This application is based upon and claims the benefit of priority from Japanese Patent Application No. 2016-183071, filed on Sep. 20, 2016; the entire contents of which are incorporated herein by reference.
Embodiments described herein relate generally to an apparatus for preprocessing paper sheets and a method for processing paper sheets.
As to paper sheets transported as a paper sheets assembly (a plurality of paper sheets is strapped by a material (band)), in order to process each paper sheet (one by one) by a paper sheets processing machine, preprocessing to remove the material is necessary. However, if the paper sheets assembly does not satisfy a predetermined specification, when preprocessing of the paper sheets assembly is performed or when paper sheets are processed by a processing machine of the paper sheets processing machine, various defects often occur. Accordingly, an operator's manual operation is required to remove the defects. As a result, in order to process the paper sheets by the paper sheets processing machine, many times and labors are necessary for the operator.
According to one embodiment, paper sheets preprocessing apparatus includes a material remover, a detector, a controller, and a display. The material remover removes a material from a paper sheets assembly. The paper sheets assembly includes a plurality of paper sheets strapped by the material. The detector is located at an upstream side than the material remover, and detects information of the paper sheets assembly. The controller decides whether the paper sheets assembly satisfies a predetermined specification, based on the information detected by the detector. If the controller decides that the paper sheets assembly does not satisfy the predetermined specification, the display displays a reason to decide that the paper sheets assembly does not satisfy the predetermined specification.
Hereinafter, a paper sheets preprocessing apparatus and a paper sheets processing method according to one embodiment will be explained by referring to drawings. In following embodiment, a paper sheets preprocessing machine 5 will be explained. The paper sheets preprocessing machine 5 functions as the paper sheets preprocessing apparatus of one embodiment. For example, paper sheets P are banknotes. However, the paper sheets are not limited to the banknotes.
First, a paper sheets verification system 1 of one embodiment will be explained.
The checking machine 200 re-inspects the rejected notes (rejected by the processing machine 100 one time) more accurately at a lower speed than the paper sheets processing machine 100. The checking machine 200 sends the re-inspection result to the paper sheets verification machine 300. The paper sheets verification machine 300 stores strap information (sent by the paper sheets preprocessing machine 5), the inspection result by the processing machine 100, and the re-inspection result by the checking machine 200 correspondingly. The host server 400 manages and accumulates the information acquired by the paper sheets verification machine 300 from the processing machine 100 or the checking machine 200.
The paper sheets preprocessing machine 5 shown in
In the present embodiment, the paper sheets assembly is a bundle B shown in
As shown in
As shown in
As shown in
The bundle feeder 10 is a part to feed the bundle B by the operator O1. The bundle feeder 10 equips a conveyance base composing a transport path L1 to transport the bundle B. For example, the transport path L1 is extended along a predetermined direction (X-axis direction) orthogonal to a vertical direction (Z-axis direction). The bundle b carried on the conveyance base of the bundle feeder 10 is transported along the transport path L1. For example, on the conveyance base of the bundle feeder 10, five bundles B can be carried. The bundle B is carried on the conveyance base of the bundle feeder 10 so that a short side direction of the strap SB (a short side direction of the paper sheets P) is in parallel with the vertical direction and a direction along which the straps B are laminated (a thickness direction of the paper sheets P) is approximately orthogonal to a transport direction (the transport path L1, X-axis direction) of the bundle B at the bundle feeder 10.
The bundle feeder 10 equips a transport stage (transporter) 11 at an edge part of the side (+X side) to which the bundle B is transferred. The transport stage 11 transports the bundle B1 (transported to an upper face of the transport stage 11) to any of the reject tray 90 and a bundling material remover 20 (explained afterward). In detail, if the controller 80 decides that the bundle B does not satisfy the specification, the transport stage 11 transports the bundle B to the reject tray 90. Furthermore, if the controller 80 decides that the bundle B satisfies the specification, the transport stage 11 transports the bundle B to the bundling material remover 20.
