The present invention relates to an apparatus and method for automatically adjusting the tension of a flexible guide rail of a mining elevator, and is particularly applicable to an elevator guide rail system that can not be satisfied by a rigid guide rail in an underground mine.
At present, elevator guiding systems mainly adopt rigid guide rails. As the rigid guide rail has errors during design, manufacture and installation, and shaft wall of the mine bears huge pressure and is deformed, lateral inclination, bending deformation, joint dislocation and local projection of the guide rail happen frequently. Consequently, the elevator car shakes violently during elevating. In serious cases, the elevator sliding guide shoes or the rolling guide wheel relying on the low-clearance guide rail are stuck and subsequently the elevator car is stuck in the shaft. It is a great hidden danger to the safe operation of the mining elevator and threatens the life and safety of the passengers in the elevator car.
In the current mine shafts, flexible guide rails of steel rope guides have been used, which are mostly a steel rope guide system based on tightening by heavy hammer in bottom hole, a steel rope guide system tightening by a hydraulic screw and a hydraulic tensioner based on a high-speed clip. Among them, the advantage of the steel rope guide system based on tightening by heavy hammer in bottom hole is a stable tightening force, but the heavier the goods in the elevating container is, the greater the mass of the heavy hammer for tightening will be and the larger the occupied space will be needed. Therefore, a deeper shaft sump needs to be dug. If coal briquettes or other sundries fall into the shaft sump and raise the level of sump bottom, i.e., the tightening force of the heavy hammer is decreased, resulting in serious lateral deflection of the elevator car. What is more, low work efficiency, high labor intensity and the accurate weight of the heavy hammer is difficult to be adjusted. The steel rope guide system tightening by a hydraulic screw overcomes many shortcomings of the tightening by heavy hammer, but the processing of the wedge device is difficult and it is not easy to have the wedge enter the bottom of the fixing device. As a result, the slipping between the steel rope and the wedge happens, resulting in fall of the steel rope of the guide from the top. The hydraulic tensioner based on a high-speed clip overcomes the drawbacks of the heavy hammer type and the screw type hydraulic tightening systems, but in case that the tightening force of the steel rope decreases due to permanent continuous tension, the steel rope is unable to realize automatic tensioning. To tension it, the steel rope clamp plate must be loosened manually. If the stroke of the cylinder is not long enough, the required tension cannot be achieved unless the steel rope is tensioned again, resulting in low efficiency of the lifting system.
According to the above analysis, it can be known that the current rigid guide rails for mining elevators cannot meet the requirement of normal lifting and there is not a steel rope guide system for mining elevator; the tightening heavy hammer in a steel rope guide system based on tightening by heavy hammer in bottom hole has large mass, occupies a large space, and the weight can not be adjusted easily; processing of the wedges of the steel rope guide system based on tightening by a hydraulic screw is difficult, and it is easy to cause the slipping between the steel rope and the wedge; the hydraulic tensioner based on a high-speed clip cannot be automatically adjusted and is inefficient.
The object of the present invention is to provide a device and method for automatically adjusting the tension of a flexible guide rail of a mining elevator, which is characterized by a simple structure, easy processing, reliable performance, easy installation and maintenance, longitudinal guiding and transversal deflection constraint, and can monitor the tension of the guide rail in real time and perform automatically according to the monitored tension.
A device for automatically adjusting the tension of a flexible guide rail of a mining elevator according to the present invention comprises an wellhead automatic tightening device and a bottom hole fixing device connected to the two ends of a steel rope respectively. The wellhead automatic tightening device is connected to a hydraulic system and a tension detection system. The wellhead automatic tightening device comprises a lower fixer seat disposed on an upper carrier bar. On the lower fixer seat, tightening oil cylinder blocks on the left and right sides of the steel rope, and a hinge pin fixing seat and a support frame in front of and behind the steel rope are disposed. Anti-fall seats are disposed in front of and behind the tightening oil cylinder blocks. The plungers inside the tightening oil cylinder blocks are connected to the hinge pin seats fixed on the bottom of the hinge pin fixing seat via hinge pins. An anti-fall rope clamp preventing the fall of the steel rope is disposed under the hinge pin fixing seat. A tightening fixing rope clamp is disposed over the hinge pin fixing seat. An upper fixer seat for fixing the left and right guideposts are disposed on the support frame. A rope adjusting guiding clamp is disposed on the upper fixer seat. Guide slots movable vertically along the guide posts are disposed on the two sides of the hinge pin fixing seat. The bottom hole fixing device comprises a fixing plate on the lower carrier bar. On the fixing plate, there is a fixing rope clamp fixed on the lower end of the steel rope.
The tension detection system comprises an oil pressure sensor disposed on the pipeline of the hydraulic system, a signal collector connected to the oil pressure sensor, and an industrial personal computer for real-time detection connected to the signal collector.
A method for automatically adjusting the tension of a flexible guide rail of a mining elevator according to the present invention monitors the tension of the steel rope through an oil pressure sensor in real time, and transfers the collected data to an industrial personal computer of a tension detection system through a signal collector. In the industrial personal computer, the data are analyzed and processed.
When the tension of the steel rope is lower than the lower limit value set by the industrial personal computer, the industrial personal computer drives the hydraulic system to pressurize the pipeline at the bottom of the tightening oil cylinder blocks to push the plungers. The plungers push upwards the tightening fixing rope clamp fixed on the hinge pin fixing seat to tighten the steel rope.
