1. Field of the Invention
The invention relates generally to apparatus for pouring pre-stressed concrete, used for roadways, walls, and structural beams and supports. More specifically, the invention pertains to and apparatus and a method, for pouring pre-stressed concrete structures in situ, through the use of a transportable cable stressing frame, positioned and maintained directly over a form for the concrete structure.
2. Description of the Prior Art
Pre-stressing concrete has long been recognized as a technique to increase the tensile strength of cast concrete structures. The method generally requires that high strength wires, cables, or rods, passing through the empty mold or form for the concrete structure, are pre-stressed under high tension using a calibrated tensioning fixture. Then, the concrete is poured into the mold or form, enveloping the pre-stressed wires or cables. After the concrete has cured, the wires outside the mold are cut from the tensioning fixture, transferring the compressive forces to the concrete through the bond between the wires or cables and the concrete.
The general principles of this technique are illustrated in U.S. Pat. No. 6,773,650, issued to Longo for a Prestressed Concrete Casting Apparatus And Method. The '650 patent illustrates a pre-stressing clamshell apparatus designed to cast cementitious power poles. In this arrangement, a plurality of stationary, cable pre-tensioning devices are lined up at a production facility. The movable clamshell mold surrounds each pre-tensioning fixture while the concrete is poured and allowed to set. Then, the mold is opened and lifted up, and then moved along to the adjacent fixture, where the process is repeated.
An Apparatus For Making Prestressed Structural Members is disclosed in U.S. Pat. No. 3,049,786, granted to Jones. This apparatus uses a cable pre-stressing fixture like that shown in the '650 patent, but relies upon a movable mold member 60. As concrete is poured into the mold member, the mold member is slid along the fixture until the entire poured structure is formed over the cables.
In U.S. Pat. No. 3,260,024, issued to Greulich, a Prestressed Girder is shown. This reference suggests that the girder can be constructed either at the prestressing plant or at the building site, using an apparatus such as that depicted in
Basically the same methods discussed above are used to manufacture pre-stressed concrete slabs or roadway segments. These concrete structures are used for new road construction, or for purposes of road repair. For example, in making a new freeway, or in repairing damaged portions of roadway, a concrete slab or roadway segment is manufactured at an off-site facility, using a cable pre-stressing apparatus and a form or mold arrangement associated with that apparatus. After the concrete is poured and cured, the slab is transported by truck or rail to the roadway site for installation. In preparing a bed within which the new slab is to rest, every effort is made to match the inclination, orientation, and depth of the bed with that of the new slab, so that a smooth roadway transition can be made between adjacent slabs. Notwithstanding these efforts, it is very difficult to effect a perfect match between the bed and the slab, and surface anomalies and gaps do occur between adjacent slabs.
Similarly, it is conventional that pre-stressed walls, beams, posts, and other concrete structures are manufactured at a production facility, where permanent fixtures are located for pre-stressing cables and forms are provided to determine the size and configuration of the concrete structures. As with the roadway slabs, after pouring and curing, these concrete structures must also be transported to a remote building site, offloaded, and assembled or arranged as required.
The apparatus and method disclosed herein are specially adapted to manufacture pre-stressed concrete structures, such as roadway segments, precisely at the site where the pre-stressed structure is to be used. Additionally, for other concrete structures, such as walls, beams, posts, and the like, production takes place at the same location where place of assembly or installation occurs.
This is accomplished by providing a transportable pre-stressing frame which is readily moved from pour site to pour site. This feature is useful, for example, when making interconnected roadway segments, arranged end-to-end, for a freeway. Transport of the pre-stressing frame from site to site can also be advantageous, where the building site is large or there is need for production of building components for multiple buildings in the same general area.
In contrast to prior art devices which generally employ a permanently mounted beam or frame on the floor of a manufacturing facility, the present device has a transportable pre-stressing frame, provided with downwardly directed outrigger assemblies at either end of the frame. The frame is initially positioned and then maintained in horizontal, spaced relation, above a form at a pour site, using adjustable mechanical, hydraulic, or electric jacks, or other equivalent raising and lowering devices. The form is typically comprised of opposing side structures or walls, spanned by opposing bulkheads at either end of the form. The length of the frame is such that each of the outrigger assemblies is located outside the form, adjacent a respective bulkhead.