The reject tray 90 is a part to collect the bundle B decided to not satisfy the specification by the controller 80. In the present embodiment, the reject tray 90 is located at one side (−Y direction) of the transport stage 11 along a direction (Y-axis direction) orthogonal to both the transport path L1 and the vertical direction. At the reject tray 90, the bundle B decided to not satisfy the specification is transported from the transport stage 11 along a transport path L7 (Y-axis direction). On the reject tray 90, bundles B not satisfying the specification are collected in order so as to see the respective transport orders.
The material remover 6 is a part to remove a material from the bundle B. In the present embodiment, the material remover 6 equips a bundling material remover 20 and a strapping material remover 50. The bundling material remover 20 is a part to remove a bundling material Bw of the bundle B transferred from the bundle feeder 10. The bundling material remover 20 is located at the other side (+Y side) of the transport stage 11 along a direction (Y-axis direction) orthogonal to both the transport path L1 and the vertical direction. At the bundling material remover 20, the bundle B is transferred from the transport stage 11 along a transport path L2 (Y-axis direction). The bundling material remover 20 equips a bundling material cut stage 22. On an upper surface of the bundling material cut stage 22, the bundle B transferred from the transport stage 11 of the bundle feeder 10 is carried.
The lift 21 is installed onto the bundling material cut stage 22 so as to be movable along the vertical direction (Z-axis direction). On an upper surface of the lift 21, an intermediate part (three straps in
The bundling material remover 20 equips a material cutter to cut the bundling material Bw1 and a material removing roller to remove the bundling material Bw1 cut by the material cutter (not shown in
In
The strapping material remover 50 transfers the strap SB (loose paper sheets) to the strap stacker 60 along a transport path L5. For example, the transport path L5 extends along a direction (Y-axis direction) orthogonal to the transport path L4 (along which the strap SB is transferred by the strap picking part 40) and the vertical direction. The strapping material remover 50 equips a bar code imaging part to image a bar code SBb put on the strap material SBw (pulled), and an analysis part to analyze the image and update the strap information by deciphering it (not shown in
The strap connection part 30 is a part to transport the bundle B (separated into a plurality of straps SB by the bundling material remover 20) and connect the bundle B with another bundle B (other straps SB). The strap connection part 30 equips a conveyance base composing the transport path L3 to transport the strap SB. For example, the transport path L3 is in parallel with the transport path L2 and orthogonal to the transport path L1. The strap connection part 30 is located at the opposite side (+Y side) of the transport stage 11 for the bundling material remover 20. The transport stage 11, the bundling material remover 20 (bundling material cut stage 22) and the strap connection part 30, are located in a linearly alignment from a planar view.
The strap SB carried on the conveyance base of the strap connection part 30 is transported along the transport path L3. On the conveyance base of the strap connection part 30, the strap SB (separated from the bundle B by the bundling material remover 20) is manually fed by an operator O2. The strap SB is carried on the conveyance base of the strap connection part 30 so that a short side of the strap SB (paper sheets P) is approximately in parallel with the vertical direction and a long side of the strap SB (paper sheets P) is approximately orthogonal to the transport path L3 (Y-axis direction) of the strap connection part 30. The strap connection part 30 connects a plurality of straps SB (included in different bundles B) while the plurality of straps SB are being transported thereby.
The strap picking part 40 is a part to automatically pick one strap SB from a plurality of straps SB connected by the strap connection part 30. The strap picking part 40 equips a lift to lift one strap SB toward the upper side (not shown in
The strap stacker 60 is a part to stack the strap SB (loose paper sheets by removing the strapping material SBw by the strapping material remover 50) along the vertical direction by dropping the strap SB. Whenever one strap SB (loose paper sheets) is transferred to the strap stacker 60, the strap stacker 60 inserts a secondary batch separator card BC-2 between two straps SB (each having loose paper sheets). In the secondary batch separator card BC-2, information to discriminate the loose paper sheets of one strap is recorded. After stacking a plurality of straps SB (each having loose paper sheets), the strap stacker 60 slides the stacked loose paper sheets along a transport direction L6, and transfers the paper sheets P to the processing machine 100. For example, the transport direction L6 is a direction (X-axis direction) orthogonal to both the transport path L5 and the vertical direction.
