Apparatus and method for progressively gravel packing an interval of a wellbore

Information

  • Patent Grant
  • 6588507
  • Patent Number
    6,588,507
  • Date Filed
    Thursday, June 28, 2001
    23 years ago
  • Date Issued
    Tuesday, July 8, 2003
    21 years ago
Abstract
An apparatus (38) and method for progressively gravel packing an interval of a wellbore (32) is disclosed. The apparatus (38) comprises a sand control screen (52) that is positioned within the wellbore (32) and a tubular member (42) that is disposed within the wellbore (32) forming a first annulus (56) with the sand control screen (52) and a second annulus (58) with the wellbore (32). The tubular member (42) initially prevents fluid communication between the first annulus (56) and the second annulus (58). Once the gravel packing operation begins, however, the tubular member (42) selectively allows fluid communication from the first annulus (56) to the second annulus (58) by progressively establishing fluid communication between the first annulus (56) and the second annulus (58) from a first end of the interval (48) to a second end of the interval (48).
Description




TECHNICAL FIELD OF THE INVENTION




This invention relates in general to preventing the production of particulate materials through a wellbore traversing an unconsolidated or loosely consolidated subterranean formation and, in particular, to an apparatus and method for progressively gravel packing an interval of the wellbore.




BACKGROUND OF THE INVENTION




It is well known in the subterranean well drilling and completion art that relatively fine particulate materials may be produced during the production of hydrocarbons from a well that traverses an unconsolidated or loosely consolidated formation. Numerous problems may occur as a result of the production of such particulates. For example, the particulates cause abrasive wear to components within the well, such as tubing, pumps and valves. In addition, the particulates may partially or fully clog the well creating the need for an expensive workover. Also, if the particulate matter is produced to the surface, it must be removed from the hydrocarbon fluids using surface processing equipment.




One method for preventing the production of such particulate material to the surface is gravel packing the well adjacent to the unconsolidated or loosely consolidated production interval. In a typical gravel pack completion, a sand control screen is lowered into the wellbore on a workstring to a position proximate the desired production interval. A fluid slurry including a liquid carrier and a relatively coarse particulate material, which is typically sized and graded and which is referred to herein as gravel, is then pumped down the workstring and into the well annulus formed between the sand control screen and the perforated well casing or open hole production zone.




The liquid carrier either flows into the formation or returns to the surface by flowing through a wash pipe or both. In either case, the gravel is deposited around the sand control screen to form the gravel pack, which is highly permeable to the flow of hydrocarbon fluids but blocks the flow of the fine particulate materials carried in the hydrocarbon fluids. As such, gravel packs can successfully prevent the problems associated with the production of these particulate materials from the formation.




It has also been found, however, that it is difficult to completely gravel pack the production interval. This is particularly true in long or inclined/horizontal production intervals. The resulting incomplete gravel packs are commonly caused by entry of the liquid carrier into permeable sections of the production interval creating sand bridge formation in the annulus. Thereafter, the sand bridge prevents the gravel pack slurry from flowing to the remainder of the annulus which, in turn, prevents the placement of sufficient gravel in the remainder of the annulus.




Therefore a need has arisen for an apparatus and method that is capable of producing a substantially complete gravel pack of the wellbore adjacent to the production interval to prevent the production of fine particulate materials when production from the formation commences.




SUMMARY OF THE INVENTION




The present invention disclosed herein comprises an apparatus and method that is capable of producing a substantially complete gravel pack of the wellbore adjacent to the production interval to prevent the production of fine particulate materials when production commences. The apparatus and method of the present invention achieves this result by progressively gravel packing the production interval from one end to the other.




The apparatus comprises a sand control screen that is positioned within the wellbore and a tubular member also positioned within the wellbore forming a first annulus with the sand control screen and a second annulus with the wellbore. The tubular member initially substantially prevents fluid communication between the first annulus and the second annulus. Thereafter, the tubular member selectively allows fluid communication from the first annulus to the second annulus by progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval.




The tubular member may include a perforated pipe having a plurality of removable members positioned on the interior or the exterior of the perforated pipe. The removable members may alternatively be positioned within the wellbore without being associated with a perforated pipe. In either case, the removable members may be propellant or other combustible material members each having an initiator. The initiators may be activated by a wireless telemetry system. Alternatively, the initiators may have pressure activated firing devices that are positioned such that the pressure required to fire the pressure activated firing devices progressively increasing from the first end to the second end interval.




The removable members may alternatively be friable members that are progressively removable from the first end to the second end of the interval. Each friable member may include a pressure actuated vibration generator. In this case, the pressure actuated vibration generators are positioned within the wellbore such that the pressure required to activate the pressure actuated vibration generators progressively increasing from the first end to the second end of the interval. Alternatively, each of the friable members may have a vibration generator that activated by a wireless telemetry system.




