The present application claims benefit of Chinese application CN 201410013831.2, entitled “Workover System Unattended at the Wellhead and Technology Thereof” and filed on Jan. 13, 2014, which is incorporated herein by reference.
The present disclosure relates to the technical field of well workover in the oil industry, and in particular, to an apparatus for tripping oil pipe which can be operated unattendedly at the wellhead, and a system for automatic well workover comprising said apparatus.
Well workover is an important step in oilfield production, and has been a labour intensive industry over the years. At present, traditional equipment, which is used in most oilfields, generally requires at least three workers to operate collaboratively. In operation, at least one worker operates a drifting machine or a workover rig to trip an oil pipe, and at least two other workers lift, and attach or detach an elevator at the wellhead. Especially when conducting a minor workover to the wellhead, the workers suffer from hostile working environment, high labour intensity, as well as potential safety hazard during operation.
The technical problem to be solved by the present disclosure is to provide an apparatus for tripping an oil pipe, which can reduce the labour intensity and improve operation safety.
The technical solution of the present disclosure is to provide an apparatus for tripping oil pipe, comprising an elevator transfer device for transferring an elevator connected with an oil pipe, the elevator transfer device being structured for enabling continuous, automatic tripping operations of the oil pipe.
As compared with the prior art, the present disclosure has the following advantages. According to the present disclosure, the oil pipe can be automatically transferred at the wellhead through the elevator transfer device, thus it is unnecessary for multiple workers to cooperate in order to realize continuous tripping operations of the oil pipe, thereby reducing the labour intensity and enabling continuous, automatic tripping operations of the oil pipe at the wellhead. In this manner, the working efficiency can be improved, the probability for accidents can also be significantly reduced, and the working safety can be higher.
It should be noted that the tripping operations, i.e., tripping out and tripping in operations, of an oil pipe in well workover can generally be divided into a broad sense and a narrow sense. The tripping out operation of an oil pipe in a broad sense includes pulling the oil pipe out of the wellhead and transporting the oil pipe to a target location on the ground, for example, transporting the oil pipe tripped out and putting it on an oil pipe rack. The tripping in operation of an oil pipe in a broad sense includes taking an oil pipe from the oil pipe rack on the ground, transporting the oil pipe to a wellhead, and tripping the oil pipe into the well. However, the tripping out operation of an oil pipe in a narrow sense only refers to pulling the oil pipe out of the well, and the tripping in operation of an oil pipe only refers to running the oil pipe above the wellhead into the well. Unless otherwise specified, the tripping operations of the oil pipe in the present disclosure are of narrow sense.
In an embodiment, the elevator transfer device comprises a lifting assembly used for lifting and releasing an oil pipe engaged with the elevator, and an elevator transport assembly used for transferring an elevator at a wellhead and/or an elevator on the lifting assembly. A cycle operation between an elevator on the lifting assembly and an elevator connected to an oil pipe at the wellhead can be realized through the elevator transport assembly.
In an embodiment, two connection points are formed by the trajectory of the elevator transport assembly and that of the lifting assembly, and the elevator transport assembly and the lifting assembly can operate simultaneously. In the accompanying drawings and the embodiments, an upper connection point is marked as A and a lower connection point is marked as B. Because the lifting assembly and the elevator transport assembly can operate simultaneously, it is unnecessary for them to wait for each other, and thus the operation time can be reduced and the operation efficiency can be improved.
In a preferred embodiment, the lifting assembly and the elevator transport assembly can perform a direct handover of an empty elevator at an upper connection point of the two connection points therebetween. It should be readily understood that the upper connection point keeps a safe distance from the wellhead, so that when the elevator is handed over between the elevator transport assembly and the lifting assembly, collision between the elevator and any other components or devices disposed adjacent to the wellhead can be avoided to the largest extent, thereby improving the operation safety.
Preferably, at a preset location below a lower connection point of the two connection points, one of the lifting assembly and the elevator transport assembly is used for picking up the elevator while the other is used for releasing the elevator. The handover of the elevator between the elevator transport assembly and the lifting assembly does not occur directly at the preset location below the lower connection point. Instead, the elevator is picked up from or placed on a platform, which is used for placing or supporting the elevator, by either the elevator transport assembly or the lifting assembly. In addition, the elevator transport assembly is configured to transfer empty elevator only. In the context, the term “empty elevator” refers to an elevator to which no oil pipe is connected. The transportation of an empty elevator means to transport an idle elevator. Because the elevator transport assembly rotates along an approximately circular path, the transportation of an empty elevator lowers the requirements on the bearing capacity of the elevator transport assembly, rendering the transportation of the elevator safer.