The detector 70 is a part to detect information of the bundle B. In the present embodiment, the information of the bundle B includes existence/nonexistence of metallic foreign body, and appearance information of the bundle B. The detector 70 is located at the upstream side more than the material remover 6. In the present embodiment, the detector 70 equips a metal detector 71 and an imaging part 72.
The metal detector 71 is located at the bundle feeder 10. In detail, the metal detector 71 is located so as to surround a circumference of the bundle feeder 10 at the upstream side more than the transport stage 11 of the bundle feeder 10. The metal detector 71 detects whether a metallic foreign body is included in the bundle B (transported along the transport path L1 by the bundle feeder 10). For example, the metallic foreign body is a coin, a pin of a stapler or a clip to staple a plurality of paper sheets P. If the metal detector 71 can detect any metal, component of the metal detector 71 is not limited. For example, the metal detector 71 equips a coil, and has component to detect the metal based on change of magnetic field of electromagnetic induction. Existence/nonexistence of metallic foreign body (detected by the metal detector 71) is output to the controller 80 by a wire or a radio.
The imaging part 72 is located at the bundle feeder 10. In detail, for example, the imaging part 72 is located at the upper side of the transport stage of the bundle feeder 10. The imaging part 72 images the bundle B transported onto the transport stage 11. One imaging part 72 may be installed, or a plurality of imaging parts to image the bundle B from different directions may be installed. Image information of the bundle B by the imaging part 72 is output to the controller 80 by a wire or a radio.
Based on information of the bundle B detected by the detector 70, the controller 80 decides whether the bundle B satisfies a predetermined specification. In the present embodiment, the predetermined specification of the bundle B includes a specification of existence/nonexistence of metallic foreign body, a specification of winding method of the material, a specification of appearance of the material, a specification of position of the material, a specification of the number of materials, a specification of width of the material, a specification of thickness of the material, a specification of quality of the material, and a specification of size of the bundle B. As mentioned above, the controller 80 inputs information of existence/nonexistence of metallic foreign body from the metal detector 71, and inputs image information of the bundle B from the imaging part 72. Based on these information, the controller 80 decides whether the bundle B satisfies the predetermined specification.
As the specification of existence/nonexistence of metallic foreign body, the metallic foreign body is not included. Namely, if the metallic foreign body is not detected from the bundle B by the metal detector 71, the controller 80 decides that the bundle B satisfies the specification of existence/nonexistence of metallic foreign body. On the other hand, if the metallic foreign body is detected from the bundle B by the metal detector 71, the controller 80 decides that the bundle B does not satisfy the specification of existence/nonexistence of metallic foreign body and the specification of the bundle B.
The specification of winding method of the material includes a specification of winding method of the bundling material Bw and a specification of winding method of the strapping material SBw. As the specification of winding method of the bundling material Bw, for example, as the bundling material Bw1 shown in
In the bundle B2 shown in
In the bundle B3 shown in
As a specification of winding method of the strapping material SBw, the strapping material SBw is wound around a short side direction and a thickness direction of a plurality of paper sheets P. The strapping material SBw shown in
The controller 80 detects a winding method of the material based on the image information of the bundle B (imaged by the imaging part 72). If the winding method of at least one material is different from above-mentioned predetermined winding method, the controller 80 decides that the bundle B does not satisfy the specification. Namely, if the controller 80 detects that the bundling material Bw and the strapping material SBw are wound around a short side direction and a thickness direction of a plurality of straps SB, the controller 80 decides that the bundle B does not satisfy the specification. Furthermore, if the controller 80 detects that the bundling material Bw bundles a part of straps SB included in the bundle B, the controller 80 decides that the bundle B does not satisfy the specification.
As a specification of appearance of the material, the bundling material Bw is visible over one round thereof from the outside.
As the specification of position of the material, a position of the material along a long side direction of the strap SB is within a predetermined range. The specification of position of the material includes a specification of position of the bundling material Bw and a specification of position of the strapping material SBw. As the specification of position of the bundling material Bw, the bundling material Bw is located at a position except for a center part along a long side direction of the straps SB. As the specification of position of the strapping material SBw, the strapping material SBw is located at a center position along a long side direction of the straps SB, or located at a position of which distance from the center position along the long side direction is within a predetermined range.