The tubular member may alternatively comprises a perforated pipe having an actuatable device disposed within each perforation. The actuatable devices may be rupture disks, pressure actuated one-way valves or other pressure actuated devices that are positioned within the perforated pipe such that the pressure required to actuate the actuatable devices progressively increases from the first end to the second end of the interval. Alternatively, the actuatable device may be progressively actuated from the first end to the second end of the interval by a wireless telemetry system.




In all embodiments, the gravel pack may progress from the top of the interval to the bottom, the bottom of the interval to the top, the heel of the interval to the toe or the toe of the interval to the heel.




The method of the present invention comprises traversing a formation with the wellbore, locating a sand control screen within the wellbore proximate the formation, positioning a tubular member within the wellbore that forms a first annulus between the tubular member and the sand control screen and a second annulus between the tubular member and the wellbore, initially substantially preventing fluid communication between the first annulus and the second annulus, injecting a fluid slurry containing gravel into the first annulus, progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval and terminating the injecting when the interval is substantially completely packed with the gravel.











BRIEF DESCRIPTION OF THE DRAWINGS




For a more complete understanding of the features and advantages of the present invention, reference is now made to the detailed description of the invention along with the accompanying figures in which corresponding numerals in the different figures refer to corresponding parts and in which:





FIG. 1

is a schematic illustration of an offshore oil and gas platform operating an apparatus for progressively gravel packing an interval of a wellbore of the present invention;





FIG. 2

is a half sectional view of an apparatus for progressively gravel packing an interval of a wellbore of the present invention in its initial position;





FIG. 3

is a half sectional view of an apparatus for progressively gravel packing an interval of a wellbore of the present invention after the first progression of the apparatus;





FIG. 4

is a half sectional view of an apparatus for progressively gravel packing an interval of a wellbore of the present invention after the second progression of the apparatus;





FIG. 5

is a half sectional view of an apparatus for progressively gravel packing an interval of a wellbore of the present invention after the third progression of the apparatus;





FIG. 6

is a half sectional view of an apparatus for progressively gravel packing an interval of a wellbore of the present invention after the next to last progression of the apparatus;





FIG. 7

is a half sectional view of an apparatus for progressively gravel packing an interval of a wellbore of the present invention after the last progression of the apparatus;





FIG. 8

is a half sectional view of another embodiment of an apparatus for progressively gravel packing an interval of a wellbore of the present invention in its initial position;





FIG. 9

is a half sectional view of another embodiment of an apparatus for progressively gravel packing an interval of a wellbore of the present invention in its initial position; and





FIG. 10

is a half sectional view of yet another embodiment of an apparatus for progressively gravel packing an interval of a wellbore of the present invention in its initial position.











DETAILED DESCRIPTION OF THE INVENTION




While the making and using of various embodiments of the present invention are discussed in detail below, it should be appreciated that the present invention provides many applicable inventive concepts which can be embodied in a wide variety of specific contexts. The specific embodiments discussed herein are merely illustrative of specific ways to make and use the invention, and do not delimit the scope of the present invention.




Referring initially to

FIG. 1

, an apparatus for progressively gravel packing an interval of a wellbore operating from an offshore oil and gas platform is schematically illustrated and generally designated


10


. A semi-submersible platform


12


is centered over a submerged oil and gas formation


14


located below sea floor


16


. A subsea conduit


18


extends from deck


20


of platform


12


to wellhead installation


22


including blowout preventers


24


. Platform


12


has a hoisting apparatus


26


and a derrick


28


for raising and lowering pipe strings such as work string


30


.




A wellbore


32


extends through the various earth strata including formation


14


. A casing


34


is cemented within wellbore


32


by cement


36


. Work string


30


includes various tools including apparatus


38


for progressively gravel packing an interval of wellbore


32


adjacent to formation


14


. Apparatus


38


includes a cross-over assembly


40


and a gravel packing assembly


42


which is used to gravel pack the production interval


48


between packers


44


,


46


. When it is desired to gravel pack interval


48


, work string


30


is lowered through casing


34


until apparatus


38


is positioned adjacent to formation


14


including perforations


50


. Thereafter, a fluid slurry containing gravel is pumped down work string


30


through apparatus


38


to progressively gravel pack interval


48


.




Even though

FIG. 1

depicts a vertical well, it should be noted by one skilled in the art that the apparatus for progressively gravel packing an interval of a wellbore of the present invention is equally well-suited for use in deviated wells, inclined wells or horizontal wells. Also, even though

FIG. 1

depicts an offshore operation, it should be noted by one skilled in the art that the apparatus for progressively gravel packing an interval of a wellbore of the present invention is equally well-suited for use in onshore operations.




Referring now to

FIG. 2

, therein is depicted a more detailed illustration of apparatus


38


. As illustrated, apparatus


38


includes cross-over assembly


40


, a screen assembly


52


, gravel packing assembly


42


and a wash pipe


54


. Apparatus


38


is connected to work string


30


extending from the surface, which lowers apparatus


38


into wellbore


32


until screen assembly


52


is properly positioned adjacent to formation


14


. Gravel packing apparatus


42


forms an annulus


56


with screen assembly


52


and an annulus


58


with casing


34


.




