes, and materials. In the present example, the conduit 55 is a steel conduit with a circular cross section having diameter of about eight inches. In other examples, alternative materials such as cast iron, copper, wrought iron, or galvanized metals, or plastics like polyvinyl chloride, acrylonitrile-butadiene-styrene, and/or polyethylene may be used In other examples, the conduit 55 may also have a different cross section or a varying cross sectional area along the length of the conduit from the sandstone formation to surface. Furthermore, the conduit 55 may include curves or changes in directions in applications where the well is not a vertical straight well. For example, the well may include horizontal portions or the conduit 55 may extend at an angle in the underground reservoir as a void is formed from the removal of sand to remove sand from the sides of the void.
The length of the conduit 55 is not particularly limited. In the present example, the conduit 55 may extend about 200 feet from the surface to the top of the sandstone formation. In other examples, the lower end of the conduit 55 may be positioned deeper to about 500 feet, about 715 feet, or even deeper to about 2000 feet in some applications. The conduit 55 may also be extendible in some examples during the extraction. For example, the conduit 55 may be moved while sand is extracted and flowing therethrough. The manner by which the conduit 55 is moved is not particularly limited and the range of movement may be limited by the position of the collection port 65. In particular, it is to be appreciated that if the collection port 65 is to remain above the surface as in the present example, a lower limit of movement is set by this restriction. The upper limit of movement may be restricted by the ability to provide support to the portion of the conduit 55 above the surface either by the strength of the conduit itself or with additional support structures on the surface to avoid collapse. In the present example, the range of motion of the conduit 55 is about 20 feet. In other examples, the range of motion may be up to about 50 feet or more. Once the limits of movement are reached, as the overall length of the conduit 55 may be extended or retracted by adding or removing sections, respectively.
The gas injection line 60 is to inject gas from the surface to an injection point proximate to the lower end of the conduit 55. The gas injected via the gas injection line 60 is not limited. In the present example, a compressor (not shown) at the surface may be used to inject air with a positive pressure and high volume flow rate, such as at a pressure within the range of about 30 psi to 90 psi with a flow rate of about 300 cubic feet per minute to about 600 cubic feet per minute. In other examples, a gas source, such as from a gas cylinder or a storage tank may provide the gas injection via a pressure regulator. In such examples, the gas injected at the injection point may include other types of gas, such as an inert gas.
It is to be appreciated by a person of skill in the art with the benefit of this description that by injecting gas that is eventually to flow upward in the conduit 55, a low pressure region will be formed at the lower end of the conduit 55 to draw a sand slurry from the sandstone formation into the conduit 55. The gas injection line 60 may inject gas at varying pressures and flow rates to maintain the low pressure region as a sand slurry is continuously extracted. Furthermore, in some examples, the gas injection line 60 may be used to further inject gas beyond the conduit 55 to generate a pressure vibration or pulsed air to agitate the sand in the sandstone formation from time to time.
The collection port 65 is disposed near the upper end of the conduit 55 generally above the surface. The sand slurry extracted via the conduit 55 is to be removed from the apparatus via the collection port 65. In the present example, the sand slurry may be forced out of a hole and discharged into a container or vehicle collecting the sand slurry and air. In some examples, the collection port 65 may be connected to downstream processing equipment via additional piping (not shown). In other examples, the sand slurry may be collected in a hopper or other container (not shown) and subsequently removed via the collection port 65.
The collection port 65 is not particularly limited. In the present example, the collection port 65 is perpendicular to the conduit 55 and ejects the sand slurry in a horizontal direction to be subsequently collected. In other examples, the collection port 65 may be oriented to eject the sand slurry in a different direction. In further examples, the collection port 65 may also be at the end of the conduit 55, such that the sand slurry is ejected in an upward direction or directed by an elbow in the conduit 55.
Referring to
Referring to
Block 310 involves lowering the conduit 55, which may be a steel pipe into a sandstone formation 110. In the present example, the conduit 55 is lowered into the well 100 drilled through a shale layer 120 into the sandstone formation 110, which may be aquifer with sand. It is to be appreciated that the well 100 is not particularly limited and may vary in depth. Furthermore, the well 100 may be a newly drilled well for the purpose of sand extraction or in other cases, the well 100 may be an old well that is repurposed for sand extraction. The manner by which the conduit 55 is lowered is not particularly limited. For example, the conduit 55 may include a plurality of sections of steel pipe where additional sections may be inserted above or near the surface to extend the conduit 55 into the sandstone formation 110. The depth into which the conduit 55 is inserted into the sandstone formation 110 is not particularly limited. In the present example, the conduit may be inserted about 20 feet into the sandstone formation 110.