As the specification of the number of materials, the number of materials is smaller than or equal to the number capable of being cut by the material remover 6. As the specification of width of the material, the width of the material is smaller than or equal to the largest length capable to be cut by the material remover 6. As the specification of thickness of the material, the thickness of the material is smaller than or equal to the largest thickness capable to be cut by the material remover 6.
As the specification of quality of the material, the quality of the material is capable to be cut by the material remover 6. As the quality capable to be cut by the material remover 6, for example, a paper, a rubber, a plastic and so on, are applied. As the plastic, for example, a polypropylene is applied. As the specification of size of the bundle B, the size of the bundle B can be transported to the bundling material remover 20 in the paper sheets preprocessing machine 5, and the bundling material Bw for the size of the bundle B can be removed by the bundling material remover 20.
The winding method of the material, the appearance of the material, the number of materials, the width of the material, the thickness of the material, the quality of the material, and the size of the bundle, are acquired from the image information of the imaging part 72. For example, the controller 80 grasps an outer shape of the material from a shadow occurred at a boundary between each material and the paper sheets P in the image information. As a result, the controller 80 acquires information of the winding method of the material, the appearance of the material, the number of materials, and the width of the material. For example, the controller 80 acquires information of the quality of the material from a color of the material in the image information.
For example, the controller 80 grasps an irregularity shape of an outer surface of the bundle B from the image which the bundle is imaged along a direction orthogonal to the paper sheets P. As a result, the controller 80 acquires information of the thickness of the material. For example, the controller 80 grasps an outer shape of the bundle B from the image which the bundle B is imaged from the upper side. As a result, the controller 80 acquires information of the size of the bundle B.
The controller 80 decides whether the bundle B satisfies the specification from above-mentioned acquired information. If a plurality of specifications is included in the specification of the bundle B as mentioned-above, and if the bundle B does not satisfy at least one of the plurality of specifications, the controller 80 decides that the bundle B does not satisfy the specification. On the other hand, if the bundle B satisfies all of the plurality of specifications, the controller 80 decides that the bundle B satisfies the specification.
As one example, for example, the controller 80 decides whether the bundling material Bw wound the bundle B (composed by straps SB) shapes a straight line from a strap SB at one end of the straps to another strap SB at the other end of the straps. As shown in
Furthermore, even if respective positions of the bundling materials Bw3 and Bw4 are same along a long side direction of the straps SB, a shadow occurs at a boundary between two neighboring straps SB of the bundling materials Bw3 and Bw4. Accordingly, while the bundling material Bw is being traced from a strap SB at one end to another strap SB at the other end, by detecting whether the shadow exists at the boundary between two neighboring straps SB of the bundling materials Bw3 and Bw4, improper bundling material Bw such as the bundling materials Bw3 and Bw4 in
Based on a decision whether the bundle B satisfies the specification, the controller 80 controls the transport stage 11 of the bundle feeder 10. If the bundle B is decided to not satisfy the specification, the controller 80 controls the transport stage 11 so as to transport the bundle B to the reject tray 90. If the bundle B is decided to satisfy the specification, the controller 80 controls the transport stage 11 so as to transport the bundle B to the bundling material remover 20.
As shown in
Furthermore, for example, if the bundle B does not satisfy each specification of the material, the display part 81 displays a purport that the material does not satisfy the specification, characters representing the reason, and an image of the bundle B. On the image of the bundle B, a material not satisfying the specification is highlighted. In this case, any of the characters and the image may be displayed. Furthermore, for example, if the bundle B does not satisfy a specification of size, the display part 81 displays characters representing a purport that the bundle B does not satisfy the specification of size.
Information displayed on the display part 81 is related in order of rejection of the bundle B. Accordingly, the operator O1 can understand that each strap of the rejected straps B is rejected by what reason respectively.
Next, flow of processing of the paper sheets preprocessing machine 5 will be explained.
