Apparatus and method for gravel packing an interval of a wellbore

Information

  • Patent Grant
  • 6516881
  • Patent Number
    6,516,881
  • Date Filed
    Wednesday, June 27, 2001
    23 years ago
  • Date Issued
    Tuesday, February 11, 2003
    21 years ago
Abstract
An apparatus (60) and method for gravel packing an interval of a wellbore is disclosed. The apparatus (60) comprises a sand control screen (78) that is positioned within the wellbore and a tube and manifold system (62) positioned between the sand control screen (78) and the wellbore. The tube and manifold system (62) delivers a fluid slurry to a plurality of levels within the interval when the apparatus (60) is in an operable position. The tubes (64, 70, 76) of the tube and manifold system (62) have first and second ends which are open such that the fluid slurry may enter one end, travel through the entire length of the tube (64, 70, 76) and exit the other end. The manifolds (66, 72) of the tube and manifold system (62) each have at least one exit port (68, 74) for the discharge of the fluid slurry from the tube and manifold system (62).
Description




TECHNICAL FIELD OF THE INVENTION




This invention relates in general to preventing the production of particulate materials through a wellbore traversing an unconsolidated or loosely consolidated subterranean formation and, in particular, to an apparatus and method for obtaining a substantially complete gravel pack within an interval of the wellbore.




BACKGROUND OF THE INVENTION




Without limiting the scope of the present invention, its background is described with reference to the production of hydrocarbon fluids through a wellbore traversing an unconsolidated or loosely consolidated formation, as an example.




It is well known in the subterranean well drilling and completion art that particulate materials such as sand may be produced during the production of hydrocarbons from a well traversing an unconsolidated or loosely consolidated subterranean formation. Numerous problems may occur as a result of the production of such particulate. For example, the particulate cause abrasive wear to components within the well, such as tubing, pumps and valves. In addition, the particulate may partially or fully clog the well creating the need for an expensive workover. Also, if the particulate matter is produced to the surface, it must be removed from the hydrocarbon fluids by processing equipment at the surface.




One method for preventing the production of such particulate material to the surface is gravel packing the well adjacent to the unconsolidated or loosely consolidated production interval. In a typical gravel pack completion, a sand control screen is lowered into the wellbore on a work string to a position proximate the desired production interval. A fluid slurry including a liquid carrier and a particulate material known as gravel is then pumped down the work string and into the well annulus formed between the sand control screen and the perforated well casing or open hole production zone.




The liquid carrier either flows into the formation or returns to the surface by flowing through the sand control screen or both. In either case, the gravel is deposited around the sand control screen to form a gravel pack, which is highly permeable to the flow of hydrocarbon fluids but blocks the flow of the particulate carried in the hydrocarbon fluids. As such, gravel packs can successfully prevent the problems associated with the production of particulate materials from the formation.




It has been found, however, that a complete gravel pack of the desired production interval is difficult to achieve particularly in long or inclined/horizontal production intervals. These incomplete packs are commonly a result of the liquid carrier entering a permeable portion of the production interval causing the gravel to form a sand bridge in the annulus. Thereafter, the sand bridge prevents the slurry from flowing to the remainder of the annulus which, in turn, prevents the placement of sufficient gravel in the remainder of the annulus.




Prior art devices and methods have been developed which attempt to overcome this sand bridge problem. For example, attempts have been made to use devices having perforated shunt tubes or bypass conduits that extend along the length of the sand control screen to provide an alternate path for the fluid slurry around the sand bridge.




It has been found, however, that shunt tubes installed on the exterior of sand control screens are susceptible to damage during installation and may fail during a gravel packing operation due, in part, to the perforations through the side wall of the shunt tubes. In addition, it has been found, that on site assembly of a shunt tube system around a sand control screen is difficult and time consuming due to the large number of fluid connections required for typical production intervals.




Therefore a need has arisen for an apparatus and method for gravel packing a production interval traversed by a wellbore that overcomes the problems created by sand bridges. A need has also arisen for such an apparatus that is not susceptible to damage during installation and will not fail during a gravel packing operation. Further, a need has arisen for such an apparatus that is cost effective and does not require difficult or time consuming on site assembly.




SUMMARY OF THE INVENTION




The present invention disclosed herein comprises an apparatus and method for gravel packing a production interval of a wellbore that traverses an unconsolidated or loosely consolidated formation that overcomes the problems created by the development of a sand bridge between a sand control screen and the wellbore. Importantly, the apparatus of the present invention is not susceptible to damage during installation or failure during the gravel packing operation, is cost effective to manufacture and does not require difficult or time consuming on site assembly.




The apparatus comprises a sand control screen that is positioned within the wellbore and a tube and manifold system that is positioned between the sand control screen and the wellbore. The tube and manifold system may be constructed in sections that are integral with each section of the sand control screen such that sections of the apparatus are simply threaded together in a known manner prior to running it downhole. Alternatively, the tube and manifold system may be run downhole and positioned proximate the formation prior to running the sand control screen downhole. In this case, when the sand control screen is run downhole, it is positioned within the tube and manifold system.




In either case, the tube and manifold system is used to selectively deliver the fluid slurry to a plurality of levels within the interval when the apparatus is in the operable position. The tube and manifold system comprises, in series, one or more tubes then a manifold followed by one or more tubes then another manifold and so forth. The tubes of the tube and manifold system have first and second ends which are open but do not have openings in their side walls as the fluid slurry is discharged from the tube and manifold system only through exit ports in the manifolds.




In most embodiments of the present invention, the exit ports of the manifolds are circumferentially misaligned with the adjacent tubes of the tube and manifold system. In other embodiment, however, some or all of the exit ports of the manifolds may be circumferentially aligned with the adjacent tubes of the tube and manifold system. There may be the same number, more or less exit ports in each manifold than the number of tubes delivering the fluid slurry to that manifold.