In a preferred embodiment, the elevator transport assembly comprises a rotation mechanism for carrying the elevator for rotation along a circular path, and a detent mechanism for loading/unloading as well as moving an elevator adjacent to the wellhead. In a preferred embodiment, during the tripping operations of the oil pipe, the angle of rotation of the rotation mechanism is larger than 180° and smaller than 360°. That is, the movement of the rotation mechanism is not around an entire circumference, such that the rotation mechanism can avoid crashing into the oil pipe during rotation. In the meantime, the rotation mechanism and the lifting assembly can both operate at the same time, and thus the operation time can be reduced and the operation efficiency can be improved. Specifically, the rotation mechanism will not rotate into a relatively small area between the upper connection point and the lower connection point in which it can easily crash into the lifting assembly. By keeping the rotation mechanism away from this area, it is unnecessary for the rotation mechanism and the lifting assembly to wait for each other to finish their operations in order to avoid collision in this area. Therefore, the rotation mechanism and the lifting assembly can operate simultaneously without interfering with each other.
In an embodiment, when tripping out the oil pipe, the lifting assembly carries an empty elevator and descends to the upper connection point, and the rotation mechanism takes down the empty elevator from the lifting assembly and rotates therewith. Then, the lifting assembly continues to descend to the preset location below the lower connection point, where an elevator carrying an oil pipe is mounted to the lifting assembly under the assistance of the detent mechanism, and then the lifting assembly ascends with the oil pipe. Subsequently, the rotation mechanism carries the empty elevator and rotates to a preset location thereof adjacent to the wellhead and releases the empty elevator under the assistance of the detent mechanism, the empty elevator being continued to move to the wellhead and connect to an oil pipe to be tripped out under the action of the detent mechanism, so as to be ready for tripping operations of a next oil pipe.
It should be understood that in order to keep the lifting assembly and the rotation mechanism from interfering with each other, the preset location below the lower connection point B of the lifting assembly is arranged to be different from that of the rotation mechanism. The preset location below the lower connection point of the lifting assembly refers to a location H at an axis of the wellhead. The preset location below the lower connection point of the rotation mechanism refers to a position on the circular trajectory thereof that has not yet reached the lower connection point B, such as a position F or a position E as shown in the drawings. The preset locations and the distance therebetween are arranged as such that the rotation mechanism will not crash into the oil pipe and the lifting assembly during a circular movement thereof. With such structure, the lifting assembly and the rotation mechanism can work independently during most of the time, thereby improving the working efficiency. Furthermore, the cooperation between the lifting assembly and the rotation mechanism guarantees that after an oil pipe is tripped out, there is still an elevator available to a next oil pipe to be tripped out. In this case, the lifting assembly carries the empty elevator and descends, in order to perform a tripping operation of the next oil pipe. In this way, continuous tripping operations of the oil pipe can be achieved.
In an embodiment, when tripping in the oil pipe, the empty elevator released at the wellhead moves and engages with the rotation mechanism under the action of the detent mechanism, and rotates towards the upper connection point under the action of the rotation mechanism. When the rotation mechanism carries the elevator to rotate towards the upper connection point, the lifting assembly carries the elevator to which an oil pipe is connected to descend to the wellhead and releases the elevator under the assistance of the detent mechanism, and then ascends to the upper connection point. The rotation mechanism hands the empty elevator over to the lifting assembly at the upper connection point, and the lifting assembly carries the empty elevator and continues to ascend to a target location, so as to be ready for tripping operations of a next oil pipe. In this case, a continuous tripping operation of the oil pipe can be realized.
In an embodiment, the detent mechanism comprises:
The moving block can push an elevator adjacent to the wellhead into the range of movement of the rotation mechanism, or take down an elevator from the rotation mechanism and push it to the wellhead where it is connected to an oil pipe. While the movable connecting plate is rotating downwards, an elevator at the wellhead can be connected to the rotation mechanism and rotate therewith up towards the upper connection point smoothly, without contacting the movable connecting plate. When the movable connecting plate rotates upwards to be flush with the fixed plate, it can support the elevator connected with the rotation mechanism and enable the elevator to move smoothly towards the wellhead onto the fixed plate under the action of the moving block, so that the elevator can be connected to an oil pipe at the wellhead.
