1. Technical Field
Embodiments of the invention relate generally to apparatus and method for transferring a hydrocarbon fluid, e.g. liquefied natural gas (LNG), between two bodies, e.g. a carrier vessel, a floating/fixed hydrocarbon facility.
2. Description of Related Art
Various apparatus and methods for offloading hydrocarbon fluid from a carrier vessel to a floating/fixed hydrocarbon facility, and vice versa, are available but have inherent problems. Offloading hydrocarbon fluid between vessels is also problematic due to unpredictable changes to sea state conditions.
US 2009/0165874 A1 (Pollack et al.) discloses a hydrocarbon transfer system that includes a first structure with a length direction and a transverse direction having a frame carrying a vertical arm with at its end a fluid connecting member for connecting to a second structure which is moored alongside the first structure. The connecting member includes a winch and first guiding elements for engaging with second guiding elements on the second structure by connecting a wire to the winch on one end to the second structure on the other end, and a tension device for moving the vertical arm away from the second structure for tensioning the wire. Due to the inherent rigidity in the above-described members, the system is susceptible to damage if there is a large relative movement between the first and second structures and/or relative dynamic motions are frequent due to severe weather condition. Further, the use of swivels increases a likelihood of leakage during hydrocarbon transfer. This system is also very expensive to manufacture.
US 2010/0147398 A1 (Thomas at al.) discloses a platform and a manifold, the latter being intended to be connected to a fluid tank. The manifold comprises a length of rigid tube defining a pipe of approximately horizontal axis and a length of connecting tube for connection to a transfer line connected to the length of rigid tube. The length of connecting tube is permanently attached to the length of rigid tube and is hinged to the length of rigid tube to allow movement relative to the length of rigid tube between: —a retracted rest position in which the length of connecting tube extends entirely inside the inner edge; and—a first or filling position, in which the free end of the length of connecting tube projects out from the outer edge of the support platform.
In S. Hoog, H. Koch, R. Huhn, C. Frohne, J. Homann, G. Clauss, F. Sprenger, D. Testa: “LNG Transfer in Harsh Environments-Introduction of a New Concept”, OTC 19866, Offshore Technology Conference, Houston, USA, 2009, an approach and handling system is disclosed for use when a carrier vessel and terminal are moored in a tandem configuration. A loading bridge is provided at the terminal to handle four transfer pipes simultaneously by a two part header structure which is transferred between the terminal and carrier vessel. The two part header structure combines the following active functionality: simultaneous support and operation of all four flexible pipes with related Quick Connect/Disconnect Couplers (QCDC) and Emergency Release Couplings (ERC); winch driven fine approach, alignment and landing at the LNGC receiving manifold aided; damping of the touch down at the manifold by means of hydraulic dampeners; operation (closing and disconnection) of all four QCDCs; operation (closing and disconnection) of all four ERCs in an Emergency Shut-Down (ESD) situation; remote controlled departing of both header parts (and subsequent lifting of the upper means of pre-tensioned wires suspended from the loading bridge) in an ESD situation. Normally, the carrier vessel would need to move away from the terminal and hence, in this system, before the carrier vessel can move away to safety, the header structure has to be lifted clear to prevent collision with parts of the carrier vessel.
Embodiments of the invention disclose various apparatus and method for transferring a hydrocarbon fluid between two bodies which may be floating and/or fixed.
According to one embodiment, an offloading system for facilitating hydrocarbon fluid transfer between two bodies includes a transfer skid and a lifting system for manipulating the transfer skid. The transfer skid is movable from a first body to a second body to be installed thereupon to facilitate hydrocarbon fluid transfer to and from the first and the second bodies. The transfer skid may comprise a skid frame, several pipes which are rigidly attached to the skid frame, and jack screw mechanisms for independently adjusting the pipes relative to the skid frame. Each of the pipes has a first end and a second distal end, where a coupler is provided at the first end to connect to the second body after installing the transfer skid on a second body, and an emergency release coupling is provided at the second end of the each of the pipes. A transfer hose is interposed or connected between the emergency release coupling and the first body.
The lifting system may be provided on the first body, and includes an extendable lifting arm; a spreader frame attachment which includes at least a first and a second lifting device to support the transfer skid, wherein the spreader frame attachment is rotatably coupled to the extendable lifting arm to allow angular adjustment of the transfer skid in a horizontal plane.
