The present disclosure relates to an apparatus for prestressing a concrete floor of an inclined shaft wall, which is applicable to supporting and protecting engineering for inclined shafts, tunnels, roadways, chambers and the like in high-water-pressure and high-expansion stratums in the fields of mine construction, water conservancy, traffic, municipal administration and the like.
In stratums with large burial depths and high water pressures, there are such waterproof requirements for design and construction of inclined shaft walls that floors of the shaft walls must make sure that no tension failures occur on upper surfaces under the high water pressures. However, due to the characteristics that concrete is pressure-proof but lack of tensile strength, the floor of the inclined shaft wall often has an extremely large design thickness and extremely high steel content, or even the floor must be designed as an inverted arch with a small curvature radius, which greatly increases the construction difficulty. Even so, floor concrete of the shaft wall still often causes a sudden water burst and even a mine flooding accident because of top surface cracking.
At present, most of inclined shaft walls in water-bearing stratums are designed as flat and straight floor structures or “flat-top and curved-bottom” concrete slab structures with bottom surfaces having certain radians. Due to the limitation of a construction process, it is very difficult to design the floor as an inverted arch structure with an extremely small curvature radius, resulting in that the floor structure of the shaft wall often hardly meets a requirement for resisting a high water pressure at the lower part, thereby remaining a risk of bending and tension failures caused by a bulged middle part of the floor. Therefore, for the inclined shaft walls with non-circular interfaces in the water-bearing stratums, it is in urgent need of taking measures to prevent the bending and tension failures of the floors.
Embodiments of the present invention provide an apparatus for prestressing a concrete floor of an inclined shaft wall in allusion to an existing inclined shaft wall construction process based on an idea of prestressing concrete structure, and the prestressing apparatus is applied to prestressing of the concrete floor of the shaft wall, which substantially improves the tensile strength of the floor of the shaft wall and practically and effectively reduces the thickness and the steel use amount of the floor, thereby fulfilling the aims of improving the engineering safety and reducing the engineering cost.
An apparatus for prestressing a concrete floor of an inclined shaft wall of an embodiment of the present invention includes two end bearing components, a corrugated pipe, a tension bearing rod piece and two anchor heads. The tension bearing rod piece is composed of a left tension bearing rod, a right tension bearing rod and a loading mechanism. The left tension bearing rod and the right tension bearing rod are connected integratedly via the loading mechanism, and the tension bearing rod piece passes through the corrugated pipe, with two ends exposed by a set length. The two end bearing components are respectively arranged at the left and right ends of the tension bearing rod piece in a sleeving manner. The two anchor heads respectively lock the left and right end bearing components.
A further optimized solution is that the prestressing apparatus further includes a loading box. The loading box is closed with a cover. The corrugated pipe is divided into two sections which are arranged on two sides of the loading box and in communication with the loading box. The loading mechanism is located in the loading box.
A grouting hole is provided on the loading box, so as to be connected to a grouting pipe (10) to perform grouting blocking after prestress application is completed. An exhaust hole is provided on an outer end part of the corrugated pipe, and is used for exhausting gas during grouting in the corrugated pipe.
The end bearing components are channel steel, I-shaped steel or steel plates.
The loading mechanism may select the following several structural forms for prestressing:
a first loading mechanism is an internal threaded sleeve, an internal thread of which is divided into a left part and a right part. Thread directions of the two parts are opposite. The end parts of the left tension bearing rod and the right tension bearing rod are respectively provided with male threads matched with the internal thread parts of the internal threaded sleeve, so that the end parts of the left tension bearing rod and the right tension bearing rod are respectively screwed into the internal threaded sleeve. Tensioning is carried out by screwing the internal threaded sleeve to apply a tension stress to the tension bearing rods on both sides.