In addition, the arm for supporting the pick-up/put-down of the elevator is engaged with the movable connecting plate. When tripping in an oil pipe, the movable connecting plate rotates downwards after the rotation mechanism is connected with an elevator. At the same time, the arm for supporting the pick-up/put-down of the elevator supporting an empty elevator also rotates downwards and releases the elevator. The elevator rotates with the rotation mechanism towards the upper connection point, where it is transferred to the lifting assembly and moves upwards therewith, so as to be ready for tripping in operations of a next oil pipe. When tripping out an oil pipe, the rotation mechanism delivers an empty elevator to a trigger point of the movable connecting plate, where the movable connecting plate starts to rotate upwards, and the movable connecting plate rotates upwards to be flush with the fixed plate. The arm for supporting the pick-up/put-down of the elevator also rotates upwards to support the elevator. The elevator moves towards the wellhead under the pulling force of the moving block and connects with an oil pipe adjacent to the wellhead, so as to be ready for tripping out operations of a next oil pipe.
In an embodiment, the driver member of the detent mechanism is in a form of a drive cam, which is connected with the movable connecting plate and the arm for supporting the pick-up/put-down of the elevator. The rotation of the cam drives the movable connecting plate and the arm for supporting the pick-up/put-down of the elevator to rotate therewith. In addition, the cam is located below the movable connecting plate, and supports the movable connecting plate when it is flush with the fixed plate.
In a preferred embodiment, the moving block is driven by a hydraulic cylinder and is disposed at one side of an axis of the wellhead opposite to the rotation mechanism, and the arm for supporting the pick-up/put-down of the elevator and the rotation mechanism are located at the other side of the axis of the wellhead. With such structure, the elevator can move along a straight path adjacent to the wellhead under the action of the moving block when it is placed on the fixed plate or the movable connecting plate adjacent to the wellhead.
In an embodiment, the rotation mechanism comprises:
In an embodiment, the elevator comprises an n-shaped ring connected to a lifting hook of the lifting assembly, and an oil pipe connecting base provided on an opening of the n-shaped ring. The n-shaped ring is in flexible connection with the oil pipe connecting base. A valve for connecting to an oil pipe is disposed on the oil pipe connecting base. When the valve is opened, a clamp which is connected to an oil pipe is loosened; and when the valve is closed, the oil pipe is tightly connected to the elevator. In addition, two side walls of the n-shaped ring are provided with pick-up/put-down projections engaged with the elevator transport assembly. Here, the flexible connection between the n-shaped ring and the oil pipe connecting base means that the n-shaped ring can rotate for a certain angle relative to a vertical axis of the oil pipe connecting base, for example 10°-50°. Preferably, this angle is 15°-35°.
In a preferred embodiment, two rotating arms symmetrically arranged relative to the axis of the wellhead are provided, an inner side of each of the rotating arms being provided with a connecting block engaged with the pick-up/put-down projection on the outside of the n-shaped ring of the elevator, wherein the two relatively arranged connecting blocks engage and interlock with each other during the transfer of the elevator, and unlock from each other when the elevator is delivered to the target location. The two rotating arms are respectively connected with the two pick-up/put-down projections on the outside of the n-shaped ring. The pick-up/put-down projections can move relative to the connecting block. During transportation of the elevator, the connecting block cannot move laterally or release the elevator, so that the safety of the elevator during transportation can be guaranteed.
In a preferred embodiment, the angle of rotation of the rotation shaft is larger than 270° and smaller than 345°. The angle of rotation of the rotation shaft is controlled by a driving motor connected therewith. Generally, a servo drive motor can be used to accurately control the angle of rotation of the rotation shaft.
In an embodiment, the lifting assembly comprises a lifting hook connected to the elevator and a locking mechanism arranged on the lifting hook for locking the elevator, wherein the locking mechanism locks up during the transfer of the elevator, and unlocks when the elevator is delivered to the target location. By locking up the lifting hook through the locking mechanism, it can be guaranteed that the elevator will not slip off the lifting hook during transportation due to vibration, thereby ensuring the operation safety.
In a preferred embodiment, the locking mechanism comprises:
The motor drives the worm gear to rotate, so that the rack slips off the sliding rail and engages with a groove arranged on the other side away from the tip of the lifting hook to lock up the elevator. If it is necessary to unlock the elevator, the motor counter-rotates so that the rack can be retracted, thereby releasing the elevator from the lifting hook.
The present disclosure further relates to a system for automatic well workover, comprising:
The present disclosure will be further explained in view of the accompanying drawings and the examples.