Cables are secured to the outrigger assemblies at one end of the frame, and passed through the bulkheads to corresponding outrigger assemblies at the other end of the frame. The elevation of the cables is maintained below the upper edge of the form. Preferably, the cables are located mid-way between the floor of the form and upper edge. Each of the cables is pre-stressed to a predetermined tension, using conventional cable pre-stressing fixtures. With the form ready and the cables pre-stressed, concrete is poured into the form entirely covering the cables. With accelerators and other additives, concrete can be cured sufficiently in a number of hours, so that the tension forces in the cables can be released and transferred to the concrete slab as compressive forces. This is accomplished by cutting the cables at a point just past each end of the formed concrete slab, in a region between the outriggers and the bulkheads. The bulkheads are of split design, allowing their removal from around the cable and the end of the slab. The pre-stressing frame can then be lifted and removed from the site, and relocated to a new site.
Successive pours of slabs can be made, in end-to-end relation, to form a continuous roadway made from pre-stressed concrete poured on the site. Adjacent slabs are perfectly aligned, as the height of each form is readily adjusted to match the height of the adjacent slab, and the orientation and horizontal position of the form are likewise adjustable at the pour site.
The same apparatus and method can be used to manufacture walls, beams, posts, and poles on site, very near to where the concrete structure is eventually installed and utilized. Transportation costs and possible damage to the structures are reduced, as the structures do not have to be moved from a manufacturing facility. Lastly, the transportable frame can quickly be moved from construction site to construction site, as needed, improving the efficiency and speed of manufacturing and assembling concrete structures.
Turning now to the drawings, the apparatus 11 of the present invention includes an elongated cable pre-stressing frame 12, having a first end 13 and a second end 14. At least one first outrigger assembly 16 depends from the first end 13, and at least one second outrigger assembly 17 depends from the second end 14. In a typical setting, such as that shown in
As shown more particularly in
In a preferred embodiment, frame 12 includes elongated side rails 27, arranged in parallel spaced relation, and transverse end rails 28 and 29. This construction provides a very strong structure against which the pre-stressed cables, discussed below, can be tensioned to predetermined specifications for manufacturing pre-stressed concrete structures. This construction also allows the frame 12 to be disassembled into a more compact configuration, in the event the side rails are provided with telescoping sleeve portions, suggested by joint lines 31. It may be desirable for manufacturing more narrow concrete structures, such as beams and posts, to fabricate frame 12 from a single I-Beam 32 fitted with transverse end rails 28 and 30. This alternative construction is shown in
As illustrated in
Form sides 34 may be constructed from reinforced metal plates, wooden planks or the like, of conventional design. Since roadway segments 39 can extend up to 60′ or so in length, it may be desirable to assemble sides 34 from a number of modular units (not shown), so as to make handling easier. On the other hand, breaking up sides 34 into a plurality of such units would require more labor to assemble and disassemble the apparatus when moving from pouring site to pouring site.
Bulkheads 36 and 37 are of split design, primarily to facilitate the passage of at least one pre-stressed cable 41 through the middle portion of each bulkhead. Making particular reference to
Although the apparatus 11 includes at least one pre-stressed cable 41, the configuration of the apparatus shown in
Apparatus 11 further includes jack means 52, for positioning and maintaining elongated frame 12 over, and generally in longitudinal alignment with, form 33. Jack means 52 may be any conventional raising and lowering device, such as a mechanical, hydraulic, or electric jack. As shown in
Each of the cables 41 is pre-stressed to a predetermined tension, by means of a conventional pre-stressing fixture 53, shown in
As a first step in the cable pre-stressing process, a pre-stress chuck 54, or other equivalent cable locking device, is engaged over one end of the cable 41, adjacent the cable restraint extension 19. The chuck 54 includes a forward nose portion that seats within chuck recess 20, provided in the lower end of cable restraint extension 19. Suitable pre-stress chucks include the Sure-Lock Splice Chuck and the Sure-Lock Strand Chuck, manufactured by MeadowBurke, located in Tampa, Fla.
Next, the pre-stressing fixture 53 is attached to the other end of the cable, adjacent a respective cable restraint extension 19, as illustrated in
After the concrete has cured, the apparatus 11 can be removed from the pour site. To release the frame 12, all of the cables 41 are severed between the end of the new roadway segment 39 and respective cable restraint extensions 19. This is usually done by means of a cutting torch. With the frame 12 free from the cables, the frame can now be lifted first vertically and then horizontally, away from the pour site. Remaining is the form 33. The elongated sides 34 are next removed, exposing the sides of the roadway segment 39. Then, the nuts and bolts holding the first and second bulkheads 36 and 37 are removed, allowing the split bulkheads to be removed from the pour site.
