Claims
- 1. A method of obtaining a survey of a wellbore during drilling of a wellbore, comprising:
(a) obtaining a plurality of magnetic and gravitational measurements at selected locations in said wellbore; (b) using a model comprising a set of model parameters for correcting values of said plurality of magnetic and gravitational measurements for producing a plurality of corrected magnetic and gravitational measurements; (c) performing a coordinate transformation of the plurality of corrected magnetic and gravitational measurements to give a plurality of transformed corrected magnetic and gravitational measurements; (d) defining a measure of a difference between the plurality of transformed corrected measurements and reference values of magnetic and gravitational measurements; (e) determining values for the set of model parameters that minimize the measure of difference, giving a survey of the wellbore referenced to magnetic north; (f) obtaining estimates of magnetic declination corresponding to said plurality of magnetic and gravitational measurements in said wellbore; and (g) correcting said survey to true north using said estimates of magnetic declination.
- 2. The method of claim 1 further comprising determining the accuracy of one or more of the plurality of magnetic and gravitational measurements using the model.
- 3. The method of claim 2 wherein determining the accuracy of one or more of the plurality of magnetic or gravitational measurements further comprises determining the minimum value of said measure of difference.
- 4. The method of claim 1 wherein the model includes one or more parameters selected from (i) a bias in at least one component of the gravity measurements, (ii) a bias in at least one component of the magnetic measurements, (iii) a scale factor for at least one component of the gravity measurements, (iv) a scale factor for at least one component of the magnetic measurement, (v) a misalignment of at least one sensor making the gravity measurements, and (vi) a misalignment of at least one sensor making the magnetic measurements.
- 5. The method of claim 1 wherein determining the model parameter includes one or more parameters selected from (i) a bias in at least one component of the gravity measurements, (ii) a scale factor for at least one component of the gravity measurements, and, (iii) a misalignment of a sensor used to make the gravity measurements, to give a subset of determined model parameters, the method further comprising using the subset of determined model parameters to obtain additional model parameters selected from (A) a bias for at least one component of the magnetic measurements (B) a scale factor for at least one of the magnetic measurements, and (C) a misalignment of at least one sensor used for making the magnetic measurements.
- 6. The method of claim 1 further comprising providing an onsite monitoring of the local magnetic field of the earth to give said reference values.
- 7. The method of claim 1 further comprising monitoring the magnetic field of the earth at a location away from the wellsite to give said reference values.
- 8. The method of claim 1 wherein said reference values further comprise at least one independent measurement selected from (i) a component of the gravitational field, and (ii) a component of the magnetic field.
- 9. The method of claim 1 wherein said reference values are averages of said plurality of said transformed corrected measurements.
- 10. The method of claim 1 further comprising determining a variation in the values for the set of model parameters over a period of time to determine any deterioration in sensors making the plurality of measurements.
- 11. The method of claim 1 wherein the plurality of magnetic and gravitational measurements are sent by telemetry to a surface processor and the surface processor is adapted to perform steps (b), (c), (d) and (e).
- 12. The method of claim 1 wherein obtaining estimates of the magnetic declination further comprises:
(i) placing at least two Global Positioning Sensor (GPS) receivers, an accelerometer and a 3-component magnetometer on a non-magnetic platform near said wellbore, said at least two GPS receivers spaced apart from each other; (ii) receiving electromagnetic signals from a plurality of satellites at the at least two GPS receivers; (iii) providing signals indicative of the position of the at least two GPS receivers to a processor; (iv) measuring three independent components of the earth's magnetic field with the 3-component magnetometer and providing signals indicative thereof to the processor; (v) measuring three independent components of acceleration using the accelerometer and providing signals indicative thereof to the processor; and (vi) using the processor to process the signals from the at least two GPS receivers, the accelerometer and the 3-component magnetometer to determine the magnetic declination.
- 13. The method of claim 12 wherein said platform is a fixed platform and said accelerometer comprises a two component accelerometer.
- 14. The method of claim 12 wherein said accelerometer comprises a three component accelerometer.
- 15. The method of claim 12 further comprising:
A. using a proton magnetometer for measurement of the total magnetic intensity of the earth's magnetic field and providing a signal indicative thereof to said processor; and B. including the signal from the proton magnetometer in the processing of signals by the processor to determine the magnetic declination.
- 16. The method of claim 12 wherein using the processor further comprises:
A. determining a yaw angle from the signals from the at least two GPS receivers and the accelerometer; B. determining a magnetic north direction from the signals from the 3-component magnetometer and the 3-component accelerometer; and C. determining the magnetic declination from the results of (i) and (ii).
CROSS REFERENCES TO RELATED APPLICATIONS
[0001] This application is a Continuation-in-Part of U.S. patent application Ser. No. 09/329,857 filed on Jun. 11, 1999, taking priority from U.S. Provisional Patent Application Serial No. 60/089,100 filed on Jun. 12, 1998, now U.S. Pat. No. ______. It also claims priority from U.S. patent application Ser. No. 09/309,864 filed on May 11, 1999 claiming priority from U.S. Provisional Patent Application Ser. No. 60/085,471 filed on May 14, 1998, now U.S. Pat. No. ______ and the contents of which are fully incorporated herein by reference.
Provisional Applications (2)
|
Number |
Date |
Country |
|
60085471 |
May 1998 |
US |
|
60089100 |
Jun 1998 |
US |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
09329857 |
Jun 1999 |
US |
Child |
09740082 |
Dec 2000 |
US |