Alignment apparatus and method for a boom of a pipe handling system

Information

  • Patent Grant
  • 9556689
  • Patent Number
    9,556,689
  • Date Filed
    Tuesday, December 9, 2014
    10 years ago
  • Date Issued
    Tuesday, January 31, 2017
    7 years ago
  • CPC
  • Field of Search
    • US
    • 166 077520
    • 166 077530
    • 175 085000
    • 294 081610
    • 414 022550
    • 414 022620
    • 414 023000
    • 414 546000
    • 414 680000
    • 414 701000
    • 414 729000
    • 414 736000
    • 414 738000
    • 414 740000
    • 414 742000
    • 414 746800
    • 414 776000
    • 414 783000
    • 052 119000
    • 052 120000
    • 052 146000
    • 052 148000
    • 074 103000
    • 074 110000
    • 074 490010
    • 074 490050
    • 074 063000
    • 074 066000
    • 074 068000
    • 901 015000
    • 901 016000
    • 901 021000
    • 901 022000
    • 901 048000
    • CPC
    • E21B19/155
    • E21B15/00
    • E21B15/02
    • B66C23/60
    • B66C23/76
    • B66C23/825
    • B66C23/826
    • B66C23/828
    • E04H9/02
  • International Classifications
    • E21B19/00
    • B66C23/06
    • E02F3/00
    • E21B19/15
    • Disclaimer
      This patent is subject to a terminal disclaimer.
      Term Extension
      73
Abstract
A pipe handling apparatus has a frame, a boom pivotally connected to the frame so as to be movable between a first position and a second position, an arm extending outwardly of the boom when the boom is in the second position, and a gripper affixed to the end of the arm opposite the boom. A pair of arm-tensioning mechanisms is connected to the arm and provide for tensioning of the arm. A pair of boom-lateral-adjustment mechanisms is connected to the upper portion of the boom and provide for lateral adjustment of the boom. A pair of rocker-arm-adjustment mechanisms is connected to the link and provide for adjustment of the link.
Description
BACKGROUND OF THE INVENTION

1. Field of the Invention


The present invention relates to the handling of tubulars from a horizontal orientation to a vertical orientation. Particularly, the present invention relates to a pipe handling apparatus that positions tubulars in a wellhead. More particularly, the present invention relates to apparatus for adjusting a position of a boom of the pipe handling apparatus when positioning tubulars at a wellhead.


2. Description of Related Art Including Information Disclosed Under 37 CFR 1.97 and 37 CFR 1.98


Drill rigs have utilized several methods for transferring tubular members from a pipe rack adjacent to the drill floor to a mousehole in the drill floor or the well bore for connection to a previously transferred tubular or tubular string. The term “tubular” as used herein includes all forms of pipe, drill pipe, drill collars, casing, liner, bottom hole assemblies (BHA), and other types of tubulars known in the art.


Conventionally, drill rigs have utilized a combination of the rig cranes and the traveling system for transferring a tubular from the pipe rack to a vertical position above the center of the well. The obvious disadvantage with the prior art systems is that there is a significant manual involvement in attaching the pipe elevators to the tubular and moving the pipe from the drill rack to the rotary table at the wellhead. This manual transfer operation in the vicinity of workers is potentially dangerous and has caused numerous injuries in drilling operations. Further, the hoisting system may allow the tubular to come into contact with the catwalk or other portions of the rig as the tubular is transferred from the pipe rack to the drill floor. This can damage the tubular and may affect the integrity of the connections between successive tubulars in the well.


In the past, various devices have been created which mechanically move a pipe from a horizontal orientation to a vertical orientation such that the vertically-oriented pipe can be installed into the well bore. Typically, these devices have utilized several interconnected arms that are associated with a boom. In order to move the pipe, a succession of individual movements of the levers, arms, and other components of the boom must be performed in a coordinated manner in order to achieve the desired result. Typically, a wide variety of hydraulic actuators are connected to each of the components so as to carry out the prescribed movement. A complex control mechanism is connected to each of these actuators so as to achieve the desired movement. Advanced programming is required of the controller in order to properly coordinate the movements in order to achieve this desired result.


Unfortunately, with such systems, the hydraulic actuators, along with other components, can become worn with time. Furthermore, the hydraulic integrity of each of the actuators can become compromised over time. As such, small variations in each of the actuators can occur. These variations, as they occur, can make the complex mechanism rather inaccurate. The failure of one hydraulic component can exacerbate the problems associated with the alignment of the pipe in a vertical orientation. Adjustments of the programming are often necessary so as to continue to achieve the desired results. Fundamentally, the more hydraulic actuators that are incorporated into such a system, the more likely it is to have errors, inaccuracies, and deviations in the desired delivery profile of the tubular. Typically, very experienced and knowledgeable operators are required so as to carry out this pipe movement operation. This adds significantly to the cost associated with pipe delivery.


To address these problems and needs, U.S. application Ser. No. 11/923,451, filed on Oct. 24, 2007 by the present applicant, discloses a pipe handling system that has a boom pivotally movable between a first position and a second position, a riser assembly pivotally connected to the boom, an arm pivotally connected at one end to the first portion of the riser assembly and extending outwardly therefrom, a gripper affixed to an opposite end of the arm suitable for gripping a diameter of the pipe, a link pivotally connected to the riser assembly and pivotable so as to move relative to the movement of the boom between the first and second positions, and a brace having one end pivotally connected to the boom and an opposite end pivotally connected to the arm between the ends of the arm. The riser assembly has a first portion extending outwardly at an obtuse angle with respect to the second portion.