Similar to the conduit 55, the gas injection line 60 is lowered into the well 100. The manner by which the conduit 55 is lowered is not particularly limited. In the present example, the relative position of the gas injection line 60 to the conduit 55 may be independently controlled. For example, the gas injection line 60 may be raised and lowered relative to the lower end of the conduit 55 to control or vary a low pressure region generated near the lower end of the conduit 55. It is to be appreciated by a person of skill in the art with the benefit of this description that the position of the gas injection line 60 is not limited and may be below the lower end of the conduit 55. In such an example, the sand near the lower end of the conduit 55 may be able to form a sufficient seal around the conduit 55 to allow gas from the gas injection line 60 to continue lifting material up through the conduit 55. By varying the low pressure region 200, the flow of sand slurry extracted from the sandstone formation 110 may be adjusted to achieve a stable rate to facilitate collection procedures. Furthermore, the gas injection line 60 may include a plurality of sections of tubing where additional sections may be inserted above or near the surface to extend the gas injection line 60 as the conduit 55 extending down the well 100 and into the sandstone formation 110.
Next, block 330 involves injecting air from the surface into the conduit 55 proximate to the lower end. The manner by which the air is injected is not limited. In the present example, the gas injection line 60 enters the conduit 55 at the upper end and extends along the length of the conduit to the lower end. The gas injection line 60 may be connected to a pump delivering air at a rate of about 300 cubic feet per minute at in the range of about 30 psi to about 90 psi. The air is delivered to a region proximate to the lower end of the conduit 55. Although the present example illustrates the gas injection line 60 to be at approximately the center of the conduit 55, variations are possible. For example, the gas injection line 60 may be a separate tube or pipe external to the conduit 55. Accordingly, the gas injection line 60 may inject gas into the conduit 55 close to the lower end.
As the air enters the lower end of the conduit 55 via the gas injection line 60, the air rises back to the water level 130 where it rejoins with atmosphere. The movement of the air toward the surface caused by the injection of the air via the gas injection line 60 generates a low pressure region 200. The low pressure region 200 is not particularly limited. For example, the pressure differential between the low pressure region 200 and the aquifer may be about 20 psi to about 40 psi. The pressure differential draws a sand slurry into the conduit 55 from the sandstone formation 110. The sand slurry is then lifted up the length of the conduit 55 with the air injected from the gas injection line 60. It is to be appreciated by a person of skill with the benefit of this description that as material is lifted to the surface, the pressure at the low pressure region 200 is further decreased. Accordingly, the pressure differential between the low pressure region 200 and the pressure in the aquifer is increased, which in turn improves the drawing of sand into the conduit 55.
The injection of air into the conduit 55 may be adjusted during the extraction process to maintain the flow of the sand slurry through the conduit 55 to the collection port 65. For example, the initial air pressure at which air is injected via the gas injection line 60 may be kept below the pressure of the sandstone formation 110. Once a flow of the sand slurry from the sandstone formation 110 is established, the injection point of the air may be adjusted by moving the gas injection line 60 relative to the conduit 55 in some examples. It is to be appreciated that by adjusting the injection point relative to the conduit 55, the flow of the sand slurry to the surface may be maintained as the sand and water interface moves during operation. In further examples, the pressure of the air injected via the gas injection line 60 as well as the volume of air injected may be adjusted to increase the pumping and lifting efficiency of the sand slurry through the conduit 55.
The movement of the sand slurry may be created by the pressure differential at the entrance to lower end of the conduit 55 as a low pressure region 200 is created and the higher pressure in the sandstone formation 110 around the bottom of the conduit 55 pushes water and sand into the conduit 55. Above the introduction point of air in the conduit 55 via the gas injection line 60, the pressure is higher but neutral to the formation due to hydrostatic head 125 in the surrounding wellbore. Once the sand slurry in the conduit 55 moves up past the static water level 130, fluid flow generates a conservation of momentum effect as the sand slurry is discharged from the collection port 65.
In some examples, as sand is removed from the sandstone formation 110, the lower end of the conduit 55 may be lowered further into the sandstone formation 110 so the bottom suction of the lower end of the conduit 55 follows the sand/water interface in the sandstone formation 110 as material is removed to the surface. Accordingly, this may allow for continued extraction of sand as voids are formed during the extraction process.
Block 330 comprises collecting the sand slurry exiting the conduit 55 via the collection port 65 at an upper end above surface. The manner by which the sand slurry is collected is not particularly limited. For example, the sand slurry may be ejected from the collection port into a hopper or dump truck for transportation. In other examples, the sand slurry may be transferred to downstream equipment for additional processing, such as a sump tank.
Referring to
In the present example, the conduit 55a, the gas injection line 60a, and the collection port 65a are substantially similar to the conduit 55, the gas injection line 60, and the collection port 65, respectively. In particular, the conduit 55a is to engage a sandstone formation 110 near a lower end of the well 100. The gas injection line 60a is to inject gas inside the conduit 55a proximate to the lower end of the conduit. The collection port 65a is used to remove the sand slurry to be removed from the conduit 55a.
In the present example, the apparatus 50a further includes a perforated wall 75a at the lower end of the conduit 55a. The perforated wall 75a is to increase the surface area between the low pressure region 200 and the sandstone formation 110. It is to be appreciated by a person of skill in the art with the benefit of this description, that by increasing the surface area during the initial phase of extracting sand from the sandstone formation, additional sand will be drawn into the conduit to the collection port 65a to provide the conservation of momentum effect. In examples where the perforated wall 75a is continuously lowered into the sand, the benefits of the increased surface area may continue for the duration of the extraction process as long as the perforated wall remains below the sand/water interface.
