Apparatus for arc-melting cold iron source and method thereof

Information

  • Patent Grant
  • 6597722
  • Patent Number
    6,597,722
  • Date Filed
    Thursday, February 1, 2001
    23 years ago
  • Date Issued
    Tuesday, July 22, 2003
    21 years ago
Abstract
The present invention provides an arc-melting apparatus, which attains extremely high efficiency by preheating scraps using exhaust gas from the melting chamber. The arc-melting apparatus needs for no device to carry and supply an iron source to a melting chamber, which makes it possible to preheat the next charge. The arc-melting apparatus has a melting furnace which melts scraps, a preheating shaft connected directly to an upper part of one side of the melting furnace, an arc electrode for melting scraps in the melting furnace, a bucket for supplying scraps to the preheat shaft so as to continuously maintain scraps in the melting furnace and in the preheating shaft, a tapping portion having a tapping hole, being projected outward from the melting furnace and a tilting device for tilting the melting furnace on a side of the tapping portion. The tapping portion is arranged at an orthogonal direction to the direction of the supplied cold iron source. The preheating shaft of the melting furnace and the tapping portion have a distance between the mutual part, so that scraps do not flow out on a the tapping hole side.
Description




FIELD OF THE TECHNOLOGY




The present invention relates to an apparatus for arc-melting a cold iron source such as iron scrap and direct smelting reduction iron, etc. efficiently, and a melting method thereof.




BACKGROUND OF THE TECHNOLOGY




Japanese unexamined patent publication No. 7-180975 discloses a scrap preheating device, wherein a shaft furnace is connected to an upper part of an arc furnace, and furthermore wherein one stage, or two stages or more of fire grates are attached to the shaft furnace, which is able to be opened or closed.




Japanese unexamined patent publication No. 7-332874 discloses a method, wherein there is arranged a first preheating chamber of rotary drum type which is horizontally placed, connected to an upper cover of a melting chamber of an arc-furnace; and wherein there is arranged a second preheating chamber which is connected to the first preheating chamber at the bottom. After a cold iron source is preheated by the exhaust gas generated from the melting chamber in the second preheating chamber, the preheated cold iron source is pushed into the first preheating chamber by a pusher and the preheated cold iron source is charged into the melting chamber via the first preheating chamber which is rotating.




Japanese examined patent publication No. 6-46145 discloses an apparatus, wherein a shaft type preheating chamber is directly connected to a melting (chamber, and wherein a charge of cold iron source is charged into the melting chamber. As the charge is melted, a new charge of iron falls from the shaft type preheating chamber into the melting chamber while the cold iron source in the shaft type preheating chamber is being preheated by an exhaust gas. This continues until all of the cold iron source which is charged into the melting chamber and the shaft type preheating chamber is melted.




By means of the method and apparatus as described above, the high preheating effect can attain an electric power unit of 250 to 270 kWh/t. However, the above described Prior Art has the following problems.




According to JP7-180975 and JP7-332874, in order to charge the preheated cold iron resource into the melting furnace of the arc-furnace, a device for transporting the preheated cold iron source such as a pusher or a rotary drum is necessary. For this reason, the preheating temperature has a limitation when preheating by the exhaust gas from the melting chamber. That is to say, if a large amount of carbonaceous material such as coke and oxygen gas are blown into the melting chamber and the cold iron source is preheated by a large amount of the generated exhaust gas having a high temperature, the preheated temperature becomes high and the preheating effect is improved. However, in an apparatus, high exhaust gas temperatures causes problems such as heat deformation and fusion of the above described transporting device. Therefore, the exhaust gas temperature cannot be elevated.




On the contrary, according to JP6-46145, the shaft type preheating chamber is directly connected to the melting furnace. Consequently, the above described device for transporting the cold iron source is not necessary and the above described problem does not occur. However, since each time the melted iron amount corresponding to one batch is melted, all of the cold iron source in the melting chamber is melted, the melted iron is poured off and none of melted iron is left in the preheating chamber. For this reason, a cold iron source for the next batch which is to be charged immediately thereafter cannot be preheated. Therefore, this method cannot be said to be sufficient, with respect to the effective use of exhaust gas.




DISCLOSURE OF THE INVENTION




It is an object of the present invention to provide an arc-melting apparatus for arc-melting a cold iron source which does not require a device for carrying and feeding the cold iron source to the preheating chamber. This apparatus con, also, preheat the cold iron source to be use in the following charge, and can melt the cold iron source with an extreme high efficiency unattainable conventional melting apparatus whereby use exhaust gas for preheat the scrap. More concretely speaking, an arc-melting apparatus for arc-melting cold iron source with electric power unit of less than 250 kWh/t can be provided. Furthermore, this apparatus provides a method for melting the cold iron source without using a large scaled apparatus, and for preventing harmful constituents from being generated. In order to attain the above-mentioned object, the present invention provides the following arc-melting apparatus for arc-melting cold iron source. That is to say,




The first invention is an arc-melting apparatus for arc-melting cold iron source comprising:




(a) a melting chamber for melting the cold iron source;




(b) a preheating shaft, which is directly connected to an upper part of one side of the melting furnace and into which is introduced the exhaust gas generated in the melting chamber, in order to preheat the cold iron source;




(c) an arc electrode for melting the cold iron source in the melting chamber;




(d) a cold iron source feed device for feeding the cold iron source to the preheating shaft so that the cold iron source is continuously maintained in the melting chamber and the preheating shaft;




(e) a tapping portion having a tapping hole, projecting into the melting chamber; and




(f) a tilting device for tilting the melting chamber on the side of the tapping portion to pour out the melted iron.




The second invention is an arc-melting apparatus for arc-melting cold iron source of the first invention, wherein being projected outward from the melting chamber the tapping portion having a tapping hole is positioned in a different direction from the direction toward which the cold iron source in the preheating shaft is fed to the melting chamber.




The third invention is an arc-melting apparatus for arc-melting cold iron source of the second invention, wherein the tapping portion is arranged at a right angle to the direction toward which the cold iron source is fed.




The fourth invention is an arc-melting apparatus for arc-melting cold iron source of the first invention or the second invention, which has a distance between the position of the preheating shaft adjacent to the melting chamber and the position of the tapping portion adjacent to the melting chamber, in order to make it possible to prevent the cold iron source from flowing over the tapping portion, when the melting chamber is tilted.




The fifth invention is an arc-melting equipment for arc-melting cold iron source of the fourth invention, wherein a distance between the position of the preheating shaft of the melting chamber and the position of the tapping position is longer than a horizontal distance of the base of the cold iron source resting in the melting chamber from the preheating shaft, to the melting chamber.




The sixth invention is an arc-melting apparatus for arc-melting cold iron source of any one of the first invention through the fifth invention, which has a travelling device for travelling the arc electrode following the molten iron which moves in the melting furnace.




The seventh invention is an arc-melting apparatus for arc-melting cold iron source of any one of the first invention through the sixth invention which has further another arc electrode which is placed at the tapping portion.




The eighth invention is an arc-melting apparatus for arc-melting cold iron source of any one of the first invention through the seventh invention which has a device for feeding oxygen gas at the lower position of the preheating shaft.




The ninth invention is an arc-melting apparatus for arc-melting cold iron source of any one of the first invention through the eighth invention which has a fuel feed device for feeding fuel together with oxygen gas to the cold iron source at the lower position of the preheating shaft of the melting furnace.




The tenth invention is an arc-melting apparatus for arc-melting cold iron source of any one of the first invention through the ninth invention which has a carbonaceous material feed device for feeding carbonaceous material to the melting furnace and an oxygen gas feed device for feeding oxygen gas to the melting chamber.




The eleventh invention is an arc-melting apparatus for arc-melting cold iron source of any one of the first invention through the tenth invention which has a device for elevating the temperature of the exhaust gas discharged from a post-burning chamber to a predetermined temperature or more, being equipped with the post-burning chamber which post-burns the residual of non-combusted gas generated in the melting furnace which has passed through the preheat chamber by feeding oxygen containing gas and with a cooling portion which cools an exhaust gas discharged from the post-burning chamber.




The twelfth invention is an arc-melting apparatus for arc-melting cold iron source of any one of the first invention through the eleventh invention which has an adsorbent feed device for feeding adsorbent to the exhaust gas which has been quickly cooled at the cooling portion.




The thirteenth invention is an arc-melting apparatus for arc-melting cold iron source of any one of the first invention through the twelfth invention. This invention has a device for burning one part or the whole of the incombustible gas generated from the melting chamber, by arranging single or plural steps of the gas introducing holes in a range from the surface of the bath in the melting chamber to the upper end of the cold iron source of the upper part of the preheating shaft and by feeding oxygen containing gas through the gas introducing holes to charge portion of the cold iron source.




The fourteenth invention is an arc-melting equipment for arc-melting cold iron source of any one of the first invention through the thirteenth invention. This invention has a gas feeding device for blowing an oxygen gas or an inert gas into the molten iron in the vicinity of boundary of the cold iron source in the melting chamber and the molten iron.




The fifteenth invention is an arc-melting method for arc-melting cold iron source comprising the steps of:




(1) introducing an exhaust gas generated in a melting chamber into a preheating chamber to preheat the cold iron source;




(2) melting the cold iron source by an arc electrode while the cold iron source is continuously or intermittently being fed to the preheating shaft so that the cold iron source may be continuously maintained in the preheating shaft and the melting chamber;




(3) tilting the melting furnace at the time when the molten iron is accumulated;




(4) heating the molten iron for a predetermined time by an arc electrode to elevate the temperature thereof; and




(5) tapping the molten iron in the state that the cold iron source may be continuously maintained in the preheating shaft and the melting chamber.




The sixteenth invention is an arc-melting method for arc-melting cold iron source of the fifteenth invention comprising the step of separating the molten iron and the cold iron source completely by tilting the melting chamber.




The seventeenth invention is an arc-melting method for arc-melting cold iron source of the fifteenth invention or the sixteenth invention comprising the step of blowing oxygen or the oxygen and fuel simultaneously onto the cold iron source at the lower position of the preheating shaft of the melting chamber.




The eighteenth invention is an arc-melting method for arc-melting cold iron source of any one of the fifteenth invention through the seventeenth invention comprising the step of blowing oxygen and carbonaceous material such as coke into the melting furnace.




The nineteenth invention is an arc-melting method for arc-melting cold iron source of any one of the fifteenth invention through the eighteenth invention wherein the cold iron source of 40% or more of one charge remains in the melting furnace and the preheating shaft during melting and at the time of tapping.




The twentieth invention is an arc-melting method for arc-melting cold iron source of any one of the seventeenth invention through the nineteenth invention, wherein the sum of the oxygen being blown into the lower part of the preheating shaft and the oxygen being blown into the melting furnace is 25 Nm


3


/ton or more.




The twenty-first invention is an arc-melting method for arc-melting cold iron source of any one of the fifteenth invention through the twentieth invention comprising the steps of:




melting the cold iron source in the melting furnace by feeding supplementary heat source such as arc heating and coke and oxygen to the melting furnace; feeding and post-burning oxygen containing gas to elevate an exhaust gas to a predetermined temperature or more without discharging to the outside of the system the residual of the non-combusted gas generated in the melting furnace which has passed through the preheat chamber; and thereafter cooling the exhaust gas continuously and quickly.




The twenty-second invention is an arc-melting method for arc-melting cold iron source of any one of the fifteenth invention through the twenty-first invention comprising the steps of:




melting the cold iron source in the melting furnace by feeding supplementary heat source such as arc heating and coke and oxygen to the melting furnace; arranging one or plural stages of gas introducing holes in a range from bath surface in the melting furnace to upper end of the cold iron source of upper part of the preheat shaft; and feeding oxygen containing gas from those gas introducing holes to the charge portion of the cold iron source to burn part or all of the non-combusted gas generated from the melting furnace.




The twenty-third invention is an arc-melting method for arc-melting cold iron source of the twenty-first invention or the twenty-second invention comprising the step of feeding adsorbent to the exhaust gas which has been quickly cooled at the cooling portion.




The twenty-fourth invention is an arc-melting method for arc-melting cold iron source of any one of the twenty-first invention through the twenty-third invention which is characterized in that the exhaust gas after the post-burning is 900° C. or more.




The twenty-fifth invention is an arc-melting method for arc-melting cold iron source of any one of the fifteenth invention through the twentieth invention comprising the steps of:




melting the cold iron source in the melting furnace by feeding supplementary heat source such as arc heating and coke and oxygen to the melting furnace; arranging one or plural stages of gas introducing holes in a range from the surface of the bath in the melting furnace to upper end of the cold iron source of the upper part of the preheat shaft; feeding a predetermined amount of the oxygen containing gas from those gas introducing holes to the charge portion of the cold iron source to burn the non-combusted CO gas generated from the melting furnace; making the exhaust gas which is generated owing to burning of the non-combusted CO gas by the oxygen containing gas in the vicinity of the outlet of the preheating shaft have a predetermined temperature or more; and thereafter cooling the exhaust gas at the cooling portion which is connected to the upper part of the preheating shaft.




The twenty-sixth invention is an arc-melting method for arc-melting cold iron source of the twenty-fifth invention comprising the step of feeding adsorbent to the exhaust gas which has been quickly cooled at the cooling portion.




The twenty-seventh invention is an arc-melting method for arc-melting cold iron source of the twenty-fifth invention or the twenty-sixth invention, wherein the exhaust gas in the vicinity of the outlet of the preheating shaft is 900° C. or more.




The twenty-eighth invention is an arc-melting method for arc-melting cold iron source of any one of the twenty-second invention through the twenty-seventh invention, wherein the whole blowing amount of the oxygen containing gas makes feed oxygen amount Q


IN


which is calculated from oxygen concentration therein and flow rate therein have the following formula (A) with respect to oxygen amount Q (Nm


3


/min) which is blown in the melting furnace:






0.55


Q


≦0.9


Q


  (A)






The twenty-ninth invention is an arc-melting method for arc-melting cold iron source of any one of the fifteenth invention through the twenty-eighth invention comprising the steps of:




melting the cold iron source in the melting furnace by feeding supplementary heat source such as arc heating and coke and oxygen to the melting furnace; at the time of thereof introducing air into the melting furnace; and burning the non-combusted CO (Mainly CO) gas in the melting furnace so that 0.3≦OD≦0.7 where CO


2


/(CO


2


+CO) is made to be OD.




The thirtieth invention is one wherein a melting method for melting the cold iron source uses the arc-melting equipment of any one of the first invention through the seventh invention.











BRIEF DESCRIPTION OF THE DRAWINGS





FIG. 1

is a perspective view showing an arc-melting apparatus, relating to one embodiment of the present invention.





FIG. 2

is a plan view showing an arc-melting apparatus, relating to one embodiment of the present invention.





FIG. 3

is a sectional view taken on line A-A′ of FIG.


1


.





FIG. 4

is a sectional view taken on line B-B′ of FIG.


1


.





FIG. 5

is a sectional view showing a state of tilting a melting furnace of an arc-melting apparatus, relating to one embodiment of the present invention.





FIG. 6

is a sectional view showing a modified example of the arc-melting apparatus, shown in

FIG. 1

or FIG.


5


.





FIG. 7

is a graph showing the relation of an oxygen unit requirement and an electric power unit requirement, when an operation is performed, using the apparatus of the present invention.





FIG. 8



a


shows a plan view and

FIG. 8



b


a sectional view showing an arc-melting apparatus, having a tilting portion at the bottom of the second embodiment of the present invention.