In one embodiment of the present invention, each section of the sand control screen has a plurality of manifolds positioned adjacently thereto. The tubes that deliver the fluid slurry to and transport the fluid slurry from these intrasectional manifolds are axially aligned with one another. In addition to these intrasectional manifolds, there is one manifold positioned between adjacent sections of the sand control screen. The tubes that deliver the fluid slurry to and transport the fluid slurry from these intersectional manifolds are typically axially misaligned with one another.




One method of the present invention involves traversing a formation with the wellbore, positioning a tube and manifold system within the wellbore proximate the formation, locating a sand control screen within the tube and manifold system, injecting a fluid slurry containing gravel through the tube and manifold system such that the fluid slurry exits the tube and manifold system through the exit ports in the manifolds at a plurality of levels of the interval and terminating the injecting when the interval is substantially completely packed with the gravel.




Another method of the present invention involves traversing a formation with the wellbore, positioning a tube and manifold system around a sand control screen, locating the sand control screen and the tube and manifold system within the wellbore proximate the formation, injecting a fluid slurry containing gravel through the tube and manifold system such that the fluid slurry exits the tube and manifold system through the exit ports in the manifolds at a plurality of levels of the interval and terminating the injecting when the interval is substantially completely packed with the gravel.











BRIEF DESCRIPTION OF THE DRAWINGS




For a more complete understanding of the features and advantages of the present invention, reference is now made to the detailed description of the invention along with the accompanying figures in which corresponding numerals in the different figures refer to corresponding parts and in which:





FIG. 1

is a schematic illustration of an offshore oil and gas platform operating an apparatus for gravel packing an interval of a wellbore of the present invention;





FIG. 2

is partial cut away view of an apparatus for gravel packing an interval of a wellbore of the present invention;





FIG. 3

is partial cut away view of an apparatus for gravel packing an interval of a wellbore of the present invention;





FIG. 4

is a side view of two adjacent sections of tubes meeting at a manifold of an apparatus for gravel packing an interval of a wellbore of the present invention;





FIG. 5

is a side view of two adjacent sections of tubes meeting at a manifold of an apparatus for gravel packing an interval of a wellbore of the present invention;





FIG. 6

is a side view of two adjacent sections of tubes meeting at a manifold of an apparatus for gravel packing an interval of a wellbore of the present invention;





FIG. 7

is a cross sectional view of two adjacent sections of tubes meeting at a manifold of an apparatus for gravel packing an interval of a wellbore of the present invention;





FIG. 8

is a cross sectional view of an apparatus for gravel packing an interval of a wellbore of the present invention positioned taken along line


8





8


of

FIG. 7

;





FIG. 9

is a cross sectional view two adjacent sections of tubes meeting at a manifold of an apparatus for gravel packing an interval of a wellbore of the present invention; and





FIG. 10

is a half sectional view depicting the operation of an apparatus for gravel packing an interval of a wellbore of the present invention.











DETAILED DESCRIPTION OF THE INVENTION




While the making and using of various embodiments of the present invention are discussed in detail below, it should be appreciated that the present invention provides many applicable inventive concepts which can be embodied in a wide variety of specific contexts. The specific embodiments discussed herein are merely illustrative of specific ways to make and use the invention, and do not delimit the scope of the present invention.




Referring initially to

FIG. 1

, an apparatus for gravel packing an interval of a wellbore operating from an offshore oil and gas platform are schematically illustrated and generally designated


10


. A semi-submersible platform


12


is centered over a submerged oil and gas formation


14


located below sea floor


16


. A subsea conduit


18


extends from deck


20


of platform


12


to wellhead installation


22


including blowout preventers


24


. Platform


12


has a hoisting apparatus


26


and a derrick


28


for raising and lowering pipe strings such as work sting


30


.




A wellbore


32


extends through the various earth strata including formation


14


. A casing


34


is cemented within wellbore


32


by cement


36


. Work string


30


includes various tools for completing the well. On the lower end of work string


30


is an apparatus


38


for gravel packing an interval of wellbore


32


including sand control screen assembly


40


as well as tube and manifold system


42


. Apparatus


38


is positioned adjacent to formation


14


between packers


44


,


46


in annular region or interval


48


including perforations


50


. When it is desired to gravel pack annular interval


48


, a fluid slurry including a liquid carrier and a particulate material such as gravel is pumped down work string


30


.




As explained in more detail below, the fluid slurry will generally be injected into annular interval


48


between apparatus


38


and wellbore


32


in a known manner such as through a crossover tool (not pictured) which allows the slurry to travel from the interior of work string


30


to the exterior of work string


30


. Once the fluid slurry is in annular interval


48


, a portion of the gravel in the fluid slurry is deposited in annular interval


48


. Some of the liquid carrier may enter formation


14


through perforation


50


while the remainder of the fluid carrier entering sand control screen assembly


40


. More specifically, sand control screen assembly


40


disallows further migration of the gravel in the fluid slurry but allows the liquid carrier to travel therethrough and up to the surface in a known manner, such as through a wash pipe and into the annulus


52


above packer


44


. If a sand bridge forms during the injection of the fluid slurry into annular region


48


, the fluid slurry will be diverted into tube and manifold system


42


of apparatus


38


to bypass this sand bridge. In this case, the fluid slurry will exit tube and manifold system


42


through the manifolds at various levels within interval


48


. Again, once in annular interval


48


, the gravel in the fluid slurry is deposited therein. Some of the liquid carrier may enter formation


14


through perforation


50


while the remainder of the fluid carrier enters sand control screen assembly


40


, as described above, and returns to the surface. The operator continues to pump the fluid slurry down work string


30


into annular interval


48


and through tube and manifold system


42


, as necessary, until annular interval


48


surrounding sand control screen assembly


40


is filled with gravel, thereby achieving a complete pack of interval


48


. Alternatively, it should be noted by those skilled in the art, that the fluid slurry may be injected entirely into tube and manifold system


42


of apparatus


38


without first injecting the fluid slurry directly into annular interval


48


.