As shown in
If the bundle B is decided to be an improper bundle (No at S102), the bundle B is transported to the reject tray 90 along the transport path L7 by the transport stage 11, and rejected (S103). Here, the controller 80 controls the display part 81 to display a reason to decide that the bundle B is improper. On the other hand, if the bundle B is decided to be a proper bundle (Yes at S102), the bundle B is transferred to the bundling material cut stage 22 of the bundling material remover 20 along the transport path L2.
In response to the bundle B transferred as one unit, the bundling material remover 20 automatically cuts the bundling material Bw of the bundle B (S104). The bundling material remover 20 removes the bundling material Bw cut thereby (S105). Straps SB of the bundle B of which the bundling material is removed are manually fed to the strap connection part 30 by the operator O2. The straps SB are automatically transported at every predetermined number of straps SB along the transport path L3 by the strap connection part 30. By transporting the predetermined number of straps SB at every (a plurality of) bundles B, the strap connection part 30 connects a plurality of the predetermined number of straps included in the bundles B (S106).
The strap picking part 40 automatically picks each strap SB (one by one) from a plurality of straps SB connected by the strap connection part 30 (S107). The strap picking part 40 transfers each strap SB (picked one by one) to the strap material remover 50 along the transport path L4.
The strap material remover 50 automatically cuts the strap material SBw of one strap SB transferred by the strap picking part 40 (S108). As to the strap SB of which the strapping material SBw is cut, the strapping is loosened, and the strap SB is regarded as loose paper sheets. The strapping material remover 50 transports loose paper sheets of one strap along the transport path L5, and transfers the loose paper sheets of one strap to the strap stacker 60 (S113).
Furthermore, by a bar code imaging part (not shown in
In response to the loose paper sheets of one strap transferred, the strap stacker 60 inserts a secondary batch separator card BC-2 into (between) two straps each having loose paper sheets (S114). The paper sheets preprocessing machine 5 sends bar code information (printed on the secondary batch separator card BC-2) with the strap information to a banknote processing machine (not shown in
By repeatedly performing above-mentioned flow, in the paper sheets preprocessing machine 5, a predetermined number of bundles B are set as loose paper sheets (paper sheets P are separated one by one) capable to be fed into the processing machine 100.
Here, as to a bundle B decided to be improper by the controller 80 and rejected into the reject tray 90, after a cause not satisfying the specification is excluded from the bundle B by the operator O1, the bundle B is fed into the paper sheets preprocessing machine 5 again. By referring to the display part 81, the operator O1 excludes the cause not satisfying the specification. Moreover, in order to exclude the cause, if the bundling material Bw needs to be rejected, after cutting and removing the bundling material Bw, the operator O1 may directly feed straps SB (mutually separated) of the bundle B into the strap connection part 30. Above-mentioned processing of the rejected bundle B may be performed after preprocessing of a predetermined number of bundles B is completed, or during preprocessing of the predetermined number of bundles B.
In the method for processing paper sheets according to the present embodiment, as mentioned-above, by the paper sheets preprocessing machine 5, strapping of the bundle B is loosened by removing the material, and paper sheets P of the bundle B are separated one by one. By the processing machine 100, each paper sheet separated from the paper sheets P is inspected.
For example, if a bundle B (to be fed into the paper sheets preprocessing machine 5) does not satisfy a predetermined specification, when the paper sheets preprocessing machine 5 performs preprocessing of the bundle B, or when the processing machine 100 performs processing of the bundle B, defect often occurs. For example, if the bundle B (to be fed into the paper sheets preprocessing machine 5) does not satisfy the predetermined specification, the material of the bundle B cannot be often removed suitably by the material remover 6.
Specifically, such as the bundling material remover 20 of the present embodiment, in the case of component to cut the bundling material Bw by moving a material cutter along a long side direction of the paper sheets P, in the bundle B2 shown in
Furthermore, if the bundling material Bw is located at a center position along a long side direction of the strap SB, a space 20a is not formed by lifting the bundling material Bw with straps SB by the lift 21. Accordingly, the bundling material Bw cannot be removed. Furthermore, along a long side direction of the paper sheets P, if a position of the strapping material SBw is largely shifted, the strapping material remover 50 cannot cut and remove the strapping material SBw. Furthermore, if the number of materials, a width of the material and a thickness of the material is large, or if a quality of the material is not suitable, the material cannot be often removed by the material remover 6. As one example, if the material is a hemp rope, this material is often hard to be cut and removed.