FIG. 9

is a sectional view showing an arc-melting apparatus, relating to the second embodiment of the present invention.





FIG. 10

is a sectional view showing a state of tilting the arc-melting apparatus, relating to the second embodiment of the present invention.





FIG. 11

is a sectional view showing a modified example of an arc-melting apparatus of the present invention.





FIG. 12

is a sectional view showing an arc-melting apparatus, having an oxygen feeding device, relating to an embodiment of the present invention.





FIG. 13

is a plan view showing an arc-melting apparatus, having an oxygen feeding device relating to an embodiment of the present invention.





FIG. 14

is a sectional view showing an essentials portion of an arc-melting apparatus equipped with a fuel feeding device, in addition to an oxygen feeding device relating to an embodiment of the present invention.





FIG. 15

is a graph showing tap-tap time depending on whether there is oxygen feed to the lower portion of the preheating shaft, relating to an embodiment of the present invention.





FIG. 16

is a sectional view of an arc-melting apparatus, equipped with plural stages of gas introducing holes relating to an embodiment of the present invention.





FIG. 17

is a plan view of an arc-melting apparatus, equipped with plural stages of gas introducing holes relating to an embodiment of the present invention.





FIG. 18

is a sectional view of an arc-melting apparatus, equipped with one stage of a gas introducing hole relating to an embodiment of the present invention.





FIG. 19

is a partially sectional view of an arc-melting apparatus, equipped with plural stages of gas introducing holes relating to an embodiment of the present invention.





FIG. 20

is a sectional view of an arc-melting equipment equipped with an exhaust gas treatment system and a gas introducing hole, relating to an embodiment of the present invention.





FIG. 21

is a sectional view showing an arc-melting apparatus, relating to another embodiment with respect to an arc-melting apparatus, equipped with an exhaust gas treatment system and one stage of a gas introducing hole relating to an embodiment of the present invention.





FIG. 22

is a sectional view showing an arc-melting apparatus, relating to another embodiment with respect to an arc melting apparatus, equipped with an exhaust gas treatment system and plurality of gas introducing holes relating to an embodiment of the present invention.





FIG. 23

is a sectional view showing an arc-melting apparatus, relating to another embodiment with respect to an arc-melting apparatus, equipped with an exhaust gas treatment system, a gas introducing hole and a post-burning chamber relating to an embodiment of the present invention.





FIG. 24

is a longitudinally schematic view of an arc-melting equipment, showing an example of an embodiment of the present invention.





FIG. 25

is a graph showing results of investing influence of oxygen blow amount on an electric power unit requirement with respect to an embodiment of the present invention.





FIG. 26

is a longitudinally schematic view of an arc-melting apparatus, showing another embodiment relating to an embodiment of the present invention.





FIG. 27

is a longitudinally schematic view of an arc-melting equipment showing another embodiment relating to an embodiment of the present invention.





FIG. 28

is another graph showing results of investing influence of oxygen blow amount on electric power unit relating to an embodiment of the present invention.





FIG. 29

is a graph showing results of investing influence of molten iron mixing ratio on an electric power unit requirement, relating to an embodiment of the present invention.





FIG. 30

is a longitudinally schematic view of an arc-melting equipment which shows another embodiment relating to an embodiment of the present invention.





FIG. 31

is a plan schematic view of the arc-melting equipment shown in FIG.


30


.





FIG. 32

is a longitudinally schematic view of an arc-melting equipment, which shows another embodiment (a melting furnace and a melting method) relating to an embodiment of the present invention.





FIG. 33

is a longitudinally schematic view of an arc-melting equipment showing state of tilting a melting furnace among other embodiments relating to an embodiment of the present invention.





FIG. 34

is a longitudinally schematic view of an arc-melting equipment, which shows another embodiment relating to an embodiment of the present invention.











DESCRIPTION OF THE PREFERRED EMBODIMENT




Now the first embodiment will be described with reference to FIG.


1


through FIG.


7


.

FIG. 1

is a perspective view showing an arc-melting apparatus, relating to an embodiment of the present invention.

FIG. 2

is a plan view of the arc-melting apparatus, relating to the embodiment of the present invention.

FIG. 3

is a sectional view taken on line A-A′ of FIG.


1


.

FIG. 4

is a sectional view taken on line B-B′ of FIG.


1


. This arc-melting apparatus is equipped with a melting furnace


1


for arc-melting cold iron source, a preheating shaft


2


directly connected to an upper portion of one side


1




a


of the melting furnace and extending upward and a tapping portion


3


arranged in a melting chamber


1


.




As shown in

FIG. 3

, an exhausting portion


2




a


which is connected to an exhaust gas adsorption system is placed at an upper end of the preheating shaft


2


. Iron scraps S as cold iron source are charged into the melting furnace


1


and the preheating shaft


2


. A bucket


4


for charging scraps is placed above the preheating shaft


2


and the iron scraps S are charged from this bucket


4


into the preheating shaft


2


. In order to prevent hanging up, carbon source, for example, coke may be charged into the preheat shaft


2


. In this case, charge of the scraps S from the bucket


4


is performed to feed the scraps S continuously or intermittently to the preheating shaft


2


so that the scraps S are continuously maintained in the melting furnace


1


and the preheating shaft


2


during the operation. The charge of the scraps S, in this case may be carried out according to a process standard prepared in advance, based on a results of the operational performance or a sensor which can detect the amount of the scraps S in the preheating shaft


2


being installed, the charge of the scraps S through the bucket


4


may be controlled by appropriate means for controlling, based on a signal outputted from this sensor.




A taper of a side wall of the preheating shaft


2


ranges preferably from 2.5 to 7 degrees. If this taper is less than 2.5 degrees, hanging up of the scrap in the shaft cannot be effectively prevented. If this taper is over 7 degrees, the charge amount of scraps


3


decreases. With a decreased amount of the scraps


3


, there is insufficient residence time during preheating,and it becomes impossible to sufficiently obtain the effect of preheating. To compensate for this and increase residence time to the same degree that is intended to be gained, the height of the preheating shaft


2


must be increased. If this is done, the building has to be heightened. Furthermore, since a sectional area of an upper part of the preheating shaft


2


becomes narrow, the amounts of scraps which can be held therein and be preheated, is limited.




A furnace cover


5


, which is capable of opening and closing, is arranged at an upper part of the melting furnace


1


and an arc electrode


6


is inserted vertically into the melting furnace, passing through the furnace cover


5


from the top of the melting furnace


1


. In addition, the furnace bottom electrodes


11


are placed in a position where the electrodes


11


confront the arc electrode


6


at a furnace bottom of the melting furnace


1


. The scraps S are melted into molten iron


8


by an arc


7


which is produced by the arc electrode


6


. Slag


9


is produced on the molten iron


8


and the arc


7


is formed in this slag


9


. The arc electrode


6


is supported by a support member


13


and can be tilted by a tilting mechanism


14


.




Two lances


12




a


,


12




b


are inserted turning their top ends into the surface of the molten iron bath, the oxygen being fed through the lance


12




a


and coke as a supplementary heat source being injected through the lance


12




b.






The scraps S in the preheating shaft


2


are fed in the direction of going from a preheating shaft side


1




a


of the melting furnace toward the opposite side


1




b


thereof, and the tapping portion


3


is arranged projecting out of the melting furnace


1


, so as to make a right angle with the direction to the scraps S are fed. The melting furnace


1


can be tilted on a side of the tapping portion


3


(See

FIGS. 4 and 5

) by a tilting mechanism which is not shown in the drawings. A portion where the preheating shaft


2


of the melting furnace


1


is placed and a portion where the tapping portion


3


is placed are apart as much as distance a and the scraps S are prevented from flowing out on the side of the tapping portion


3


by a wall portion thereof when the melting furnace


1


is tilted. In this case as shown in

FIG. 3

, the distance a is preferably longer than a distance that the scraps S extends with an angle of repose ranging from the preheat shaft


2


to the melting furnace


1


. By way of doing in this manner, the scraps S are completely prevented from flowing out on the side of the tapping portion


3


, when the melting furnace is tilted.




A tapping hole


15


is formed at a bottom portion in the vicinity of the top end of the tapping portion


3


(see

FIG. 4

) and a stopper


16


which is movable up and down, in order to open and close the tapping hole


15


is placed. In addition, a slag door


17


is placed on the top end side of the tapping hole


3


.




When the iron scraps are melted in a melting equipment constituted in this manner, the iron scraps S are firstly charged into the melting furnace


1


and the preheat shaft


2


so that the iron scraps S are continuously maintained in the melting furnace


1


and in the preheat shaft


2


.




In this state, the arc


7


is formed by the arc electrode


6


to melt the scraps S. In this case, oxygen is fed through lance


12




a


to assist the melting of the scraps. After molten iron accumulates in the furnace, coke is injected as a supplementary heat source through lance


12




b


into the slag to start slag forming operations for the new scrap being melted, and a top end of the electrode


6


is buried in the slag


9


so that the arc


7


is formed in the slag


9


. The coke is a supplementary heat source which contributes to melting of the scraps S.




An exhaust gas containing CO is generated by melting the scraps in this manner and is discharged through the preheating shaft


2


and the exhausting portion


2




a


. The heat of this exhaust gas is transferred to the scraps S in the preheating shaft


2


, whereby the scraps are preheated. Since the scraps in the preheating shaft


2


are gradually fed into the melting furnace


1


, accompanied by melting of the scraps S within the melting furnace


1


, the upper end position of the scraps S goes down. Therefore, additional scraps S are continuously or intermittently fed from the bucket


4


to the preheating shaft


2


, so that the scraps S are continuously maintained in the melting chamber and in the preheating shaft. In this way, at least a predetermined amount of scraps are always maintained in the melting furnace


1


and in the preheating shaft


2


. The charging of the scraps S is controlled according to a process standard prepared in advance based on results of operational performance or a sensor which can detect amount of the scraps S in the preheat shaft


2


. A signal from the sensors is then used to control the bucket


4


.




As the scraps S are being melted, a state that the scraps S as iron source and the molten iron co-exist in the melting furnace


1


. And the temperature of the molten iron becomes low, for example, 1540˜1550° C. This is only a slight super heat compared with 1530° C. of solidification temperature of molten iron, which can cause such inconvenience as a blocking of the tapping hole at the time of tapping by solidified material. For this reason according to the present invention, arc heat is continued by tilting the melting furnace


1


on the side of the tapping portion


3


before tapping as shown in FIG.


5


. In this case the tapping portion


3


is arranged projecting out of the melting furnace


1


so as to make a right angle with the direction to which the scraps S flow in, and further a portion where the preheat shaft


2


of the melting furnace


1


is placed and a portion where the tapping portion


3


is placed are apart as much as distance a (See

FIG. 3

) and the scraps S are prevented from flowing out on the side of the tapping portion


3


by a wall portion thereof. Owing to this prevention, area where the molten iron having flown into the side of the tapping portion


3


contacts with the scraps S can be made to be small. Therefore, super heat (ΔT) of the molten iron can be increased and it is possible to avoid the problem that temperature of the molten iron which is tapped is low. By making the separation distance a longer than the distance of the scraps S which extends with an angle of repose, rising from the preheat shaft


2


to the melting furnace


1


, the scraps S are nearly completely prevented from flowing into the tapping portion


3


. This allows the temperature of the molten iron to be elevated all the more.




If the melting furnace


1


is tilted, the arc electrode


6


is positioned on the broken line in FIG.


5


and arc is not effectively fed. By tilting the arc electrode


6


by the tilting mechanism


14


, however, the arc electrode is positioned on the solid line in FIG.


5


and the arc can be effectively fed to the molten iron.




Instead of moving the arc electrode


6


in this manner, as shown in

FIG. 6

, another arc electrode


6


′ is installed and when the melting furnace


1


is tilted, by generating the arc from the arc electrode


6


′ the arc can be effectively fed.




In the manner of the foregoing, the melting progresses. When a predetermined amount of the molten iron is accumulated in the furnace, the melting furnace


1


is tilted to make small the area where the molten iron contacts with the scraps. After the molten iron is superheated by arc heat for a certain time, while the scraps S are maintained continuously in the melting furnace


1


and in the preheat shaft


2


by further tilting the melting furnace


1


, the stopper


16


which has closed the tapping hole


15


is moved upward to open the tapping hole


15


. And then one charge of molten iron is tapped through the tapping hole


15


into a ladle.




When the scraps are melted in this manner, since the preheat shaft


2


is not equipped with a scrap carry and supply equipment such as a pusher or a finger, the preheat shaft


2


can have the oxygen amount increased to a greater extent than in conventional melting equipment equipped with these facilities whereby the temperature of the exhaust gas can be elevated. The melting equipment of the present invention can, therefore, preheat the scraps to higher temperature than is preheated in conventional melting equipment.




In case that the scraps S are fed to the preheat shaft


2


so that the scraps S are continuously maintained in the melting furnace


1


and the preheat shaft


2


and when one charge or more of molten iron are produced in the melting furnace to also tap the molten iron, the scraps are continuously maintained in the melting furnace


1


and the preheat shaft


2


and for this reason, efficiency of preheating the scraps by exhaust gas is high. In this case, by realizing that the scraps of 40% or more of one charge are maintained in the melting furnace


1


and in the preheat shaft


2


, the efficiency of preheating becomes extremely high.




In addition, from a view point of melting scraps efficiently supplementary heat source such as coke is preferably used, by feeding oxygen through the lance


12




a


(

FIG. 3

) as well as injecting coke as supplementary heat source through the above described lance


12




b


CO gas is generated in the melting furnace


1


and heat can be produced. In this case feed amount of oxygen is preferably 25 Nm


3


/t or more. Thanks to this scraps can be melted more efficiently. The feed amount of oxygen is more preferably 40 Nm


3


/t or more.

FIG. 7

shows electric power unit consumption in a melting furnace of an embodiment described later when oxygen unit consumption is 15˜45 Nm


3


/t. As accompanied by increase of the oxygen unit consumption, the electric power unit consumption decreases as shown in

FIG. 7

, and if the oxygen unit consumption is in particular 25 Nm


3


/t or more, the electric unit consumption is so extremely low as to be 200 KWh or less. Furthermore if the oxygen unit consumption is 40 Nm


3


/t or more, the electric unit consumption is about 120 KWh or less, which is a furthermore low value.




Since as described above, according to the above described embodiment facilities such as a pusher or a plunger are not necessary, temperature of the exhaust gas can be elevated and since the scraps S can continuously be maintained in the melting furnace


1


and in the preheating shaft


2


, the efficiency of melting the scraps is extremely high. In addition, since the area which the scraps S as iron source contact with the molten iron in which the scraps S are melted can be made small, the molten iron can be super heated and it is possible to solve the problem which result when the temperature of the molten iron being tapped, is low.




Subsequently the second embodiment will be described with reference to FIG.


8


through FIG.


10


. FIG.


8


(


a


) is a plan view showing an arc-melting equipment relating to the second embodiment of the present invention. FIG.


8


(


b


) is a sectional view taken on line X-X′ of FIG.


8


(


a


).




According to this embodiment as shown in FIGS.