The pipe handling system delivers a pipe to a wellhead when in the second position. Pipes can be of extraordinary lengths and weights. The boom of the above pipe handling system is pivotally connected to a skid so as to pivot between the first and second positions. Pipes can be of extraordinary lengths and weights; therefore, the pivotal connection between the boom and skid must be strong so as to withstand the forces created by the movement of the boom between the first and second positions. Typically, hydraulic cylinders are placed between the boom and skid so as to raise and lower the boom between the first and second positions. The hydraulic cylinders are connected to a hydraulic power system so as to raise and lower the boom between the first and second positions.


Various patents have issued relating to the movement of a boom of a pipe handling system with hydraulic cylinders or other similar means. For example, U.S. Pat. No. 7,077,209, issued on Jul. 18, 2006 to McCulloch et al., discloses a mast for lifting and suspending a coiled tubing injector and blowout preventer over a wellhead that is pivotally mounted on a rear portion of a truck. The mast has two side-by-side telescoping legs that extend and retract synchronously. Hydraulic cylinders pivotally move the mast between a lower position and an upper position.


U.S. Pat. No. 4,336,840, issued on Jun. 29, 1982 to Bailey, discloses a suspension system for use with a mast. The system has two or more fluid pressure piston-and-cylinder assemblies. The cylinders are linked in pairs so that retraction of both piston rods reduces the length of the pair of assemblies to the length of a single assembly. Operation of both pistons in a pair provides an effective stroke twice the length of a single assembly stroke. In a particular embodiment, a double-cylinder system is used as a pickup system for elevating equipment along a mast in a well work over rig.


U.S. Pat. No. 7,289,871, issued on Oct. 30, 2007 to Williams, discloses a drilling apparatus that has a base from which a drilling arm is pivotally mounted. The drilling arm has an inner arm and an outer arm. The inner arm has a first end and a second end. The first end is pivotally connected by a first pivot joint to the base. The outer arm has a first end and a second end. The second end of the inner arm is pivotally connected via a second pivot joint to the first end of the outer arm. A drill-mounting assembly is positioned at the second end of the outer arm. Actuation of the inner and outer arms is achieved by hydraulic cylinders. Proper operation of the cylinders causes the second end of the outer arm to follow a substantially linear path.


U.S. Pat. No. 6,003,598, issued on Dec. 21, 1999 to Andreychuk, discloses a mobile hybrid rig adapted to run coiled tubing and wireline equipment for oil and gas wells. The rig has a chassis and power unit for transporting the rig. An adjustable platform with a number of hydraulically-operated stabilizers aligns the tubing at the wellhead. A mast is pivotable into slanted or vertical positions for coil tubing operation with a blowout preventer and an injector. A cradle supports and aligns an injector to the wellhead. A coil-tubing reel cartridge assembly is adapted to run coil-tubing reels. A winching facility is used to manipulate wireline equipment. A control cabin is used to manage rig activities.


U.S. Pat. No. 6,234,253, issued on May 22, 2001 to Dallas, discloses a method and apparatus for servicing a well. The apparatus has a pair of hydraulic cylinders pivotally mounted to a pair of base beams. The cylinders are movable from a horizontal position for transportation to a vertical position for operation. In the vertical position, the cylinders flank a wellhead and are adapted to lift the wellhead and attached production tubing using a workover beam and a lifting sub. The wellhead and production tubing can be rotated during or after elevation. A motor can be mounted to the workover beam to rotate the wellhead and the tubing. A calibrated pressure gauge can be used to indicate the weight being lifted. The apparatus can be connected to a crane truck.


U.S. Pat. No. 6,264,128, issued on Jul. 24, 2001 to Shampine et al., discloses a levelwind system for a coiled-tubing reel that has an arcuate guide arm extending over the upper surface of the reel, a universal joint mounted to the lower end of the arm, a guide member supported on the free end of the guide arm, a lift cylinder for raising and lowering the guide arm, a balancing cylinder for moving the guide arm laterally, and a hydraulic fluid circuit that is responsive to a position sensor and a microprocessor.


U.S. Pat. No. 6,431,286, issued on Aug. 13, 2002 to Andreychuk, discloses an injector arrangement for use in a rig that has a movable carrier, a derrick tiltably mounted to the carrier, and a trolley capable of sliding along the derrick. An injector cradle is movable along the trolley in at least a plane perpendicular to the derrick and is pivotally mountable beneath the trolley. An injector is supported at its upper end from the cradle. At least two hydraulic cylinders are supported at one end by the derrick. The cylinders are engaged at an opposed end to a lower end of the injector.


In the pipe handling system of U.S. application Ser. No. 11/923,451, filed on Oct. 24, 2007, by the present applicant, it was found that fine adjustments of the boom could be necessary so as to precisely align the pipe with the wellhead. Also, it was found desirable to properly tension the boom during movement of the boom between the stowed position to the deployed position.


It is an object of the present invention to provide an alignment device for a boom that provides fine adjustments to the boom and the associated pipe.


It is another object of the present invention to provide an alignment device that can selectively tension the boom during movement and positioning of the boom.


It is another object of the present invention to provide an alignment device that can be easily applied to the boom and easily operated.


