This application claims the priority benefit of China application serial no. 202211681117.1, filed on Dec. 27, 2022. The entirety of the above-mentioned patent application is hereby incorporated by reference herein and made a part of this specification.
The present invention relates to the technical field of water conservancy engineering, and particularly relates to an anti-ice pushing/pulling device installed on the slope of an earth-rock dam and an ice thrust calculation method.
The earth-rock dam slope is vulnerable to damage by frost and ice. In an aspect, the cycle of frost heaving and thaw settlement will increase the slope protection gap, resulting in the failure of a reversed filter layer and a cushion layer; and in a further aspect, an ice pressure will cause ice climbing or pushing against the slope, thus resulting in damage to the dam slope. Therefore, freezing damage to earth-rock dam slopes is a common problem.
A first objective of the present invention is to provide an anti-ice pushing/pulling device installed on the slope of an earth-rock dam to solve the problem of freezing damage to the slope of an earth-rock dam. The device is capable to prevent ice pushing/pulling damage to the slope of an earth-rock dam. A second objective of the present invention is to provide an ice thrust calculation method.
In an aspect, the present invention provides an anti-ice pushing/pulling device installed on the slope of an earth-rock dam, and the device is arranged in a groove formed on the surface of an upstream slope of the earth-rock dam in the winter water level change area;
Furthermore, the maximum flip angle of the upper concrete slab is 90° to the horizontal plane, and the minimum flip angle of the upper concrete slab is the angle of the dam slope to the horizontal plane.
Further, the concrete block is in the form of an isosceles right triangle, its hypotenuse is provided with an isosceles trapezoidal hole symmetric about the symmetry axis, and occlusal parts are formed on both sides of the isosceles trapezoidal hole; and the occlusal parts are used for occlusal splicing between the concrete blocks.
Further, the holes formed on the concrete blocks include small triangular holes located at two 45° angles of the concrete block, small circular holes located at the right angle of the concrete block, and two large triangular holes at the main body portion of the concrete block.
Further, the formed holes are symmetric about the symmetry axis of the concrete block.
Furthermore, in view that the sharp angles of the two large triangular holes on the concrete block shrink upward along the slope direction and are most vulnerable to damage by ice pushing, the two large triangular holes are rounded.
Furthermore, for a plurality of anti-ice pushing/pulling devices arranged on the surface of an upstream slope of the earth-rock dam, adjacent upper concrete slabs are connected by hinges to realize synchronous flip.
Further, a water-stop material is arranged on an edge of the lower concrete slab away from the rotating shaft structure to prevent water from flowing into the interlayer between the two concrete slabs.
In a further aspect, the present invention provides an ice thrust calculation method, the anti-ice pushing/pulling device described in the first aspect is adopted for the slope of the earth-rock dam, and the ice thrust F of the slope of the earth-rock dam is calculated via the equation (1):
where F is the ice thrust; a is the material coefficient of the upper concrete slab, a=a1*a2*a3, a1 is the surface roughness, a2 is the shape coefficient, a3 is the contact condition coefficient; m is the slope of the upper concrete slab; h is the maximum ice thickness of the very day; (∇t/T) is the temperature rise rate, ∇t is the absolute value of the difference between the average temperature and the maximum or minimum temperature of the day; T is the temperature rise time; v is the average wind speed; and H is the water depth in front of the dam.
Because the anti-ice pushing/pulling devices are arranged in the grooves formed on the slope surface of the earth-rock dam in the winter water level change area, the calculation of the ice thrust on the slope of the earth-rock dam means the calculation of the ice thrust on the upper concrete slab.
In the past, calculation of ice thrust on the dam slope could only be performed by interpolation based on empirical values specified in the Specification. Inspection results show that the ice thrust calculation method provided by the present invention accords with the Specification and has strong practicability.
Further, the maximum ice thickness h0 after cutting is calculated via the equation (2):
where h0 is the maximum ice thickness after cutting; K1 and K2 are coefficients; C1 is the perimeter of a vertical projected area of all unfilled parts of rectangular grooves of the upper concrete slab on the dam slope; d is the thickness of the concrete block; S is the projected area of the upper concrete slab on the dam slope; θ1 is the angle between the upper concrete slab and the horizontal plane after flipping and unfolding; θ is the angle between the upstream slope and the horizontal plane; and
If the ice thrust after cutting is not ideal, further adjustments can be made to the angle of the upper concrete slab and the groove structure, and the above equation can be used to check again.
A working principle of the present invention is as follows.
When the ice pushing/pulling phenomenon occurs, the upper concrete slab is the main object of stress, which mainly causes wear to the concrete block, thus avoiding direct damage to the dam slope.
By adjusting the angle of the upper concrete slab, its slope is changed, so that ice thrust can be reduced. The angle of the upper concrete slab can be changed so that the anti-ice pushing/pulling device has strong adaptability, which can meet the application conditions of earth-rock dams with different slopes in different climate regions in winter.