8


(


a


) and


8


(


b


), a portion corresponding to the preheat shaft of the melting chamber and a part of a bottom of a portion corresponding to the separating distance portion, constitute a slant portion


1




c


, which locates slantwise at a higher position gradually from the position of


1




d


(the deepest position at a bottom of a portion


1




b


). In this case, the bottom (


1




d


) moves higher toward the tilting direction, when the furnace tilts. The tapping portion


3


is placed in the slant portion (


1




c


) in the melting chamber. Therefore, the tapping portion (


15


) moves toward the deepest position, when the furnace is tilting.




As shown in FIG.


9


and

FIG. 10

, by tilting the melting furnace


1


, the area where scraps contact with molten iron


8


turns from the slant line portion


8




a


of

FIG. 9

to the slant line portion of FIG.


10


. And due to the existence of the slant portion


1




c


, the area where the scraps contact with the molten iron


8


, becomes remarkably smaller than that of the first embodiment. Super heat (ΔT) of the molten iron can, therefore, be increased, as compared with the first embodiment. And it is possible to more effectively avoid the problem that occur when the temperature of the molten metal being tapped is low. After overheating is carried out in this manner, the operation is the same as in the first embodiment. Thus, the scraps S are continuously maintained in the melting furnace


1


and the preheat shaft


2


by further tilting the melting furnace


1


, the stopper


16


which has closed the tapping hole


15


is moved upward to open the tapping hole


15


. And then one charge of molten iron is tapped through the tapping hole


15


into a ladle.




It should be noted that the arc-melting equipment can be constituted as shown in FIG.


11


. According to the arc-melting equipment of

FIG. 11

, a portion directly under the preheating shaft


2


forms a slant portion


18


which slants toward a bottom portion of an separation distance a. By providing the slant portion


18


in this manner, following the melting of the scraps S in contact with the molten iron


8


the scraps S can be fed more smoothly from the preheat shaft


2


to the separating distance portion a.




The present invention is not limited to the above described embodiment but can be variably modified. In the above described embodiment, for example, the tapping portion


3


is arranged facing so as to make a right angle with the direction wherein the scraps flow in facing from a side


1




a


of the preheat shaft of the melting furnace


1


to the opposite side


1




b


. It is, however, not limited to the embodiment, and any direction will do so long as the direction is other than the direction wherein the scraps flow in. If the direction is other than the direction wherein the scraps flow in, the effect of preventing the scraps from flowing out to the tapping portion can be obtained.




In addition, the embodiment gives an example wherein scraps are used as iron source to produce molten iron, but other iron source such as direct reduced iron is also applicable. It is, of course, applicable to equipment which produces molten iron in addition to molten iron. In the above described embodiment, an example wherein an arc electrode is tilted to melt scraps, is shown. However, the arc electrode is not always limited to tilting, but any movement means thereof can be available.




Furthermore, as an apparatus for completely separating molten iron and scraps during tapping or a method thereof such a practical embodiment as given in the following can be employed. That is to say, a method as shown in

FIG. 32

is raised wherein a temperature-rise chamber is arranged on the opposite side of a preheat chamber putting a melting chamber between the temperature rise chamber and the preheat chamber, the melting chamber is tilted at the time when a predetermined amount of molten iron accumulates in the melting chamber and the molten iron is led to the temperature-rise chamber to completely separate the molten iron and cold iron source in the melting chamber. Furthermore as shown in

FIG. 1

, there is a method wherein the temperature rise chamber is arranged in the direction different from the direction to which cold iron source from the preheat shaft is fed, the melting chamber is tilted as shown in

FIG. 33

at the time when a predetermined amount of molten iron is accumulated in the melting chamber and the molten iron is led to the temperature-rise chamber to completely separate the molten iron and cold iron source in the melting chamber. Still furthermore, as shown in

FIG. 34

a bottom-up portion is arranged at a bottom portion of a side of a melting chamber, molten iron is elevated in temperature before the molten iron surface arrives at the bottom-up portion of the melting chamber and the molten iron is tapped.




The reference numerals of

FIG. 32

are described below.






802


: a melting chamber;


803


: a preheat chamber;


807




a


: an upper electrode for arc generation in the melting chamber;


807




b


: an upper electrode for arc generation in the temperature-rise chamber;


810




a


and


810




b


: lances for feeding oxygen; and


811




a


and


811




b


: a device for blowing coke in.




The reference numerals of

FIG. 33

are described below.






1007




a


and


1007




b


: an electrode for arc generation;,


1014


: slag;


1014


: molten iron; and


1022


: a tapping hole.




Subsequently referential numerals of

FIG. 34

are described below.






902




c


: a bottom-up portion;


903


: a preheat chamber;


905


a furnace wall;


906


: a furnace cover;


907


: furnace bottom electrodes;


908


: an upper electrode;


910


: a tilting device;


912


: a lance for blowing oxygen in;


913


: a lance for blowing carbonaceous material in;


914


: a burner;


915


: a tapping hole;


917


: supply bucket;


918


: cold iron source;


920


: molten slag; and


921


: an arc.




In the second embodiment, one example is shown, wherein a slant portion is composed of two sorts of the portions, one corresponds to the preheating shaft of the melting chamber and the other is a part of the bottom corresponding to an separation distance portion. The whole part of the above described bottom portion, however, may be the slant portion. In the above described embodiment, an example wherein scraps are used as iron source to produce molten iron is shown, but it is applicable to apparatus, wherein cold pig iron is used as iron source to produce molten iron.




Embodiment 1




Scraps of 150 ton were charged into a melting furnace of a direct current arc apparatus as shown in FIG.


1


through

FIG. 15

, wherein a melting furnace (length: 8.5 m; width: 3 m; height: 4 m) is directly connected to a preheating shaft (3 m W×3 m D) and an arc was formed in the melting furnace by a graphite electrode of 28 inches with maximum electric power source capacity of 600 V, 100 kA to melt the scraps. In addition, a water cooled lance was inserted through a working entrance placed at a furnace side wall and oxygen of 6000 Nm


3


/hr was fed there-through. When molten iron accumulated in the furnace, coke was injected at a rate of 80 kg/min into slag to start the slag forming operation and the top end of the graphite electrode was buried in the forming slag. Voltage at this time was set to 400 V. If the scraps in the preheating shaft descended following melt of the scraps in the melting furnace, additional scraps were fed from an upper part of the preheating shaft by the bucket


4


for charging scraps to keep a level of the scraps at a certain height in the preheating shaft.




In this manner, the melting was promoted in a state that the scraps were continuously maintained in the melting furnace and in the preheating shaft. At a stage where 180 tons of molten iron was totally produced in the melting furnace, the melting furnace was tilted on the tapping portion side at 15 degrees, a contact area of the molten iron and the scraps was reduced to allow superheating of the molten iron above its heating point and furthermore the melting furnace was tilted. And 120 tons of molten metal was tapped through a tapping hole into a ladle, leaving 60 tons in the furnace. Temperature of the molten iron at the time of tapping was 1575° C. Carbon concentration in the molten iron was 0.1%.




After 120 tons of molten iron was tapped, the melting furnace was returned to the state before the tapping. While oxygen feed and the coke injection were being carried out, slag forming operation was performed and the melting was continued. When the molten iron in the melting furnace amounted again to 180 ton, the melting furnace was tilted again to superheat the molten iron and tapping of 120 ton of the molten iron was repeated. Molten iron of 120 ton was obtained for time of between tapping of about 40 minutes on average. Electric power unit consumption of 175 kWh was obtained by using an oxygen amount of 33 Nm


3


/t and coke unit consumption of 26 kg/t.




The 120 tons of the molten iron which was tapped, was elevated to a temperature of 1620° C. by a ladle furnace (LF), and was continuously cast to produce a billet of 175×175 mm. Electric power unit consumption of LF was 45 kWh/t on average.




On the other hand, with regard to Comparative example (similar to Prior Art


3


) which was melted in a single batch, using the same equipment, without feeding scraps continuously, electric power unit consumption was also investigated.




These results were shown in Table 1. As shown in Table 1, Example 1, wherein oxygen was continuously fed on condition that oxygen consumption is substantially equal, showed electric power unit consumption reduced by about 140 kWh from the consumption of the Comparative example, and less by about 125 kWh, even if electric power unit consumption which is necessary for LF, is included. In addition, even if compared with reported examples of other process which conventional art showed, the present invention shows that the electric power unit consumption which is necessary, without considering LF, is less by 50 kWh/t and thus it has been confirmed that preheat efficiency of scraps according to the present example is very high.




Embodiment 2




Melting similar to Example 1 was carried out in the above described melting furnace except that oxygen amount was 45 Nm


3


/t and coke unit consumption was 36 kg/t. The results were also shown in Table 1. Electric power unit consumption in this case was extremely low to show 135 kWh, and molten iron having 1575° C. on average was obtained for time of tap to tap of about 37 minutes.




Embodiment 3




Melting was carried out under conditions similar to that of the above described Example 1 using a melting furnace and a preheating shaft of a direct arc apparatus, wherein there is a portion corresponding to a preheating shaft of a melting furnace as shown in

FIG. 8

, FIG.


9


and

FIG. 10

a melting furnace (length: 8.5 m; width: 3 m; height: 4 m) directly connected to the preheat shaft (3 m W×3 m D) and a half part of a bottom portion of a portion corresponding to an separating distance portion have a slant surface for example of 15 degrees.




As the results, as shown in Table 1 the tapping temperature in this case was 1600° C. higher than the temperatures of Example 1 and Example 2. Electric power unit consumption of 188 kWh was obtained by oxygen amount of 33 Nm


3


/t and coke unit consumption of 26 kg/t, and electric power unit consumption of LF was 30 kWh/t on average.




Embodiment 4




Melting similar to Example 3 was carried out in the above described melting furnace except that oxygen amount was 45 Nm


3


/t and coke unit consumption was 36 kg/t. The results were also shown in Table 1. Electric power unit consumption in this case was extremely low to show 148 kWh, and molten iron having 1600° C. on average was obtained for time of tap to tap of about 37 minutes.

















TABLE 1














Comparative







Example 1




Example 2




Example 3




Example 4




Example







The present




The present




The present




The present




Batch






Operation method




invention




invention




invention




invention




Operation




























Oxygin unit




33




45




33




45




33






consumption






(Nm3/t)






Coke unit




26




36




26




36




26






consumptin






(kg/t)






Tappig




1575




1575




1600




1600




1620






temperature






(° C.)






Electric power




175




135




188




148




315






unit consumption






(kWh/t)






LF unit




45




45




35




35




30






consumption






(kWh/t)






Total power




220




180




223




183




345






unit consumption






(kWh/t)














Now subsequently another embodiment of the present invention will be described with reference to FIG.


12


through FIG.


15


.

FIG. 12

is a sectional view showing an arc-melting apparatus relating to an embodiment of the present invention. This arc-melting apparatus is equipped with a material furnace


101


for arc-melting a cold iron source, and a preheating shaft


102


directly connected to an upper portion of the melting furnace. An exhausting portion


102




a


, which is connected to an exhaust gas adsorption system, is placed at an upper end of the preheating shaft


102


. Iron scraps


103


as cold iron source are charged into the preheat shaft


102


.




Two lances


112




a


,


112




b


are inserted turning their top ends into surface of molten iron bath in the melting furnace


101


, oxygen being supplied through the lance


12




a


and coke as supplementary heat source being injected through lance


112




b


. It should be, however, noted that as supplementary heat source carbonaceous material other than the coke may be also used.




A tapping hole


114


is formed at a bottom portion of a projecting portion


101




a


arranged at a portion different from a side where the preheat shaft


102


of the melting furnace


101


is directly connected, and at a side end of the tapping hole a slag door


115


is placed. It should be, however, noted that the tapping hole may be placed on the same peripheral surface with the slag door


115


. Into the projecting portion


101




a


, a burner


113


is inserted from above the projecting portion, where it is possible to elevate the temperature of molten iron which is tapped. In this case, heating means such as an arc electrode or the like can be installed instead of the burner


113


.




As shown

FIG. 12

, a side wall of the preheating shaft


102


has a taper which extends downward. By forming such taper high temperature, the scraps can be steadily supplied into molten iron


108


in the melting furnace


101


. In case that the taper is not formed, the scraps


103


do not slide freely over the wall portion of the preheat shaft


102


so much that the scraps do not fall under their own weight, which causes hanged up of the scraps.




Oxygen supplying devices


116


for supplying oxygen to the scraps


103


, are located at a lower portion of the shaft


102


in the melting furnace


101


. And in the vicinity of the devices, the scraps are fulfilled. As shown in

FIG. 13

, six of these supplying devices are installed, and by supplying oxygen therefrom to the scraps


103


, the scraps can be cut off into smaller size, simultaneously with being melted. By cutting off the scraps


103


, simultaneously with melting in this manner, state of hanging up is prevented more effectively.




It should be noted that in case where oxygen is supplied through the oxygen supply devices


116


the oxygen gas may be supplied alone or other gas may be mixed with the oxygen gas. Oxygen compound gas may be used so long as it will support combustion.




In addition, as shown in

FIG. 14

, a fuel supply device


117


for supplying fuel such as oil and gas can be installed together with the oxygen supply devices. By supplying fuel in this manner, the scraps


103


can be more easily cut off by being melted.




When the iron scraps are melted in the melting equipment constituted in this manner, the scraps


103


are firstly charged into the melting furnace


101


and the preheat shaft


102


to form a combustion, whereby the iron scraps


103


are continuously maintained in the melting furnace and in the preheat shaft


102


.




In this state an arc


107


is formed by an arc electrode


106


, the iron scraps


103


are melted and simultaneously the oxygen is supplied from the oxygen supply devices


116


to cut off the scraps


103


by melting.




In case that the fuel supply device


117


is installed, the fuel such as oil is supplied together with the oxygen. In case that the oxygen is supplied to the scraps


103


in this manner, the scraps


103


are preheated by the burning fuel to high temperature, whereby the scraps


103


are cut off by melting. Owing to this, even if the scraps


103


pile at a portion thereof which remain as not yet melted in a lower portion of the preheating shaft


102


, since the scraps are cut off, hanging-up can be prevented. Although as described above, by forming the taper on the preheating shaft


102


, hanging-up is reduced. Some hanging-up of scraps in the preheating shaft occurs to some extent of frequency. Since the scraps


103


at a lower part of the preheating shaft


102


are cut off in this manner, hanging-up is almost completely prevented from being caused by the piling of the scraps at the not yet melted portion thereof.




At the time of melting the scraps


103


by the arc


107


, the oxygen is supplied through the lance


112




a


into the furnace to assist the scraps


103


to be melted. When molten iron is accumulated in the furnace, coke is injected as supplementary heat source through the lance


112




b


into slag continue the slag forming operation and a top end of the electrode


106


is buried in slag


109


so that the arc


107


is formed in the slag


109


. This coke which has been injected as supplementary heat source reacts with the oxygen which has separately been supplied to generate CO gas and simultaneously the reaction heat contributes to melting the scraps


103


.




In addition the oxygen which has been supplied through the oxygen supply devices


116


reacts with iron to form FeO, and this FeO is also reduced by coke which has been supplied through the lance


112




b.






Melting of the scraps progresses and when the molten iron of for example one charge or more is accumulated in the furnace, the furnace is tilted to elevate the temperature for a predetermined time. And while the scraps are continuously maintained in the melting furnace


101


and the preheating shaft


102


, the melting furnace


101


is tilted to tap the molten iron of one charge from the tapping hole


114


into a ladle or the like. At the time of the tapping, in order to prevent the tapping hole


114


from being blocked by solidification of the molten iron, the molten iron may be heated by the burner


113


.