In the spreader frame attachment, the first lifting device is adapted to support one side of the skid frame which is proximate to the coupler, and the second lifting device is adapted to support an opposed side of the skid frame which is proximate to the emergency release coupling. The first and the second lifting devices are adapted to independently adjust the skid frame to prevent tilting of the skid frame.
Each coupler of the transfer skid is adapted to connect to a pipe extension installed on the second body, wherein the pipe extension includes a flexible expansion joint which is deflectable in an axial direction, a lateral direction and an angular direction to align with the coupler.
Upon installing the transfer skid onto the second body, the coupler is disposed inboard the second body while the emergency release coupling is disposed outboard of the second body, since the coupler and the emergency release coupling are arranged spaced apart by the pipes connected therebetween.
During an emergency release operation, the emergency release coupling disconnects the transfer hose from the transfer skid installed at the second body by way of detaching a part of the emergency release coupling. The detached part of the emergency release coupling, together with the corresponding transfer hose attached thereto, is allowed to fall away from the transfer skid due to gravity force. As the detached part of the emergency release coupling is supported by the lifting system, which is provided on the first body, to limit the fall of the detached part of the emergency release coupling, the detached part of the emergency release coupling and its corresponding transfer hose are prevented from falling into the water, and are lifted and returned to the first body.
Other features and advantages of the invention will be apparent from the following description and accompanying drawings.
Embodiments of the invention are disclosed hereinafter with reference to the drawings, in which:
In the following description, numerous specific details are set forth in order to provide a thorough understanding of various illustrative embodiments of the invention. It will be understood, however, to one skilled in the art, that embodiments of the invention may be practiced without some or all of these specific details. In other instances, well known process operations have not been described in detail in order not to unnecessarily obscure pertinent aspects of embodiments being described. In the drawings, like reference numerals refer to same or similar functionalities or features throughout the several views.
Embodiments of the invention provide an apparatus and method for offloading or transferring a hydrocarbon fluid between two bodies in ship-to-ship, ship-to-shore, and shore-to-ship applications. Examples of the two bodies involved include, but are not limited to, a carrier vessel, a barge, a receiving terminal, a floating/fixed hydrocarbon facility, offshore platforms. Hydrocarbon fluid to be transferred includes, but is not limited to, liquefied natural gas (LNG) and liquefied petroleum gas (LPG).
The utility platform 100 may be provided as an elevated structure which houses various utilities for handling the transfer skid 200 and transfer hoses 250. A parking platform 102 may be provided on the utility platform 100 to support or house the transfer skid 200 in a parking position. The parking platform 102 may be arranged at a suitably elevated level above a main deck of the floating/fixed hydrocarbon facility 10 so that when the transfer skid 200 is arranged in a parking position, the transfer hoses 250 connected to the transfer skid 200 may be allowed to hang in a catenary form (i.e. naturally free-hanging).
The lifting system 400 allows improved manipulation of the transfer skid 200. Particularly, the telescopic crane arm is extendable towards a desired destination to position the spreader frame attachment 420 thereon. Accordingly, the crane arm is capable of creating an additional adjustable horizontal and/or vertical extension to assist in installation and retrieval of the transfer skid 200 from a carrier vessel 20 (also referred to as “second body”). Since the spreader frame attachment 420 is rotatable relative to the tip of the crane arm, the spreader frame attachment 420 allows the transfer skid 200 to be angularly or rotationally adjusted in a horizontal plane. As a person skilled in the art would appreciate, it may not be possible to position a carrier vessel 20 in parallel with the floating/fixed hydrocarbon facility 10 due to environmental conditions, and therefore an angular displacement between the carrier vessel 10 and the floating/fixed hydrocarbon facility 10 is likely. Hence, the ability of the spreader frame attachment 420 to angularly or rotationally adjust the transfer skid 200 is particularly advantageous during installation when the transfer skid 200 is positioned on a carrier vessel 20 to align to a pipe deck 500 on the carrier vessel 20 and during retrieval of the transfer skid 200 after an offloading operation.