As shown in
An alternative method of pouring is shown in
When multiple lanes of a roadway are manufactured using the apparatus 11, such as the three lane construction shown in
Another scenario where the apparatus 11 may be used advantageously, is to repair an old roadway 64 which has become cracked, vertically displaced, or otherwise damaged. First, the damaged section of the old roadway is defined, by cutting around the damaged section using conventional concrete saws. The concrete within the damaged section is subsequently removed and the floor of the excavation is graded. The apparatus 11 is then moved into place, in spaced relation above the excavation, using jacks 52 resting on the adjacent old roadway 64. Since the existing sidewalls of the old roadway 64 effectively provide the sides of the form 33, only the bulkheads 36 and 37 need to be installed to confine the pour, as shown in
To accommodate the need to manufacture a shorter roadway segment length, frame 12 may be fitted with a secondary outrigger frame 66, shown in detail in
Secondary outrigger frame 66 also includes a plurality of outrigger assemblies 68 identical to assemblies 16 and 17, described above. Each of these assemblies includes a receiver 18 and a cable restraint extension 19. Each receiver 18 further includes a slot portion 21 to receive a tongue portion 22 of an extension 19, and the two structures are secured together by means of removable pins 23. A chuck recess 20 is also provided in the lower end of extension 19, to receive the nose portion of a chuck 54.
Because there may be a need to locate one or more of the pre-stress cables 41 immediately beneath sleeves 67, a plurality of receiver plates 69 are attached to the underside of sleeves 67. These receiver plates include a slot 71 which is sized and configured to receive tongue portion 22 of an extension 19. It should be noted that there are opposing pairs of receiver plates in longitudinal alignment to accommodate an extension 19. The right hand pairs of receiver plates 69 will be used when the cables are strung from the first outrigger assembly 16 to the secondary outrigger frame. (See,
After the concrete has been poured and has had a sufficient amount of time to cure, the frame 12 and the bulkheads 36 and 37 are removed from the excavation, leaving the new roadway segment 39, shown in
For the purpose of manufacturing beams, posts, and the like, a frame 76, having a more compact configuration, may be utilized. Frame 76 comprises an elongated “I”-Beam member 32, a coupler sleeve 77, and transverse end rails 28 and 29. Although only one end of frame 76 is shown in
The apparatus 11 employing frame 76, also includes a form 79, having elongated sides 81 and split bulkheads 82, identical in all respects except size, with those corresponding components previously described. In this application, the frame 76 is lowered over the form 79, and supported by jacks 52. Cables 41 are strung between the outrigger assemblies, and the height of the frame is adjusted so that the cables lie below an upper edge 83 of the form 79. The cables are then pre-stressed using a conventional pre-stressing fixture, and locked in place with a chuck 54 nested within a respective cable restraint extension 19.
With the apparatus 11 fully prepared, concrete is then poured into form 79 until its upper surface reaches upper edge 83. After the concrete is cured, the cables 41 are cut and frame 76 is removed from the pour site. After the bulkheads 82 and the sides 81 are removed, an elongated pre-stressed post 84 remains, as shown in
It is also apparent that in a particular application, it may be desirable to have additional sets of cables 41, interspersed throughout a concrete structure such as a post, pole, or beam. In other words, in addition to having one set of cables 41 arranged in a horizontal plane as shown in
Number | Name | Date | Kind |
---|---|---|---|
3049786 | Jones | Aug 1962 | A |
3260024 | Greulich | Jul 1966 | A |
3422586 | Parma | Jan 1969 | A |
3475529 | Johnson | Oct 1969 | A |
3552074 | Rajchman | Jan 1971 | A |
3882651 | Gilchrist | May 1975 | A |
4574545 | Reigstad et al. | Mar 1986 | A |
4621943 | Swanson | Nov 1986 | A |
4700516 | Grossman | Oct 1987 | A |
4953280 | Kitzmiller | Sep 1990 | A |
6416693 | Lockwood | Jul 2002 | B1 |
6773650 | Longo | Aug 2004 | B1 |
Number | Date | Country | |
---|---|---|---|
20110194897 A1 | Aug 2011 | US |