As described above, from a standpoint of melting the scraps efficiently, it is preferable to use supplementary heat source such as coke and by supplying oxygen through the different lance


112




a


as well as injecting coke as supplementary heat source through the above described lance


112




b


CO gas is generated to be able to produce heat. In this case total amount of oxygen which is supplied from the lance


112




a


and the oxygen supply device


116


is preferably 25 Nm


3


/t or more. Owing to this, the scraps can be more efficiently melted. More preferably the total amount of oxygen is 40 Nm


3


/t.




If the melting is performed in this manner under conditions wherein the scraps are maintained in contact with the molten iron, since temperature of the molten iron is low to be approximately 1550° C., there is the possibility that the tapping hole


114


is blocked by partial solidification of the molten iron. As described above, however, by heating the molten iron by the burner


113


, such problem can be avoided. Of course, for the purpose other means for heating such as an arc electrode can be employed.




Embodiment 5




Scraps of 150 tons were charged into a melting furnace and a preheating shaft of a direct current arc apparatus, wherein the melting furnace (furnace diameter: 7.2 m; height 4 m) is directly connected to the preheating shaft (5 m W×3 m D×7 m H), and as shown in

FIG. 13

oxygen, supplying devices (oxygen supplying nozzles)


116


are installed at six places and an arc was formed by a graphite electrode of 30 inches with an electric power source capacity of maximum 750V, 130 kA to melt the scraps. In addition, a water cooled lance was inserted through a working entrance placed at a furnace side wall to supply oxygen at a rate of 4000 Nm


3


/hr there-through. When molten iron has accumulated in the furnace, coke was injected at a rate of 80 kg/min into slag to continue the slag forming operation and the top end of the graphite electrode was buried in the forming slag. Voltage at this time was set to be 550 V. When the scraps in the preheating shaft descended the following melt of the scraps in the melting furnace, the scraps were supplied from a bucket for charging the scraps at an upper part of the preheating shaft to keep a level of the scraps at a certain height in the preheating shaft.




During this time, oxygen was supplied through the above described oxygen supplying devices (oxygen supplying nozzles) at a rate of 350˜500 Nm


3


/hr per nozzle to the scraps at a lower part of the preheating shaft


102


to melt and cut the scraps


103


. And by preventing the hanging-up of scraps in the furnace, a stable state was maintained whereby the scraps continuously fall into the molten iron.




In this manner, the melting is promoted under conditions where the scraps were continuously maintained in the melting furnace and in the preheating shaft. At a stage where 180 tons of molten iron was produced, the furnace was tilted to elevate temperature thereof by arc heating for a predetermined time. Therefore, 120 tons of molten iron was tapped from the tapping hole into a ladle, leaving 60 tons in the furnace for continuing the molten process. Temperature of the molten iron at the tapping time was 1550° C. Carbon concentration in the molten iron was 0.1%. The molten iron in the vicinity of the tapping hole was heated by an oxygen-oil burner.




Even after the molten iron of 120 tons was tapped, the melting was continued and when the molten iron amounted again to 180 tons in the melting furnace tapping the molten iron of 120 tons was repeated. The molten iron (120 tons) was obtained by time with a tap to tap time of about 40 minutes on average. Electric power unit consumption of 170 kWh/t was obtained by total oxygen amount of 33 Nm


3


/t from the oxygen supply nozzles and the water cooled lance and coke unit consumption of 26 kg/t.




In case that oxygen was not supplied through the oxygen supplying nozzles installed at a lower part of the preheating shaft, the scraps were piled on a portion of scraps which remained as not melted at a lower part of the preheating shaft, and the scraps did not drop in the furnace in spite of there being space on the whole surface of the scraps. The condition of so-called hanging-up continued for a long time and it resulted in stagnated melting about once per 6 charges (6 numbers of the tapping time). According to the present invention, however, by actively melting and cutting off the scraps by means of supplying oxygen through the oxygen supplying nozzles at a lower part of the preheating shaft, such a stagnation of melting did not occur.




Tap to tap time and its frequency, which is in the case scraps were melted and cut off by supplying oxygen, compared with in the case scraps were not melted and not cut off by oxygen (in the case oxygen was supplied at a rate of 6000 Nm


3


/hr, exclusively through a water cooled lance) are shown in FIG.


15


. As seen apparently from

FIG. 15

, in case that oxygen was not supplied, it has been confirmed that supply of scraps was delayed and it has also been confirmed that as the results there existed charge wherein tap-tap time was long. However, in case that cutting was performed by oxygen, it has been confirmed that in any charge was taken the tap-tap time of about 40 minutes.




Subsequently another embodiment of the present invention will be described with reference to FIG.


16


through FIG.


18


.

FIG. 16

is a sectional view showing an arc-melting apparatus, which relates to an embodiment of the present invention. This arc-melting apparatus cannot always prevent the in-furnace hanging-up of scraps effectively, because the friction force of its wall surface and scraps


203


is large, when the preheating shaft is rectangular, even when a taper is given to the preheating shaft


202


. In order to prevent the in-furnace hanging-up of scraps, it is preferable that the sectional shape of the preheating shaft is circular, an ellipse or a curve.




In a range from the surface position of the molten iron bath in the melting furnace


201


to an upper end position of scraps of the preheating shaft


202


, plural stages (3 stages in the drawing) of gas introduction entrances


216


, for supplying oxygen containing gas such as oxygen gas and air to a portion where scraps are charged, are installed. By the oxygen containing gas, which is introduced from the gas introduction entrances


216


, CO gas generated in the melting furnace is made to burn.




In such a way, by installing a plurality of gas introduction entrances at arbitrary positions in the range, which is, from the surface position of the molten iron bath in the melting furnace


201


to an upper end position of scraps of the preheating shaft


202


, CO gas generated from the melting furnace


201


can be made to burn at a plural of the arbitrary positions in a scraps layer in the melting furnace


201


and a scraps layer


202


in the preheating shaft


202


. For example, one third of the entire combustion amount at a scraps layer in the melting furnace


201


, one third thereof at a scraps layer in a lower part of the preheating shaft


2


directly above the melting furnace


1


and the rest one third thereof at a medium position between the surface of the molten iron bath in the preheating shaft


2


and the highest position of the scraps can be made to burn. Since, therefore, the whole amount of CO is not made to burn at one position, temperature of the combustion gas does not become high and the dissociation of CO


2


by O


2


took into CO is prevented. In addition, since CO is made to burn at a position which is desired, it is well controllable and it can be made to burn surely and efficiently.




As shown in

FIG. 17

, these gas introduction entrances


216


are placed in plurality (4 places in

FIG. 17

) in number in peripheral direction per one stage. Two stages or more of these gas introduction entrances are preferably formed at a position lower than 0.5 L, where L is the length or distance from the surface of the molten iron bath in the melting furnace


201


to an upper end position of cold iron source at an upper part of the shaft. If the position is higher than 0.5 L, the heat transfer time after burning is short, and the effect is small. If one stage is formed, combustible gas becomes high in temperature and there is possibility that problems that scraps are oxidized and that heat load to equipment is too high. Furthermore these gas introduction entrances exist preferably with 5 stages or less at the position lower than 0.5 L. In case that the gas introduction entrances with 6 stages or more are installed at a position lower than 5 L, reversibly distance where oxygen containing gas such as air goes into the preheat shaft is reduced, burning at a center portion of the preheat shaft


2


is delayed, gas which has not yet burnt burns at a position higher than 0.5L and efficiency is lowered.




According to the present embodiment, since a plurality of gas introduction entrances


216


are installed at arbitrary positions in a range from molten iron bath surface position in the melting furnace


1


to an upper end position of scraps of the preheating shaft


202


, by blowing oxygen containing gas such air and oxygen gas through these gas introduction entrances


216


, CO gas generated from the melting furnace


201


can be made to burn at plural arbitrary positions in a scraps layer in the melting furnace


201


and a scraps layer


203


in the preheating shaft


202


. As opposed to the situation where CO is made to burn at one position of a scraps layer


203


, using plural portion avoids that the temperature of combustible gas is too high resulting in the scraps becoming fused and in the dissociation of CO


2


, which had been produced by burning gases in O


2


. In addition since CO is made to burn at a position which is desired, burning is well controlled so that it can be made to burn surely and efficiently, and the heat thereof can be effectively used for preheating the scraps.




In this case, total blow amount of oxygen containing gas is preferably made so that oxygen amount in which is calculated from oxygen concentration in the total blow amount of oxygen containing gas and flow rate has the following formula(A) with respect to reaction with supplementary heat source and with respect to oxygen amount Q(Nm


3


/min) which is blown in the furnace to oxidize metal.






0.55


Q≦Q


in≦0.9


Q


  (A)






This is because if Qin is over 0.9 Q, oxygen which does not take part in burning remains along with surplus N


2


and results in increased drop in temperature of generated gas, thereby lowering efficiency. Furthermore, there is an increased problem of oxidation caused by the surplus oxygen, because on the other hand, if Qin less than 0.55 Q, the whole amount of generated CO cannot to be made to burn and CO which has not burnt will exist at an upper part of the shaft.




Subsequently another embodiment of the present invention will be described with reference to FIG.


16


through FIG.


19


.




According to the above described embodiment, the substantially whole part of CO exhaust gas which was generated in the melting furnace


201


was made to burn by an oxygen containing gas from gas introduction entrances which were installed with plural stages at arbitrary positions in the range from molten iron bath surface position in the melting furnace


201


to an upper end position of scraps of the preheat shaft


202


. According to the present embodiment, however, a slag door


215


of the melting furnace


201


is made to work as a working door for having air enter into the melting furnace


201


, this working door


215


is opened during melt treatment to have air enter into the melting furnace and a part of the CO exhaust gas which has not yet burnt is made to burn in the melting furnace


201


. And then the rest of the CO exhaust gas which has not yet burnt is made to burn by an oxygen containing gas from gas introduction entrances which are installed at arbitrary positions in the range from molten iron bath surface position in the melting furnace


201


to an upper end position of scraps of the preheat shaft


202


.




If air is introduced into the melting furnace


201


in this manner, a part of high temperature CO gas which has been generated in the furnace burns in the entering air, but since the burning occurs in the melting furnace


201


, the burning does not result in locally high temperatures in a layer of scraps which have not yet been melted and fusion of the scraps does not occur. In addition, this burning heat transfers the heat to the scrap


203


between the molten iron surface and an lower end position of the preheat shaft


202


before exhaust gas enters into the preheat shaft


202


, and the burning heat lowers to temperatures where local fusion does not occur when the exhaust gas enters into the preheat shaft


202


. Furthermore, since the heat of the gas transfers heat to the scraps even in the preheat shaft


202


, the temperature of the exhaust gas is not high and the fusion of the scraps does not occur even in the preheat shaft


202


. The scraps of that part can be efficiently preheated. And the transfer of heat of the exhaust gas to the scraps


203


is ensured in this manner so that the heat is effectively used for preheating the scraps


203


.




According to the present embodiment, when a part of the CO exhaust gas burns in the entering air in the melting furnace


201


, the CO gas which has not yet burnt burns in the melting furnace


1


, so that OD is less than 0.7, if CO


2


/(CO


2


+CO) is made to be OD. If the value of OD is 0.7 or more, heating value in the furnace becomes so large that damage to the furnace and fusion of scraps occur. It is more preferable that OD is less than 0.6.




In the above-mentioned way, according to the present embodiment, a part of the non-combustible CO gas is made to burn in the melting furnace


201


. Therefore, compared with an embodiment, wherein there is burning at only one position of a scraps layer in this embodiment, there is no possibility that the temperature of the combustible gas will be so high as for the scraps to be fused, or for the O


2


to be produced by dissociation of CO


2


, which has been produced by burning. In addition, since CO is made to burn at a position which is desired, burning is well controlled so that it can be made to burn surely and efficiently and the heat can be used effectively for preheating the scraps.




The present embodiment is different from other embodiments. As shown in

FIG. 18

, according to the present embodiment, a part of the CO exhaust gas has already burned in the melting furnace


201


. One stage of the gas introduction entrance


216


may be satisfactory. Of course, plurality of stages of the gas introduction entrances may also be satisfactory. As in the same way as other embodiments, from a standpoint of increasing efficiency of preheating the scraps


203


, it is preferable that the gas introduction entrance


216


is located preferably at a lower part.




In the case where there is one stage of gas introduction entrance


216


, and where gas introduction amount is small even if there are plurality of stages of gas introduction entrances, the value of OD is preferably more than 0.3. If the value of OD is 0.3 or less, the heating value of gas in the preheating shaft


2


is so short that the scraps cannot be sufficiently preheated. It is more preferable that OD is more than 0.4.




Since even according to the present embodiment, in the same way as conventional embodiment the scraps


203


are supplied so that the scraps


203


are continuously maintained in the melting furnace


201


and in the preheating shaft


202


, efficiency of preheating the scraps by exhaust gas is high. By detaining 40% or more of scraps of one charge continuously in the melting furnace


201


and the preheat shaft


202


during melting and at the tapping time, efficiency of preheating becomes extremely high. In addition, CO gas is generated by reacting with supplementary heat source such as coke and the oxygen supply used for oxidation of metal for slag forming. This oxygen supply amount is preferably 25 Nm


3


/t or more as well. It is more preferable that the oxygen supply amount is 40 Nm


3


/t.




Embodiment 6




Scraps (150 tons) were charged into a melting furnace and a preheating shaft of a direct current arc apparatus, wherein the melting furnace (furnace diameter: 7.2 m; height: 4 m) is directly connected to the preheat shaft (5 m W×3 m D×7 m H). And an arc was formed by a graphite electrode of 28 inches with an electric power source capacity of maximum 600V, 100 kA, to melt the scraps. In addition, a water cooled lance was inserted through a working entrance placed at a furnace side wall for supplying oxygen at a rate of 6600 Nm


3


/hr there-through.




As shown in

FIG. 19

, nozzles (gas introduction entrances)


216


for blowing air into the melting furnace


1


and the preheating shaft


2


are installed at 9 stages. That's to say, this 9 number of stages comprises, as the total result of one stage(A) having 4 places, at a side wall above the molten iron bath surface in the melting furnace


1


(lower by 1.5 m from an upper end of the melting furnace) and further 8 stages(B, C, D, E, F, G, H & I) having respectively 4 places, from a position lower by 500 mm from the shaft at the preheat shaft


202


. Through each of the nozzles, air was blown in, in amounts as shown in Table 2. And electric power unit consumption and a gas constituent of an upper part of the preheating shaft were measured at the same time.




Furthermore, after the molten iron accumulated in the furnace, the coke was injected at a rate of 80 kg/min into slag, in order to drive the slag forming operation. And then, the top end of the graphite electrode was buried in the forming slag. Voltage at this time was set to be 400 V. In order to keep the level of scraps at a predetermined height in the preheating shaft, as the scraps in the preheating shaft dropped into the melting furnace, additional scraps were supplied into the preheating shaft from a bucket for charging the scraps into an upper part of the preheating shaft.




In this way, the melting is promoted under the condition that the scraps were continuously maintained in the melting furnace and the preheating shaft. When 180 tons of molten metal was produced in the melting furnace, 120 tons was tapped from the tapping hole into a ladle, leaving 60 tons in the furnace. Temperature of the molten iron at the tapping time was 1550° C. Carbon concentration in the molten iron was 0.1%. The molten iron in the vicinity of the tapping hole was heated by using an oxygen-oil burner.