Fixed hard pipe manifolds 110 (see
The pipes 204 may be rigidly attached to the skid frame 202 to prevent load unbalance and swaying movements due to wind. However, jack screws may be provided at each pipe 204 to allow independent adjustment of each pipe 204 relative to the skid frame 202 in one or more directions, e.g. x, y and z directions (see
The ERC 216 may be formed of a pair of mating parts or connectors (hereinafter ERC1 216a and ERC2 216b respectively) which are normally securely engaged to each other when the transfer skid 200 is disposed in a parked position and during offloading operation. The mating parts may be activated to disconnect from each other within a predetermined time during an emergency release operation. ERC1 216a connects to a transfer or flexible hose 250 which is to connect, directly or via other connectors or pipes 204, to a floating/fixed hydrocarbon facility 10. ERC2 216b is interposed or connected between ERC1 216a and the pipe 204, directly or indirectly through a swivel 215. A slack ERC hoist sling 222 attaches each ERC1 216a to a common spreader beam 210.
At two ends of the skid frame 202, shock absorbers or hydraulic dampeners 206 and guide funnels 208 may be provided. The shock absorbers 206 are constructed and arranged to dampen impact on the transfer skid 200 upon landing of the guide funnels 208 during installation of the transfer skid 200 on a carrier vessel. The guide funnels 208 are constructed and arranged to guide the transfer skid 200, in cooperation with guide wires 220, to a desired position during installation.
The skid frame 202 may have opposed sides which are supported by lifting devices or winches which may be capable of exerting independent control. Particularly, one side of the skid frame 202, which is proximate to the QC/DCs 212, may be supported by hoist wires 211a which are in turn supported by a first lifting device 430 (see
Quick release connectors may be provided at the hoist wires 211a, 211b to allow disconnection of the transfer skid 200 from the spreader beam 210 and lifting devices.
As would be appreciated from the above, the functions of the transfer skid 200 include, but are not limited to, providing a connection interface for hydrocarbon fluid transfer between two bodies 10, 20 and allowing simultaneous transfer of multiple transfer hoses 250 with a single lift.
Preparation for Offloading Operation & Offloading Operation
A sequence for installing a pipe deck 500 on a carrier vessel 20, connecting a transfer skid 200 to the carrier vessel 20 is described with reference to
Once the transfer skid 200 is positioned approximately over the pipe deck 500, the guide wires 220 may be lowered towards the pipe deck 500 on the carrier vessel 20 (see
During landing, funnels 208 of the transfer skid 200 may collide with the deck of the carrier vessel 20 (see
At this stage, the hoist wires 211a, 211b supporting the transfer skid 200 may be disconnected from the lifting system 400 (see
Although the transfer skid 200 is landed onto the carrier vessel 20, there may exist gaps between the QCDCs 212 of the transfer skid 200 and the flanges of the flexible expansion joint 504. Adjustments to the alignment of the QCDCs 212 to engage with the flanges of the flexible expansion joints 504 may be performed by jack screw mechanisms provided in the transfer skid 200. Particularly, jack screw mechanism of each pipe 204 of the transfer skid 200 may be controlled to move the pipe 204 in vertical, horizontal and/or transverse directions. Thereafter, fine adjustments to the alignment of the QCDCs 212 to engage with the flanges of the flexible expansion joints 504 may be compensated by the flexible expansion joints 504 provided at the pipe extensions (see
At this stage, the transfer skid 200 is installed at the carrier vessel 20 in preparation for an offloading operation. The QCDCs 212 are disposed inboard the carrier vessel 20, e.g. above the main deck of the carrier vessel 20, while the ERCs 216 are disposed outboard of the carrier vessel 20, e.g. exterior of the carrier vessel 20 and over the sea. This is possible as each QCDC 212 is spaced apart from an ERC 216 by a pipe 204 interposed or connected therebetween.
Before commencing offloading operation, the lifting system 400 may retract and the ERC hoist slings 222 connected to the spreader beam 210 may be allowed to slack. Other checks and procedures may take place as required. Offloading operation may then take place in which hydrocarbon fluid, e.g. liquefied natural gas (LNG), may be transferred from the carrier vessel 20 to the floating/fixed hydrocarbon facility 10 by way of transfer pumps. Hydrocarbon fluid is transferred from the carrier vessel 20 to the floating/fixed hydrocarbon facility 10, or vice versa, via the fluidly connected transfer hoses 250, pipes 204 of the transfer skid 200 and pipe extensions 502 installed on the carrier vessel 20. In one embodiment, two transfer hoses 250 are configured for hydrocarbon fluid transfer while the remaining hose 250 is configured for vapour return. In certain embodiments, vapour return may not be required. During offloading, transfer hoses 250 may be disposed outboard of the carrier vessel 20 and floating/fixed hydrocarbon facility 10 and hung in a catenary form. This way, less stress will be induced in the transfer hoses 250.