Screen assembly


52


is designed to allow fluid to flow therethrough but prevent particulate matter of sufficient size from flowing therethrough. The exact design of screen assembly


52


is not critical to the present invention as long as it is suitably designed for the characteristics of the formation fluids and the gravel pack slurry. For example, as illustrated, screen assembly


52


may include a perforated base pipe


60


having a wire


62


wrapped directly thereon. Alternatively, a plurality of ribs may be placed around the base pipe to provide stand off between the base pipe and the wire wrap. Another suitable alternative is to use a screen assembly having a sinterred wire mesh or sinterred metal between the base pipe and an outer housing.




In the illustrated embodiment, gravel packing apparatus


42


includes an axially extending substantially tubular member


64


that includes a perforated pipe


66


and a plurality of progressively removable members


68


A-


68


E disposed on the interior of perforated pipe


66


. Removable members


68


A-


68


E may be constructed from a variety of materials such as combustible materials, referred to herein as propellants, that are removable by combustion, friable materials, including ceramics, that are removable by disintegration, or other materials that are removable in a downhole environment.




When removable members


68


A-


68


E are constructed from propellants, suitable initiators are attached to each removable member


68


A-


68


E such that the combustion process of each removable member


68


A-


68


E may be triggered independently. The initiators may be operated using a variety of known techniques including pressure actuation, electrical actuation, acoustic actuation or the like. For example, as explained in more detail below, the pressure generated by the fluid slurry containing gravel can be used to trigger the initiators. Alternatively, a wireless telemetry system can be used wherein pressure pulses, electromagnetic waves, acoustic signals or the like are used to the operate the initiators.




When removable members


68


A-


68


E are constructed from friable materials, suitable vibration generators are attached to each removable member


68


A-


68


E such that the disintegration process of each removable member


68


A-


68


E may be triggered independently. The vibration generators may be operated using a variety of known techniques including pressure actuation, electrical actuation, acoustic actuation or the like. For example, as explained in more detail below, the pressure generated by the fluid slurry containing gravel can be used to trigger the vibration generators. Alternatively, a wireless telemetry system can be used wherein pressure pulses, electromagnetic waves, acoustic signals or the like are used to the operate the vibration generators.




To begin the completion process, interval


48


adjacent to formation


14


is isolated. Packer


44


seals the upper end of interval


48


and packer


46


seals the lower end of interval


48


. Cross-over assembly


40


is located adjacent to screen assembly


52


, traversing packer


44


with portions of cross-over assembly


40


on either side of packer


44


. When the gravel packing operation commences, the objective is to uniformly and completely fill interval


48


with gravel. To help achieve this result, wash pipe


54


is disposed within screen assembly


52


. Wash pipe


54


extends into cross-over assembly


40


such that return fluid passing through screen assembly


52


, indicated by arrows


70


, may travel through wash pipe


54


, as indicated by arrow


72


, and into annulus


74


, as indicted by arrow


76


, for return to the surface.




The fluid slurry containing gravel


78


is pumped down work string


30


into cross-over assembly


40


along the path indicated by arrows


80


. The fluid slurry containing gravel


78


exits cross-over assembly


40


through cross-over ports


82


and is discharged into annulus


56


. In the illustrated embodiment, the fluid slurry containing gravel


78


then travels through annulus


56


to the end of interval


48


. At this point, a portion of fluid slurry containing gravel


78


may leak off into annulus


58


as a fluid tight seal is not created. Nonetheless, as gravel packing assembly


52


is designed to initially substantially prevent fluid communication between annulus


56


and annulus


58


, the pressure within annulus


56


will begin to increase, indicating that the fluid slurry containing gravel


78


has reached the end of interval


48


.




Once the pressure in annulus


56


begins to increase, the operation of gravel packing assembly


52


may begin which provides for the progressive gravel packing of interval


48


. Specifically, as best seen in

FIG. 3

, removable member


68


A is removed which allows the fluid slurry containing gravel


78


to travel from annulus


56


to annulus


58


through perforations


84


A-


84


B. As the fluid slurry containing gravel


78


enters annulus


58


, the gravel


78


drops out of the slurry and builds up from formation


14


, filling perforation


50


A, annulus


56


and annulus


58


around the end section of screen assembly


52


forming the initial portion of the gravel pack. Some of the carrier fluid in the slurry may leak off through perforation


50


A into formation


14


while the remainder of the carrier fluid pass through screen assembly


52


, as indicated by arrows


70


, that is sized to prevent gravel


78


from flowing therethrough. The fluid flowing back through screen assembly


52


, as explained above, follows the paths indicated by arrows


72


,


76


back to the surface.