Even after the 120 tons of molten steel was tapped, Oxygen supply and coke injection continued, slag forming operation continued and the melting continued. When the molten iron amounted again to 180 tons in the melting furnace, tapping of 120 tons of molten iron was repeated. The results of Table 2 show an average value of 5 numbers of charges which repeated this melting. It should be noted that Example 1 through 9 in the Table 2 were within the scope of the present invention and Comparative examples 1 through 4 were out of the scope of the present invention. In Comparative examples 1 through 3, the melting furnace was shut tightly, in Examples 1 and 2 air blow was performed with one stage and in Comparative example 3, air blow was not performed. In addition, in Comparative example 4, conventional operation by batch was performed.




According to the results of the Table, it has been confirmed that in Examples in which scraps are always maintained in the melting furnace and the preheat shaft and where CO gas which has not yet burnt can burn efficiently, efficiency of preheating the scraps is high and electric power unit consumption can be reduced. Above all, in Examples 1, 2 and 4 wherein the location of air blow and an amount of air blow were particularly in a preferable range, molten iron of 120 tons was obtained between tappings in about 40 minutes on average, electric power unit consumption of 175 to 180 kWh was possible when the oxygen amount of 33 Nm


3


/t and coke unit consumption was 26 kg/t. Electric power unit consumption was therefore lowered by 60 to 120 kWh/t in comparison with Comparative examples 1 through 4 to which the present invention did not apply.




The molten iron (120 tons) which had been tapped was elevated to a temperature of 1620° C. by a ladle furnace (LF) to produce a billet of 175×175 mm by continuous casting.















TABLE 2













Example




Comparative example

























1




2




3




4




5




6




7




8




9




1




2




3




4





























Secondary combustion





380




380




380




381




381




380




240




480




480




380




380




0




0






air (Nm3/min)







Air blowing position




A




190






127






120




160




120




380






and blowing amount




B




190




190





127




127





120




160




120





380






(Nm3/min.)




D





190





127




127




127





160




120







F






190





127




127






120







H






190






127






Electric power unit





175




180




220




180




195




210




230




215




225




250




240




280




300






consumption(kWh/t)







Coke unit consumption





26




26




26.2




26.1




26




26.3




25.8




29.2




29.1




31.9




30




26




26






(kg/t)






Tap-Tap(min)





40.1




40.5




44.5




40.5




42




43.1




45.5




44.1




45




46.5




46.2




48.9











Exhausting gas




CO(%)




0.4




0.5




2.8




0.35




0.55




2.4




32.5




0




0.1




0.4




0.4




42











composition




CO2(%)




99.2




99




93.3




99.3




99




94.3




67.5




79




77.5




99.3




99




52.3











(Excluding N2 content)




O2(%)




0.4




0.5




3.9




0.35




0.45




3.3




0




21




22.4




0.3




0.6




5.7











Remarks

















Batch




















type














Embodiment 7




In the above described melting furnace, the same melting as that of Example 1 was performed, except that the supplied oxygen amount was 9500 Nm


3


/hr, coke was 120 kg/min, oxygen amount was 45 Nm


3


/t and coke unit consumption was 36 kg/t. The air blow position, the air blow condition and the results are shown in Table 3. Examples 10 through 18 of the Table 2 were within the scope of the present invention and Comparative examples 5 through 8 were out of the scope of the present invention. In Comparative examples 5 through 7 the melting furnace was shut tightly, in Comparative examples 5 and 6 air blow was performed by one stage and in Comparative example 7 air blow was not performed. In addition, in Comparative example 8 operation by batch was performed.




From the results of Table 3, according to the present embodiment, it has been confirmed as follows.




Since the scraps are always maintained in the melting furnace and the preheating shaft and CO gas which has not yet burnt can be made to burn efficiently, efficiency of preheating the scraps is high and electric power unit consumption can be reduced. Above all, in Examples 10, 11 and 14, wherein a position of air blow and an amount of air blow were particularly in a preferable range, molten iron of 120 tons was obtained from tapping to tapping in about 37 minutes on average, electric power unit consumption of 120 kWh/t was obtained by oxygen amount of 45 Nm


3


/t and coke unit consumption of 36 kg/t and electric power unit consumption was lowered by 80˜150 kWh/t, in comparison with Comparative examples 5 through 8 to which the present invention did not apply.















TABLE 3













Example




Comparative example

























10




11




12




13




14




15




16




17




18




5




6




7




8





























Secondary combustion





570




570




570




570




570




570




570




360




720




570




570




0




0






air (Nm3/min)






Air blowing position




A




285







190







180




570






and blowing amount




B




285




285






190




190





180




180





570






(Nm3/min)




C





285




285





190




190





180




180







E






285






190




190





180







G







285






190







I







285






190






Electric power unit





120




120




140




175




120




150




170




185




200




200




240




245




270






consumption(kWh/t)





36.1




36




36




36.2




35.9




36




36.2




39




42.2




42




36




26




37






Coke unit consumption





37




37.1




38.2




40




37




38.5




39.5




40.5




43.5




43




46.1




48.9






(kg/t)






Tap-Tap(min)





37




37.1




38.2




40




37




38.5




39.5




40.5




43.5




43




46.1




48.9











Exhausting gas




CO(%)




0.45




0.45




0.5




0.55




0.45




0.45




0.55




33.5




0.1




0.42




0.53




41











composition




CO2(%)




99.2




99.15




99.1




99




99.15




99.15




99




66.5




77.4




99.3




99.12




53.5











(Excluding N2 content)




O2(%)




0.35




0.4




0.4




0.45




0.4




0.4




0.45




0




22.5




0.28




0.35




5.5











Remarks

















Batch




















type














Embodiment 8




Scraps of 150 tons were charged into a melting furnace and a preheating shaft of a direct current arc apparatus, wherein the melting furnace(furnace diameter: 7.2 m; height: 4 m) is directly connected to the preheating shaft (5 m W×3 m D×7 m H) and an arc was formed by a graphite electrode of 28 inches with an electric power source capacity of maximum 600V, 100 kA to melt the scraps. In addition, a water cooled lance was inserted through a working entrance placed at a furnace side wall to supply oxygen at a rate of 9500 Nm


3


/hr there-through.




As shown in

FIG. 18

, a gas introduction entrance


216


for introducing air as oxygen containing gas to a lower part of a preheating shaft


202


was installed at one stage (at 4 places), and further amount of entering air into the melting furnace


201


was made adjustable by the working door


215


. And then, air was supplied through the working door


215


and the gas introduction entrance


216


to burn CO. Total post-combustion air amount and values of OD(=CO


2


/(CO


2


+CO)) at respective positions at that time are shown in Table 4. In addition, electric power unit consumption and gas constituent at an upper part of the preheat shaft at that time were measured.




At the time when the molten iron had accumulated in the furnace, coke was injected at a rate of 120 kg/min into slag to drive the slag forming operation, and the top end of the graphite electrode was buried in the forming slag. The voltage at this time was set to be 400 V. As the scraps in the preheating shaft descended following melt of the scraps in the melting furnace, additional scraps were supplied from a bucket for charging the scraps from an upper part of the preheating shaft to keep a level of the scraps at a predetermined height in the preheating shaft.




In this manner, the melting is promoted under conditions where scraps were continuously maintained in the melting furnace and the preheating shaft, and at a stage where molten iron of 180 tons was produced in the melting furnace, 120 tons for one charge was tapped from the tapping hole into a ladle, leaving 60 tons of molten iron in the furnace. Temperature of the molten iron at the time of tapping was 1550° C. Carbon concentration in the molten iron was 0.1%.




The molten iron in the vicinity of the tapping hole was heated by an oxygen-oil burner.




Even after 120 tons of molten iron was tapped while oxygen supply and coke injection were being performed, slag forming operation was performed and the melting was continued. When the molten iron amounted again to 180 tons in the melting furnace, tapping 120 tons of molten iron was repeated. The results of Table 4 show an average value of 5 charges which repeated this melting and tapping cycle. It should be noted that Example 19 in the Table 13 is within the scope of the present invention and Comparative example 9 is out of the scope of the present invention. In Comparative example 9 OD in the melting furnace shows 0.7 or more.




From the results of Table 4, it has been confirmed that in Example 19, efficiency of preheating the scraps is high enough to be able to reduce electric power unit consumption. According to this inventive Example, molten iron of 120 tons was obtained with a tapping to tapping time of 40 minutes on average, and electric power unit consumption of 175 kWh/t was obtained by oxygen amount of 36 Nm


3


/t and coke unit consumption of 26 kg/t. On the other hand, according to Comparative example 9, electric power unit consumption was, a little bit, lower than that of Example 19. However, a lot of troubles on apparatus and a lot of troubles on operation such as fusion, frequently occurred in the Comparative example 9.















TABLE 4












Comparative







Example 19




example 9



























In-furnace OD





0.5




0.85






(═CO2/CO2 + CO)






Secondary combustion air





190




60






Electric power unit consumption





175




170






(Kwh/t)






Coke unit consumption(kg/t)





26




26






Tap-Tap (min)





40




40






Exhausting gas combustion




CO(%)




0.4




0.3






(excluding N2 content)




CO2(%)




99.2




99.4







O2(%)




0.4




0.3












Remarks




Furnace cover is damaged







to a large extent







Occurrence of scrap fusion














Subsequently, another embodiment of the present invention will be described with reference to FIG.


20


and

FIG. 21

of the present invention. According to the present embodiment, a slag door


315


of a melting furnace


301


is the working door for introducing air into the melting furnace


301


, and air is introduced into the melting furnace


301


by opening this working door


315


during melting treatment to burn a part of the CO exhaust gas which has not yet burnt in the melting furnace


301


. And then, the rest of the CO exhaust gas which has not yet burnt is made to burn by oxygen containing gas from a gas introduction entrance


316


, which is placed in the area between the molten iron bath surface position and the upper end position of the scraps in the preheating shaft.




In this manner, if air is introduced into the melting furnace


301


, a portion of high temperature CO gas which has been generated in the furnace is made to burn by the introduced air.But since the burning occurs in the melting furnace


301


, it does not become high locally in temperature within a layer of the scraps which have not yet been melted and fusion of the scraps does not occur. In addition, heat of this gas transfers to the scraps


303


between the surface of the molten iron bath and the lower end position of the preheating shaft


302


before the exhaust gas enters into the preheating shaft


302


and its temperature, is lowered sufficiently to avoid local fusion of scraps when the exhaust gas enters into the preheat shaft. Furthermore, since heat of the gas transfers to the scraps


303


the temperature of the exhaust gas is not high when the rest of CO gas is made to burn in the vicinity of the upper end surface of the scraps in the preheat shaft


302


and therefore, local fusion does not occur at that portion, either. According to the above described embodiment, since CO gas is made to basically burn at a portion wherein the scraps exist there is some possibility that scraps fuse, but the present embodiment can substantially prevent the scraps from fusing.




In addition, the position of the gas introduction entrance


316


is appropriately arranged to adjust the supply amount of oxygen containing gas and to adjust the combustion ratio at the melting furnace


301


. This points the temperature of the exhaust gas in the vicinity of the exit of the preheat shaft


302


namely at a portion of an exhaust portion


302


can be controlled to be a predetermined temperature or more. Furthermore, by rapidly cooling the exhaust gas thereafter, the occurrence of injurious substances such as aromatic chlorine compound which is represented by dioxin and occurrence of white smoke and malodor can be prevented.




According to the present embodiment, CO gas which has not yet burnt is made to burn in the melting furnace


301


so that OD is less than 0.7 at the time when a portion of CO exhaust gas is made to burn by entering air in the melting furnace, where CO


2


/(CO


2


+CO) is made to be OD. If the value of OD is 0.7 or more, the remaining CO amount is so small that even if the rest of CO is made to burn at the upper-most portion of the preheat shaft


2


, the temperature of the exhaust gas cannot be made to be sufficiently high (e.g. a temperature of 750° C. or more) to decompose the above described injurious substances. The value of OD is more preferably made to be less than 0.6.




In this way, according to the present embodiments, a portion of CO in the oxygen containing gas is burnt in the melting furnace


301


. Therefore, as well as burning in one position of the scrap layer


316


, the temperature of the burning gas is so high that the fusion of the scraps


303


can surely be prevented, comparing with the above-described embodiment. Furthermore, there is no possibility to generate O


2


by the dissociation of CO


2


. In addition, since the amount of CO which burns by introducing air into the melting furnace and the amount of CO which burns by blowing oxygen containing gas into the scraps


303


can be controlled, and since oxygen containing gas can be supplied to a desired position of the scraps


303


with a desired amount, the temperature of the exhaust gas in the vicinity of the exit of the preheat shaft


302


is well controlled at a predetermined temperature or more, to burn surely with high efficiency.




In addition, as shown in

FIG. 21

according to the present embodiment, since a portion of the non-combustible CO exhaust gas in the melting furnace


301


has already been burnt by oxygen in the melting furnace, the gas introduction at entrance


316


may be composed of one stage. Of course it may be composed of plurality of stages. Similarly to conventional embodiment, in order to arise the temperature of the exhaust gas at an exhaust portion


302


a to a predetermined temperature or more, the gas introduction entrance


316


is preferably installed in the vicinity of an upper end surface of the preheat shaft


302


. More specifically, the gas introduction entrance


316


is preferably formed at least in the space from an upper surface of the scraps of the preheat shaft


302


and a lower position by 2 m therefrom.




In this manner in case that the gas introduction entrance


316


is composed of one stage and in case that gas introduction amount is small even if the gas introduction entrance


316


is composed of plurality of stages, the value of OD is preferably more than 0.3. In such a case if the value of OD is 0.3 or less, heat of gas is so low that it is impossible to sufficiently preheat the scraps. The value of OD is more preferably more than 0.4.




Even according to the present embodiment, melting of the scraps progresses and when a predetermined amount of molten iron accumulates, while maintaining the scraps continuously in the melting furnace


301


and the preheat shaft


302


, the furnace is tilted to tap the molten iron for one charge through the tapping hole


314


into a ladle. Therefore, the scraps can be similarly preheated to temperature higher than in the conventional melting equipment.




Furthermore, since the scraps


303


are supplied to the preheat shaft


302


so that the scraps


303


are continuously maintained in the melting furnace


301


and in the preheat shaft


302


, efficiency of preheating the scraps by the exhaust gas is high. By continuously maintaining at least the scraps of 50% of one charge in the melting furnace


301


and in the preheat furnace


302


during melting and at time of tapping, efficiency of preheating becomes extremely high.




Furthermore, in addition, CO gas is generated by reaction with a supplementary heat source such as coke and the oxygen supplied amount for slag forming is also preferably 25 Nm


3


/t or more as well. It is more preferably 40 Nm


3


/t.




Embodiment 9




Scraps (150 tons) were charged into a melting furnace and a preheating shaft of a direct current arc apparatus, wherein the melting furnace (furnace diameter: 7.2 m; height: 4 m) is directly connected to the preheating shaft (5 m W×3 m D×7 m H) and an arc was formed by a graphite electrode of 28 inches with an electric power source capacity of maximum 600V, 100 kA to melt the scraps. In addition, a water cooled lance was inserted through a working entrance placed at a furnace side wall to supply oxygen at a rate of 9500 Nm


3


/hr there-through.