Even though

FIG. 1

depicts a vertical well, it should be noted by one skilled in the art that the apparatus for gravel packing an interval of a wellbore of the present invention is equally well-suited for use in deviated wells, inclined wells or horizontal wells. In addition, it should be apparent to those skilled in the art that the use of directional terms such as above, below, upper, lower, upward, downward and the like are used in relation to the illustrative embodiments as they are depicted in the figures, the upward direction being toward the top of the corresponding figure and the downward direction being toward the bottom of the corresponding figure. Also, even though

FIG. 1

depicts an offshore operation, it should be noted by one skilled in the art that the apparatus for gravel packing an interval of a wellbore of the present invention is equally well-suited for use in onshore operations. Further, even though

FIG. 1

has been described with regard to a gravel packing operation, it should be noted by one skilled in the art that the apparatus of the present invention is equally well-suited for fracture operations and frac pack operations wherein a fluid slurry containing propping agents is delivered at a high flow rate and at a pressure above the fracture pressure of formation


14


such that fractures may be formed within formation


14


and held open by the propping agents and such that annular interval


48


is packed with the propping agents or other suitable particulate materials to prevent the production of fines from formation


14


.




Referring now to

FIG. 2

, therein is depicted a partial cut away view of an apparatus for gravel packing an interval of a wellbore of the present invention that is generally designated


60


. Apparatus


60


includes a tube and manifold system


62


that has four tubes extending between each manifold. Specifically, four tubes


64


, only two of which are pictured, deliver the fluid slurry to manifold


66


. A portion of the fluid slurry in manifold


66


will enter the annular interval surrounding apparatus


60


via two exit ports


68


, only one of which is shown. The remainder of the fluid slurry enters four tubes


70


, only two of which are pictured, and is delivered to manifold


72


. Again, a portion of the fluid slurry in manifold


72


will enter the annular interval surrounding apparatus


60


via two exit ports


74


, only one of which is shown. The remainder of the fluid slurry enters four tubes


76


, only two of which are pictured, and is delivered to the next manifold of tube and manifold system


62


. This process continues through the various levels of the tube and manifold system


62


along the entire length of the interval to be gravel packed such that a complete gravel pack of the interval can be achieved.




Importantly, the tubes of tube and manifold system


62


do not have openings or perforations in the side walls thereof for the discharge of the fluid slurry into the annular interval surrounding apparatus


60


. It has been found that fluid delivery tubes, such as shunt tubes or conduits that have openings or perforations in their side walls are susceptible to damage during installation and failure during use due to their lack of strength. In fact, use of the non perforated tubes of the present invention allows for the delivery of a greater volume of fluid at a higher flowrate, making frac packing a possibility. In addition, having the exit ports in the manifolds instead of in the tubes allows for the use of nozzles in the exit ports which improve the overall delivery of the fluid slurry from tube and manifold system


62


.




Another important feature of this embodiment of the present invention is that the exit ports of the manifolds are not circumferentially aligned with the tubes of tube and manifold system


62


. This feature helps to minimize liquid leak off after the area adjacent to a particular manifold has been packed with the gravel. Specifically, even after an area surrounding one of the manifolds has been packed with the gravel, it has been found that liquid from the fluid slurry may nonetheless leak off into this porous region causing not only a reduction in the velocity of the fluid slurry in tube and manifold system


62


, but also, an increase in the effective density of particles in the fluid slurry, each of which is a hindrance to particle transport to locations further along tube and manifold system


62


. Positioning the exit ports out of phase with the tubes reduces the liquid leak off by increasing the pressure required to push the liquid through the porous matrix and reduces the velocity of the liquid near the exit ports, thereby reducing the rate of liquid leak off. This rate of liquid leak off is further reduced by using a liquid in the fluid slurry that is thixotropic such that its viscosity increases with reduced velocity through the porous matrix.




Even though

FIG. 2

has depicted exit ports


68


,


74


as being circular, it should be understood by those skilled in the art that exit ports


68


,


74


could alternatively have other shapes without departing from the principles of the present invention, those shapes being considered within the scope of the present invention. Also, it should be noted by those skilled in the art that even though

FIG. 2

has depicted tubes


64


,


70


,


76


as having a rectangular cross section, tubes having other cross sectional configurations may alternatively be used without departing from the principles of the present invention and are considered within the scope of the present invention.




Disposed within tube and manifold system


62


is a sand control screen assembly


78


. Sand control screen assembly


78


includes a base pipe


80


that has a plurality of openings


82


which allow the flow of production fluids into the production tubing. The exact number, size and shape of openings


82


are not critical to the present invention, so long as sufficient area is provided for fluid production and the integrity of base pipe


80


is maintained. Positioned around base pipe


80


is a fluid-porous, particulate restricting, sintered metal material such as a plurality of layers of a wire mesh that are sintered together to form a porous sintered wire mesh screen


84


. Screen


84


is designed to allow fluid flow therethrough but prevent the flow of particulate materials of a predetermined size from passing therethrough. Positioned around screen


84


is a screen housing


86


that has a plurality of openings


88


which allow the flow of production fluids therethrough. The exact number, size and shape of openings


88


is not critical to the present invention, so long as sufficient area is provided for fluid production and the integrity of housing


86


is maintained.