It is still another object of the present invention to provide an alignment device that can be remotely operated and automatically controlled.


These and other objects and advantages of the present invention will become apparent from a reading of the attached specification and appended claims.


BRIEF SUMMARY OF THE INVENTION

The present invention is an alignment apparatus for a boom of a pipe handling device having a first line with a first end suitable for connection to the boom, a second line having an end connected to the first line, and an actuator means interconnected to at least one of the first and second lines for changing an angular relationship between the first and second lines. A connector member is connected to an end of the first line and to the end of the second line. The actuator means is cooperative with the connector member. In the preferred embodiment of the present invention, the connector member is a ring.


The second line has an opposite end suitable for connection to a fixed surface away from the boom. In particular, the second line includes a first cable offset from linear alignment with the first line and a second cable extending in angular relationship to the first cable.


The actuator means comprises a hydraulic piston-and-cylinder assembly having one end affixed to a fixed surface and an opposite end interconnected to the first and second lines. The hydraulic actuator extends in angularly offset relationship to the first and second lines. This actuator means is movable between a first position in which the first and second lines are untensioned and a second position in which first and second lines are tensioned.


The present invention is also a pipe handling device that comprises a frame, a boom pivotally connected to the frame so as to be movable between a first position and a second position, an arm extending outwardly of the boom when the boom is in the second position, a first line having a first end affixed to the boom, a second line interconnected to an opposite end of the first line and interconnected to the frame, and an actuator means interconnected to the first and second lines. The actuator means serves to change an angular relationship of the first and second lines so as to selectively tension the first and second lines. The arm has a gripper at an end thereof opposite the boom so as to receive a tubular therein.


In the present invention, the second line includes a first cable offset from linear alignment with the first line and a second cable extending in angular relationship with the first cable. Each of the first and second cables has an end affixed to the frame. A connector member is affixed to an opposite end of the first and second cables. The opposite end of the first line is connected to the connector member. The actuator means is connected to the connector member. The first cable extends in an inverted V-shaped orientation relative to the second cable. The actuator means includes a piston-and-cylinder assembly having one end connected to the frame and an opposite end interconnected to the first and second lines. The piston-and-cylinder assembly extends in angularly offset relationship to the first and second lines. The piston-and-cylinder assembly is movable between a first position in which the first and second lines are untensioned and the second position in which the first and second lines are tensioned.


The boom has a first end pivotally connected to the frame. The arm is pivotally connected to an opposite end of the boom. The first end of the first line is affixed to the boom between the first and second ends of the boom. A hydraulic actuator has an end connected to the frame and an opposite end connected to the boom. The hydraulic actuator is suitable for moving the boom between the first and second positions. The first and second lines of the actuator means are positioned on an opposite side of the boom from the hydraulic actuator. The piston-and-cylinder assembly has a piston rod with an end connected to the connector member and a cylinder having an end opposite the piston rod connected to the frame. A lever member is pivotally connected to an end of the boom opposite the frame. The arm is pivotally connected to the lever member. A link has one end pivotally connected to the frame and an opposite end pivotally connected to an end of the lever member opposite the arm. The gripper is affixed to the end of the arm opposite the lever member.





BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS


FIG. 1 shows a side elevational view of the preferred embodiment of the apparatus of the present invention as used on a pipe handling system.



FIG. 2 shows a side elevational view of the preferred embodiment of the apparatus of the present invention as used on a pipe handling system, with the system in a first position.



FIG. 3 shows a side elevational view of the apparatus of the present invention as used on the pipe handling system, with the pipe handling system moving from the first position toward a second position.



FIG. 4 shows a side elevational view of the apparatus of the present invention as used on a pipe handling system, with the pipe handling system moving further towards the second position.



FIG. 5 shows a side elevational view of the apparatus of the present invention as used on a pipe handling system, with the pipe handling system in the second position.



FIG. 6 shows an isolated perspective view of the preferred embodiment of the apparatus of the present invention attached to the boom of the pipe handling system.



FIG. 7 shows a side elevational view of the preferred embodiment of the apparatus of the present invention.



FIG. 8 shows a side elevational view of an alternate embodiment of the apparatus of the present invention as used on a pipe handling system.



FIG. 9 shows an isolated view of a rocker-arm-adjustment mechanism.





DETAILED DESCRIPTION OF THE INVENTION

Referring to FIG. 1, there is shown a side elevational view of the preferred embodiment of the apparatus 100 of the present invention as used with a pipe handling system 10. The pipe handling system 10 is mounted on a frame 12 (such as a skid) that can be supported upon the bed 14 of a vehicle, such as a truck. The pipe handling system 10 includes a boom 16 that is pivotally movable between a first position and a second position relative to a frame 12. In FIG. 1, an intermediate position of the pipe handling system 10 is particularly shown. In this position, the pipe 18 is illustrated in its position prior to installation on the drill rig 20. A lever assembly 22 is pivotally connected to the boom 16. An arm 24 is pivotally connected to an end of the lever assembly 22 opposite the boom 16. A gripper assembly 26 is fixedly connected to an opposite end of the arm 24 opposite the lever assembly 22. The gripper assembly 26 includes a stab frame 28 and grippers 30 and 32. A link 34 has one end pivotally connected to the frame 12 and an opposite end pivotally connected to the end of the lever assembly 22 opposite the arm 24. A brace 36 is pivotally connected to a small frame member 46 of the boom 16 and also pivotally connected to the arm 24 between the lever assembly 22 and the stab frame 28 of gripper assembly 26.