After the offloading operation is completed, various checks and procedures may take place to ensure that the hydrocarbon fluid transfer is ceased and it is safe to disconnect the transfer skid 200. The lifting system 400 may be deployed to connect to the transfer skid 200 in preparation to return the transfer skid 200 to the floating/fixed hydrocarbon facility 10 after the transfer skid 200 is disconnected from the carrier vessel 20. In one embodiment where the ERCs 216 has a dual function of a double block valve, after transfer pumps are stopped, the valves in the ERCs 216 may be closed and hydrocarbon fluid in the pipes 204 of the transfer skid 200 may be drained and purged towards the carrier vessel 20. After purging, the transfer skid 200 may be disconnected from the pipe deck 500 by unlocking the QCDCs 212 of the transfer skid 200. The transfer skid 200, supported by the lifting system 400, may be lifted away from the carrier vessel 20 and the carrier vessel 20 may then move off as and when required without waiting for hydrocarbon fluid remaining in the transfer hoses 250 to boil off and to be purged as required in conventional systems. Embodiments of the invention thus allow faster disconnection of the transfer skid 200 after an offloading operation is completed, and without waiting for hydrocarbon fluid in the transfer hoses 250 to boil off and to be purged before disconnecting the transfer skid 200 from the carrier vessel 20. In certain embodiments, the separate double block valves may be provided in the pipes 204 and may also be similarly utilized as described above.
The transfer skid 200, supported by the lifting system 400, is lifted to allow hydrocarbon fluid in the transfer hoses 250 drain by gravity towards the floating/fixed hydrocarbon facility 10 (see
Emergency Situation and Emergency Release Operation
During the offloading operation, an emergency situation may occur that requires the transfer hoses 250 to separate or disconnect from the carrier vessel 20 safely and quickly. Examples of an emergency situation include, but are not limited to, extreme weather and environmental conditions causing carrier vessel 20 to drift away from the floating/fixed hydrocarbon facility 10, failure of mooring lines resulting in undesirable repositioning of the carrier vessel 20, and fire breakout.
Once the operating conditions are ascertained to have exceeded certain safe operating threshold, an Emergency Shut Down situation may be triggered in which transfer pumps are stopped and an Emergency Release System may be subsequently triggered to disconnect the transfer hoses 250 from the transfer skid 200 installed at the carrier vessel 20. Particularly, the ERCs 216 are activated to detach the parts 216a, 216b or connectors forming the ERC 216 (see
However, the fall of the detached part 216a of the ERC 216 may be limited by the second lifting device 440 which supports the detached part 216a of the ERC. Particularly, as illustrated in
During the emergency release of the ERCs 216, the transfer skid 200, including pipes 204, QCDCs 212 and the other part 216b of the ERCs 216 which is attached to the QCDCs 212, will remain installed at the carrier vessel 20 until the emergency situation is brought under control or is resolved. Subsequently, a separate operation may be initiated to uninstall the transfer skid 200 from the carrier vessel 20 and move or return the transfer skid 200 to the floating/fixed hydrocarbon facility 10. Suitable procedures may take place to re-assemble the detached ERC parts 216a, 216b to prepare the transfer skid 200 for the next offloading operation.
In the above-described offloading operation, emergency release operation and return of the detached ERCs 216 to the parked position, the transfer hoses 250 may be allowed to hang naturally in a catenary form.
Embodiments of the invention achieve various advantages such as but not limited to the following:
(1) If an emergency release is required during an offloading operation, the ERCs are disconnected thereby resulting in one halves of the ERCs and the corresponding transfer hoses detach from the transfer skid. The detached connector of each ERC and corresponding transfer hose may free fall up to a predetermined distance but are nonetheless supported by a spreader beam and lifting system. The detached connector of each ERC may be moved or returned to the utility platform or parked position using the lifting system. Accordingly, when an emergency condition occurs, the carrier vessel may move away to safety upon detaching of the ERC. This results in a faster and safer emergency release operation.