As the initial portion of the gravel pack becomes tightly packed, the pressure in annulus


56


again increases. At this point and as best seen in

FIG. 4

, removable member


68


B is removed which allows the fluid slurry containing gravel


78


to travel from annulus


56


to annulus


58


through perforations


84


C-


84


D. As the fluid slurry containing gravel


78


enters annulus


58


, the gravel


78


drops out of the slurry and builds up from formation


14


, filling perforation


50


B, annulus


56


and annulus


58


around the adjacent section of screen assembly


52


forming the next portion of the gravel pack. While some of the carrier fluid in the slurry may leak off through perforation


50


B into formation


14


, the remainder of the carrier fluid passes through screen assembly


52


, as indicated by arrows


70


and returns to the surface as indicated by arrows


72


,


76


.




As this portion of the gravel pack becomes tightly packed, the pressure in annulus


56


again increases. At this point and as best seen in

FIG. 5

, removable member


68


C is removed which allows the fluid slurry containing gravel


78


to travel from annulus


56


to annulus


58


through perforations


84


E-


84


F. As the fluid slurry containing gravel


78


enters annulus


58


, the gravel


78


drops out of the slurry and builds up from formation


14


, filling perforation


50


C, annulus


56


and annulus


58


around the adjacent section of screen assembly


52


forming the next portion of the gravel pack. While some of the carrier fluid in the slurry may leak off through perforation


50


C into formation


14


, the remainder of the carrier fluid passes through screen assembly


52


, as indicated by arrows


70


and returns to the surface as indicated by arrows


72


,


76


.




This process continues to progress back from the end of interval


48


toward cross-over assembly


40


. Specifically, as best seen in

FIG. 6

, removable member


68


D is removed which allows the fluid slurry containing gravel


78


to travel from annulus


56


to annulus


58


through perforations


84


G-


84


H. As the fluid slurry containing gravel


78


enters annulus


58


, the gravel


78


drops out of the slurry and builds up from formation


14


, filling perforation


50


D, annulus


56


and annulus


58


around the adjacent section of screen assembly


52


forming the next portion of the gravel pack. While some of the carrier fluid in the slurry may leak off through perforation


50


D into formation


14


, the remainder of the carrier fluid passes through screen assembly


52


, as indicated by arrows


70


and returns to the surface as indicated by arrows


72


,


76


.




As this portion of the gravel pack becomes tightly packed, the pressure in annulus


56


again increases. At this point and as best seen in

FIG. 7

, the last removable member, removable member


68


E, is removed which allows the fluid slurry containing gravel


78


to travel from annulus


56


to annulus


58


through perforations


84


I-


84


J. As the fluid slurry containing gravel


78


enters annulus


58


, the gravel


78


drops out of the slurry and builds up from formation


14


, filling perforation


50


E, annulus


56


and annulus


58


around the adjacent section of screen assembly


52


to packer


44


forming the last portion of the gravel pack. While some of the carrier fluid in the slurry may leak off through perforation


50


E into formation


14


, the remainder of the carrier fluid passes through screen assembly


52


, as indicated by arrows


70


and returns to the surface as indicated by arrows


72


,


76


.




As can be seen, using the apparatus for progressively packing an interval of a wellbore of the present invention, the gravel pack progresses from one end of interval


48


toward the other end as fluid communication is progressively allowed between annulus


56


and annulus


58


. Also, as should be apparent to those skilled in the art, even though

FIGS. 2-7

present the apparatus for progressively gravel packing an interval of a wellbore of the present invention in a vertical orientation with packer


44


at the top of interval


48


and packer


46


at the bottom of interval


48


, these figures are intended to also represent wellbores that have alternate directional orientations such as inclined wellbores and horizontal wellbore. In the horizontal orientation, for example, packer


44


is at the heel of interval


48


and packer


46


is at the toe of interval


48


.




Likewise, even though

FIGS. 2-7

present the apparatus for progressively gravel packing an interval of a wellbore of the present invention performing a progressive gravel pack from the bottom of the interval to the top of the interval, in the vertical orientation, or the toe of the interval to heel of the interval, in the horizontal orientation, those skilled in the art will understand that the apparatus for progressively gravel packing an interval of a wellbore of the present invention can alternatively be configured to progressively gravel pack from the top of the interval to the bottom of the interval, in the vertical orientation, or the heel of the interval to toe of the interval, in the horizontal orientation.




As stated above, there are numerous ways to remove removable members


68


from perforated pipe


66


to progressively establish fluid communication between annulus


56


and annulus


58


. One preferred method allows the pressure created by the fluid slurry within annulus


56


to progressively trigger the removal of removable member


68


. For example, when the removable members


68


are constructed of propellant material, pressure activated firing devices may be attached to initiators that are coupled on each of the removable members


68


. The pressure activated firing devices are then positioned within wellbore


32


such that the pressure required to fire the pressure activated firing devices progressively increases from the end of interval


48


toward cross-over assembly


40


. Each adjacent pressure activated firing device may be set to fire at an incremental pressure above the prior pressure activated firing device such as at increments of between about 50-100 psi. This assures a proper progression of the gravel pack by preventing any out of sequence activations. In addition, this approach is particularly advantageous in that the incremental pressure increase of adjacent pressure activated firing devices helps to insure that each section of the gravel pack is tightly packed prior to initiating the gravel packing of subsequent sections.