In an example, the lifting assembly 21 generally carries the oil pipe 9 through the elevator 8, and moves upwards or downwards relative to the wellhead 7 along an axis thereof.
In an example, the elevator transport assembly 22 mainly comprises a rotation mechanism 221 and a detent mechanism 222. The rotation mechanism 221 carries the elevator 8 to rotate along a circular path, and the detent mechanism 222 enables an empty elevator 8 to move adjacent to the wellhead 7. Furthermore, the detent mechanism 222 is also used for picking up or putting down the elevator 8 adjacent to the wellhead 7. For example, the rotation mechanism 221 carries an empty elevator 8 and moves to the vicinity of the wellhead 7, and then releases the empty elevator 8 therefrom through the detent mechanism 222. When a lifting hook 210 of the lifting assembly 21 descends to vicinity of the wellhead 7, it is also the detent mechanism 222 that connects the elevator 8, to which an oil pipe 9 is connected, to the lifting hook 210.
In an example as shown in
In a preferred example, in the tripping operations of the oil pipe, the angle of rotation of the rotation mechanism 221 is larger than 180° and smaller than 360°. Because the rotation of the rotation mechanism 221 is not around an entire circumference, the rotation mechanism 221 can stay away from an area between the upper connection point A and the lower connection point B in which it can easily crash into the oil pipe 9 or the lifting assembly 21, thereby avoiding such crash. In the meantime, the lifting assembly 21 and the rotation mechanism 221 can operate simultaneously, and thus it is unnecessary for them to wait for each other for a long time. As a result, the operation time can be reduced, and the operation efficiency can be significantly improved.
In an example as shown in
Furthermore, the two arms 22i for supporting the pick-up/put-down of the elevator can operate in cooperation with the movable connecting plate 22h. When tripping in an oil pipe, the movable connecting plate 22h rotates downwards after the rotation mechanism 221 is connected with an elevator 8. At the same time, the arms 22i supporting the elevator 8 also rotates downwards and then releases the elevator. In this case, the elevator 8 can rotate smoothly with the rotation mechanism 221 towards the upper connection point A, where the empty elevator 8 is transferred from the rotation mechanism 221 to the lifting assembly 21, so as to be ready for tripping operations of a next oil pipe. When tripping out an oil pipe, the rotation mechanism 221 delivers an empty elevator 8 to a trigger point of the movable connecting plate 22h, and the movable connecting plate 22h rotates upwards until being flush with the fixed plate 22f. In the meantime, the arms 22i also rotate upwards to the position where they support the elevator 8. The elevator 8 moves towards the wellhead 7 under the pulling force of the moving block 22g and connects with an oil pipe 9 adjacent to the wellhead 7, so as to be ready for tripping operations of a next oil pipe.
Still further, in the tripping in operation of the oil pipe, when the lifting hook 210 moves with the oil pipe 9 and the elevator 8 to the preset location and releases the elevator 8, the two arms 22i for supporting the pick-up/put-down of the elevator support the elevator 8 released from the lifting hook 210. In the tripping out operation of the oil pipe, when the lifting hook 210 descends to the preset location, the two arms 22i push the elevator 8 and enable it to be connected to the lifting hook 210.
In an example as shown in
In an example as shown in
In a preferred example as shown in
In an example, the connecting blocks 22e of the two rotating arms 22c are connected with the two pick-up/put-down projections 83, thereafter forming an anti-rotational lock against the pick-up/put-down projections 83. Such structure can guarantee a high safety coefficient of the rotation mechanism during the transportation of the elevator 8. After the elevator 8 is delivered to the target location, the anti-rotational lock of the connecting blocks 22e against the pick-up/put-down projections 83 is released, so that the rotating arms 22c can be separated from the elevator 8 easily. Preferably, the locking and unlocking actions of the connecting blocks 22e of the rotating arms 22c are controlled by a relay or controller 6 connected therewith, which can be realized by means of conventional control technology, or any known technology capable of controlling such locking and unlocking actions. Thus the control means will not be explained in details herein.
In an example, the lifting assembly 21 is connected with a travelling block of the workover rig through a pin which passes through a pin hole 211 at an upper part of the hook body of the lifting hook 210, thereby achieving the tripping operations of the oil pipe. Since the lifting hook 210 is directly connected with the elevator 8, in order to prevent the elevator 8 from falling off from the lifting hook 210 due to vibration during transportation, a locking mechanism is disposed on a position near the tip of the lifting hook 210 for locking the elevator 8. The locking mechanism can lock up during the transfer of the elevator 8, so as to guarantee a safe transportation thereof. When the elevator 8 is delivered to the target location, such as the upper connection point A or an unloading location adjacent to the wellhead 7, the locking mechanism unlocks, so that the elevator 8 can be demounted from the lifting hook 210.