As mentioned-above, if the material cannot be removed suitably, the operator O1 needs to cope with this defect by temporarily stopping the paper sheets preprocessing machine 5 and by manually rejecting the bundle B. As a result, time and labor required for this operation often increase.
Furthermore, even if both the bundling material Bw and the strapping material SBw are removed from the bundle B, if specification of the paper sheets P bundled is improper, inspection of the paper sheets P by the processing machine 100 cannot be often performed. Specifically, the case that several paper sheets P among the strap SB included in the bundle B are stapled by a pin of a stapler or a clip is applied. In this case, when the paper sheets P are taken out one by one from (preprocessed) loose paper sheets by the processing machine 100, a plurality of paper sheets P stapled by the pin of the stapler or the clip are collectively pulled into the processing machine 100, and the paper sheets P are often jammed. Here, the jammed paper sheets P need to be removed. As a result, time and labor for this operation often increase. Furthermore, due to jam of the paper sheets P, the processing machine 100 is often damaged.
Furthermore, even if the paper sheets P can be taken out one by one by the processing machine 100, if a foreign body is mixed onto one paper sheet P itself or between two paper sheets P, the processing machine 100 is often damaged. Specifically, for example, if a metallic foreign body (such as a pin of a stapler or a clip) is stapled onto one paper sheet P, by moving the one paper sheet P into the processing machine 100, the metallic foreign body is rubbed with a guide plate to guide moving of the paper sheet P, and the guide plate is often damaged. Furthermore, by rubbing the metallic foreign body with a head to read magnetism of the paper sheet P, the head is often damaged. Furthermore, after the paper sheets P is inspected by the processing machine 100, the paper sheets P stapling the metallic foreign body is often recirculated.
Furthermore, among paper sheets P in the bundle B, a coin is sometimes caught in. In this case, the coin is often pulled into the processing machine 100. As a result, the coin is rubbed with a guide plate in the processing machine 100 or a head to read magnetism, the processing machine 100 is often damaged.
In order to resolve above-mentioned detects, in the present embodiment, the detector 70 to detect information of the bundle B is installed at the upstream side than the material remover 6. Based on the information detected by the detector 70, the controller 80 decides whether the bundle B satisfies the specification. Accordingly, the bundle B not satisfying the specification can be rejected before the bundle B is transported to the material remover 6. As a result, above-mentioned defect occurred due to the bundle B not satisfying the specification can be suppressed, and burden to process the paper sheets P can be reduced. As a result, efficiency of preprocessing-operation and efficiency of operation by the processing machine 100 can be improved together.
Furthermore, on the display part 81, a reason to decide that the bundle B does not satisfy the specification is displayed. By watching the display part 81, the operator O1 can easily find a part of the bundle B not satisfying the specification. Accordingly, as for the bundle B not satisfying the specification, a suitable disposition to satisfy the specification can be performed quickly. As a result, time and labor to refeed the rejected bundle B can be reduced, and the operator's burden to process the paper sheets P can be more reduced.
Furthermore, in the present embodiment, the paper sheets preprocessing machine 5 equips the material remover 6 to remove the material from the bundle B. Accordingly, in preprocessing to feed the paper sheets P into the processing machine 100, a burden to remove the material can reduced. Furthermore, in the present embodiment, removal of the material is performed automatically. Accordingly, the preprocessing of the bundle B need not be stopped, and wait time until the paper sheets P are fed can be reduced. As a result, burden to preprocess the paper sheets P can be reduced.
Especially, if a paper sheets assembly is a bundle B as a predetermined number of straps SB (each strap including a plurality of paper sheets P strapped by a strapping material SBw) bundled by a bundling material Bw, after the bundling material Bw is removed, preprocessing to remove the strapping material SBw is necessary. Accordingly, more times and labors are required. Contrary to this, in the present embodiment, the material remover 6 equips the bundling material remover 20 to remove the bundling material Bw and the strapping material remover 50 to remove the strapping material SBw. Accordingly, the bundling material Bw and the strapping material SBw can be removed automatically. As a result, burden to preprocess the paper sheets P can be further reduced.