Alternatively, a wireless telemetry system may be used to progressively trigger the removal of removable member


68


. For example, when the removable members


68


are constructed of a friable material, vibration generators may be coupled on each of the removable members


68


. Each vibration generator is activated by a particular wireless signal addressed specifically for that vibration generator. This assures a proper progression of the gravel pack by preventing any out of sequence activations. The wireless signals may be manually or automatically sent based upon the pressure response in annulus


56


. For example, the wireless signal to remove the next removable member


68


may be sent each time the pressure within annulus


56


reaches a particular level or each time the pressure within annulus


56


reaches the next preselected pressure increment. As with the direct pressure response method, the particular removal sequence should insure that each section of the gravel pack is tightly packed prior to initiating the gravel packing of subsequent sections.




Referring now to

FIG. 8

, therein is depicted an apparatus for progressively gravel packing an interval of a wellbore that is generally designated


86


. As illustrated, apparatus


86


includes cross-over assembly


40


, a screen assembly


52


, gravel packing assembly


88


and a wash pipe


54


. Apparatus


86


is connected to work string


30


extending from the surface, which lowers apparatus


86


into wellbore


32


until screen assembly


52


is properly positioned adjacent to formation


14


. Gravel packing assembly


88


forms an annulus


90


with screen assembly


52


and an annulus


92


with casing


34


.




In the illustrated embodiment, gravel packing assembly


88


includes an axially extending substantially tubular member


94


that includes a perforated pipe


96


and a plurality of removable members


98


A-


98


E disposed on the exterior surface of perforated pipe


96


. Apparatus


86


with removable members


98


A-


98


E operates substantially identical to apparatus


38


with removable members


68


A-


68


E except that removable members


98


A-


98


E are removed from the exterior surface of the perforated pipe.




Referring now to

FIG. 9

, therein is depicted an apparatus for progressively gravel packing an interval of a wellbore that is generally designated


100


. As illustrated, apparatus


100


includes cross-over assembly


40


, a screen assembly


52


, gravel packing assembly


102


and a wash pipe


54


. Apparatus


100


is connected to work string


30


extending from the surface, which lowers apparatus


100


into wellbore


32


until screen assembly


52


is properly positioned adjacent formation


14


. Gravel packing assembly


102


forms an annulus


104


with screen assembly


52


and an annulus


106


with casing


34


.




In the illustrated embodiment, gravel packing apparatus


102


includes an axially extending substantially tubular member


108


that includes a perforated pipe


110


and a plurality of actuatable members


112


A-


112


J disposed within the perforations of perforated pipe


110


. Actuatable members


112


A-


112


J may be operated by a variety of known techniques including pressure actuation, electrical actuation, acoustic actuation or the like. Examples of suitable actuatable members


112


A-


112


J include rupture disks, valves, such as one way valves and the like.




When actuatable members


112


A-


112


J are designed to be directly pressure actuated, the pressure required to actuate the actuatable members


112


A-


112


J is progressively increases from the end of interval


48


toward cross-over assembly


40


. For example, more pressure may be required to actuate actuatable member


112


B than


112


A, while more pressure is required to actuate actuatable member


112


C than


112


B and so forth along interval


48


. Alternatively, groups of actuatable members


112


may be actuated together such that actuatable members


112


A-


112


B actuate at the same pressure while actuatable members


112


C-


112


D actuate at a higher pressure. Each adjacent actuatable member or group of actuatable members may be set to actuate at increments such as 50-100 psi. This assures a proper progression of the gravel pack by preventing any out of sequence actuations. In addition, as stated above, this approach is particularly advantageous in that the incremental pressure increase of adjacent actuatable members or groups of actuatable members helps to assure that each section of the gravel pack is tightly packed prior to initiating the gravel packing of subsequent sections.




Alternatively, a wireless telemetry system may be used to progressive actuate actuatable members


112


A-


112


J. In this case, one or a group of actuatable members


112


A-


112


J may be actuated a particularly addressed wireless signal. This assures a proper progression of the gravel pack by preventing any out of sequence activations. As explained above, the wireless signals may be manually or automatically initiated based upon the pressure response in annulus


104


in a manner that insures that each section of the gravel pack is tightly packed prior to initiating the gravel packing of subsequent sections.




In the case where actuated devices


112


are valves, once the gravel packing operation is complete, the valve may be locked open using, for example, a wireless telemetry system to allow production fluids to flow therethrough. Alternatively, other perforations in perforate pipe


110


that did not include valves but were plugged during the gravel packing operation may be unplugged to allow production fluids to flow therethrough.