In a preferred example, the locking mechanism mainly comprises a locking block 213, a rack 215, a worm gear 214, and a motor 216. The motor 216 is fixedly connected to the lifting hook 210, and an output shaft thereof is connected with the worm gear 214. The worm gear 214 is engaged with the rack 215, so as to drive the rack 215 to extend or retract along a sliding rail on the lifting hook 210. The locking block 213 is fixedly connected with an end of the rack 215 near an inlet of the lifting hook. A groove 212 is disposed on the other side of the lifting hook 210 relative to said inlet, which can be engaged with the locking block 213. When the motor 216 rotates in a forward direction, the worm gear 214 rotates therewith, thereby driving the rack 215 to extend toward the groove 212. When the locking block 213 enters the groove 212, the inlet of the lifting hook 210 is locked up. When it is necessary to unlock, the motor 6 counterrotates, so that the rack 215 drives the locking block 213 to retract back to the side of the lifting hook 210 adjacent to the tip thereof, thereby opening the inlet of the lifting hook 210. Such a locking mechanism can be flexibly controlled. In the meantime, because the rack 215 extends or retract in a relatively small range, the locking mechanism can be locked or unlocked rapidly.
In an example, the tripping out operation of an oil pipe is as follows.
First of all, the lifting hook 210 carries the elevator 8a and descends. In the meantime, the driving motor or hydraulic motor 22a of the rotation mechanism 221 drives the rotating arms 22c to rotate counterclockwisely through the rotation shaft 22b. When the elevator 8a on the lifting hook 210 descends to the upper connection point A, the positions of the connecting blocks 22e of the rotating arms 22c overlap with the positions of the pick-up/put-down projections 83 of the elevator 8a. At this time, the locking mechanism of the lifting hook 210 drives the worm gear 214 through the motor 216, thereby driving the rack 215 to retract, so that the locking mechanism can be remotely unlocked and the elevator 8a can be picked up by the rotating arms 22c. Then, the rotating arms 22c carry the elevator and rotate clockwisely, and the lifting hook 210 continues to descend along the axis of the wellhead 7. The movable connecting plate 22h and the arms 22i for supporting the pick-up/put-down of the elevator rotate counterclockwisely under the action of the drive cam 22j. In this case, the lifting hook 210, the rotating arms 22c, and the arms 22i move simultaneously in different spatial regions. The lifting hook 210 continues to descend to a preset location H which is a little lower than the lower connection point B. The arms 22i for supporting the pick-up/put-down of the elevator rotate and lift the n-shaped ring 81 of the elevator 8b to the preset location H. The rotating arms 22c carry the elevator 8a and rotate clockwisely to any position that does not exceed position E. Further, the lifting hook 210 lifts and the n-shaped ring 81 of the elevator 8b is connected to the lifting hook 210. The lifting hook 210 remotely controls the locking mechanism to lock up the n-shaped ring 81, and carries the elevator 8b to which an oil pipe 9 is connected and continues to ascend. At this time, the elevator 8b is locked to the lifting hook 210 and ascends with the oil pipe 9. While the lifting hook 210 is lifting the oil pipe 9, a driving mechanism, such as a motor or electrical machine, drives the drive cam 22j to rotate back to the lower dead-center position. In this case, the rotating arms 22c carry the elevator 8a to move to a preset location F without being blocked by the arms 22i for supporting the pick-up/put-down of the elevator. Next, the motor or electrical machine drives the arms 22i to rotate counterclockwisely to a position G, where elevator 8a rests on the movable connecting plate 22h and the arms 22i take over the n-shaped ring 81 of elevator 8a. The rotating arms 22c move back to the initial positions thereof to stand by. When a coupling of a next oil pipe 9 lifted by the lifting hook 210 from the wellhead 7 exceeds the height of elevator 8a, the lifting hook 210 stops moving. Elevator 8a moves to the wellhead 7 under the actions of the arms 22i for supporting the pick-up/put-down of the elevator and the moving blocks 22g. When the valve of the elevator 8a is remotely closed, the next oil pipe 9 is connected to the elevator 8a. The elevator 8a suspends the next oil pipe 9 and breaks out the oil pipe joint from the oil pipe. When the oil pipe 9 is separated from a next oil pipe to be tripped out, the lifting hook 210 carries the oil pipe 9 and moves upwards to the ground, and then releases the oil pipe 9. Then, the lifting hook 210 brings the empty elevator back to an initial stage of the tripping operation. While the lifting hook 210 is hoisting the broken-out oil pipe, the arms 22i for supporting the pick-up/put-down of the elevator also return to their initial positions. The repetition of the above operations enables continuous, automatic tripping out operations of the oil pipe.