It should be understood by those skilled in the art that other types of filter media may be used in conjunction with tube and manifold system


62


. For example, as seen in

FIG. 3

, a wire wrap screen assembly


90


may alternately be used. Screen assembly


90


has a base pipe


92


that has a plurality of openings


94


. A plurality of ribs


96


are spaced around base pipe


92


. Ribs


96


are generally symmetrically distributed about the axis of base pipe


92


. Ribs


96


are depicted as having a cylindrical cross section, however, it should be understood by one skilled in the art that ribs


96


may alternatively have a rectangular or triangular cross section or other suitable geometry. Additionally, it should be understood by one skilled in the art that the exact number of ribs


96


will be dependent upon the diameter of base pipe


92


as well as other design characteristics that are well known in the art.




Wrapped around ribs


96


is a screen wire


98


. Screen wire


98


forms a plurality of turns, such as turn


100


, turn


102


and turn


104


. Between each of the turns is a gap through which formation fluids flow. The number of turns and the gap between the turns are determined based upon factors such as the characteristics of the formation from which fluid is being produced and the size of the gravel to be used during the gravel packing operation. Together, ribs


96


and screen wire


98


may form a sand control screen jacket which is attached to base pipe


92


by welding or other suitable technique.




In this embodiment, an outer shroud


106


having a plurality of perforations


108


is disposed around the tubes of tube and manifold system


62


. Outer shroud


106


provides protection to tubes


64


,


70


during, for example, installation of tube and manifold system


62


in an uncased well. Alternatively, it should be noted by those skilled in the art, that a shroud could be placed around both the tubes and the manifolds of tube and manifold system


62


.




Referring now to

FIG. 4

, therein is depicted an alternate embodiment of a manifold for the apparatus for gravel packing an interval of a wellbore that is generally designated


120


. Apparatus


120


includes a tube and manifold system


122


and a sand control screen assembly


124


. Tube and manifold system


122


includes four tubes


126


, only two of which are pictured, that deliver the fluid slurry to manifold


128


. A portion of the fluid slurry in manifold


128


will enter the annular interval surrounding apparatus


120


via four exit ports


130


, only two of which are shown. The remainder of the fluid slurry enters four tubes


132


, only two of which are pictured, and is delivered to the next manifold of tube and manifold system


122


. This process continues along the entire length of the interval to be gravel packed such that a complete gravel pack of the interval can be achieved. In this embodiment, exit ports


130


of manifold


128


are circumferentially aligned with or are in phase with the adjacent tubes


126


,


132


that deliver the fluid slurry to and transport the fluid slurry from manifold


128


.




Referring now to

FIG. 5

, therein is depicted an alternate embodiment of a manifold for the apparatus for gravel packing an interval of a wellbore that is generally designated


140


. Apparatus


140


includes a tube and manifold system


142


and a sand control screen assembly


144


. Tube and manifold system


142


includes four tubes


146


, only two of which are pictured, that deliver the fluid slurry to manifold


148


. A portion of the fluid slurry in manifold


148


will enter the annular interval surrounding apparatus


140


via eight exit ports


150


, only five of which is shown. The remainder of the fluid slurry enters four tubes


152


, only two of which are pictured, and is delivered to the next manifold of tube and manifold system


142


. This process continues along the entire length of the interval to be gravel packed such that a complete gravel pack of the interval can be achieved. In this embodiment, there are more exit ports


150


in manifold


148


than there are tubes


146


,


152


, respectively delivering the fluid slurry to and carrying the fluid slurry from manifold


148


. In addition, some of the exit ports are circumferentially aligned with or are in phase with the adjacent tubes


146


,


152


and some of the exit ports


150


are circumferentially misaligned with or are out of phase with the adjacent tubes


146


,


152


.




Referring now to

FIG. 6

, therein is depicted an apparatus for gravel packing an interval of a wellbore at the point where sections of the sand control screen assembly are joined together, that is generally designated


160


. Apparatus


160


includes a tube and manifold system


162


and a sand control screen assembly


164


having sections


166


,


168


that are coupled together in a known manner such as via a threaded coupling. Tube and manifold system


162


includes four tubes


170


, only two of which are pictured, that deliver the fluid slurry to manifold


172


. A portion of the fluid slurry in manifold


172


will enter the annular interval surrounding apparatus


160


via two exit ports


174


, only one of which is shown. The remainder of the fluid slurry enters four tubes


176


, only three of which are pictured, and is delivered to the next manifold of tube and manifold system


162


. This process continues along the entire length of the interval to be gravel packed such that a complete gravel pack of the interval can be achieved. As illustrated, tubes


170


that deliver the fluid slurry to manifold


172


are not axially aligned with tubes


176


that transport the fluid slurry from manifold


172


. Unlike the manifolds pictured in

FIGS. 2-5

that are positioned within the length of a single section of the sand control screen assembly and wherein the tubes adjacent to each manifold are axially aligned with one another, tubes


170


,


176


that are adjacent to a manifold between two sections of the sand control screen such as manifold


172


will likely not be axially aligned. If the tube and manifold system is preassembled on each section of the sand control screen prior to coupling the sections of the sand control screen assembly into a string, the adjoining sections of the tube and manifold system at the ends of each section of the sand control screen assembly are coupled when the sections of the screen assembly are threaded together. Accordingly, it is likely that the tubes on either side of this manifold will not be axially aligned with one another.




As should become apparent to those skilled in the art, even though

FIG. 6

depicts tubes


170


and tubes


176


at a forty-five-degree circumferential phase shift relative to one another, any circumferential phase shift is acceptable using the present invention as the relative circumferential positions of adjoining sections of the tube and manifold system of the present invention does not affect the operation of the present invention. As such, the mating of adjoining sections of the apparatus for gravel packing an interval of a wellbore of the present invention is substantially similar to mating typical joints of pipe to form a pipe string requiring no special coupling tools or techniques. As such, even if the tubes adjacent to a manifold are not axially aligned with one another, they are nonetheless in fluid communication with one another such that the fluid slurry may travel from one level of tubes to the next level of tubes as the manifolds provide a substantially annular region through which the fluid slurry travels allowing for such misalignment.