Furthermore, in the present embodiment, the detector 70 is located at the upstream side than both the bundling material remover 20 and the strapping material remover 50. Accordingly, improper bundles B can be collectively rejected at the upstream side. As a result, while component of the paper sheets preprocessing machine is simplified, the bundle B not satisfying the specification can be effectively rejected.
Furthermore, in the present embodiment, the detector 70 equips the imaging part 72, and appearance information of the bundle B is detected from the image. Accordingly, respective information such as an appearance of the material, a position of the material, the number of materials, a winding method of the material, a width of the material, a thickness of the material, and a quality of the material, can be acquired. As a result, the bundle B from which the material is hard to be removed can be rejected more suitably, and efficiency of preprocessing-operation can be more improved.
Furthermore, as the improper bundle B, the winding method of the material is often improper. Accordingly, by detecting the winding method of the material from the image and by comparing the winding method with the specification, the improper bundle B can be rejected more effectively. Especially, as the improper bundle B, the bundle B including the bundling material Bw (such as bundling materials Bw3 and Bw4 shown in
Furthermore, for example, as shown in
Furthermore, in the present embodiment, the detector 70 equips the metal detector 71, and can detect whether a metallic foreign body is included in the bundle B. If the detector 70 detects that the metallic foreign body is included in the bundle B, the controller 80 decides that the bundle B does not satisfy the specification. Accordingly, the bundle B into which a coin, a pin of a stapler or a clip is mixed can be rejected. As a result, efficiency of operation by the processing machine 100 can be further improved, and damaging of the processing machine 100 can be further suppressed.
Furthermore, in the present embodiment, when the controller 80 decides that the bundle B does not satisfy the specification, the transport stage 11 transports the bundle B to the reject tray 90. Accordingly, the bundle B not satisfying the specification is rejected automatically. As a result, a burden for the operator O1 to reject the bundle B can be reduced. Furthermore, by stacking improper bundles into the reject tray 90 collectively, when a cause not to satisfying the specification is excluded from a plurality of improper bundles B, the operator O1 can operate effectively.
Moreover, in above-mentioned embodiment, the detector 70 equips the metal detector 71 and the imaging part 72. However, the detector 70 is not limited to this component.
For example, if the paper sheets P includes moisture, the paper sheets P are mutually adhered, and each of the paper sheets P cannot be suitably taken out from (stacked) loose paper sheets by the processing machine 100. A weight of the paper sheets P including moisture is larger than a weight of the (regular) paper sheets P. Accordingly, if the weight of the bundle B is larger than the predetermined value, the controller 80 decides that the bundle B does not satisfy the specification. As a result, the bundle B bundling the paper sheets P including moisture can be rejected.
Furthermore, for example, if the number of straps SB included in respective bundles B (fed) are different, the number of straps SB is recognized from the image information acquired by the imaging part 72, and a weight of the bundle B acquired by the weight measurement part 73 is compared with a weight of the bundle B in proportion to the number of straps SB. As a result, the controller 80 can decide the bundle B bundling the paper sheets P including moisture.
Furthermore, the detector 70 may equip a displacement measurement part 74 to measure a displacement of an outer surface of the bundle B. The displacement measurement part 74 shown in
Furthermore, the detector 70 may equip any of the metal detector 71, the imaging part 72, the weight measurement part 73 and the displacement measurement part 74, equip any two or any three combinations therefrom, or equip all four parts thereof. For example, component of the detector 70 can be suitably selected, based on the case that many bundles B (fed into the processing machine 5) do not satisfy which specification. Furthermore, as above-mentioned embodiment, if a plurality of materials of different types is set, the detector 70 may have component to detect information of a part of the materials. In the example of above-mentioned embodiment, the detector 70 may have component to detect information of the strapping material SBw among the bundling material Bw and the strapping material SBw. In this case, the detector 70 may be located at the downstream side of the bundling material remover 20 and the upstream side of the strapping material remover 50.
