Claims
- 1. A junction liner for use in a wellbore comprising:
a tubular body having at least three openings for fluid communication therethrough and at least one perforation in a wall thereof.
- 2. The junction liner of claim 1, whereby the body is multi-layered.
- 3. The junction liner of claim 1, further comprising a mating feature.
- 4. A wellbore junction apparatus for a junction between a central and a lateral wellbore comprising:
a first tubular portion comprising a first wall with a first aperture therein; and a second tubular portion comprising a second wall and an end operatively connected to the first portion proximate the aperture, wherein at least one of the walls includes a perforation therethrough for filtering particulates.
- 5. The apparatus of claim 4, wherein the portions are multi-layered.
- 6. The apparatus of claim 4, further comprising a string of casing.
- 7. The apparatus of claim 4, wherein the portions are joined to the junction with cement.
- 8. The apparatus of claim 4, wherein the second portion extends to the exterior of the first leg.
- 9. The apparatus of claim 4, wherein the second portion is extendable from the interior of the first leg.
- 10. The apparatus of claim 4, wherein the second portion comprises an expandable screen.
- 11. The apparatus of claim 4, wherein the first portion comprises an expandable screen.
- 12. The apparatus of claim 6, wherein the first portion is substantially located within the casing string.
- 13. The apparatus of claim 12, wherein the casing string includes an aperture in a wall thereof and the second tubular portion extends through the aperture.
- 14. The apparatus of claim 9, wherein the second portion is folded and substantially contained within the first portion.
- 15. The apparatus of claim 4, further comprising a deflector with a cut-out portion, wherein the second portion is folded and substantially contained within the cut-out portion.
- 16. The apparatus of claim 4, further comprising:
a deflector with a cut-out portion substantially containing the folded second portion; an anchor attached to an upper end of the first portion; and a run-in string with a reformer disposed through the anchor and at least partially through the first portion.
- 17. A system for completing a central wellbore and a lateral wellbore, comprising:
an at least partially expandable junction component located in a junction of the central and lateral wellbores; a first expandable production string disposed within the lateral wellbore, coupled to the junction component; a first packer located above the junction; a second packer located below the junction in the central wellbore; and a second production string running from a top surface of the central wellbore through the first packer to the second packer.
- 18. The system of claim 17, wherein the junction component comprises a particulate filtering portion.
- 19. A method of excluding formation solids from a wellbore junction, comprising:
installing a junction liner having a flow path therethrough for a central wellbore and a flow path therethrough for a lateral wellbore; and causing fluid adjacent the wellbore junction to enter the junction via perforations formed in at least one wall of the junction liner while filtering solid particles therefrom.
- 20. A method of supporting a wellbore junction, comprising:
at least partially forming at least one central wellbore and at least one lateral wellbore extending therefrom; installing a junction liner having flow paths therethrough corresponding to the at least one central and the at least one lateral wellbore, the liner permitting fluid communication between at least one of the wellbores and the formation therearound; and placing the walls of the junction liner in substantial contact with an intersection formed by the central and lateral wellbores.
- 21. The method of claim 20, wherein the substantial contact is made by expanding the junction liner in at least one location to increase the diameter thereof to correspond to the inner diameter of that location.
- 22. A method of forming a lateral wellbore from a central bore comprising:
placing a first tubular screen across a window in the central wellbore; expanding the first screen against the walls of the central wellbore; placing a second tubular screen through an aperture formed in a portion of the first screen extending across the window; and expanding the second screen into substantial contact with the walls of the lateral wellbore.
- 23. A method of preparing a junction apparatus for installation in a junction between a central and an at least partially formed lateral wellbore, comprising:
providing the junction apparatus comprising:
a first tubular portion comprising a first wall with a first aperture therein; and a second tubular portion comprising a second wall and an end operatively connected to the first portion proximate the aperture, wherein at least one of the walls includes a perforation therethrough for filtering particulates; and folding the second portion so that it is substantially contained within the first portion.
- 24. The method claim 23, further comprising:
running the junction apparatus through the central wellbore to the junction; and unfolding the second portion so that it extends into the at least partially formed lateral wellbore.
- 25. A method of supporting a junction between two intersecting wellbores, comprising:
milling a casing wall to form a window therein whereby the window is formed in the casing and a partial extension is formed in the earth outwards of the window; inserting a tubular screen member into the window whereby a portion of the screen remains in the window and a portion extends outwards into the extension; and causing the screen to substantially contact the walls of the window and walls of the extension.
- 26. A method of forming a lateral wellbore from a central bore comprising:
placing a central portion of a tubular screen across a window in the central wellbore; expanding the central portion against the walls of the central wellbore; placing a lateral portion of a tubular screen in the lateral wellbore; and expanding the lateral portion into substantial contact with the walls of the lateral wellbore.
- 27. The method of claim 26, further comprising: cementing the screen into place inside the wellbore.
- 28. A method of forming a lateral wellbore comprising:
running an at least partially expandable, perforated junction component to the junction of a central and an at least partially formed lateral wellbore; and expanding the junction component.
- 29. The method of claim 28, further comprising: providing a deflector device and an anchor in the central wellbore, whereby running includes guiding the at least partially expandable perforated junction component into the junction using the deflector device.
- 30. The method of claim 28, whereby the at least partially expandable, perforated junction component further comprises multiple layers.
- 31. The method of claim 28, further comprising: opening a central wellbore access port in the expandable perforated junction component.
- 32. The method of claim 28, whereby the at least partially expandable, perforated junction component further comprises a preformed central wellbore access port.
- 33. The method of claim 28, wherein the at least partially formed lateral wellbore is a lateral wellbore and the method further comprises: running expandable production tubing into the lateral wellbore through the junction component; and
expanding the production tubing.
- 34. The method of claim 28, wherein the at least partially formed lateral wellbore is a lateral wellbore and running an at least partially expandable perforated junction component further comprises running an at least partially expandable perforated junction component and a first string of expandable production tubing, whereby the first string is run into the lateral wellbore and the junction component is run into a junction of the central and lateral wellbores; and
expanding the junction component and the production tubing.
- 35. The method of claim 34, further comprising: running a second string of production tubing from a top surface of the central wellbore into the central wellbore to a point near the junction, whereby the second string comprises a packer; isolating a lower end of the second string from the junction; and setting the packer at a location above the junction.
- 36. The method of claim 35, wherein the second string further comprises a sump pump.
- 37. The method of claim 35, wherein the second string further comprises a remotely operated sleeve valve.
- 38. The method of claim 34, further comprising: selectively producing from the central wellbore, the lateral wellbore, the junction, or any combination of the three.
- 39. A method of forming a lateral wellbore comprising:
placing a partially expandable junction component at the junction of a central and an at least partially formed lateral wellbore, whereby the component comprises a preformed central bore access port; and expanding the junction component.
- 40. A method of forming a lateral wellbore comprising:
placing an expandable junction component at the junction of a central and an at least partially formed lateral wellbore; expanding the junction component; and opening a central wellbore access port in the junction component.
CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] This application claims benefit of U.S. provisional patent application serial No. 60/424,455, filed Nov. 7, 2002, which is herein incorporated by reference.
Provisional Applications (1)
|
Number |
Date |
Country |
|
60424455 |
Nov 2002 |
US |