Referring now to

FIGS. 7 and 8

, therein are depicted cross sectional views of an apparatus for gravel packing an interval of a wellbore that is generally designated


180


. Apparatus


180


includes a tube and manifold system


182


and a sand control screen assembly


184


. In the illustrated embodiment, sand control screen assembly


184


includes base pipe


186


that has a plurality of openings


188


, porous sintered wire mesh screen


190


and screen housing


192


that has a plurality of openings


194


. Tube and manifold system


182


includes four tubes


196


that deliver the fluid slurry to manifold


198


. A portion of the fluid slurry in manifold


198


will enter the annular interval surrounding apparatus


180


via two exit ports


200


which are not aligned with any of the tubes


196


. The remainder of the fluid slurry enters four tubes


202


, only two of which are pictured in

FIG. 7

, and is delivered to the next manifold of tube and manifold system


182


.




As illustrated, manifold


198


has an inner sleeve


204


that seals against screen housing


192


such that the fluid slurry passing through manifold


198


does not enter sand control screen assembly


184


through perforations


194


. Manifold


198


also includes a pair of retainer members


206


,


208


. Retainer member


206


and inner sleeve


204


receive and provide a seal with the discharge ends of tubes


196


. Retainer member


208


and inner sleeve


204


receive and provide a seal with the receptor ends of tubes


202


. Manifold


198


has an outer housing


210


that includes exit ports


200


. An annular region


212


is formed between outer housing


210


and inner sleeve


204


that provides fluid communication between tubes


196


and tubes


202


.




Referring now to

FIG. 9

, therein is depicted a cross sectional view of an apparatus for gravel packing an interval of a wellbore showing adjacent tubes on either side of a manifold that is generally designated


220


. Apparatus


220


includes a tube and manifold system


222


and a sand control screen assembly


224


. In the illustrated embodiment, sand control screen assembly


224


includes base pipe


226


that has a plurality of openings


228


, porous sintered wire mesh screen


230


and screen housing


232


that has a plurality of openings


234


. Tube and manifold system


222


includes four tubes


236


, only two of which are visible, that deliver the fluid slurry to manifold


238


. A portion of the fluid slurry in manifold


238


will enter the annular interval surrounding apparatus


220


via exit ports (not pictured) which are not aligned with any of the tubes


236


. The remainder of the fluid slurry enters four tubes


242


, only two of which are pictured, and is delivered to the next manifold of tube and manifold system


222


.




As illustrated, manifold


238


has an inner sleeve


244


that seals against screen housing


232


such that the fluid slurry passing through manifold


238


does not enter sand control screen assembly


224


through perforations


228


. Manifold


238


has an outer housing


246


that includes exit ports (not pictured). An annular region


248


is formed between outer housing


246


and inner sleeve


204


providing fluid communication between tubes


236


and tubes


242


. Partially disposed within outer housing


246


of manifold


238


is a pair of perforated outer shrouds


250


,


252


. Outer shroud


250


protects tubes


236


and, along with inner sleeve


244


, retains and provides a seal with the discharge ends of tubes


196


. Likewise, outer shroud


252


protects tubes


242


and, along with inner sleeve


244


, retains and provides a seal with the receptor ends of tubes


242


.




Even though

FIGS. 2-9

have depicted the tube and manifold system of the apparatus for gravel packing an interval of a wellbore of the present invention as having four tubes at each tube level, it should be understood by those skilled in the art that a variety of configurations of the apparatus for gravel packing an interval of a wellbore of the present invention having different numbers of tubes, either more tubes or fewer tubes are possible and is considered within the scope of the present invention. In fact, it is likely and may even be preferable to use different configurations of the tube and manifold system of the apparatus for gravel packing an interval of a wellbore of the present within a single interval.




Specifically, it may be desirable to have a volumetric capacity within the tube and manifold system that is greater toward the near end, the top in a vertical well or heel in an inclined or horizontal well, than toward the far end, the bottom or toe, of the interval. This may be achieved by using a tube and manifold system having more tubes proximate the near end of the interval and fewer tubes proximate the far end of the interval. Likewise, it may be desirable to have different numbers of exit ports on different manifolds within a tube and manifold system installed within a single interval. Specifically, it may be desirable to have fewer exit ports toward the near end of the interval compared to the far end of the interval.




Referring now to

FIG. 10

, a typical completion process using an apparatus


248


for gravel packing an interval of a wellbore of the present invention will be described. First, interval


48


adjacent to formation


14


is isolated. Packer


44


seals the upper end of annular interval


48


and packer


46


seals the lower end of annular interval


48


. Cross-over assembly


250


is located adjacent to screen assembly


252


, traversing packer


44


with portions of cross-over assembly


250


on either side of packer


44


. When the gravel packing operation commences, the objective is to uniformly and completely fill interval


48


with gravel. To help achieve this result, wash pipe


254


is disposed within screen assembly


252


. Wash pipe


254


extends into cross-over assembly


250


such that return fluid passing through screen assembly


252


, indicated by arrows


256


, may travel through wash pipe


254


, as indicated by arrow


258


, and into annulus


52


, as indicted by arrow


260


, for return to the surface.