Referring now to

FIG. 10

, therein is depicted an apparatus for progressively gravel packing an interval of a wellbore that is generally designated


120


. As illustrated, apparatus


120


includes cross-over assembly


40


, a screen assembly


52


, gravel packing assembly


122


and a wash pipe


54


. Apparatus


120


is connected to work string


30


extending from the surface, which lowers apparatus


120


into wellbore


32


until screen assembly


52


is properly positioned adjacent formation


14


. Gravel packing assembly


122


forms an annulus


124


with screen assembly


52


and an annulus


126


with casing


34


.




In the illustrated embodiment, gravel packing assembly


122


includes an axially extending substantially tubular member


128


that includes a plurality of removable members


130


A-


130


E. Apparatus


120


with removable members


130


A-


130


E operates substantially identical to apparatus


38


with removable members


68


A-


68


E except that removable members


130


A-


130


E are not associated with a perforated pipe.




In operation, the apparatus for progressively gravel packing an interval of a wellbore of the present invention is used to progressively distribute the fluid slurry containing gravel to various locations within the interval to be gravel packed by progressively allowing fluid communication between a first annulus and a second annulus. As this fluid communication is sequentially established in adjacent sections of the interval, the gravel in the fluid slurry fills that section of the interval from the formation to the sand control screen. This process progresses along the entire length of the interval such that the interval becomes completely packed with the gravel. Once the interval is completely packed with gravel, the gravel pack operation may cease. As such, once the gravel pack is complete and the well is brought on line, formation fluids that are produced into the gravel packed interval must travel through the gravel pack in the interval, prior to entering the screen assembly, thereby filtering out any particulate materials in the formation fluid.




While this invention has been described with reference to illustrative embodiments, this description is not intended to be construed in a limiting sense. Various modifications and combinations of the illustrative embodiments as well as other embodiments of the invention, will be apparent to persons skilled in the art upon reference to the description. It is, therefore, intended that the appended claims encompass any such modifications or embodiments.