In a preferred example, the tripping in operation of an oil pipe is as follows.
First, the elevator 8a which is suspended on the lifting hook 210 descends and is connected with an oil pipe on a well site. After a valve of the elevator 8a is remotely closed, the lifting hook 210 ascends and lifts the elevator 8a to which the oil pipe 9 is connected. After the body of the oil pipe 9 is above the height of an oil pipe coupling at the wellhead, the elevator 8a descends and connects the oil pipe 9 with the oil pipe at the wellhead. The lifting hook 210 further lifts the oil pipe connected to the elevator 8a for a certain distance. And then, the valve of the elevator 8b is remotely opened. Subsequently, the lifting hook 210, the hydraulic cylinder 22k, the motor or electrical machine, an elevator transfer hydraulic motor 41 operate simultaneously respectively in different spatial regions. The hydraulic cylinder 22k drives the moving block 22g to a position L, push the elevator 8b away from the axis of the wellhead 7, and return to position K for stand-by. After the hydraulic cylinder 22k pushes the elevator 8b away from the wellhead 7, the lifting hook 210 carries the elevator 8a to which the oil pipe 9 is connected to descend. The rotating arms 22c rotate counterclockwisely to a position G, and connect with the pick-up/put-down projections 83 located at a position F. The movable connecting plate 22h and the arms 22i for supporting the pick-up/put-down of the elevator rotate clockwisely to a lower dead-center position. Rotating arms 22c rotate counterclockwisely, thereby taking the elevator 8b therewith. The lifting hook 210 carries the elevator 8a to which an oil pipe is connected and descends to the wellhead 7. The movable connecting plate 22h and the arms 22i rotate counterclockwisely. When the lifting hook 210 descends with the elevator 8a to the preset location H below the lower connection point B, the arms 22i also move to the position H. At this time, the elevator 8a is located on a platform at the wellhead 7, and suspends the oil pipe in the well. The locking mechanism of the lifting hook 210 is remotely unlocked. After further descending for a small distance, the lifting hook 210 is separated from the elevator 8a. An n-shaped ring 81 of the elevator 8a is driven by the arms 22i to rotate clockwisely to the lower dead-center position for stand-by. In the meantime, the lifting hook 210 ascends to the upper connection point A, where it takes over the elevator 8b which is carried by the rotating arms 22c. After the elevator 8b is connected to the lifting hook 210, the locking mechanism of the lifting hook 210 is remotely locked. The lifting hook 210 hoists the elevator 8b and returns to the initial position for a tripping in operation of the oil pipe, so as to be ready for connecting to a next oil pipe. While the lifting hook 210 is hoisting the elevator 8b, the rotating arms 22c and the arms 22i also rotate clockwisely back to their initial positions for stand-by. In this case, the system restores its initial state for a tripping in operation of the oil pipe. The repetition of the above operations enables continuous, automatic tripping in operations of the oil pipe.
While the present disclosure has been described with reference to the embodiments, various modifications can be made thereto without departing from the scope and spirit of the present disclosure and components in the present disclosure could be substituted with equivalents. In particular, as long as there is no structural conflict, all the technical features mentioned in all the embodiments may be combined together in any manner. The present disclosure is not limited to the specific embodiments disclosed in the description, but rather includes all the technical solutions falling into the scope of the claims.
Number | Date | Country | Kind |
---|---|---|---|
2014 1 0013831 | Jan 2014 | CN | national |
Number | Name | Date | Kind |
---|---|---|---|
4591007 | Shaginian | May 1986 | A |
5711382 | Hansen | Jan 1998 | A |
Number | Date | Country |
---|---|---|
101429855 | May 2009 | CN |
201963221 | Sep 2011 | CN |
202249834 | May 2012 | CN |
102733764 | Oct 2012 | CN |
102889061 | Jan 2013 | CN |
103352664 | Oct 2013 | CN |
203756073 | Aug 2014 | CN |
2444608 | Oct 2012 | RU |
Number | Date | Country | |
---|---|---|---|
20150197997 A1 | Jul 2015 | US |