The fluid slurry containing gravel is pumped down work string


30


into cross-over assembly


250


along the path indicated by arrows


262


. The fluid slurry containing gravel exits cross-over assembly


250


through cross-over ports


264


and is discharged into annular interval


48


as indicated by arrows


266


. This is the primary path as the fluid slurry seeks the path of least resistance. Under ideal conditions, the fluid slurry travels throughout the entire interval


48


until interval


48


is completely packed with gravel. If, however, a sand bridge forms in annular interval


48


before the gravel packing operation is complete, the fluid slurry containing gravel will enter tube and manifold system


268


to bypass the sand bridge as indicated by arrows


269


. As tubes


270


of tube and manifold system


268


do not have openings in their side walls, the entire volume of fluid slurry entering each tube


270


exits that tube


270


into one of the manifolds


272


. Some of the fluid slurry exits each of the manifolds


272


through exit ports


274


, as indicated by arrows


276


. Some of the fluid slurry may also exit tube and manifold system


268


through an opening in the bottom of the last manifold, as indicated by arrow


278


.




As the fluid slurry containing gravel enters annular interval


48


, the gravel drops out of the slurry and builds up from formation


14


, filling perforations


50


and annular interval


48


around screen assembly


252


forming the gravel pack. Some of the carrier fluid in the slurry may leak off through perforations


50


into formation


14


while the remainder of the carrier fluid passes through screen assembly


252


, as indicated by arrows


256


, that is sized to prevent gravel from flowing therethrough. The fluid flowing back through screen assembly


252


, as explained above, follows the paths indicated by arrows


258


,


260


back to the surface.




In operation, the apparatus for gravel packing an interval of a wellbore of the present invention is used to distribute the fluid slurry to various locations within the interval to be gravel packed by injecting the fluid slurry into the tube and manifold system when sand bridge formation occurs. The fluid slurry exits through the various exit ports in the manifolds along the length of the tube and manifold system into the annulus between the apparatus and the wellbore which may be cased or uncased. Once in this annulus, a portion of the gravel in the fluid slurry is deposited around the apparatus in the annulus such that the gravel migrates both circumferentially and axially from the exit ports. This process progresses along the entire length of the apparatus such that the annular area becomes completely packed with the gravel. Once the annulus is completely packed with gravel, the gravel pack operation may cease.




Alternatively, it should be noted by those skilled in the art that instead of first injecting the fluid slurry directly into annular interval


48


until a sand bridge forms, the fluid slurry may initially be injected directly into the apparatus for gravel packing an interval of a wellbore of the present invention. In either embodiment, once the gravel pack is completed and the well is brought on line, formation fluids that are produced into the gravel packed interval must travel through the gravel pack in the annulus prior to entering the sand control screen assembly. As such, the apparatus for gravel packing an interval of a wellbore of the present invention allows for a complete gravel pack of an interval so that particulate materials in the formation fluid are filtered out.




While this invention has been described with reference to illustrative embodiments, this description is not intended to be construed in a limiting sense. Various modifications and combinations of the illustrative embodiments as well as other embodiments of the invention, will be apparent to persons skilled in the art upon reference to the description. It is, therefore, intended that the appended claims encompass any such modifications or embodiments.