The cover 80a is disposed at an upper end of the conduit to provide a seal. It is to be appreciated by a person of skill with the benefit of this description that the cover 80a is not particularly limited and is to direct the flow of the sand slurry to the collection port 65a. Accordingly, the material from which the cover 80a is constructed is not limited. In the present example, the cover 80a is a made from steel with a flexible membrane seal to seal the upper end of the conduit 55a. In other examples, the cover 80a may be constructed of other metals, rubber, cork, or a plastic (e.g. polyvinyl chloride or similar material). The cover 80a is to be secured at the upper end of the conduit 55a with sufficient strength to withstand the pressure forces from the impact of the sand slurry moving at high velocity toward the upper end of the conduit. The manner by which the cover 80a is secured is not limited and may involve using a fastener such as a clamp or screw. In other examples, the cover 80a may be affixed with a sealant such as epoxy. In further examples, the cover 80a may also be friction fitted to an opening of the conduit 55a.
In the present example, the cover 80a includes an opening for the gas injection line 60a to pass through. In the present example where the cover 80a is formed from a rubber material, the opening may be slightly smaller than the outside diameter of the gas injection line 60a such that the cover 80a forms an airtight seal at the upper end of the conduit 55a.
In some examples, the cover 80a may slidably engage the gas injection line 60a such that the gas injection line 60a may able to move within the conduit 55a in a vertical manner. The movement of the gas injection line 60a allows for the gas injection point within the conduit 55a to be controlled to adjust the flow rate of the sand slurry drawn into the conduit 55a. Furthermore, the gas injection line 60a may also be lowered beyond the lower end of the conduit and into the sandstone formation 110 to generate a pressure vibration or inject a pulse of air to agitate the sand from time to time.
Referring to
Referring to
In the present example, a compressor 85a is shown connected to the gas injection line 60a to provide air pressure into the gas injection line 60a. The compressor 85a is not particularly limited and may provide a wide range of pressures as well as flow rates. In the present example, the pressure provided by the compressor 85a may be variable between about 30 psi and about 90 psi. Furthermore, the compressor 85a may provide a flow rate of about 300 cubic feet per minute to 600 cubic feet per minute.
A separator 90a may be connected to the collection port 65a to receive the sand slurry. The separator 90a is to separate the sand component from the water component as well as remove the air that is received from the collection port 65a. In the present example, the air is released into atmosphere. The water component and the sand component from the sand slurry may be separated by allowing the sand component to settle. In other examples, the separator 90a may use a filtration system.
Upon separating the water component from the sand component, the separator 90a may return the liquid component to the sandstone formation 110 by releasing the liquid component into the well 100 to maintain the static water level. In other examples, the sand component may be collected while the liquid component is discarded. For example, due to local regulations, it may not be possible to reintroduce the liquid component into the well 100 to reduce the possibility of contaminating the water in the aquifer.
Referring to
It is to be appreciated by a person of skill with the benefit of this description that by increasing the surface area of a low pressure region to the sandstone formation at the lower end of the conduit, it is easier to draw in the sand slurry to start the extraction process during the initial phase. Accordingly, to initiate the extraction of sand from the sandstone formation, the perforated wall 75b may have the openings in the perforated wall 75b opened to be in the open state. Once a flow of sand slurry is established, the openings may no longer provide an advantage to toward maintaining the flow. This may be especially true when a void, such as the void 140 develops which causes any openings to draw water without sand. Accordingly, once the flow of sand slurry is established through the conduit 55b, the openings at the perforated wall 75b may be closed such that the suction of sand slurry from the main opening at the end of the conduit 55b where most of the sand is located will be increased.
Referring to
In the present example, the conduit 55c and the collection port 65c are substantially similar to the conduit 55 and the collection port 65, respectively. In particular, the conduit 55c is to engage a sandstone formation near a lower end of the well. The collection port 65c is used to remove the sand slurry to be removed from the conduit 55c.
In the present example, the gas injection line 60c includes a directional injection point 62c at the lower end of the gas injection line 60c. It is to be appreciated that the directional injection point 62c is not particularly limited and may be to inject gas into the conduit 55c in any direction. In the present example, the gas injection line 60c includes an elbow to direct the gas or air in an upward direction and in the same direction as the flow of the sand slurry. In other examples, the directional injection point 62c may include directed the flow of gas at an angle. In further examples, the gas injection line 60c may include a mechanism where the directional injection point 62c may direct the flow of gas and have the capability of changing directions during operation. In such an example, the direction of the injected gas may be another variable that can be adjusted to increase the flow of the sand slurry.
It should be recognized that features and aspects of the various examples provided above may be combined into further examples that also fall within the scope of the present disclosure.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/IB2020/054159 | 5/1/2020 | WO |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2021/220040 | 11/4/2021 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
9534482 | Schneider | Jan 2017 | B2 |
20120175127 | Yale | Jul 2012 | A1 |
20150107905 | Kinley | Apr 2015 | A1 |
Number | Date | Country | |
---|---|---|---|
20230193735 A1 | Jun 2023 | US |