Referring momentarily to FIG. 6, the preferred embodiment of the apparatus 100 of the present invention has a first line 104 connected to the boom 16 of the pipe handling system 10. A second line arrangement 107 is connected to an end of the first line 104 opposite the boom 16. The second line arrangement 107 has a first cable 106 connected to the first line 104. A second cable 108 is connected to the first line 104. An actuator 102 is connected to the first line 104. An end of the actuator 102 opposite the first line 104 is connected to the frame 12. An end of the second cable 108 opposite the first line 104 is connected to the frame 12. An end of the first cable 106 opposite the first line 104 is connected to the frame 12. The first cable 106 is connected to the first line 104 by a connector member, such as junction ring 110. The second cable 108 is connected to the first line 104 by the junction ring 110. The actuator 102 is connected to the first line 104 by junction ring 110. The first line 104, the first cable 106, the second cable 108, and the actuator 102 are of appropriate lengths so that the apparatus 100 is tensioned when the boom 16 is in the second position. The actuator 102 may be a hydraulic cylinder, a screw or a turnbuckle. In FIG. 6, the actuator 102 is a hydraulic cylinder. The hydraulic cylinder can be actuated so as to move a piston rod inwardly or outwardly of the cylinder. The actuator 102 varies the alignment of the boom 16 so as to vary the alignment of a pipe held by the boom 16, and the pipe handling system 10, over a wellhead. The apparatus 100 can finely adjust the position of the boom 16. For example, if the apparatus 100 is positioned to a side of the boom 16, then the apparatus 100 would align the boom laterally with respect to the wellhead. If the apparatus 100 were positioned in front or behind the boom 16, then the boom would be aligned forward or backward of the wellhead. Thusly, the apparatus 100 may apply a tension to the boom 16, and may cause forward, backward and lateral movement to the boom 16.



FIG. 2 illustrates the drill pipe 18 in a generally horizontal orientation. In the present invention, it is important to note that the drill pipe can be delivered to the apparatus 10 in a position below the boom 16. In particular, the drill pipe can be loaded upon the frame 12 in a location generally adjacent to the grippers 30 and 32 associated with the gripper assembly 26. As such, the present invention facilitates the easy delivery of the drill pipe to the desired location. The grippers 30 and 32 will grip the outer diameter of the pipe 18 in this horizontal orientation.


In FIG. 2, it can be seen that the boom 16 resides above the drill pipe 18 and in generally parallel relationship to the top surface of the skid 12. The lever assembly 22 is suitably pivoted so that the arm 24 extends through the interior of the framework of the boom 16 and such that the gripper assembly 26 engages the pipe 18. The brace 36 resides in connection with the small frame member 46 of the boom 16 and also is pivotally connected to the arm 24. In this position, the link 34 will reside below the boom 16 generally adjacent to the upper surface of the skid 12 and is connected to the second portion 50 of the lever assembly 22 below the boom 16.



FIG. 3 shows an intermediate position of the drill pipe 18 during the movement from the horizontal orientation to the vertical orientation. As can be seen, the gripper assembly 26 has engaged with the pipe 18. The lever assembly 22 is pivoting so that the top end 79 of pipe 18 will pass through the interior of the framework of the boom 16. Also, the arm 24 associated with the gripper assembly 26 serves to move the stab frame 28 of the gripper assembly 26 through the interior of the framework of the boom 16. The brace 36 is pulling on the first portion 48 of lever assembly 22 so as cause this motion to occur. The link 34 is pulling on the end of the second portion 50 of the lever assembly 22 so as to draw the first portion 48 upwardly and to cause the movement of the body 28 of the gripper assembly 26. The hydraulic actuators 56 and 58 have been operated so as to urge the boom 16 pivotally upwardly.



FIG. 4 shows a further intermediate movement of the drill pipe 18. Once again, the hydraulic actuators 56 and 58 urge the boom 16 angularly upwardly away from the top surface of the frame 12. This causes the link 34 to have a pulling force on the pivotal connection 68 of the second portion 50 of the lever assembly 22. This causes the first portion 48 of the lever assembly 22 to move upwardly thereby causing the arm 24, in combination with the brace 36, to lift the gripper assembly 26 further upwardly and draw the pipe 18 completely through the interior of the boom 16. As can be seen, the relative size and relation of the various components of the present invention achieve the movement of the pipe 18 without the need for separate hydraulic actuators, apart from hydraulic actuators 56 and 58.



FIG. 5 illustrates the drill pipe 18 in its vertical orientation. As can be seen, the drill pipe 18 is positioned directly above the underlying pipe 62 on the drilling rig 20. The further upward pivotal movement of the boom 16 is caused by the hydraulic cylinders 56 and 58. This causes the link 34 to rotate and draw the end of the second portion 50 of the lever assembly 22 downwardly. The lever assembly 22 rotates about the pivot point 40 such that the first portion 48 of the lever assembly 22 has a pivot 72 at an end of the first portion 48. The brace 36 is now rotated in a position so as to provide support for the arm 24 in this upper position. The gripper assembly 26 has grippers 30 and 32 aligned vertically and in spaced parallel relationship to each other. If any further precise movement is required between the bottom end 80 of the pipe 18 and the upper end 82 of pipe 62, then the vehicle 14 can be moved slightly so as to achieve further precise movement. In the manner described hereinbefore, the drill pipe 18 has achieved a completely vertical orientation by virtue of the interrelationship of the various components of the present invention and without the need for complex control mechanisms and hydraulics.