(2) During an offloading operation, the ERCs would be disposed outboard. If emergency release is required, the disconnected ERCs would free fall towards the sea and therefore would not result in hydrocarbon spill on the carrier vessel or collision with the carrier vessel.
(3) Although the transfer skid allow simultaneous transport of the multiple pipes and transfer hoses from a floating/fixed hydrocarbon facility to a carrier vessel, each pipe of the transfer skid may be independently positioned and connected to the flanges of flexible expansion joints on the carrier vessel. This improves mating connection even if there is misalignment which may be due various reasons, e.g. a deck of the carrier vessel supporting the pipe deck is uneven or tilted.
(4) The transfer skid supports multiple transfer devices so that transport of the transfer hoses together with the QCDCs and ERCs between two bodies is simultaneous and therefore efficient.
Other embodiments will be apparent to those skilled in the art from consideration of the specification and practice of the invention. Furthermore, certain terminology has been used for the purposes of descriptive clarity, and not to limit the disclosed embodiments of the invention. The embodiments and features described above should be considered exemplary, with the invention being defined by the appended claims.
This application is a continuation-in-part of U.S. Ser. No. 13/236,262, filed Sep. 19, 2011, and claims the benefit of U.S. Provisional Application No. 61/451,710, filed Mar. 11, 2011 and U.S. Provisional Application No. 61/385,459, filed Sep. 22, 2010, the entire contents of each of which are hereby incorporated by reference into this application.
Number | Name | Date | Kind |
---|---|---|---|
2818891 | Loeser | Jan 1958 | A |
2914080 | Silveston | Nov 1959 | A |
2922446 | Sheiry | Jan 1960 | A |
3032082 | Vilain | May 1962 | A |
3210114 | Lawton | Oct 1965 | A |
3217748 | Harper | Nov 1965 | A |
3228421 | Sheiry | Jan 1966 | A |
3249121 | Bily | May 1966 | A |
3401804 | Link | Sep 1968 | A |
3567040 | Thomson | Mar 1971 | A |
3608577 | Blanchard | Sep 1971 | A |
3974864 | Fournier et al. | Aug 1976 | A |
4019333 | Karsan | Apr 1977 | A |
4168857 | Kloos | Sep 1979 | A |
4220177 | Gill | Sep 1980 | A |
4286722 | Tax et al. | Sep 1981 | A |
4350254 | Noly | Sep 1982 | A |
4352516 | Gasper | Oct 1982 | A |
4388948 | Carminati et al. | Jun 1983 | A |
4538849 | Khachaturian et al. | Sep 1985 | A |
5067013 | Lindholm et al. | Nov 1991 | A |
5163726 | Boos et al. | Nov 1992 | A |
6609544 | Williamson | Aug 2003 | B1 |
6637479 | Eide et al. | Oct 2003 | B1 |
7066219 | Poldervaart et al. | Jun 2006 | B2 |
7147022 | Le Devehat | Dec 2006 | B2 |
7174930 | Poldervaart et al. | Feb 2007 | B2 |
7565982 | Kurotsu et al. | Jul 2009 | B2 |
20040011424 | Dupont et al. | Jan 2004 | A1 |
20070289517 | Poldervaart et al. | Dec 2007 | A1 |
20090165874 | Pollack et al. | Jul 2009 | A1 |
20090272459 | Biaggi | Nov 2009 | A1 |
20100147398 | Thomas et al. | Jun 2010 | A1 |
20120230772 | Foo et al. | Sep 2012 | A1 |
Entry |
---|
Hoog, S., Koch, H., Huhn, R., Frohne, C., Homann, J., Clauss, G., . . . Testa, D. (2009). LNG transfer in harsh environments—introduction of a new concept. OTC-19866-PP, Offshore Technology Conference. Houston, Texas. |
European Search Report, including Annex to the European Search Report and European Search Opinion, dated Dec. 27, 2011 and issued in connection with European Patent Application No. EP 11 18 2036.1. |
Number | Date | Country | |
---|---|---|---|
20120152366 A1 | Jun 2012 | US |
Number | Date | Country | |
---|---|---|---|
61451710 | Mar 2011 | US | |
61385459 | Sep 2010 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 13236262 | Sep 2011 | US |
Child | 13407577 | US |