Under the condition that the groove depth of the upper concrete slab is changed, if no phenomenon of freezing occurs very soon after the device installation, and the ice does not climb into the upper concrete slab, then the maximum ice thickness is that disclosed in the public data; when complete freezing occurs and the ice fills the grooves of the upper concrete slab, the maximum ice thickness is reduced; the deeper the groove is, the more ice can be retained, and the better the ice thickness cutting effect is.
Compared with the prior art, the present invention has the following significant advantages and beneficial effects:
In order to describe the technical solutions in embodiments of the present invention more clearly, the accompanying drawings required in the description of the embodiments will be described below briefly. Apparently, the accompanying drawings in the following description are merely some embodiments of the present invention, and other drawings can be derived from these accompanying drawings by those of ordinary skill in the art without creative efforts.
The technical solutions in the embodiments of the present invention will be clearly and completely described below in combination with the accompanying drawings in the embodiments of the present invention. Apparently, the embodiments described are not all of the embodiments of the present invention. Based on the described embodiments of the present invention, all other embodiments acquired by those of ordinary skill in the art without making creative efforts fall within the protection scope of the present invention.
As shown in
In this embodiment, the upper concrete slab 1 is rectangular, 1 m long and 0.64 m wide, and its thickness is 0.4 times the thickness of a dam slope protective layer.
Referring to
The concrete block is in the form of an isosceles right triangle, an isosceles trapezoid symmetric about the symmetry axis is cut out from its hypotenuse, and occlusal parts are formed on both sides of the isosceles triangular hole; and the occlusal parts are used for occlusal splicing between the concrete blocks. The length of the lower base of the isosceles triangular hole cut off by the concrete block should be slightly greater than the sum of the lengths of the remaining two sections after the trapezoid is cut off by the hypotenuse of the isosceles right triangle, as shown in
In a single rectangular groove, the concrete blocks are divided into three rows along the width direction of the rectangle. In the upper row or the lower row, three concrete blocks whose bottom edges are closely attached to the edge of the groove are placed first, and then the remaining two concrete blocks are embedded after aligning the right angles at the two intersection points with those of the two concrete blocks. That is, either of the two rows is provided with 5 concrete blocks. The middle row is composed of 3 similar rectangular patterns, and each pattern consists of 4 concrete blocks, indicating 12 concrete blocks in total. The remaining four corners of the rectangular groove are filled with semi-concrete blocks obtained by cutting the concrete blocks along the symmetry axis, and each corner is filled by 2 concrete blocks.
The anti-ice pushing/pulling device is installed in the excavated groove, the lower concrete slab 2 is located below, and the rotating shaft structure 3 is located at the end of the dam slope groove away from the dam crest. The maximum flip angle of the upper concrete slab 1 is 90° to the horizontal plane, and the minimum flip angle of the upper concrete slab 1 is the angle of the dam slope to the horizontal plane.
When there is no freezing phenomenon and the water level is high in summer, the upper concrete slab 1 is completely folded, and the water-stop material 5 is capable to prevent water from flowing into the interlayer. At this time, the anti-ice pushing/pulling device plays the role of reducing wave runup and preventing erosion. After the water surface is frozen in winter, the upper concrete slab 1 is unfolded, the water-stop material 5 is removed, and the jack 4 is used to jack up the upper concrete slab 1, as shown in
When a plurality of anti-ice pushing/pulling devices are arranged on the upstream side of the earth-rock dam, the adjacent upper concrete slabs 1 are connected by hinges to achieve linkage when the plurality of the upper concrete slabs 1 are unfolded.
The embodiment of the present application further provides an ice thrust calculation method, and the anti-ice pushing/pulling device installed on the slope of an earth-rock dam described in the embodiment of the present application is adopted to protect the slope of the earth-rock dam.
Because the anti-ice pushing/pulling devices are arranged in the grooves formed on the slope surface of the earth-rock dam in the winter water level change area, the calculation of the ice thrust on the slope of the earth-rock dam means the calculation of the ice thrust on the upper concrete slab 1.
The ice thrust F acting on the dam slope, i.e. on the upper concrete slab 1, is calculated via the equation (1):
where F is the ice thrust, kN/m; a is the material coefficient of the upper concrete slab 1, a=a1*a2*a3, a1 is the surface roughness, a2 is the shape coefficient, and a3 is the contact condition coefficient; m is the slope of the upper concrete slab 1; h is the maximum ice thickness of the very day, m; (∇t/T) is the temperature rise rate, ∇t is the absolute value of the difference between the average temperature and the maximum or minimum temperature of the day, ° C.; T is the temperature rise time, h; v is the average wind speed, m/s; and H is the water depth in front of the dam, m.
The above temperature rise time T is generally 6 h from 8:00 am to 14:00 pm.
The maximum ice thickness h0 (i.e. after the action of the anti-ice pushing/pulling device) after cutting is calculated via the equation (2):
where h0 is the maximum ice thickness after cutting, m; K1 and K2 are coefficients; C1 is the perimeter of a vertical projected area (on the dam slope) of all unfilled parts of rectangular grooves formed on the upper concrete slab 1, m; d is the thickness of the concrete block, m; S is the projected area of the upper concrete slab 1 on the dam slope, m2; θ1 is the angle between the upper concrete slab 1 and the horizontal plane after flipping and unfolding, rad; θ is the angle between the upstream dam slope and the horizontal plane, rad.