In order to install the drill pipe 18 upon the pipe 62, it is only necessary to vertically translate the grippers 30 and 32 within the body 28 of the gripper assembly 26. As such, the end 80 can be stabbed into the box connection 82 of pipe 62. Suitable tongs, spinners, or other mechanisms can be utilized so as to rotate the pipe 18 in order to achieve a desired connection. The grippers 30 and 32 can then be released from the exterior of the pipe 18 and returned back to the original position such that another length of drill pipe can be installed.


Returning to FIG. 7, there is shown an isolated view of the preferred embodiment of the apparatus 100 of the present invention. In FIG. 7, the actuator 102 of the apparatus 100 may be a hydraulic cylinder 101. The hydraulic cylinder 101 may be connected to a hydraulic power supply 103. The hydraulic power supply 103 transfers hydraulic fluid to and from the hydraulic cylinder 101 via a hydraulic fluid line 105 so as to increase and decrease the length of the actuator 102.


In FIG. 7, it can be seen that the first line 104 is connected, at one end, to the junction ring 110. First cable 106 and second cable 108 each have one end fixedly connected to the frame 12 and an opposite end connected to the junction ring 110. The first cable 106 and the second cable 108 may extend in an inverted V-shaped angular relationship to each other. In a preferred embodiment, the actuator 102 may have a piston rod 109 that has an end connected to the junction ring 110. The actuator 102 has an opposite end connected to the frame 12. When the hydraulic power supply 103 introduces hydraulic fluid into the hydraulic cylinder 101 via the hydraulic fluid 105, the piston rod 109 can be pushed outwardly so as to change the angular relationship between the first line 104 and the first cable 106 and the second cable 108. When the piston rod 109 of the actuator 102 is pulled inwardly, a different angular orientation between the first line 104 and the first cable 106 and second cable 108 is achieved. In the position shown in FIG. 7, the relationship between the first line 104 and the first cable 106 and the second cable 108 is relatively untensioned. However, by the movement of the piston rod 109 of the actuator 102, along with the movement of the junction ring 110, the angular orientation can be changed so as to properly tension the first line 104, the first cable 106 and the second cable 108. As a result, by relatively small movements of the junction ring 110, the first line 104, the first cable 106 and the second cable 108, fine adjustments of the boom 16 may be achieved. As a result, the apparatus 100 may enable an operator to finely adjust the position of the tubular 18 as held by the grippers 30 and 32 of the pipe handling system 10. The apparatus 100 may also allow an operator to selectively tension the boom 16 of the pipe handling system 10.


Various techniques, such as laser measurement, can be utilized so as to properly orient the pipe 18 with the wellhead. In this manner, proper signals can be transmitted to the hydraulic power supply 103 so as to manipulate the actuator 102 for the fine adjustment of the boom 16.


The present invention also allows additional tension to be applied to the boom. In certain circumstances, the weight of the load carried by the grippers of the pipe handling apparatus may cause certain movements or deflections of the boom 16. By placing the first line 104, along with the first cable 106 and the second cable 108, into a properly tensioned condition, the boom 16 may achieve proper strength so as to avoid such deflections and movements. Additionally, through the use of the apparatus 100 of the present invention, the actual weight of the components of the pipe handling system 10 of the present invention may be reduced since proper tensioning can be achieved without the need for heavy structural components.


Referring to FIG. 8, an alternate system 200 for providing alignment and tensioning exemplified on pipe handling system 10. Pipe handling system 10 is substantially similar as described above.


System 200 comprises a pair of arm-tensioning mechanisms 210. Each arm-tensioning mechanism 210 comprises upper line 212. Upper line 212 is connected to arm 24 at one end and connected to tensioning device 214 at its other end. Tensioning device 214 may be a hydraulic cylinder, tension-spring mechanism, or other means for providing tension. Optionally, each arm-tensioning mechanism 210 comprises stiffening brace 218, which is connected to the upper end of tensioning device 214. Tensioning device 214 and stiffening brace 218 are connected to frame 12 at their distal end. Preferably, tensioning device 214 is connected to frame 12 via jack screws 216, which permit fine adjustments of arm-tensioning mechanism 210. Arm-tensioning mechanism 200 is pivotally connected to frame 12, which permits rotation when boom 16 is moved from a stowed to a deployed position.


A pair of boom-lateral-adjustment mechanisms 240 is provided. Each boom-lateral-adjustment mechanism 240 comprises boom-lateral-adjustment line 242, which is connected at one end to the upper portion 38 of boom 16 and connected at the other end to frame 12. Preferably, each boom-lateral-adjustment line 242 is connected to frame 12 via jack screw 244, which permit fine adjustments. Boom-lateral-adjustment mechanisms 240 advantageously allow the lateral angle of boom 16 to be adjusted up to 2 degrees or more.


Referring to FIG. 9, rocker-arm-adjustment mechanism 230 is illustrated in pipe handling system 10 with the exterior components of pipe handling system 10 removed. Rocker-arm-adjustment mechanism 230 comprises rocker arm 232, which is connected to frame 12 via jack screw 234 at one end. The other end of rocker arm 232 is connected to link 34, which in turn is connected to lever assembly 22, which in turn is connected to arm 24. Rocker-arm-adjustment mechanism 230 permits adjustment of the angle of pipe being carried.