As shown in

FIG. 22

, nozzles(gas introduction entrances)


316


for blowing air into the melting furnace


1


and in the preheating shaft


2


were installed at 6 stages in total at one stage(A) with 4 places at a side wall above molten iron bath surface in the melting furnace


301


(lower by 1.5 m from an upper end of the melting furnace) and further respectively at 5 stages (B, C, D, E & F) with 4 places at an interval, as shown in the figure from a position lower by 500 mm from the shaft at the preheating shaft


202


. Through each of the nozzles air was blown in as allocated as shown in Table 31 and electric power unit consumption, the temperature of the exhaust gas at an upper part of the preheating shaft was measured as was the occurrence of injurious substances such as dioxin and the occurrence of white smoke and malodor accompanied thereby.




When molten iron accumulated in the furnace, coke was injected at a rate of 120 kg/min into slag to drive slag forming operation, and the top end of the graphite electrode was made to be buried in the forming slag. The voltage at this time was set to be 400 V. When the scraps in the preheat shaft descended following melt of the scraps in the melting furnace, additional scraps were supplied from a bucket for charging the scraps from an upper part of the preheat shaft to keep the level of the scraps at a certain height in the preheat shaft.




In this manner, the melting is promoted while the scraps were continuously maintained in the melting furnace and in the preheat shaft. When 180 tons of the molten iron was produced in the melting furnace and 60 tons of molten iron where maintained in the furnace and the 120 tons was tapped from the tapping hole into a ladle, the temperature of the molten iron at the time of the tapping was 1550° C. Carbon concentration in the molten iron was 0.1%.




The molten iron in the vicinity of the tapping hole was heated by an oxygen-oil burner.




Even after the molten iron of 120 tons was tapped, the oxygen supply and coke injection were continued along with slag forming operations and the melting was continued. When the molten iron amounted again to 180 tons in the melting furnace, 120 tons of the molten iron were again tapped. The results of Table 31 show an average value of 5 charges which repeated this melting. It should be noted that Examples 1 through 3 in the Table 31 were within the scope of the present invention and Comparative examples 1 through 3 were out of the scope of the present invention. In any one of Comparative examples 1 through 3, temperature of the exhaust gas was low at the exit of the shaft. In Comparative example 3 the melting furnace was shut tightly and air was not blown.




From the results of Table 5 it has been confirmed that temperature of the exhaust gas at the exit of the shaft can be raised to 900° C. or more, that therefore, occurrence of injurious substances such as dioxin can be made to be substantially zero and the occurrence of the white smoke and the malodor can be avoided. In contrast to this, in each of Comparative examples wherein temperature is low at the exit of the shaft, the injurious substance is frequently produced, and the white smoke and the malodor is also produced.




In addition, it has been confirmed that as shown by the inventive Examples, when the scraps are continuously maintained in the melting furnace and in the preheat shaft, and CO gas which has not yet burnt is made to post-combust, efficiency of preheating the scraps is high and electric power unit consumption can be lowered. In these Examples the molten iron (120 tons) was obtained in a time between tapping of 37 minutes on average, electric power unit consumption of 140˜150 kWh/t was obtained by oxygen amount of 45 Nm


3


/t and coke unit consumption of 36 kg/t, electric power unit consumption was low by 80 kWh/t in comparison with Comparative example 3 wherein air blow was not performed.




The molten iron of 120 tons which had been tapped was elevated to temperature of 1620° C. by a ladle furnace (LF) to produce a billet of 175×175 mm by continuous casting.















TABLE 5













Example




Comparative example


















1




2




3




1




2




3






















Secondary combustion air(Nm3/Min)





570




570




570




570




570




0






Air blowing position &




A







285






blowing amount (Nm3/Min)




B




285







190







C





285




190





190







D







285




190







E






190







F




285




285




190






Electric power unit consumption(kWh/t)





155




170




170




130




140




240






Coke unit consumption(kg/t)





36.1




36




36




36.2




35.9




36






Tap-Tap(min)





37




37.3




37.6




36.2




37




48.6






Temperature of exhausting gas





955




960




925




320




395




125






at the exit of the shaft (° C.)













White smoke, Malodor




Not found




Found






Harmful matter as Dioxin




1/500-1/1500*




1











*Defined Comparative example as 1













Embodiment 10




Scraps of 150 tons were charged into a melting furnace and a preheat shaft of a direct current arc equipment wherein the melting furnace(furnace diameter: 7.2 m; height: 4 m) is directly connected to the preheat shaft (5 m W×3 m D×7 m H) and an arc was formed by a graphite electrode of 28 inches with an electric power source capacity of maximum 600V, 100 kA to melt the scraps in addition, a water cooled lance was inserted through a working entrance placed at a furnace side wall to supply oxygen at a rate of 9500 Nm


3


/hr there-through.




As shown in

FIG. 21

, a gas introduction entrance


316


for blowing air as oxygen containing gas into a space between an upper end surface of the scraps of the preheat shaft


302


and a position lower by 2 m therefrom is installed at one stage (with 4 places) and furthermore amount of the entering air into the melting furnace


301


is made by a working door


315


to be adjustable. And then air was supplied through the working door


315


and the gas introduction entrance


316


to burn CO. Total amount of post-combustion air and values of OD(=CO


2


/(CO


2


+CO) at respective positions are shown in Table 6. In addition, electric power unit consumption, the temperature of the exhaust gas at an upper part of the preheat shaft, the occurrence state of injurious substances such as dioxin and the occurrence state of white smoke and malodor accompanied thereby were investigated.




When molten iron accumulated in the furnace, coke was injected at a rate of 120 kg/min into slag to drive slag forming operation, and the top end of the graphite electrode was buried in the forming slag. The voltage at this time was set to be 400 V. When the scraps in the preheat shaft descended following melt of the scraps in the melting furnace, additional scraps were supplied from a bucket for charging the scraps from an upper part of the preheat shaft to maintain the level of the scraps at a predetermined height in the preheat shaft.




In this manner, the melting is promoted in a state that the scraps were continuously maintained in the melting furnace and in the preheat shaft. When 180 tons of the molten iron was produced in the melting furnace, 120 tons was tapped from the tapping hole into a ladle, leaving 60 tons in the furnace. The temperature of the molten iron at the time of the tapping was 1550° C. Carbon concentration in the molten iron was 0.1%.




The molten iron in the vicinity of the tapping hole was heated by an oxygen-oil burner.




Even after the molten iron of 120 tons was tapped ,oxygen supply and coke injection were continued as was the slag forming operation, and the melting was continued. When the molten iron amounted again to 180 tons in the melting furnace, tapping of 120 tons of the molten iron was repeated. The results of Table 6 show an average value of 5 charges which repeated this melting. It should be noted that inventive Example 4 in the Table 6 was within the scope of the present invention and Comparative examples 4 through 6 were out of the scope of the present invention. In Comparative example 4, OD in the melting furnace is 0.7 or more, and in Comparative example 5 wherein the melting furnace was shut tightly and air was not blown through the gas introduction entrance, the temperature of the exhaust gas at the exit of the shaft was low.




From the results of Table 6 it has been confirmed that in Example 4, the temperature of the exhaust gas at the exit of the shaft can be increased to 900° C. or more, the occurrence amount of the injurious substance such as dioxin can be reduced substantially to zero and the white smoke and the malodor can be prevented. In contrast to this, in each of the Comparative examples 4 and 5 wherein temperature is low at the exit of the shaft, injurious substance has frequently been produced, and white smoke and malodor have also occurred.




In addition, it has been confirmed that because the scraps are maintained continuously in the melting furnace and in the preheat shaft for the inventive examples, CO gas which has not yet burnt can be made to post-combust and efficiently preheat the scraps, while electric power unit consumption can be lowered. In these Examples, 120 tons of the molten iron was obtained whereby a time between tapping of 37 minutes on average, electric power unit consumption was reduced to 140˜150 kWh/t, when oxygen was injected in an amount of 45 Nm


3


/t and coke unit consumption was at 36 kg/t. This is an electric power unit consumption which is lower by 80 kWh/t in comparison with Comparative example 5 wherein air injection was not used. The 120 tons of molten iron which had been tapped was elevated to temperature of 1620° C. by a ladle furnace(LF) to produce a billet of 175×175 mm by continuous casting.















TABLE 6













Example




Comparative example















4




4




5


















Secondary combustion air (Nm3/min)




570




570




0






OD(═CO 2/CO2 + CO))






Inside of the melting Furnace




0.6




0.8




0.4






Center of the preheating shaft




0.6




0.8




0.8






Exit of the reheating shaft




1




1




1






Electric power unit consumptior




155




140




240






(kWt/t)






Coke unit consumptio (kg/t)




36.1




36.2




36






Tap-Tap (min)




37




36.2




48.6






Temperature of the shaft exit (° C.)




955




350




125






White smoke, Malodor




Not found




Found




Found






Harmful matter as dioxin




1/500-




1




1







1/1500*






Fusion Phenomenon




Not found




Not found




Not found














Another embodiment of the present invention will now be described with reference to

FIG. 23

of the present invention. In the foregoing described embodiment, a plurality of gas introduction entrances


416


were installed at random positions in a range from a molten iron bath surface position in a melting furnace


401


to an upper end position of scraps of a preheat shaft. These gas introduction entrances


416


are optional. In the case that the gas introduction entrances


416


are not installed, CO gas which has not yet burnt is made to entirely burn in a post-combustion chamber


417


. Alternatively a pipe through which CO gas which has not yet burnt is introduced to the post-combustion chamber


417


is arranged and a portion of gas which has not yet burnt may be supplied to the post-combustion chamber


417


without passing through a preheat shaft


1


.




Embodiment 11




Scraps of 150 tons were charged into a melting furnace and a preheating shaft of a direct current arc apparatus, wherein the melting furnace (furnace diameter: 7.2 m; height: 4 m) is directly connected to the preheat shaft (5 m W×3 m D×7 m H) and an arc was formed by a graphite electrode of 28 inches with an electric power source capacity of maximum 600V, 100 kA to melt the scraps. In addition, a water cooled lance was inserted through a working entrance placed at a furnace side wall to supply oxygen at a rate of 9500 Nm


3


/hr there-through.




As shown in

FIG. 23

, nozzles (gas introduction entrances)


416


for blowing air into the melting furnace


401


and the preheating shaft


402


were installed at 5 stages in total at one stage(A) with 4 places at a side wall above molten iron bath surface in the melting furnace


401


(lower by 1.5 m from an upper end of the melting furnace) and further respectively at 4 stages (B, C, D & E) with 4 places at an interval as shown in the figure from a position lower by 500 mm from the shaft at the preheat shaft


402


and furthermore a nozzle(a gas introduction entrance)


418


was installed at a position of an upper part(F) of a post-combustion chamber


417


which was connected to an exhaust portion


402


a of the preheat shaft


402


. Through each of the nozzles, a predetermined amount of air was blown in as shown in Table 7 and the electric power unit consumption, the temperature of the exhaust gas at an upper part of the preheat shaft, and the occurrence of the injurious substances such as dioxin and the occurrence state of white smoke and malodor accompanied thereby at that time, were measured.




As the molten iron accumulated in the furnace at time of melting, coke was injected at a rate of 120 kg/min into slag to drive the slag forming operation, and the top end of the graphite electrode buried in the forming slag. The voltage at this time was set to be 400 V. When the level of scraps in the preheat shaft lowered following melting of the scraps in the melting furnace, additional scraps were supplied from a bucket for charging the scraps into an upper part of the preheat shaft to keep the level of the scraps at a predetermined height in the preheat shaft.




In this manner, the melting is promoted under conditions where the scraps were continuously maintained in the melting furnace and the preheat shaft. When 180 tons of molten iron was produced in the melting furnace, 120 tons were tapped, leaving 60 tons of the molten iron in the furnace. The 120 tons of iron for one charge, was tapped from the tapping hole into a ladle. Temperature of the molten iron at the time of the tapping was 1550° C. Carbon concentration in the molten iron was 0.1%.




The molten iron in the vicinity of the tapping hole was heated by an oxygen-oil burner.




Even after the molten iron of 120 tons was tapped, oxygen supply, coke injection, slag forming operation and the melting were continued. When 180 tons of the molten iron accumulated in the melting furnace, tapping of 120 tons of the molten iron was repeated. The results of Table 1 show an average value of 5 charges which repeated this melting. It should be noted that Examples 1 through 3 in the Table 1 were within the scope of the present invention and Comparative examples 1 through 3 were out of the scope of the present invention. In each one of Comparative examples 1 through 3, wherein post-combustion was not performed, the temperature of the exhaust gas at the exit of the shaft was low. In Comparative example 3, the melting furnace was shut tightly and air injection was not performed.




From the results of Table 6, it has been confirmed that in Examples of the present invention, the temperature of the exhaust gas which is discharged from the post-combustion chamber increased to 900° C. or more, whereby the amount of the injurious substance such as dioxin can be reduced substantially to zero and white smoke and malodor can be eliminated. In contrast to this, in each of the Comparative examples, wherein temperature is low at the exit of the shaft, injurious substances are frequently produced, and white smoke and malodor occur.




In addition, it has been confirmed that because the scraps are always maintained in the melting furnace and in the preheating shaft for the inventive example, CO gas which has not yet burnt can be made to post-combust efficiency and efficiently preheat the scraps, while electric power unit consumption can be lowered. In these Examples, 120 tons of the molten iron was obtained, with a time between tapping of 37 minutes on average, electric power unit consumption of 140˜150 kWh/t was obtained when oxygen was injected in an amount of 45 Nm


3


/t and coke unit consumption was at 36 kg/t. This is an electric power unit consumption which is lower by 80 kWh/t in comparison with Comparative example 3 wherein air injection was not used.




The 120 tons of molten iron which had been tapped was elevated to temperature of 1620° C. by a ladle furnace(LF) to produce a billet of 175×175 mm by continuous casting.















TABLE 7













Example




Comparative example


















1




2




3




1




2




3






















Secondary combustion air(Nm3/min)





570




570




570




570




570




0






Air blowing position &




A







285






blowing amount (Nm3/min)




B




285







190







C





285




190





190







D







285




190







E






190







F




285




285




190






Electric unit consumption(kWh/t)





155




170




170




130




140




240






Coke unit consumption(kg/t)





36.1




36




36




36.2




35.9




36






Tap-Tap(min)





37




37.3




37.6




36.2




37




48.6






Temperature of exhausting gas





935




940




905




320




395




125






at the exit of the shaft (° C.)













White smoke, Malodor




Not found




Found






Harmful matter as Dioxin




1/500-1/1500*




1











*Defined Comparative example as 1













Embodiment 12




An Example which uses iron scraps and DRI (carbon concentration: 1.5 wt %) of direct reduction iron together in a direct current arc furnace, as shown

FIG. 24

will be described here-below. The arc furnace has a melting chamber of a furnace diameter: 7.2 m; a height: 4 m, a preheating chamber of a width: 3 m; a length: 5 m; a height: 7 m and a furnace capacity of 180 tons. First changed into the melting chamber were 30 tons of DRI at a normal temperature and 50 tons of iron scraps at a normal temperature, subsequently 70 tons of iron scraps at a normal temperature were charged into the preheating chamber. Melting was begun using an upper electrode made of graphite with a diameter of 30 inches and using an electric power source of maximum 750 V, 130 KA. As the molten iron was produced, quick lime and fluorite were added to form molten slag and subsequently oxygen gas was blown in at a rate of 4000 Nm


3


/hr through an oxygen gas blow lance and coke was blown in at a rate of 50 kg/min through a carbonaceous material blow lance into the molten slag. By blowing in oxygen gas and coke the molten slag was formed and a top end of the upper electrode was buried in the molten slag. Voltage at this time was set to be 520˜550 V.




