Claims
- 1. A process for manufacture of tunnel tube modules comprising the steps of:
- (a) rolling up a flat steel plate around a collapsible fixture into a cylindrical shell, said fixture having a plurality of wheel mechanisms thereon,
- (b) positioning said fixture and shell onto supports for rotation,
- (c) assembling a support framework on the external surface of said shell,
- (d) lowering said fixture and shell onto base means,
- (e) collapsing said fixture within said shell,
- (f) raising up said collapsed fixture within said shell,
- (g) lowering the wheel mechanisms into operating positions, and
- (h) removing the fixture from said shell.
- 2. The process as set forth in claim 1 further comprising the step of positioning roller mechanisms in said shell when said wheel mechanisms are lowered into operating position.
- 3. The process as set forth in claim 1 further comprising the step of rolling said fixture onto a roll-out table when said fixture is removed from said shell, said roll-out table being positioned adjacent one end of said shell.
- 4. The process as set forth in claim 1 wherein said fixture is removed from said shell by being pulled out by winch means.
- 5. The process as set forth in claim 3 wherein said fixture is removed from said shell by being pulled out by winch means.
Parent Case Info
This is a division of application Ser. No. 256,710, filed Apr. 23, 1981, now U.S. Pat. No. 4,418,561.
US Referenced Citations (11)
Divisions (1)
|
Number |
Date |
Country |
Parent |
256710 |
Apr 1981 |
|