Furthermore, by installing a plurality of reject trays 90, the bundles B may be distributed by respective reasons to decide that the specification is not satisfied, and respectively rejected into one reject tray (of the reject trays 90) corresponding to one reason to decide that the bundle does not satisfy the specification. Furthermore, as long as a plurality of paper sheets P included in a paper sheets assembly is strapped by the material, the paper sheets assembly is not limited. The paper sheets assembly may be the strap SB.
According to above-mentioned embodiment, the detector 70 to detect information of the bundle B is located at the upstream side than the material remover 6. Based on the information detected by the detector 70, the controller 80 decides whether the bundle B satisfies the specification. Accordingly, the bundle B not satisfying the specification can be rejected before the bundle B is transported to the material remover 6. As a result, occurrence of above-mentioned defects due to the bundle B not satisfying the specification can be suppressed, and burden to process the paper sheets P can be reduced. Furthermore, efficiency of preprocessing-operation and efficiency of operation by the processing machine 100 can be improved together.
Furthermore, according to above-mentioned embodiment, the display part 81 displays a reason to decide that the bundle B does not satisfy the specification. By watching the display 81, the operator O1 can easily find a part of the bundle B not satisfying the specification. Accordingly, as for the bundle B not satisfying the specification, a suitable disposition to satisfy the specification can be performed quickly. As a result, time and labor to refeed the rejected bundle B can be reduced, and the operator's burden to process the paper sheets P can be more reduced.
Furthermore, according to above-mentioned embodiment, the material remover 6 to remove the material from the bundle B is equipped. Accordingly, in preprocessing to feed the paper sheets P into the processing machine 100, burden to remove the material can be reduced. Furthermore, according to above-mentioned embodiment, removal of the material can be performed automatically. Accordingly, the preprocessing of the bundle B need not be stopped, and wait time until the paper sheets P are fed can be reduced. As a result, burden to preprocess the paper sheets P can be reduced.
Especially, the material remover 6 equips the bundling material remover 20 to remove the bundling material Bw and the strapping material remover 50 to remove the strapping material SBw. Accordingly, the bundling material Bw and the strapping material SBw can be removed automatically. As a result, burden to preprocess the paper sheets P can be further reduced.
While certain embodiments have been described, these embodiments have been presented by way of examples only, and are not intended to limit the scope of the inventions. Indeed, the novel embodiments described herein may be embodied in a variety of other forms; furthermore, various omissions, substitutions and changes in the form of the embodiments described herein may be made without departing from the spirit of the inventions. The accompanying claims and their equivalents are intended to cover such forms or modifications as would fall within the scope and spirit of the inventions.
Number | Date | Country | Kind |
---|---|---|---|
2016-183071 | Sep 2016 | JP | national |
Number | Name | Date | Kind |
---|---|---|---|
4414730 | Ohmura | Nov 1983 | A |
4447885 | Biss | May 1984 | A |
4674060 | Larkin | Jun 1987 | A |
4722443 | Maruyama et al. | Feb 1988 | A |
5090573 | Takahashi | Feb 1992 | A |
5193629 | Lare | Mar 1993 | A |
6098373 | Ashikawa | Aug 2000 | A |
6502052 | Someya | Dec 2002 | B1 |
RE38663 | Kayani | Nov 2004 | E |
8393472 | Hayduchok | Mar 2013 | B2 |
8811710 | Demmeler | Aug 2014 | B2 |
9042632 | Petker | May 2015 | B2 |
9613481 | Jacomet | Apr 2017 | B2 |
9731849 | Ito | Aug 2017 | B1 |
20030168308 | Maier et al. | Sep 2003 | A1 |
20140260115 | Mayhall, III et al. | Sep 2014 | A1 |
20160264278 | Hirose et al. | Sep 2016 | A1 |
Number | Date | Country |
---|---|---|
2155190 | Sep 1985 | GB |
2015180982 | Oct 2015 | JP |
2009040941 | Apr 2009 | WO |
Entry |
---|
Extended European Search Report issued in related EP Application No. EP 17191680, dated Jan. 31, 2018, 11 pages. |
Number | Date | Country | |
---|---|---|---|
20180079618 A1 | Mar 2018 | US |