The foregoing disclosure and description of the invention is illustrative and explanatory thereof. Various changes in the details of the illustrated construction and method can be made without departing from the true spirit of the invention. The present invention should only be limited by the present specification and appended claims.

Claims
  • 1. A tensioning apparatus comprising: a frame;a boom pivotally movable between a first position and a second position;a lever having a first and second portion, the lever pivotally connected to the boom;an arm pivotally connected at one end to the first portion of the lever, the arm movable between a stowed position and a deployed position;a gripper assembly affixed to an opposite end of the arm, the gripper assembly for gripping a diameter of a pipe;a link having a first end pivotally connected at one end to the second portion of the lever, the link having a second end pivotally connected to the frame; and,a tensioning assembly having one end connected to the arm and an opposite end connected to the frame, the tensioning assembly configured to apply a tension to the arm.
  • 2. The apparatus of claim 1, wherein the tensioning assembly further comprises: an upper line having one end connected to the arm and an opposite end connected to a tensioning device; and,the tensioning device being connected to the frame.
  • 3. The apparatus of claim 2, where the tensioning device is connected to a jack screw and the jack screw is connected to the frame.
  • 4. The apparatus of claim 2 further comprising a stiffening brace having one end connected to the frame and the other end connected to the tensioning device.
  • 5. A boom-lateral-adjustment apparatus comprising: a frame;a boom pivotally movable between a first position and a second position;a lever having a first and second portion, the lever pivotally connected to the boom;an arm pivotally connected at one end to the first portion of the lever, the arm movable between a stowed position and a deployed position;a gripper assembly affixed to an opposite end of the arm, the gripper assembly for gripping a diameter of a pipe;a link having a first end pivotally connected at one end to the second portion of the lever, the link having a second end pivotally connected to the frame; and,a pair of boom-lateral-adjustment mechanisms each having one end connected to the upper portion of the boom and an opposite end connected to the frame, the boom-lateral-adjustment mechanism configured to selectively adjust the alignment of the boom.
  • 6. The apparatus of claim 5, wherein each boom-lateral-adjustment mechanism comprises: a jack screw connected to the frame; and,a boom-lateral-adjustment line having one end connected to the upper portion of the boom and an opposite end connected to the jack screw.
  • 7. A rocker-arm-adjustment apparatus comprising: a frame;a boom pivotally movable between a first position and a second position;a lever having a first and second portion, the lever pivotally connected to the boom;an arm pivotally connected at one end to the first portion of the lever, the arm movable between a stowed position and a deployed position;a gripper assembly affixed to an opposite end of the arm, the gripper assembly for gripping a diameter of a pipe;a link having a first end pivotally connected at one end to the second portion of the lever, the link having a second end; and,a rocker-arm-adjustment mechanism having one end connected to the second end of the link and an opposite end connected to the frame, the rocker-arm-adjustment mechanism configured to adjust the alignment of the link.
  • 8. The apparatus of claim 7, wherein each rocker-arm-adjustment mechanism comprises: a jack screw connected to the frame; and,a rocker arm having one end connected to the second end of the link and an opposite end connected to the jack screw.
US Referenced Citations (252)
Number Name Date Kind
62404 Gile et al. Feb 1867 A
184168 Nickle Nov 1876 A
364077 Addis May 1887 A
514715 Jenkins Feb 1894 A
1175792 Mickelsen Mar 1916 A