Claims
  • 1. An apparatus for progressively gravel packing an interval of a wellbore comprising:a sand control screen positioned within the wellbore; and a tubular member disposed within the wellbore forming a first annulus with the sand control screen and a second annulus with the wellbore, the tubular member initially substantially preventing fluid communication between the first annulus and the second annulus, the tubular member selectively allowing fluid communication from the first annulus to the second annulus by progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval.
  • 2. The apparatus as recited in claim 1 wherein the tubular member further comprises a plurality of propellant members that are selectively combustible from the first end to the second end of the interval.
  • 3. The apparatus as recited in claim 2 wherein each of the propellant members further comprises an initiator.
  • 4. The apparatus as recited in claim 3 wherein the initiators further comprise initiators that are activated by a wireless telemetry system.
  • 5. The apparatus as recited in claim 3 wherein the initiators further comprise pressure activated firing devices.
  • 6. The apparatus as recited in claim 5 wherein the pressure activated firing devices are positioned such that the pressure required to fire the pressure activated firing devices progressively increasing from the first end to the second end.
  • 7. The apparatus as recited in claim 2 wherein the plurality of propellant members are disposed on the interior of a perforated pipe.
  • 8. The apparatus as recited in claim 2 wherein the plurality of propellant members are disposed on the exterior of a perforated pipe.
  • 9. The apparatus as recited in claim 1 wherein the tubular member further comprises a perforated pipe, each of the perforations having an actuatable device disposed therein.
  • 10. The apparatus as recited in claim 9 wherein the actuatable devices are rupture disks that are positioned within the perforated pipe such that the pressure required to actuate the rupture disks progressively increases from the first end to the second end.
  • 11. The apparatus as recited in claim 9 wherein the actuatable devices are pressure actuated one-way valves that are positioned within the perforated pipe such that the pressure required to actuate the one-way valves progressively increases from the first end to the second end.
  • 12. The apparatus as recited in claim 9 wherein the actuatable devices are one-way valves that are progressively actuated from the first end to the second end by a wireless telemetry system.
  • 13. The apparatus as recited in claim 1 wherein the first end is closer to the bottom of the wellbore than the second end.
  • 14. The apparatus as recited in claim 1 wherein the first end is closer to the top of the wellbore than the second end.
  • 15. The apparatus as recited in claim 1 wherein the first end is closer to the toe of the wellbore than the second end.
  • 16. The apparatus as recited in claim 1 wherein the first end is closer to the heel of the wellbore than the second end.
  • 17. The apparatus as recited in claim 1 wherein the tubular member further comprises a plurality of friable members that are progressively removable from the first end to the second end of the interval.
  • 18. The apparatus as recited in claim 17 wherein each of the friable members further comprises a pressure actuated vibration generator and wherein the pressure actuated vibration generators are positioned such that the pressure required to activate the pressure actuated vibration generators progressively increasing from the first end to the second end.
  • 19. The apparatus as recited in claim 17 wherein each of the friable members further comprises a vibration generator and wherein the vibration generators are progressively activated from the first end to the second end by a wireless telemetry system.
  • 20. An apparatus for progressively gravel packing an interval of a wellbore comprising:a sand control screen positioned within the wellbore; and a tubular member disposed within the wellbore forming a first annulus with the sand control screen and a second annulus with the wellbore, the tubular member including a perforated pipe and a plurality of propellant members disposed thereon, each propellant member having a pressure activated firing device associated therewith the pressure activated firing devices are positioned such that the pressure required to fire the pressure activated firing devices progressively increases from a first end to a second end of the interval, thereby progressively allowing fluid communication from the first annulus to the second annulus as the pressure created by a fluid slurry containing gravel pumped into the first annulus progressively increases from the first end to the second end such that the wellbore is substantially completely gravel packed from the first end to the second end.
  • 21. The apparatus as recited in claim 20 wherein the first end is closer to the bottom of the wellbore than the second end.
  • 22. The apparatus as recited in claim 20 wherein the first end is closer to the top of the wellbore than the second end.
  • 23. The apparatus as recited in claim 20 wherein the first end is closer to the toe of the wellbore than the second end.
  • 24. The apparatus as recited in claim 20 wherein the first end is closer to the heel of the wellbore than the second end.
  • 25. A method for progressively gravel packing an interval of a wellbore, the method comprising the steps of:traversing a formation with the wellbore; locating a sand control screen within the wellbore proximate the formation; positioning a tubular member within the wellbore that forms a first annulus between the tubular member and the sand control screen and a second annulus between the tubular member and the wellbore; initially substantially preventing fluid communication between the first annulus and the second annulus; injecting a fluid slurry containing gravel into the first annulus; progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval; and terminating the injecting.
  • 26. The method as recited in claim 25 wherein the step of positioning a tubular member within the wellbore further comprises disposing a plurality of propellant members within the wellbore and wherein the step of progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval further comprises progressively combusting the propellant members from the first end to the second end.
  • 27. The method as recited in claim 26 wherein the step of progressively combusting the propellant members from the first end to the second end further comprises initiating the combustion with a wireless telemetry system.
  • 28. The method as recited in claim 26 wherein the step of progressively combusting the propellant members from the first end to the second end further comprises initiating the combustion with pressure activated firing devices.
  • 29. The method as recited in claim 28 wherein the step of initiating the combustion with pressure activated firing devices further comprises positioning the pressure activated firing devices such that the pressure required to fire the pressure activated firing devices progressively increases from the first end to the second end.
  • 30. The method as recited in claim 26 wherein the step of disposing a plurality of propellant members within the wellbore further comprises disposing the plurality of propellant members on the interior of a perforated pipe.
  • 31. The method as recited in claim 26 wherein the step of disposing a plurality of propellant members within the wellbore further comprises disposing the plurality of propellant members on the exterior of a perforated pipe.