A second loading mechanism is composed of a U-shaped connection piece, a baffle plate and two nuts. A back side of a curved section of the U-shaped connection piece is connected to the left tension bearing rod. The baffle plate is fixed at the end part of the right tension bearing rod. Two ends of the baffle plate are provided with two holes, and are arranged on two legs of the U-shaped connection piece in a sleeving manner. The two legs of the U-shaped connection piece are provided with male threads. The two nuts are respectively screwed onto the two legs of the U-shaped connection piece. A prestress is applied to the tension bearing rods by screwing the nuts.
A third loading mechanism is composed of a work anchor, a tool anchor and two jacks. Two left tension bearing rods are provided, the end parts of which are symmetrically fixed on two sides of the work anchor. The other ends of the left tension bearing rods are connected to the anchor heads in one of the following two ways:
the first one is that the two left tension bearing rods pass through a same hole in each of the anchor heads and then are fixed, and the second one is that the two left tension bearing rods respectively pass through two holes in each of the anchor heads and then are fixed.
The middle part of the work anchor is provided with a conical hole. The head part of the right tension bearing rod passes through the middle conical hole of the work anchor at first, then passes through a preset conical hole in the tool anchor, and enables the right tension bearing rod to be self-locked onto the work anchor and the tool anchor through clamps.
The two jacks are placed between the work anchor (14) and the tool anchor (15) symmetrically.
The apparatus for prestressing the concrete floor of the inclined shaft wall of an embodiment of the present invention is used for loading the prestress to the floor of the inclined shaft wall, and solves the difficulty in prestressing in a narrow space of the floor of the shaft wall. By the application of the prestress, the bending and tension resistance properties of the floor structure of the shaft wall under high external water pressure and high surrounding rock pressure may be substantially improved, the safety is improved, and the engineering cost is substantially reduced.
In embodiments of the present invention, a prestressed floor structure of an inclined shaft wall, as shown in
The concrete 3 wrapped around is concrete required for general shaft wall pouring.
The steel framework 2 is a metal framework, such as steel bar or profile steel, bound before shaft wall concrete pouring.
The apparatus 1 for prestressing the concrete floor of the inclined shaft wall of an embodiment of the present invention includes two end bearing components 4, a corrugated pipe 5, a tension bearing rod piece 6 and two anchor heads 7. The tension bearing rod piece 6 is composed of a left tension bearing rod, a right tension bearing rod and a loading mechanism. The left tension bearing rod and the right tension bearing rod are connected integratedly via the loading mechanism, and the tension bearing rod piece passes through the corrugated pipe, with two ends exposed by a set length. The two end bearing components 4 are respectively arranged at the left and right ends of the tension bearing rod piece in a sleeving manner. The two anchor heads 7 respectively lock the left and right end bearing components. The prestressing apparatus further includes a loading box 8. The loading box is closed with a cover. A top surface box cover of the loading box may be opened and provided with a grouting hole 17 which can be connected to a grouting pipe 10 to perform grouting blocking after prestress application is completed. The corrugated pipe 5 is divided into two sections which are arranged on two sides of the loading box and in communication with the loading box. The loading mechanism is located in the loading box. Exhaust holes 11 are provided on the end parts of the left and right ends of the corrugated pipe, and are used for exhausting gas during grouting in the corrugated pipe.
The apparatus 1 for prestressing the concrete floor of the inclined shaft wall of an embodiment of the present invention is flexibly arranged along a direction perpendicular to an axial direction of an inclined shaft wellbore, or may be arranged in an equal or unequal spacing manner along the axial direction of the inclined shaft wellbore. After installation, the concrete floor is poured. After concrete is solidified, the loading box cover is opened, and a prestress is loaded to the floor through the loading mechanism according to set parameter values. The loading box cover is closed, and the grouting pipe 10 is connected to grout concrete into a threaded pipe.
The loading mechanism of the loading apparatus 1 in an embodiment of the present invention may select (but not limited to) the following several forms. Detailed descriptions are made specifically in combination with the drawings.
As shown in
A specific construction method which applies the apparatus 1 for prestressing the concrete floor of the inclined shaft wall of an embodiment of the present invention includes:
(1) after the inclined shaft wellbore is dug, before the floor of the shaft wall is poured, firstly binding steel bars or profile steel to form a spatial metal framework structure.