After this DRI was continuously charged at a rate of 1.8 tons /min into the melting chamber and the melting was continued. In addition, as iron scraps in the preheating chamber descended following the melting, iron scraps were charged by a supply bucket into the preheating chamber to maintain the level of the iron scraps at a predetermined height as the melting continued. When 180 tons of molten iron was produced in the melting chamber, the charge of DRI into the melting chamber was stopped and the DRI was allowed to completely melt. Molten iron (120 tons) for one charge was tapped into a ladle, leaving 60 tons behind in the melting chamber. At the tapping the molten iron was heated by a heavy oil burner. Carbon concentration of the molten iron at the time of the tapping was 0.1 wt %, and temperature of the molten iron was 1560° C.




After the tapping a tapping hole was filled up with filling sand and thereafter a charge of DRI and injection of oxygen gas and coke were continued. When the molten iron amounted to 180 tons again the tapping the molten iron of 120 tons was repeated. The molten iron after being tapped was refined by a ladle refinery furnace, elevated to a temperature of 1620° C. and cast by a continuous caster. The electric power consumption at the ladle refinery furnace was 50 kWh/t on average.




With the combination ratio of DRI of 70%, the time from tapping to tapping was 65 minutes on average, with an oxygen gas blow amount of 33 Nm


3


/t, coke blow amount of 25 kg/t and the electric power unit consumption by 535 kWh/t for the melting to be accomplished. Total electric power consumption by the arc furnace and the ladle refinery furnace was 585 kWh/t.




In addition, in order to make comparison, in the arc furnace as shown in

FIG. 24

, 30 tons of DR


1


of a normal temperature were charged into the melting chamber, subsequently 36 tons of iron scraps at a normal temperature were charged into the preheating chamber and the melting was begun. When molten iron was produced direct reduction iron of 54 tons was continuously charged without additionally charging iron scraps to obtain 120 tons of molten iron and after this molten iron was elevated to a temperature of 1600° C., a tapping operation (Comparative example 1) was also performed. Oxygen gas blow amount and coke blow amount in Comparative example 1 were the same as those of the above described Example 12, and in addition, the electric power unit consumption in the ladle refinery furnace was 30 kWh/t. Operation conditions and operation results in Example 12 and Comparative example 1 are shown in Table 8.















TABLE 8












Comparative







Example 1




example 1


























Iron scrap supplying method to




All the time,




Per heat






to preheating Furnace




filling up






Oxygen-gas blowing amount (Nm3/t)




33




33






Carbonacious material blowing amount(kg/t)




25




25






Tapping temperature(° C.)




1560




1600














Electric power unit




Arc Furnace




535




595






consumption (kWh/t)




Ladle refinary




50




30







furnace







Total unit




585




625







consumption














As shown in Table 8, in Comparative example 1, the electric power unit consumption in the arc furnace was 595 kWh/t and total electric power unit consumption of an arc furnace and a ladle finery furnace was 625 kWh/t. In this manner according to Example 1 of the present invention, electric power of about 40 kWh/t in terms of total unit consumption could be reduced in comparison with Comparative example 1.




Embodiment 13




Example 2 which uses iron scraps and cold iron (carbon concentration: 4.5 wt %) together in a direct current arc furnace will be described here-below. The arc furnace has a melting chamber of a furnace diameter: 7.2 m; a height: 4 m, a preheating chamber of a width: 3 m; a length: 5 m; a height: 7 m and a furnace capacity, of 180 tons.




First charged into the melting chamber were 30 tons of cold iron at a normal temperature and 50 tons of iron scraps at a normal temperature, subsequently 70 tons of iron scraps at a normal temperature were charged into the preheating chamber and melting was begun using an upper electrode made of graphite with a diameter of 30 inches and using an electric power source of maximum 750 V, 130 KA. As molten iron was produced, quick lime and fluorite were added to form molten slag and subsequently oxygen gas was blown at a rate of 6000 Nm


3


/hr through an oxygen blow lance and coke was blown at a rate of 80 kg/min through a carbonaceous material blow lance into the molten slag. By blowing oxygen gas and coke the molten slag was formed and a top end of the upper electrode was buried in the molten slag. Voltage at this time was set to be 550 V.




After this, as iron scraps in the preheating chamber descended following the melting, iron scraps were charged by a supply bucket into the preheating chamber to maintain the level of the iron scraps at a determined height as the melting continued. When 180 tons of molten iron was produced, 120 tons of molten iron for one charge was tapped into a ladle, leaving 60 tons behind in the melting chamber. At the tapping the molten iron was heated by a heavy oil burner. Carbon concentration of the molten iron at the time of the tapping was 0.1 wt %, and temperature of the molten iron was 1560° C.




After the tapping, the tapping hole was filled up with filling sand and thereafter 30 tons of cold iron of a normal temperature was directly charged into the melting chamber and at the same time oxygen gas and coke were injected. When molten iron amounted to 180 tons again, the tapping 120 tons of the molten iron repeated. The molten iron after being tapped was refined in a ladle refinery furnace, elevated to a temperature of 1620° C. and thereafter cast by a continuous caster. The electric power consumption at the ladle refinery furnace was 60 kWh/t on average.




As a result of a combination of the use of cold iron at 25%, a time from tapping to tapping of 40 minutes on average, an oxygen gas blow amount of 33 Nm


3


/t, a coke blow amount of 16 kg/t and an electric power unit consumption of 195 kWh/t, the melting could be performed. Total electric power consumption was 255 kWh/t by the arc furnace and the ladle refinery furnace.




In addition, in order to make comparison, 30 tons of cold iron at a normal temperature and 20 tons of iron scrap at a normal temperature were charged into the melting chamber, subsequently 70 tons of iron scraps of a normal temperature were charged into the preheating chamber and melting was begun. Molten iron (120 tons) was obtained without additionally charging iron scraps into the preheating chamber and after this molten iron was elevated to a temperature of 1590° C. tapping operation (Comparative example 2) and a mixture of iron scraps and cold iron(hereinafter referred to as “mixture A”) in which combination ratio of cold iron was 25% was charged into the preheating chamber melting, was begun. When the mixture A in the melting chamber melted and descended, additional mixture A was charged into the preheating chamber to maintain a level of the mixture A at a predetermined height, while the melting was continued. At the time when 180 tons of molten iron was produced in the melting chamber, 120 tons for one charge was tapped, leaving about 60 tons behind in the melting chamber. The melting and tapping operation was repeated (Comparative example 3). Oxygen gas blow amount and coke blow amount in Comparative example 2 and Comparative example 3 were the same as those of the above described Example 2. In addition, the electric power unit consumption on average in the ladle refinery furnace was 30 kWh/t according to Comparative example 2 and 60 kWh/t according to Comparative example 3. Operation conditions and operation results in Example 2, Comparative example 2 and Comparative example 3 are shown in Table 9.












TABLE 9











Operational condition and its results
















Comparative




Comparative







Example 1




example 2




example 3


















Iron scrap supplying




All the time




Per heat




All the time






method to




fillig up




fillig up






to preheating Furnace






Supplying method for cold




Direct supplying




Direct supplying




Supplying by way






Iron source




to melting chamber




to melting chamber




of preheating









furnace






Oxygen-gas b (Nm3/t)




33




33




33






Carbonacous material




16




16




16






blowing amount (kg/t)






Tapping temperature (° C.)




1560




1590




1560






Tap-Tap time(min)




40




45




43















Electric power




Arc Furnace




195




310




180






unit




Ladle refinary




60




30




60






consumption




furnace






(kWh/t)




Total unit




255




340




240







consumption














Occurrence ratio out of the




0.8




0.8




3.1






constitution (%)














As shown in Table 9, according to Comparative example 2, the electric power unit consumption in the arc furnace was 310 kWh/t and the total unit consumption of an electric power by the arc furnace and a ladle finery furnace was 340 kWh/t. Thus, the electric power unit consumption was increased by 85 kWh/t, in comparison with Example 2 of the present invention. In addition, since in Comparative example 3 cold iron was preheated, the electric power unit consumption was decreased by 15 kWh/t, in comparison with the inventive example 2. However, in Comparative example 3, by spending time in adjusting carbon concentration before tapping time, the tapping to tapping time was extended by 3 minutes, and at the same time the occurrence amount of out of requirement with respect to carbon concentration of molten iron after having been tapped, was high, in comparison with the inventive example 2. The occurrence amount was 3.1% which was almost 4 times, in comparison with that of Example 2. In this manner, according to Example 2 of the present invention, not only an electric power unit consumption could be reduced but also the product which is out of specification with respect to carbon concentration was small, making a stable operation possible.




Next another embodiment of the present invention will be described with reference to

FIGS. 26 and 27

.




Embodiment 14




An example in an arc furnace which is shown in FIG.


25


and FIG.


26


will be described here-below. The arc furnace has a melting chamber of a furnace diameter: 7.2 m; a height: 4 m, a preheating chamber of a width: 3 m; a length: 5 m; a height: 7 m and a furnace capacity of 180 tons. First charged into the preheating chamber, were 70 tons of iron scraps at a normal temperature, subsequently 40 tons of cold iron(carbon concentration: 4.5 wt %) and 50 tons of iron scraps at a normal temperature were charged into the melting chamber. Melting was begun using an upper electrode made of graphite with a diameter of 30 inches and using an electric power source of maximum 750 V, 130 KA. In addition, immediately after electric current was turned on quick lime and fluorite were added and at the same time oxygen was blown at a rate of 6000 Nm


3


/hr through an oxygen blow lance and coke was blown at a rate of 36 kg/min through a carbonaceous material blow lance into the melting chamber. The quick lime and the fluorite were heated and by blowing oxygen and coke the molten slag was formed. A top end of the upper electrode was buried in the molten slag. Voltage at this time was set to be 550 V. Thereafter as iron scraps in the preheating chamber descended as a result of melting, additional iron scraps were charged by a supply bucket into the preheating chamber to maintain a level of the iron scraps at a certain height while the melting continued. When molten 180 tons of molten iron was produced, 120 tons was tapped into a ladle, leaving about 60 tons of molten iron behind in the melting chamber. At tapping the molten iron was heated by a heavy oil burner. Carbon concentration of the molten iron at the time of the tapping was 0.1 wt %, and temperature of the molten iron was 1560° C. After the tapping 40 tons of molten iron was charged again into the melting chamber and subsequently the injection of oxygen and coke was restarted when the molten iron again amounted to 180 tons, the tapping of 120 tons of the molten iron was repeated. The molten iron after being tapped was refined by a ladle refinery furnace, elevated to a temperature of 1620° C., and thereafter cast by a continuous caster. The electric power consumption at the ladle refinery furnace was 60 kWh/t on average.




The results shows that melting can be accomplished with a combination ratio of molten iron: 33%, oxygen blow amount: 33 Nm


3


/t and coke blow amount: 12 kg/t, time from tapping to tapping of 40 minutes on average and an electric power unit consumption of 80 kWh/t. Total electric power consumption by the arc furnace and the ladle refinery furnace was 140 kWh/t.




In addition, for comparison, 70 tons of iron scraps at a normal temperature were charged into the preheating chamber, subsequently 40 tons of molten iron(carbon concentration: 4.5 wt %) and 10 tons of iron scraps at a normal temperature were charged into the melting chamber and melting was begun. In this case, molten iron (120 tons) was obtained, without additional charging iron scraps, continuing the melting. After the molten iron was elevated to a temperature of 1600° C., the molten iron was tapped. (Comparative Example, Inventive Example). In this case, oxygen gas blow amount and coke blow amount in the Comparative example, were the same as those of the above inventive Example. In addition, in the Comparative Example, the electric power unit consumption in the ladle refinery furnace was 30 kWh/t. Operation conditions and operation results for the inventive Example and for the Comparative example are shown in Table 10.












TABLE 10











Operational condition and its results















Comparative







Example




example

















Iron scrap supplying




All the time




Per heat






method to




fillig up






to preheating furnace






Oxygen-gas blowing amount (Nm3/t)




33




33






Carbon




12




12






blowing amount (kg/t)






Tapping temperature(° C.)




1560




1600






Tap-Tap time(min)




40




60














Electric power




Arc Furnace




80




240






unit




Ladle refinary




60




30






consumption




furnace






(kWh/t)




Total unit




140




270







consumption














As shown in Table 10, according to the Comparative example an electric power unit consumption in an arc furnace was 240 kWh/t, total unit consumption of an electric power by an arc furnace and a ladle finery furnace was 270 kWh/t and in addition, time from tapping to tapping was 60 minutes on average. However, following the Example of the present invention, total electric power consumption could be reduced by 130 kWh/t in comparison with Comparative example and at the same time, the tapping to tapping could be shorten by 20 minutes.





FIG. 29

shows an electric power unit consumption in an arc furnace according to an example which varies combination ratio of molten iron to 20˜45% on condition that oxygen blow amount of 33 Nm


3


/t is constant. As shown in

FIG. 4

, it has been found that with an increase in the amount of molten iron, the electric power unit consumption decreases and that if the combination ratio of the molten iron is made to be about 50% or more the arc furnace can be operated solely by the heat of burning the carbon in the molten iron without using electric power.




Now subsequently another embodiment of the present invention will be described with reference to FIG.


30


and FIG.


31


.




The present invention will be described with reference to the drawings herein-after.

FIG. 30

is a longitudinally sectional schematic view of an-arc melting equipment which shows one example of an embodiment of the present invention.




In

FIG. 30

, a shaft type preheating chamber


703


and a furnace wall


704


with a water cooling structure are arranged at an upper part of a melting chamber


702


which is internally constructed with refractory. The melting chamber


702


is equipped with furnace bottom electrodes


706


at bottom and an upper opening of the furnace wall


704


, which is not covered with the preheating chamber


703


, is covered with a furnace cover


705


having a water cooling structure which can be freely opened and closed. An upper electrode


707


made of graphite which is movable up and down is arranged passing through this furnace cover


705


, and a base of an arc-melting equipment


701


is constructed. The furnace bottom electrodes


706


and the upper electrode


707


are connected to a direct current power source(not shown) and an arc


719


is produced between the furnace bottom electrodes


706


and the upper electrode


707


.




At an upper part of the preheating chamber


703


a hopper type supply bucket


715


is provided hanging up on a travelling truck


724


, and from this supply bucket


715


cold iron source


716


such as iron scraps and direct reduction iron is charged via a supply opening


720


which can be freely opened and closed into the preheating chamber


703


. A duct


721


placed at an upper end of the preheating chamber


703


is connected to a dust collector (not shown). High temperature exhaust gas which is generated in the melting chamber passes through the preheating chamber


703


and the duct


721


in sequence to be absorbed and the cold iron source


716


in the preheating chamber


703


is preheated, thereby. The cold iron source


716


which has been preheated falls down into the melting chamber with dead load corresponding to amount of the cold iron source


716


which is melted in the melting chamber and thereby the preheated cold iron source is charged into the melting chamber


702


.




The side wall of the preheating chamber


703


has a taper which extends downward. By providing the taper the cold iron source


716


which has been preheated can be supplied stably to the melting chamber


702


. If the taper is not formed, the cold iron source


716


does not fall smoothly and can hang up in the preheating chamber


703


. This taper is preferably in a range from 2.5˜7 degrees. If the taper is less than 2.5 degrees, it is impossible to effectively prevent hanging up in the preheating chamber


3


. On the other hand, if it is over 7 degrees, the charge amount of the cold iron source


716


in the preheating chamber


703


is reduced and it is impossible to control the time for which the cold iron source


716


stays in the preheating chamber


703


to be sufficiently long to obtain sufficient preheating.