In this embodiment, C1/C2=7.75 can be obtained based on the splicing method, where C2 refers to the perimeter of the upper concrete slab 1.
The maximum ice thickness h0 after cutting is substituted into the equation (1) to calculate the ice thrust after cutting.
A specific example is given below to further illustrate the above ice thrust calculation method.
According to public data, the maximum ice thickness of the earth-rock dam over the years is 0.8 m, the minimum temperature on that day is −15° C., the average temperature is −10° C., the average wind speed is 5 m/s, the water depth in front of the dam is 10 m, the slope of the upstream dam slope is 1:2, and the length of the retaining dam section is 20 m.
The depth of the rectangular groove on the upper concrete slab 1 of the anti-ice pushing/pulling device is 8 cm, the surface roughness a1 of the concrete blocks filled in the rectangular groove is 1.2, the shape coefficient a2 is 1.5, and the contact condition coefficient a3 is 0.5.
The upper concrete slab 1 is unfolded to a slope of 1:1.9, and K1 and K2 are 0.1 and 0.15 respectively.
The ice thrust of the earth-rock dam just when the anti-ice pushing/pulling device is arranged is calculated first. According to the Specification for Load Design of Hydraulic Structures (SL744-2016), the ice thrust at this time is 215 kN, and the ice thrust obtained via the equation (1) is 227.20 kN, which meets the requirements.
Furthermore, when the ice thicknesses are 0.4 m, 0.6 m, 1.0 m, and 1.2 m, the ice thrust is calculated via the equation (1) and is compared with the static ice pressure value given in the Specification for Load Design of Hydraulic Structures (SL744-2016). The comparison results are shown in Table 1 and
After freezing for a period of time, the ice thickness after cutting by the anti-ice pushing/pulling device per unit length calculated.
h0=0.8×(1−0.1×0.08×7.75×1.64×2÷0.64−0.15×0.523333÷0.436111)=0.402 m
Calculation results show that the anti-ice pushing/pulling device has a more significant effect on cutting the ice thickness. At this time, the ice thrust F is calculated to be 87.187 kN via the equation (1). Therefore, it can be seen that the anti-ice pushing/pulling device can significantly reduce the ice thrust so as to protect the slope of the earth-rock dam.
When the present invention is implemented, the following steps can be followed.
First, basic data of the dam site area are collected, including air temperature, ice thickness, water level, wind speed, etc., and the ice thrust on the dam slope is calculated via the equation (1).
Then, an anti-ice pushing/pulling device that can meet the technological requirements is designed, the ice thickness after cutting is calculated via the equation (2), and the equation (1) is used to check and determine whether the adjustment angle and groove structure of the upper concrete slab can achieve the expected anti-ice pushing/pulling effect. If such effect cannot be achieved, this step is repeated until the anti-ice pushing/pulling device can meet the requirements.
Then, an anti-ice pushing/pulling device is made; and rectangular grooves are excavated on the surface of the dam slope in the winter water level change area. The long side of the groove is parallel to the horizontal plane, its length is equal to the length of an upstream dam section, its width is equal to the width of the lower concrete slab of the device, and its depth is equal to the thickness of the dam slope protection layer. The elevation of the top of the groove slightly exceeds the highest water level in winter in previous years. The lower concrete slab of the device is aligned with the short side of the groove of the dam slope to be perfectly embedded, so as to fill the groove with the device.
Finally, the upper concrete slab is unfolded to the designed angle to reduce the maximum ice thickness and ice thrust on the dam slope.
The foregoing descriptions are merely preferred specific implementations of the present invention, and are not intended to limit the protection scope of the present invention. Any equivalent substitutions or changes made by a person skilled in the art easily within the technical scope disclosed in the present invention shall fall within the protection scope of the present invention. Therefore, the protection scope of the present invention should be subject to a protection scope of the claims.
Number | Date | Country | Kind |
---|---|---|---|
202211681117.1 | Dec 2022 | CN | national |
Number | Name | Date | Kind |
---|---|---|---|
1112018 | McGillivray | Sep 1914 | A |
1885470 | Noetzili | Nov 1932 | A |
2949743 | Wolff | Aug 1960 | A |
6079902 | Pettee, Jr. | Jun 2000 | A |
6267533 | Bourg | Jul 2001 | B1 |
6955500 | Smith | Oct 2005 | B1 |
9797106 | Smith | Oct 2017 | B1 |
11555284 | Smith | Jan 2023 | B1 |
11661716 | Jonassen | May 2023 | B1 |
20030017000 | Jansson | Jan 2003 | A1 |
20080075535 | Han | Mar 2008 | A1 |
Number | Date | Country |
---|---|---|
106436646 | Feb 2017 | CN |
107152009 | Sep 2017 | CN |