Claims
  • 1. An apparatus for gravel packing an interval of a wellbore, the apparatus comprising:a sand control screen positioned within the wellbore; and a tube and manifold system positioned between the sand control screen and the wellbore, the tube and manifold system delivers a fluid slurry to a plurality of levels of the interval when the apparatus is in an operable position, the tubes of the tube and manifold system having first and second ends, the tubes being open only at the first and second ends, the manifolds of the tube and manifold system having at least one exit port for the discharge of the fluid slurry from the tube and manifold system.
  • 2. The apparatus as recited in claim 1 wherein one tube extends between each of the manifolds of the tube and manifold system.
  • 3. The apparatus as recited in claim 1 wherein a plurality of tubes extend between each of the manifolds of the tube and manifold system.
  • 4. The apparatus as recited in claim 1 wherein the exit ports of the manifolds are not circumferentially aligned with adjacent tubes of the tube and manifold system.
  • 5. The apparatus as recited in claim 1 wherein the exit ports of the manifolds are circumferentially aligned with adjacent tubes of the tube and manifold system.
  • 6. The apparatus as recited in claim 1 wherein the number of exit ports in each manifold is less than the number of tubes delivering the fluid slurry to that manifold.
  • 7. The apparatus as recited in claim 1 wherein the number of exit ports in each manifold is the same as the number of tubes delivering the fluid slurry to that manifold.
  • 8. The apparatus as recited in 1 wherein the number of exit ports in each manifold is greater than the number of tubes delivering the fluid slurry to that manifold.
  • 9. The apparatus as recited in claim 1 wherein the sand control screen further comprises a plurality of sections, wherein each section of the sand control screen has a plurality of the manifolds positioned adjacent thereto and wherein one of the manifolds is positioned between each adjacent section of the sand control screen.
  • 10. The apparatus as recited in claim 9 wherein the tubes on either side of the manifolds positioned adjacent to the sections of the sand control screen are axially aligned.
  • 11. The apparatus as recited in claim 9 wherein the tubes on either side of the manifolds positioned between adjacent sections of the sand control screen are not axially aligned.
  • 12. An apparatus for gravel packing an interval of a wellbore, the apparatus comprising:a sand control screen positioned within the wellbore; and a tube and manifold system positioned between the sand control screen and the wellbore, the tube and manifold system delivers a fluid slurry to a plurality of levels of the interval when the apparatus is in an operable position, the tubes of the tube and manifold system having first and second ends, the tubes being open only at the first and second ends, the manifolds of the tube and manifold system having at least one exit port for the discharge of the fluid slurry from the tube and manifold system, the exit ports of the manifolds are not circumferentially aligned with adjacent tubes of the tube and manifold system.
  • 13. The apparatus as recited in claim 12 wherein one tube extends between each of the manifolds of the tube and manifold system.
  • 14. The apparatus as recited in claim 12 wherein a plurality of tubes extend between each of the manifolds of the tube and manifold system.
  • 15. The apparatus as recited in claim 12 wherein the number of exit ports in each manifold is less than the number of tubes delivering the fluid slurry to that manifold.
  • 16. The apparatus as recited in claim 12 wherein the number of exit ports in each manifold is the same as the number of tubes delivering the fluid slurry to that manifold.
  • 17. The apparatus as recited in 12 wherein the number of exit ports in each manifold is greater than the number of tubes delivering the fluid slurry to that manifold.
  • 18. The apparatus as recited in claim 12 wherein the sand control screen further comprises a plurality of sections, wherein each section of the sand control screen has a plurality of the manifolds positioned adjacent thereto and wherein one of the manifolds is positioned between each adjacent section of the sand control screen.
  • 19. The apparatus as recited in claim 18 wherein the tubes on either side of the manifolds positioned adjacent to the sections of the sand control screen are axially aligned.
  • 20. The apparatus as recited in claim 18 wherein the tubes on either side of the manifolds positioned between adjacent sections of the sand control screen are not axially aligned.
  • 21. An apparatus for gravel packing an interval of a wellbore, the apparatus comprising:a sand control screen having a plurality of sections, the sand control screen positioned within the wellbore; and a tube and manifold system positioned between the sand control screen and the wellbore, the tube and manifold system delivers a fluid slurry to a plurality of levels of the interval when the apparatus is in an operable position, the tubes of the tube and manifold system having first and second ends, the tubes being open only at the first and second ends, the manifolds of the tube and manifold system having at least one exit port for the discharge of the fluid slurry from the tube and manifold system, the exit ports of the manifolds are not circumferentially aligned with adjacent tubes of the tube and manifold system, each section of the sand control screen having a plurality of manifolds positioned adjacent thereto and each adjacent section of the sand control screen having one of the manifolds positioned therebetween.
  • 22. The apparatus as recited in claim 21 wherein one tube extends between each of the manifolds of the tube and manifold system.
  • 23. The apparatus as recited in claim 21 wherein a plurality of tubes extend between each of the manifolds of the tube and manifold system.
  • 24. The apparatus as recited in claim 21 wherein the number of exit ports in each manifold is less than the number of tubes delivering the fluid slurry to that manifold.
  • 25. The apparatus as recited in claim 21 wherein the number of exit ports in each manifold is the same as the number of tubes delivering the fluid slurry to that manifold.
  • 26. The apparatus as recited in 21 wherein the number of exit ports in each manifold is greater than the number of tubes delivering the fluid slurry to that manifold.
  • 27. The apparatus as recited in claim 21 wherein the tubes on either side of the manifolds positioned within the sections of the sand control screen are axially aligned.
  • 28. The apparatus as recited in claim 21 wherein the tubes on either side of the manifolds positioned between adjacent sections of the sand control screen are not axially aligned.
  • 29. A method for gravel packing an interval of a wellbore, the method comprising the steps of:traversing a formation with the wellbore; positioning a tube and manifold system within the wellbore proximate the formation, the tubes of the tube and manifold system having first and second ends, the tubes having openings only at the first and second ends, the manifolds of the tube and manifold system having at least one exit port; locating a sand control screen within the tube and manifold system; injecting a fluid slurry containing gravel through the tube and manifold system such that the fluid slurry exits the tube and manifold system through the exit ports in the manifolds at a plurality of levels of the interval; and terminating the injecting when the interval is substantially completely packed with the gravel.
  • 30. The method as recited in claim 29 wherein the step of injecting a fluid slurry containing gravel through the tube and manifold system further comprises injecting the fluid slurry containing gravel through a single tube extending between each of the manifolds of the tube and manifold system.
  • 31. The method as recited in claim 29 wherein the step of injecting a fluid slurry containing gravel through the tube and manifold system further comprises injecting the fluid slurry containing gravel through a plurality of tubes extending between each of the manifolds of the tube and manifold system.