The oxygen blow lance


708


and the carbonaceous material blow lance


709


which are movable up and down in the melting chamber


2


are arranged passing through the furnace cover


705


. Oxygen is injected through the oxygen blow lance


708


into the melting chamber


702


and carbonaceous material such as coke, char, coal, charcoal graphite is blown through the carbonaceous material blow lance


709


into the melting chamber


702


using air and nitrogen as carrier gas.




On the opposite side of a part where the preheating chamber


703


of the melting chamber


702


is arranged, there are (i) at the furnace bottom, a tapping hole


713


in which filling sand or mud agent is filled with an exit side being pressed by a door


722


and (ii) at the side wall a slag discharge hole


714


in which filling sand or mud agent is filled with an exit side being pressed by a door


723


. A burner


710


is fitted into the furnace cover


705


which is a part corresponding to an upper part perpendicular to this tapping hole


713


. The burner


710


burns fossil fuel such as heavy oil, kerosene, pulverized coal, propane gas and natural gas in the air or oxygen or oxygen enriched air in the melting chamber


702


.




A tuyere


712


is provided as gas supply means for blowing oxygen or inert gas into the melting chamber


702


. The tuyere


712


is arranged at a furnace bottom of the melting chamber


702


in the vicinity of boundary of the cold iron source


716


which is supplied from the preheating chamber


703


and the molten iron


717


which is produced in the melting chamber


702


. When oxygen is to be blown in, the tuyere


712


is made of a double tube structure to form a structure in which cooling gas such as propane is made to flow through an outer tube. When inert gas such as Ar is to be blown in, the tuyere


712


may be made of a single tube, and may be one which many small tubes of about 1 mm in diameter are put together. Alternately, a porous brick may be used in place of the tuyere


712


. Anyone of those described in the foregoing will do.




The method of melting cold iron source


716


in an arc-melting equipment


701


which is constituted in this manner is carried out as follows. First, from the supply bucket


715


, the cold iron source


716


is charged into the preheating chamber


703


. The cold iron source


716


which has been charged into the preheating chamber


703


is also charged into the melting chamber and it fills up the inside of the preheating chamber


703


. Since the cold iron source


716


is charged uniformly into the melting chamber


702


, the cold iron source


716


can also be charged into the melting chamber


702


on the opposite side of the preheating chamber


703


by opening the furnace cover


705


.




Subsequently while oxygen or inert gas is being blown in, direct current is being supplied between the furnace bottom electrodes


706


and the upper electrode


707


to make the upper electrode


7


move up and down, and an arc


719


is generated among the upper electrode


707


, the furnace bottom electrodes


706


and the cold iron source


716


which has been charged. The cold iron source


716


is melted by arc heat which is generated to produce molten iron


717


. The molten iron is produced and at the same time flux such as quick lime and fluorite is charged into the melting chamber


702


to form molten slag


718


over the molten iron


717


, whereby not only is oxidization of the molten iron


717


prevented but also the molten iron


717


is kept warm. In case that the molten slag


718


is too much in amount, it can be discharged through the slag discharge hole


714


.




In addition, as the melting progress is, if the cold iron source


716


piles up in the vicinity of boundary of the cold iron source


716


, which piles at a lower position of the preheating chamber


703


and the molten iron


717


, the molten iron


717


is stirred by oxygen and inert gas which is blown in through the tuyere


712


. Since the cold iron source


716


which has piled is melted by the molten iron


717


which has been stirred, the cold iron source


716


can be prevented from hanging up.




From about the time when the molten iron


717


is produced, oxygen and carbonaceous material are blown preferably through the oxygen blow lance


708


and the carbonaceous material blow lance


709


into the molten iron


717


or the molten slag


718


. The carbonaceous material which is melted in the molten iron


717


or the carbonaceous material which is suspended in the molten slag


718


reacts with oxygen to generate heat of combustion, which works as supplementary heat source to save electric power consumption. At the same time, CO gas as a product of reaction makes the molten slag


718


formed, whereby invites, what is called, slag forming operation in which the arc


719


is wrapped in the molten slag. Therefore, heat transfer efficiency of the arc


719


goes up. In addition, high temperature CO gas which is generated in a large quantity and CO


2


gas which is generated by combustion of this CO gas, preheat the cold iron source


716


efficiently in the preheating chambers


703


. Blow amount of this carbonaceous material is determined in response to blow amount of oxygen. That is to say, carbonaceous material almost equal to chemical equivalent of oxygen which is blown in is introduced. If the amount of carbonaceous material which is blown in is small in comparison with oxygen blow amount, the molten iron is excessively oxidized. In addition, oxygen which is blown in through a tuyere


712


reacts with the molten iron to form FeO, but this FeO is reduced by carbonaceous material which has been blown in. In this case the total amount of oxygen which is blown in through the oxygen blow lance


708


and the tuyere


712


is preferably 25 Nm


3


or more per ton molten iron


717


which is melted, and it is more preferably 40 Nm


3


or more. By this the cold iron source


716


can be more efficiently melted.




Accompanied by production of the molten iron


717


the cold iron source


716


in the preheating chamber


3


drops into the melting chamber


702


to be reduced, under its own weight, in response to the amount which is melted in the melting chamber. In order to make up for this reduced amount the cold iron source


716


is charged into the preheating chamber


703


from the supply bucket


715


. This cold iron source


716


is charged continuously or intermittently into the preheating chamber


703


so that the cold iron source


716


is continuously maintained in the preheating chamber


703


and in the melting chamber


702


. In that case in order to increase preheat efficiency amount of the cold iron source


716


which is maintained in the preheating chamber


703


and in the melting chamber


702


is preferably made to be 40% or more of the cold iron source


716


for one charge.




In this manner, the cold iron source


716


is melted until one charge of molten iron


717


is at least accumulated in the melting chamber. Therefore, maintaining the cold iron steel


716


continuously in the melting chamber


702


and in the preheating chamber


703


, the melting chamber


702


is tilted to tap the molten iron


717


for one charge from the tapping hole


713


into a molten iron hold vessel (not shown) such as a ladle. At the time of tapping, in order to avoid problems such as the closing of the tapping hole


713


due to a fall of molten iron temperature, the molten iron


717


may be heated by a burner


710


.




And after the tapping the molten iron


717


is elevated to temperature by the ladle refinery furnace, depending on requirement, it is cast by a continuous caster. After the molten iron


717


is tapped and the molten slag


718


is discharged, the melting chamber


702


is returned to horizontal, and filling sand or mud agent is put up in the tapping hole


713


and the slag discharge hole


714


. Subsequently an electric current is turned on again and the melting is continued. Since as for next heating the melting can be begun with the cold iron source


716


which has been preheated, efficiency of melting is improved. At the time of tapping, leaving the molten iron


717


of several dozens of tons behind in the melting chamber


702


the melting for next charge may be started. By doing this, initial melting is promoted and efficiency of melting is further improved.




By heating and melting the cold iron source


716


in this manner, the cold iron source


716


can be prevented from hanging-up at a lower position of the preheating chamber


703


in the melting chamber


702


and efficient and stable melting can be accumulated. As a result, improvement of productivity and reduction of electric power unit consumption are attained.




Embodiment 15




An example of an arc-melting equipment shown in

FIG. 30

will be described here-below. The present example is an example wherein melting is performed while oxygen is being blown in through two double tube tuyeres placed on a bottom of an melting chamber. The arc-melting equipment has a melting chamber of a furnace diameter: 7.2 m; a height: 4 m, a preheating chamber of a width: 3 m; a length: 5 m; a height: 7 m and a furnace capacity of 180 tons.




Firstly charged into the preheating chamber were 150 tons of iron scraps of a normal temperature and melting was begun using an upper electrode of made graphite with a diameter of 30 inches using electric power source of maximum 750 V, 130 KA. Immediately after an electric current was turned on quick lime and fluorite were added and at the same time oxygen was blown in at a rate of 4000 Nm


3


/hr through an oxygen blow lance. At the time when molten iron accumulated in the melting chamber, coke was blown, at a rate of 80 kg/min into slag to drive the slag forming operation and a top end of the upper electrode was buried in the slag which was forming. Voltage at this time was set to be 550 V. As the iron scraps in the preheating chamber descended following the melting, iron scraps were charged from the supply bucket into the preheating chamber to maintain a level of the iron scraps in the preheating chamber at a certain height as the melting was continued.




During this time, oxygen was blown in through the double tube tuyere 40 Nm


3


/hr per one tuyere and 80 Nm


3


/hr per total tuyeres to prevent the cold iron source from hanging up and so that the cold iron source dropped continuously into the molten iron. Propane gas was blown in through an outer tube of a double tube to cool the tuyere.




While iron scraps were continuously maintained in the melting chamber and in the preheating chamber, the melting was promoted. When 180 tons of the molten iron was produced in the melting chamber, 120 tons for one charge was tapped into a ladle, leaving about 60 tons of behind in the melting chamber. At the tapping the molten iron was heated by a heavy oil burner. Carbon concentration at the tapping was 0.1 wt % and temperature of the molten iron was 1550° C. After the tapping an electric current was turned on again and at the same time injection of oxygen and coke was commenced. When the molten iron amounted to 180 tons again tapping, 120 tons of the molten iron was repeated.




By maintaining the conditions that total oxygen blow amount through an oxygen blow lance and a bottom blow tuyere is at a rate of 33 Nm


3


/t and that coke blow amount is 26 kg/t, the time from tapping to tapping was 40 minutes on average and the electric power unit consumption was reduced to 170 kWh/t, and melting could be completed.




In case that oxygen was not blown in through a tuyere, iron scraps which piled on a portion which had not yet melted were left not melted in the vicinity of boundary of the molten iron and the cold iron source. Furthermore, in spite of there being a pace below the iron scraps, the iron scraps did not fall down into the melting chamber. The hanging-up was continued for a long time and that melting stagnated about once per 6 charge. According to the present invention, by blowing in oxygen, such stagnation of melting can be prevented.




As the results of investigating the relation between time from tapping to tapping and its frequency with respect to the condition where oxygen was blown in from a furnace bottom and the condition where oxygen was not blown in, in the case that oxygen was not blown in as the same as Example 1, supply of iron scraps to molten iron was delayed with the result that the time from tapping to tapping was increased. But in the case that oxygen was blown in tapping was accomplished about every 40 minutes and extension of melting time did not occur.




Availability in Industry




As described above, since according to the present invention iron source such as scraps is melted using an arc-melting equipment which has a melting chamber and a preheat shaft directly connected to the upper portion of the melting chamber a device for carrying and supplying the iron source to the melting chamber is not required. Since the iron source is being supplied so that the iron source is continuously maintained in the melting chamber and the preheat shaft, high efficiency can be obtainable as below. Actually, in the present invention, the iron source in the melting chamber is melted by an arc, and under conditions that the iron source is continuously maintained, in the melting chamber and in the preheat shaft, the molten iron is tapped, whereby the iron source for next charge is also preheated. In addition since contact area, the iron source and molten iron bath which is produced by melting the iron source can be made to be small, the molten iron can be super heated. This can solve a ,problem that temperature of the molten iron tapped is too low. In addition, a part of or the whole of the bottom portion, which correspond to the preheat shaft of the melting chamber or correspond to the separating part, can have a slanted portion, from the bottom of the tapping portion (the deepest position) toward a direction which a furnace is tilted. The contact area with the iron source and the molten iron, can remarkably be small, in comparison with a case where a bottom of the melting chamber does not have a slanted portion at a bottom of the melting chamber. Therefore, the problem that temperature of the molten iron is too low, can be avoided more effectively.



Claims
  • 1. An arc-melting apparatus for melting a cold iron source comprising:(a) a melting chamber which is used as a space for melting the cold iron source; (b) a preheating shaft directly connected to an upper part of one side of the melting chamber, to preheat the cold iron source by introducing exhaust gas generated in the melting chamber, wherein the preheating shaft and the melting chamber form an integral structure; (c) an arc electrode for supplying heat for melting the cold iron source in the melting chamber; (d) a cold iron source supply device for supplying the cold iron source to the preheating shaft, so as to continuously maintain the cold iron source in the melting chamber and in the preheating shaft, so that the scraps in the preheating shaft are continuously maintained in contact with the surface of the molting metal in the melting furnace; (e) a tapping portion having a tapping hole, projecting outwardly from the melting chamber; and (f) a tilting device for tilting the melting chamber toward the tapping portion, simultaneously for tilting the preheating shaft toward the tapping portion, by the integral structure.
  • 2. The apparatus according to claim 1, wherein the tapping portion having the tapping hole is located in a different direction from a direction of supplying the cold iron source in the preheating shaft into the melting chamber.
  • 3. The apparatus according to claim 2, wherein the tapping portion is arranged at an orthogonal direction to the direction of the supplied cold iron source.
  • 4. The apparatus according to claim 1, wherein a distance between a position where the preheating shaft is placed adjacent to the melting chamber and a position where the tapping portion is placed adjacent to the melting chamber is predetermined to prevent the cold iron source from flowing out to the tapping portion, when the melting chamber is tilted.
  • 5. The apparatus according to claim 4, wherein the distance between the position where the preheating shaft is placed adjacent to the melting chamber and the position where the tapping portion is placed adjacent to the melting chamber, is longer than a horizontal distance that the cold iron source extends from the preheating shaft into the melting chamber.
  • 6. The apparatus according to claim 1, further comprising a travelling device for travelling the arc electrode, following the molten iron which moves in the melting chamber, when the melting chamber is tilted at a tapping time.
  • 7. The apparatus according to claim 1, further comprising another arc electrode which is placed at the tapping portion.
  • 8. The apparatus according to claim 1, further comprising a device for supplying an oxygen gas at a lower position of the preheating shaft.
  • 9. The apparatus according to claim 1, further comprising a fuel supply device for supplying a fuel, together with an oxygen gas to the cold iron source at a lower position of the preheating shaft.
  • 10. The apparatus according to claim 1, further comprising a carbonaceous material supply device for supplying a carbonaceous material to the melting chamber and an oxygen gas supply device for supplying an oxygen gas to the melting chamber.
Parent Case Info

This is a continuation application (35 USC 111) of International Application PCT/JP99/03690 filed Jul. 8, 1999 (not published in English).

US Referenced Citations (9)
Number Name Date Kind
4617673 Fuchs et al. Oct 1986 A
5117438 Ehle et al. May 1992 A
5153894 Ehle et al. Oct 1992 A
5535235 Ao et al. Jul 1996 A
5680413 Ogushi et al. Oct 1997 A
5835524 Berger et al. Nov 1998 A
5898726 Matsumoto et al. Apr 1999 A
5999556 Haissig Dec 1999 A
6269112 Poloni et al. Jul 2001 B1
Foreign Referenced Citations (6)
Number Date Country
6-046145 Jun 1994 JP
7-180975 Jul 1995 JP
7-332874 Dec 1995 JP
10-310813 Nov 1998 JP
11-037663 Feb 1999 JP
11-183045 Jul 1999 JP
Continuations (1)
Number Date Country
Parent PCT/JP99/03690 Jul 1999 US
Child 09/775153 US