  • 32. The method as recited in claim 25 wherein the step of positioning a tubular member within the wellbore further comprises disposing a pressure actuatable device in each perforation of a perforated pipe such that the pressure required to actuate the pressure actuatable devices progressively increases from the first end to the second end.
  • 33. The method as recited in claim 32 wherein the step of disposing a pressure actuatable device in each perforation of a perforated pipe further comprises disposing a rupture disk in each perforation.
  • 34. The method as recited in claim 32 wherein the step of disposing a pressure actuatable device in each perforation of a perforated pipe further comprises disposing a one-way valve in each perforation.
  • 35. The method as recited in claim 25 wherein the step of progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval further comprises positioning the first end closer to the bottom of the wellbore than the second end.
  • 36. The method as recited in claim 25 wherein the step of progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval further comprises positioning the first end closer to the top of the wellbore than the second end.
  • 37. The method as recited in claim 25 wherein the step of progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval further comprises positioning the first end closer to the toe of the wellbore than the second end.
  • 38. The method as recited in claim 25 wherein the step of progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval further comprises positioning the first end closer to the heel of the wellbore than the second end.
  • 39. The method as recited in claim 25 wherein the step of positioning a tubular member within the wellbore further comprises disposing a one-way valves in each perforation of a perforated pipe and progressively actuating the one-way valves from the first end to the second end with a wireless telemetry system.
  • 40. The method as recited in claim 25 wherein the step of positioning a tubular member within the wellbore further comprises positioning a plurality of friable members within the wellbore.
  • 41. The method as recited in claim 40 further comprising the step of progressively removing the friable members from the first end to the second end by progressively actuating pressure actuate vibration generators coupled to the friable members that are positioned such that the pressure required to actuate the pressure actuate vibration generators progressively increasing from the first end to the second end.
  • 42. The method as recited in claim 40 further comprising the step of progressively removing the friable members from the first end to the second end by progressively actuating vibration generators coupled to the friable members with a wireless telemetry system.
  • 43. A method for progressively gravel packing an interval of a wellbore, the method comprising the steps of:traversing a formation with the wellbore; locating a sand control screen within the wellbore proximate the formation; positioning a tubular member including a perforated pipe and a plurality propellant members disposed thereon within the wellbore that forms a first annulus between the tubular member and the sand control screen and a second annulus between the tubular member and the wellbore; initially substantially preventing fluid communication between the first annulus and the second annulus; injecting a fluid slurry containing gravel into the first annulus; progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second and of the interval by activating pressure activated firing devices coupled to each propellant member, the pressure activated firing devices being positioned such that the pressure required to fire the pressure activated firing devices progressively increases from the first end to the second end; and terminating the injecting.
  • 44. The method as recited in claim 43 wherein the step of progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval further comprises positioning the first end closer to the bottom of the wellbore than the second end.
  • 45. The method as recited in claim 43 wherein the step of progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval further comprises positioning the first end closer to the top of the wellbore than the second end.
  • 46. The method as recited in claim 43 wherein the step of progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval further comprises positioning the first end closer to the toe of the wellbore than the second end.
  • 47. The method as recited in claim 43 wherein the step of progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval further comprises positioning the first end being closer to the heel of the wellbore than the second end.
  • 48. A method for progressively gravel packing an interval of a wellbore, the method comprising the steps of:providing a casing within the wellbore traversing a formation; perforating the casing proximate the formation to form a plurality of perforations; locating a sand control screen within the wellbore proximate the formation; positioning a tubular member within the wellbore that forms a first annulus between the tubular member and the sand control screen and a second annulus between the tubular member and the casing; initially substantially preventing fluid communication between the first annulus and the second annulus; injecting a fluid slurry containing gravel into the first annulus; progressively establishing fluid communication between the first annulus and the second annulus from a first end to a second end of the interval; and terminating the injecting.
US Referenced Citations (33)
Number Name Date Kind
2342913 Williams et al. Feb 1944 A
2344909 Williams et al. Mar 1944 A
4945991 Jones Aug 1990 A
5082052 Jones et al. Jan 1992 A
5113935 Jones et al. May 1992 A
5161613 Jones Nov 1992 A
5161618 Jones et al. Nov 1992 A
5332039 Primeaux et al. Jul 1994 A
5333688 Jones et al. Aug 1994 A
5355956 Restarick Oct 1994 A
5390966 Cox et al. Feb 1995 A
5419394 Jones May 1995 A
5443117 Ross Aug 1995 A
5476143 Sparlin et al. Dec 1995 A
5515915 Jones et al. May 1996 A
5588487 Bryant Dec 1996 A
5636691 Hendrickson et al. Jun 1997 A
5755286 Ebinger May 1998 A
5842516 Jones Dec 1998 A
5848645 Jones Dec 1998 A
5868200 Bryant et al. Feb 1999 A
5890533 Jones Apr 1999 A
5921318 Ross Jul 1999 A
5934376 Nguyen et al. Aug 1999 A
6003600 Nguyen et al. Dec 1999 A
6047773 Zeltmann et al. Apr 2000 A
6059032 Jones May 2000 A
6116343 Van Petegem et al. Sep 2000 A
6125933 Ross Oct 2000 A
6220345 Jones et al. Apr 2001 B1
6227303 Jones May 2001 B1
6230803 Morton et al. May 2001 B1
6343651 Bixenman Feb 2002 B1
Foreign Referenced Citations (6)
Number Date Country
1 132 571 Sep 2001 EP
WO 9912630 Mar 1999 WO
WO 0061913 Oct 2000 WO
WO 0114691 Mar 2001 WO
WO 0144619 Jun 2001 WO
WO 0210554 Feb 2002 WO
Non-Patent Literature Citations (7)
Entry
“Screenless Single Trip Multizone Sand Control Tool System Saves Rig Time,” Travis Hailey and Morris Cox of Haliburton Energy Services, Inc.; and Kirk Johnson of BP Exploration (Alaska), Inc. Society of Petroleum Engineers Inc., Feb., 2000.
“Simultaneous Gravel Packing and Filter Cake Removal in Horizontal Wells Applying Shunt Tubes and Novel Carrier and Breaker Fluid,” Pedro M. Saldungaray of Schlumberger; Juan C. Troncoso of Repson-YPF; Banbang T. Santoso of Repsol-YPF. Society of Petroleum Engineers, Inc., Mar., 2001.
“CAPSSM Concentric Annular Packing Service for Sand Control,” Halliburton Energy Services, Inc., Aug., 2000.
“CAPSSM Sand Control Service for Horizontal Completions Improves Gravel Pack Reliability and Increases Production Potential from Horizontal Completions,” Halliburton Energy Services, Inc., Aug., 2000.
“Frac Pack Technology Still Evolving,” Charles D. Ebinger of Ely & Associates Inc.; Oil & Gas Journal, Oct. 23, 1995.
“Mechanical Fluid-Loss Control Systems Used During Sand Control Operations,” H.L. Restarick of Otis Engineering Corp., 1992.
“Sand Control Screens,” Halliburton Energy Services, 1994.