  • 32. The method as recited in claim 29 further comprising the step of circumferentially misaligning the exit ports of the manifolds with adjacent tubes of the tube and manifold system.
  • 33. The method as recited in claim 29 further comprising the step of circumferentially aligning the exit ports of the manifolds with adjacent tubes of the tube and manifold system.
  • 34. The method as recited in claim 29 further comprising the step of positioning a plurality of manifolds adjacent to each section of the sand control screen and positioning one of the manifolds between adjacent sections of the sand control screen.
  • 35. The method as recited in claim 34 further comprising the step of axially aligning the tubes on either side of the manifolds positioned adjacent to the sections of the sand control screen.
  • 36. The method as recited in claim 34 further comprising the step of axially misaligning the tubes on either side of the manifolds positioned between adjacent sections of the sand control screen.
  • 37. A method for gravel packing an interval of a wellbore, the method comprising the steps of:traversing a formation with the wellbore; positioning a tube and manifold system around a sand control screen, the tubes of the tube and manifold system having first and second ends, the tubes having openings only at the first and second ends, the manifolds of the tube and manifold system having at least one exit port; locating the sand control screen and the tube and manifold system within the wellbore proximate the formation; injecting a fluid slurry containing gravel through the tube and manifold system such that the fluid slurry exits the tube and manifold system through the exit ports in the manifolds at a plurality of levels of the interval; and terminating the injecting when the interval is substantially completely packed with the gravel.
  • 38. The method as recited in claim 37 wherein the step of injecting a fluid slurry containing gravel through the tube and manifold system further comprises injecting the fluid slurry containing gravel through a single tube extending between each of the manifolds of the tube and manifold system.
  • 39. The method as recited in claim 37 wherein the step of injecting a fluid slurry containing gravel through the tube and manifold system further comprises injecting the fluid slurry containing gravel through a plurality of tubes extending between each of the manifolds of the tube and manifold system.
  • 40. The method as recited in claim 37 further comprising the step of circumferentially misaligning the exit ports of the manifolds with adjacent tubes of the tube and manifold system.
  • 41. The method as recited in claim 37 further comprising the step of circumferentially aligning the exit ports of the manifolds with adjacent tubes of the tube and manifold system.
  • 42. The method as recited in claim 37 further comprising the step of positioning a plurality of manifolds adjacent to each section of the sand control screen and positioning one of the manifolds between adjacent sections of the sand control screen.
  • 43. The method as recited in claim 42 further comprising the step of axially aligning the tubes on either side of the manifolds positioned adjacent to the sections of the sand control screen.
  • 44. The method as recited in claim 42 further comprising the step of axially misaligning the tubes on either side of the manifolds positioned between adjacent sections of the sand control screen.
  • 45. A method for gravel packing an interval of a wellbore, the method comprising the steps of:traversing a formation with the wellbore; positioning a tube and manifold system around a sand control screen having a plurality of sections, the tubes of the tube and manifold system having first and second ends, the tubes having openings only at the first and second ends, the manifolds of the tube and manifold system having at least one exit port; positioning a plurality of manifolds adjacent to each section of the sand control screen and positioning one of the manifolds between adjacent sections of the sand control screen; circumferentially misaligning the exit ports of the manifolds with adjacent tubes of the tube and manifold system; locating the sand control screen and the tube and manifold system within the wellbore proximate the formation; injecting a fluid slurry containing gravel through the tube and manifold system such that the fluid slurry exits the tube and manifold system through the exit ports in the manifolds at a plurality of levels of the interval; and terminating the injecting when the interval is substantially completely packed with the gravel.
  • 46. The method as recited in claim 45 wherein the step of injecting a fluid slurry containing gravel through the tube and manifold system further comprises injecting the fluid slurry containing gravel through a single tube extending between each of the manifolds of the tube and manifold system.
  • 47. The method as recited in claim 45 wherein the step of injecting a fluid slurry containing gravel through the tube and manifold system further comprises injecting the fluid slurry containing gravel through a plurality of tubes extending between each of the manifolds of the tube and manifold system.
  • 48. The method as recited in claim 45 further comprising the step of axially aligning the tubes on either side of the manifolds positioned adjacent to the sections of the sand control screen.
  • 49. The method as recited in claim 45 further comprising the step of axially misaligning the tubes on either side of the manifolds positioned between adjacent sections of the sand control screen.
US Referenced Citations (34)
Number Name Date Kind
2342913 Williams et al. Feb 1944 A
2344909 Williams et al. Mar 1944 A
4945991 Jones Aug 1990 A
5082052 Jones et al. Jan 1992 A
5113935 Jones et al. May 1992 A
5161613 Jones Nov 1992 A
5161618 Jones et al. Nov 1992 A
5333688 Jones et al. Aug 1994 A
5355956 Restarick Oct 1994 A
5390966 Cox et al. Feb 1995 A
5419394 Jones May 1995 A
5443117 Ross Aug 1995 A
5476143 Sparlin et al. Dec 1995 A
5515915 Jones et al. May 1996 A
5588487 Bryant Dec 1996 A
5636691 Hendrickson et al. Jun 1997 A
5755286 Ebinger May 1998 A
5842516 Jones Dec 1998 A
5848645 Jones Dec 1998 A
5868200 Bryant et al. Feb 1999 A
5890533 Jones Apr 1999 A
5921318 Ross Jul 1999 A
5931229 Lehr et al. Aug 1999 A
5934376 Nguyen et al. Aug 1999 A
6003600 Nguyen et al. Dec 1999 A
6047773 Zeltmann et al. Apr 2000 A
6059032 Jones May 2000 A
6116343 Van Petegem et al. Sep 2000 A
6125933 Ross Oct 2000 A
6220345 Jones et al. Apr 2001 B1
6227303 Jones May 2001 B1
6230803 Morton et al. May 2001 B1
6298916 Tibbles et al. Oct 2001 B1
6343651 Bixenman Feb 2002 B1
Foreign Referenced Citations (6)
Number Date Country
1 132 571 Sep 2001 EP
WO 9912630 Mar 1999 WO
WO 0061913 Oct 2000 WO
WO 0114691 Mar 2001 WO
WO 0144619 Jun 2001 WO
WO 0210554 Feb 2002 WO
Non-Patent Literature Citations (7)
Entry
“Frac Pack Technology Still Evolving,” Charles D. Ebinger of Ely & Associates Inc.; Oil & Gas Journal, Oct. 23, 1995.
“Mechanical Fluid-Loss Control Systems Used During Sand Control Operations,” H.L. Restarick of Otis Engineering Corp., 1992.
“Sand Control Screens,” Halliburton Energy Services, 1994.
“Screenless Single Trip Multizone Sand Control Tool System Saves Rig Time,” Travis Hailey and Morris Cox of Haliburton Energy Services, Inc.; and Kirk Johnson of BP Exploration (Alaska), Inc. Society of Petroleum Engineers Inc., Feb., 2000.
“Simultaneous Gravel Packing and Filter Cake Removal in Horizontal Wells Applying Shunt Tubes and Bovel Carrier and Breaker Fluid,” Pedro M. Saldungaray of Schlumberger; Juan C. Troncoso of Repson-YPF; Bambang T. Santoso of Repsol-YPF. Society of Petroleum Engineers, Inc., Mar., 2001.
“CAPSSM Concentric Annular Packing Service for Sand Control,” Halliburton Energy Services, Inc., Aug., 2000.
“CAPSSM Sand Control Service for Horizontal Completions Improves Gravel Pack Reliability and Increases Production Potential from Horizontal Completions,” Halliburton Energy Services, Inc., Aug., 2000.