When the primary lift of the plungers is unable to make the tension of the steel rope reach the upper limit value set by the industrial personal computer, the cylinders apply pressure to the other side, the plungers pull the tightening fixing rope clamp fixed on the hinge pin fixing seat back from the top, and the wedge of the tightening fixing rope clamp is disengaged from the steel rope, while due to the self-locking feature of the wedge, the steel rope of the anti-fall rope clamp and the rope adjusting guiding clamp is clamped by the wedge and the tension of the steel rope is maintained.
Subsequently, the pipeline at the bottom of the tightening oil cylinder blocks is further pressurized to push the plungers upwards. This process is repeated one time or a few times until the tension of the steel rope reaches the upper limit value set by the industrial personal computer.
The present invention can perform longitudinal guiding and transversal deflection restriction on the lift car during lifting. The guide rail can overcome the lateral deformation of the shaft and ensure the lift car of the mining elevator moves stably on the flexible guide rail. Meanwhile, it can monitor the tension of the guide rail in real time, perform automatic adjustment according to the value of tension and realize the functions of automatic monitoring and automatic adjustment. It is also applicable to the steel rope cage guide guiding systems of mine cages and skips. It has the following advantages:
In the figures: wellhead automatic tightening device—1, bottom hole fixing device—2, steel rope—3, tension detection system—4, hydraulic system—5; upper carrier bar—1-1, tightening oil cylinder block—1-2, plunger—1-3, hinge pin—1-4, hinge pin seat—1-5, support frame—1-6, guide post—1-7, rope adjusting guiding clamp—1-8, upper fixer seat—1-9, tightening fixing rope clamp—1-10, hinge pin fixing seat—1-11, anti-fail rope clamp—1-12, anti-fall seat—1-13, lower fixer seat—1-14, wedge—1-15, pin roller—1-16, rack—1-17, connecting bolt—1-18, front clamp plate—1-19, rear clamp plate—1-20; lower carrier bar—2-1, fixing bolt—2-2, fixing plate—2-3, rope clamp—2-4, fixing rope clamp—2-5; oil pressure sensor—4-1, signal collector—4-2, industrial personal computer—4-3.
An embodiment of the present invention is described below by referring to the accompanying drawings:
As shown in
In the wellhead automatic tightening device 1 shown in
As shown in
In the bottom hole fixing device 2 as shown in
The tension detection system as shown in
A method for automatically adjusting the tension of a flexible guide rail of a mining elevator according to the present invention:
If the tension of the steel rope 3 is lower than the lower limit value set by the industrial personal computer 4-3, the industrial personal computer 4-3 will drive the hydraulic system 5 to pressurize the pipeline at the bottom of the tightening oil cylinder blocks 1-2 and push the plungers 1-3. The plungers 1-3 will push the tightening fixing rope clamp 1-10 fixed on the hinge pin fixing seat 1-11 upwards to tighten the steel rope 3.
If the primary lift of the plungers 1-3 is unable to make the tension of the steel rope 3 reach the upper limit value set by the industrial personal computer 4-3, the plungers 1-3 will pull the tightening fixing rope clamp 1-10 fixed on the hinge pin fixing seat 1-11 back from the top, and the wedge 1-15 of the tightening fixing rope clamp 1-10 will be disengaged from the steel rope 3, while due to the self-locking feature of the wedges 1-15 of the rope adjusting guiding clamp 1-8 and the anti-fall rope clamp 1-12, the steel rope 3 is clamped by the wedge 1-15 and the tension of the steel rope 3 is maintained.
Afterwards, the pipeline at the bottom of the tightening oil cylinder blocks 1-2 is further pressurized to push the plungers 1-3 upwards. The plungers 1-3 drive the tightening fixing rope clamp 1-10 to move upwards. The steel rope 3 inside the tightening fixing rope clamp 1-10 is clamped again and pulled up, thereby further increasing the tension of the steel rope 3. This process is repeated one time or a few times until the tension of the steel rope 3 reaches the upper limit value set by the industrial personal computer 4-3.
Number | Date | Country | Kind |
---|---|---|---|
2010 1 0572049 | Dec 2010 | CN | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/CN2011/078880 | 8/25/2011 | WO | 00 | 12/5/2012 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2012/071912 | 6/7/2012 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
3692277 | Schwartz et al. | Sep 1972 | A |
4615509 | Biass | Oct 1986 | A |
5809710 | Jungwirth et al. | Sep 1998 | A |
6283451 | Stankus et al. | Sep 2001 | B1 |
6352226 | Gordon | Mar 2002 | B1 |
7143871 | Wesson et al. | Dec 2006 | B2 |
7313975 | Scorteanu | Jan 2008 | B1 |
20110168960 | Steidinger et al. | Jul 2011 | A1 |
Number | Date | Country |
---|---|---|
1316365 | Oct 2001 | CN |
2789398 | Jun 2006 | CN |
102085993 | Jun 2011 | CN |
201873409 | Jun 2011 | CN |
846096 | Aug 1960 | GB |
897025 | May 1962 | GB |
593998 | Feb 1978 | SU |
2012071912 | Jun 2012 | WO |
Entry |
---|
Wikibooks.org, Introductory PLC Programming, Apr. 19, 2015, pp. 1-2 of 7. |
International Search Report issued in PCT/CN2011/078880, dated Dec. 1, 2011, with English translation. (6 pgs.). |
Number | Date | Country | |
---|---|---|---|
20130233654 A1 | Sep 2013 | US |