1264867 Schuh Apr 1918 A
1312009 Thrift Aug 1919 A
1318789 Moschel Oct 1919 A
1369165 Cochran et al. Feb 1921 A
1396317 Boyter Nov 1921 A
1417490 Brandon May 1922 A
1483037 Zallinger Feb 1924 A
1768861 Richards Jul 1930 A
1972635 Whinnen Sep 1934 A
1981304 Brandt Nov 1934 A
2124154 Sovincz Jul 1937 A
2147002 Volpin Feb 1939 A
2327461 Rowe Aug 1943 A
2328197 Cowin Aug 1943 A
2369534 Cohen Feb 1945 A
2382767 Zeilman Aug 1945 A
2476210 Moore Jul 1949 A
2497083 Hildebrand Feb 1950 A
2509853 Wilson May 1950 A
2535054 Ernst et al. Dec 1950 A
2592168 Morris et al. Apr 1952 A
2595307 Selberg May 1952 A
2710431 Griffin Jun 1955 A
2715014 Garnett et al. Aug 1955 A
2770493 Fieber Nov 1956 A
2814396 Neal, Sr. Nov 1957 A
2828024 True Mar 1958 A
2840244 Thomas, Jr. Jun 1958 A
2937726 Walther May 1960 A
3016992 Wilson Jan 1962 A
3033529 Pierrat May 1962 A
3059905 Tompkins Oct 1962 A
3076560 Bushong et al. Feb 1963 A
3136394 Woolslayer et al. Jun 1964 A
3177944 Knights Apr 1965 A
3180496 Smith Apr 1965 A
3194313 Fanshawe Jul 1965 A
3262593 Hainer Jul 1966 A
3280920 Scott Oct 1966 A
3290006 Dubberke Dec 1966 A
3331585 Dubberke Jul 1967 A
3365762 Spiri Jan 1968 A
3421269 Medow Jan 1969 A
3432159 Rakatansky Mar 1969 A
3464507 Alexander et al. Sep 1969 A
3477522 Templeton Nov 1969 A
3498375 McEwen et al. Mar 1970 A
3559821 James Feb 1971 A
3561811 Turner, Jr. Feb 1971 A
3633771 Woolslayer et al. Jan 1972 A
3675303 McKinnon Jul 1972 A
3682259 Cintract et al. Aug 1972 A
3702640 Cintract et al. Nov 1972 A
3703968 Uhrich et al. Nov 1972 A
3706347 Brown Dec 1972 A
3774781 Merkley Nov 1973 A
3792783 Brown Feb 1974 A
3797672 Vermette Mar 1974 A
3804264 Hedeen Apr 1974 A
3805463 Lang et al. Apr 1974 A
3806021 Moroz et al. Apr 1974 A
3823916 Shaw Jul 1974 A
3848850 Bemis Nov 1974 A
3860122 Cernosek Jan 1975 A
3883009 Swoboda et al. May 1975 A
3942593 Reeve, Jr. et al. Mar 1976 A
3963133 Gilli Jun 1976 A
3986619 Woolslayer et al. Oct 1976 A
3991887 Trout Nov 1976 A
3995746 Usagida Dec 1976 A
4007782 Nybo et al. Feb 1977 A
4011694 Langford Mar 1977 A
4030698 Hansen Jun 1977 A
4044952 Williams et al. Aug 1977 A
4135340 Cox et al. Jan 1979 A
4142551 Wilms Mar 1979 A
4158283 Nation Jun 1979 A
4172684 Jenkins Oct 1979 A
4201022 Jennings May 1980 A
4221269 Hudson Sep 1980 A
4269554 Jackson May 1981 A
4276918 Sigouin Jul 1981 A
4277044 Hamilton Jul 1981 A
4290495 Elliston Sep 1981 A
4297908 Zimmer Nov 1981 A
4303270 Adair Dec 1981 A
4336840 Bailey Jun 1982 A
4359089 Strate et al. Nov 1982 A
4383455 Tuda et al. May 1983 A
4386883 Hogan et al. Jun 1983 A
4403666 Willis Sep 1983 A
4403897 Willis Sep 1983 A
4403898 Thompson Sep 1983 A
4407629 Willis Oct 1983 A
4420917 Parlanti Dec 1983 A
4426182 Frias et al. Jan 1984 A
4440536 Scaggs Apr 1984 A
4492501 Haney Jan 1985 A
4529094 Wadsworth Jul 1985 A
4547110 Davidson et al. Oct 1985 A
4595066 Nelmark et al. Jun 1986 A
4598509 Woolslayer Jul 1986 A
4604724 Shaginian et al. Aug 1986 A
4605077 Boyadjieff Aug 1986 A
4650237 Lessway Mar 1987 A
4658970 Oliphant Apr 1987 A
4688983 Lindbom Aug 1987 A
4708581 Adair Nov 1987 A
4756204 Wittwer et al. Jul 1988 A
4759414 Willis Jul 1988 A
4765225 Birchard Aug 1988 A
4765401 Boyadjieff Aug 1988 A
4767100 Philpot Aug 1988 A
4822230 Slettedal Apr 1989 A
4834604 Brittain et al. May 1989 A
4837992 Hashimoto Jun 1989 A
4869137 Slator Sep 1989 A
4982853 Kishi Jan 1991 A
5060762 White Oct 1991 A
5121793 Busch et al. Jun 1992 A
5135119 Larkin Aug 1992 A
5150642 Moody et al. Sep 1992 A
5186264 du Chaffaut Feb 1993 A
5415057 Nihei et al. May 1995 A
5458454 Sorokan Oct 1995 A
5595248 Denny Jan 1997 A
5597987 Gilliland et al. Jan 1997 A
5609226 Penisson Mar 1997 A
5609260 Liao Mar 1997 A
5609457 Burns Mar 1997 A
5649745 Anderson Jul 1997 A
5660087 Rae Aug 1997 A
5671932 Chapman Sep 1997 A
5702139 Buck Dec 1997 A
5806589 Lang Sep 1998 A
5816565 McGuffin Oct 1998 A
5848647 Webre et al. Dec 1998 A
5931238 Gilmore et al. Aug 1999 A
5934028 Taylor Aug 1999 A
5957431 Serda, Jr. Sep 1999 A
5964550 Blandford et al. Oct 1999 A
5988299 Hansen et al. Nov 1999 A
5992801 Torres Nov 1999 A