(2) in a binding and fixing process of the spatial metal framework, installing and fixing the end bearing components 4, the corrugated pipe 5 and the tension bearing rod piece 6 in sequence according to designed positions, wherein the tension bearing rod piece 6 passes through the corrugated pipe 5 from the inside of the corrugated pipe 5, and is connected to the end bearing components 4 through the anchor heads 7, and exhaust pipes 11 located on the corrugated pipe 5 shall be slightly higher than the top surface of the floor of the shaft wall and closed.
(3) mounting the loading box 8 at a middle position between the two sections of the corrugated pipe 5, wherein the loading mechanism (the internal threaded sleeve 12) is located in the loading box 8, and the surface of the loading box cover shall be flush with the upper surface of the floor of the shaft wall.
(4) mounting a shaft wall floor template (if required), pouring floor concrete, removing the template when the concrete strength increases to certain extent, chiseling the concrete, and opening a top cover of the loading box 8.
(5) applying a tension stress to the tension bearing rod piece 6 by screwing the loading mechanism, namely the internal threaded sleeve 12, and applying a prepressing stress to the floor concrete under the dispersing action of the end bearing components 4.
(6) in order to improve the uniformity of floor prestress application, firstly loading the prestress continuously or at intervals along the axial direction of the well bore (see
(7) after the prestress application to the floor of the shaft wall is completed, opening the exhaust pipes 11, closing the top cover of the loading box 8, connecting the grouting pipe 10 so as to grout and fill internal spaces of the corrugated pipe 5 and the loading box 8 so as to integrate the tension bearing rod piece, the loading apparatus and the like with the floor concrete to avoid rust corrosion to the components and prestress loss.
The floor structure of the inclined shaft wall of the present embodiment is basically the same as that of Embodiment 1, and also adopts a flat and straight floor (see
the construction method involved in the present embodiment is basically the same as that in Embodiment 1. A difference is that in Step 5, the tension bearing rod piece is gradually tightened to apply the prestress by screwing the two nuts on the U-shaped connection piece 13 or the nut in the center of the baffle plate, thereby applying a tension stress to the tension bearing rod piece 6 and applying a prepressing stress to the floor concrete under the dispersing action of the end bearing components 4.
The floor structure of the inclined shaft wall of the present embodiment is basically the same as that in Embodiment 1, but adopts a “flat and straight-top and inverted arch-bottom” floor (see
as shown in
as shown in
The jacks 16 are mounted between the tool anchor and the work anchor. The prestress is applied through the jacks. After the prestress application is completed, the tool anchor and the jacks may be removed.
A specific construction method which applies the apparatus 1 for prestressing the concrete floor of the inclined shaft wall of an embodiment of the present invention is as follows:
the construction method involved in the present embodiment is basically the same as that in Embodiment 1. A difference is that in Step 5, through cooperation with one tool anchor 15, the two jacks 16 are placed between the tool anchor 15 and the work anchor 14. The work anchor 14 is pushed forwards through a force applied by the jacks. After the prestress is increased to a predetermined value, the force of the jacks 16 is released, and the work anchor 14 completes self-locking through its clamping sheets 18 to maintain the applied prestress, thereby enabling the tension bearing rod piece 6 to be in a tension state and applying a prepressing stress to the floor concrete under the dispersing action of the end bearing components 4. For selection of jacks in an implementation process, in consideration of a limited space in a metal box, a small-sized jack screw may be used for replacing a conventional hydraulic jack. In consideration of the size of a jacking force, two jack screws are symmetrically provided. After the prestress application is completed, the tool anchor and the jacks may be removed.
In general, in the following claims, the terms used should not be construed to limit the claims to the specific embodiments disclosed in the specification and the claims, but should be construed to include all possible embodiments along with the full scope of equivalents to which such claims are entitled.
Number | Date | Country | Kind |
---|---|---|---|
201710129849.2 | Mar 2017 | CN | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2017/114231 | 12/1/2017 | WO | 00 |