5993140 Crippa Nov 1999 A
6003598 Andreychuk Dec 1999 A
6047771 Roynestad Apr 2000 A
6053255 Crain Apr 2000 A
6079490 Newman Jun 2000 A
6079925 Morgan et al. Jun 2000 A
6158516 Smith et al. Dec 2000 A
6220807 Sorokan Apr 2001 B1
6227587 Terral May 2001 B1
6234253 Dallas May 2001 B1
6237445 Wesch, Jr. May 2001 B1
6253845 Belik Jul 2001 B1
6263763 Feigel, Jr. et al. Jul 2001 B1
6264128 Shampine et al. Jul 2001 B1
6264395 Allamon et al. Jul 2001 B1
6276450 Seneviratne Aug 2001 B1
6279662 Sonnier Aug 2001 B1
6298928 Penchansky Oct 2001 B1
6311788 Weixler Nov 2001 B1
6343892 Kristiansen Feb 2002 B1
6398186 Lemoine Jun 2002 B1
6431286 Andreychuk Aug 2002 B1
6471439 Allamon et al. Oct 2002 B2
6502641 Carriere et al. Jan 2003 B1
6524049 Minnes Feb 2003 B1
6533045 Cooper Mar 2003 B1
6543551 Sparks et al. Apr 2003 B1
6543555 Casagrande Apr 2003 B2
6550128 Lorenz Apr 2003 B1
6557641 Sipos et al. May 2003 B2
6564667 Bayer et al. May 2003 B2
6581698 Dirks Jun 2003 B1
6609573 Day Aug 2003 B1
6705414 Simpson et al. Mar 2004 B2
6745646 Pietras et al. Jun 2004 B1
6748823 Pietras Jun 2004 B2
6763898 Roodenburg et al. Jul 2004 B1
6779614 Oser Aug 2004 B2
6814149 Liess et al. Nov 2004 B2
6845814 Mason et al. Jan 2005 B2
6854520 Robichaux Feb 2005 B1
6969223 Tolmon et al. Nov 2005 B2
7017450 Bangert Mar 2006 B2
7021880 Morelli et al. Apr 2006 B2
7028585 Pietras et al. Apr 2006 B2
7036202 Lorenz May 2006 B2
7040411 Kainer et al. May 2006 B2
7044315 Willim May 2006 B2
7055594 Springett et al. Jun 2006 B1
7077209 McCulloch Jul 2006 B2
7090035 Lesko Aug 2006 B2
7090254 Pietras et al. Aug 2006 B1
7117938 Hamilton et al. Oct 2006 B2
7121166 Drzewiecki Oct 2006 B2
7172038 Terry et al. Feb 2007 B2
7249639 Belik Jul 2007 B2
7289871 Williams Oct 2007 B2
7296623 Koithan et al. Nov 2007 B2
7398833 Ramey et al. Jul 2008 B2
7438127 Lesko Oct 2008 B2
7503394 Bouligny Mar 2009 B2
7726929 Orgeron Jun 2010 B1
7918636 Orgeron Apr 2011 B1
7946795 Orgeron May 2011 B2
7980802 Orgeron Jul 2011 B2
8011426 Orgeron Sep 2011 B1
8128332 Orgeron Mar 2012 B2
8172497 Orgeron et al. May 2012 B2
8192128 Orgeron Jun 2012 B2
8192129 Orgeron Jun 2012 B1
8235104 Sigmar et al. Aug 2012 B1
8371790 Sigmar et al. Feb 2013 B2
8419335 Orgeron Apr 2013 B1
8469085 Orgeron Jun 2013 B2
8469648 Orgeron Jun 2013 B2
8474806 Orgeron Jul 2013 B2
8496238 Orgeron Jul 2013 B1
8506229 Orgeron Aug 2013 B2
8550174 Orgeron et al. Oct 2013 B1
8646522 Orgeron Feb 2014 B1
8690508 Orgeron Apr 2014 B1
8696288 Orgeron Apr 2014 B2
8905699 Orgeron Dec 2014 B2
20020070187 Willim Jun 2002 A1
20020079105 Bergeron Jun 2002 A1
20030170095 Slettedal Sep 2003 A1
20030221871 Hamilton et al. Dec 2003 A1
20040040926 Irsch Mar 2004 A1
20040262015 Mazzella et al. Dec 2004 A1
20050269133 Little Dec 2005 A1
20060016775 Willim Jan 2006 A1
20060027793 Kysely Feb 2006 A1
20060045654 Guidroz Mar 2006 A1
20060151215 Skogerbo Jul 2006 A1
20060278400 Bouligny Dec 2006 A1
20070074460 Belik Apr 2007 A1
20080023432 Paschke Jan 2008 A1
20080078965 Lane et al. Apr 2008 A1
20080174131 Bouligny et al. Jul 2008 A1
20080202812 Childers et al. Aug 2008 A1
20080253866 Lops et al. Oct 2008 A1
20090071720 Cowan Mar 2009 A1
20120118639 Gerber May 2012 A1
20120167485 Trevithick et al. Jul 2012 A1
Foreign Referenced Citations (9)
Number Date Country
0024433 Mar 1981 EP
727780 Apr 1955 GB
2264736 Sep 1993 GB
05-044385 Feb 1993 JP
2001287127 Oct 2001 JP
9315303 Aug 1993 WO
02-057593 Jul 2002 WO
2006-038790 Apr 2006 WO
2009-055590 Apr 2009 WO
Non-Patent Literature Citations (2)
Entry
U.S. Appl. No. 12/111,907, filed Apr. 29, 2008; non-published; titled “Pipe Gripping Apparatus” and having common inventors with the present patent application.
Chronis, Nicholas P.; Mechanisms & Mechanical Devices Sourcebook, 1991, Ch. 10, pp. 399-414, ISBN 0-07-010918-4, McGraw-Hill, Inc.
Related Publications (1)
Number Date Country
20150167408 A1 Jun 2015 US
Continuations (1)
Number Date Country
Parent 12469598 May 2009 US
Child 13489358 US
Continuation in Parts (1)
Number Date Country
Parent 13489358 Jun 2012 US
Child 14565304 US