Arch bracket for diaphragm pressure gauge

Information

  • Patent Grant
  • 11543319
  • Patent Number
    11,543,319
  • Date Filed
    Sunday, August 22, 2021
    2 years ago
  • Date Issued
    Tuesday, January 3, 2023
    a year ago
  • CPC
  • Field of Search
    • US
    • 073 700-756
    • CPC
    • G01L19/147
    • G01L9/0072
    • G01L19/0645
    • G01L19/0084
    • G01L13/025
    • G01L19/0007
    • G01L9/0042
    • G01L19/0038
    • G01L9/0073
    • G01L9/0075
    • G01L9/0054
    • G01L9/0055
    • G01L19/04
    • G01L7/00
    • G01L7/04
    • G01L19/148
    • G01L19/143
    • G01L19/14
    • G01L17/00
    • G01L7/18
    • G01L15/00
    • G01L19/0092
    • G01L9/0051
    • G01L7/041
    • G01L9/065
    • G01L9/12
    • G01L19/0618
    • G01L9/0052
    • G01L7/16
    • G01L9/125
    • G01L19/0609
    • G01L9/007
    • G01L19/003
    • G01L19/0627
    • G01L9/0022
    • G01L19/0046
    • G01L7/084
    • G01L9/06
    • G01L19/0636
    • G01L13/02
    • G01L19/0023
    • G01L19/142
    • G01L7/043
    • G01L19/08
    • G01L9/0002
    • G01L9/008
    • G01L19/02
    • G01L19/141
    • G01L9/006
    • G01L11/02
    • G01L23/18
    • G01L23/10
    • G01L19/0672
    • G01L19/0681
    • G01L9/0077
    • G01L19/12
    • G01L27/005
    • G01L7/082
    • G01L9/0044
    • G01L19/0015
    • G01L19/0069
    • G01L7/063
    • G01L9/0001
    • G01L19/146
    • G01L21/12
    • G01L9/16
    • G01L11/00
    • G01L27/007
    • G01L27/002
    • G01L9/0026
    • G01L19/00
    • G01L9/0089
    • G01L9/045
    • G01L9/14
    • G01L1/2281
    • G01L11/025
    • G01L11/008
    • G01L19/0654
    • G01L7/22
    • G01L9/0047
    • G01L13/026
    • G01L9/0076
    • G01L9/0025
    • G01L9/0035
    • G01L13/00
    • G01L19/0061
    • G01L9/0005
    • G01L9/08
    • G01L9/10
    • G01L9/0019
    • G01L11/006
    • G01L21/00
    • G01L7/08
    • G01L9/04
    • G01L9/0041
    • G01L9/0008
    • G01L11/004
    • G01L19/086
    • G01L9/0057
    • G01L1/18
    • G01L19/069
    • G01L19/10
    • G01L19/16
    • G01L13/023
    • G01L7/048
    • G01L9/0016
    • G01L9/0027
    • G01L9/0086
    • G01L9/00
    • G01L9/0079
    • G01L11/04
    • G01L9/0048
    • G01L9/0091
    • G01L19/06
    • G01L23/24
    • G01L7/182
    • G01L11/002
    • G01L9/0663
    • G01L27/00
    • G01L7/166
    • G01L1/20
    • G01L23/22
    • G01L9/0036
    • G01L1/02
    • G01L9/0061
    • G01L9/0039
    • G01L23/125
    • G01L9/0013
    • G01L9/0092
    • G01L21/04
    • G01L7/104
    • G01L9/0045
    • G01L19/145
    • G01L9/0033
    • G01L9/0083
    • G01L9/0098
    • G01L1/142
    • G01L7/24
    • G01L1/2293
    • G01L9/0029
    • G01L21/22
    • G01L9/02
    • G01L7/022
    • G01L9/0064
    • G01L23/08
    • G01L23/16
    • G01L5/14
    • G01L7/088
    • G01L7/163
    • G01L9/0007
    • G01L1/205
    • G01L23/222
    • G01L9/0085
    • G01L1/16
    • G01L1/2212
    • G01L1/2287
    • G01L13/06
    • G01L9/0004
    • G01L21/14
    • G01L23/02
    • G01L9/003
    • G01L9/025
    • G01L9/085
    • G01L1/14
    • G01L1/148
    • G01L9/0058
    • G01L9/105
    • G01L7/061
    • G01L9/002
    • G01L7/02
    • G01L13/028
    • G01L1/2231
    • G01L23/28
    • G01L9/0095
    • G01L1/162
    • G01L7/12
    • G01L9/0032
    • G01L9/0038
    • G01L19/0076
    • G01L7/024
    • G01L21/10
    • G01L1/246
    • G01L19/149
    • G01L7/086
    • G01L1/005
    • G01L7/06
    • G01L7/102
    • G01L1/2206
    • G01L13/021
    • G01L27/02
    • G01L5/228
    • G01L1/2262
    • G01L23/00
    • G01L9/0094
    • G01L1/24
    • G01L9/0082
    • G01L1/125
    • G01L1/26
    • G01L11/06
    • G01L9/0097
    • G01L1/2268
    • G01L21/30
    • G01L21/34
    • G01L23/221
    • G01L7/20
    • G01L19/144
    • G01L23/26
    • G01L7/068
    • G01L1/225
    • G01L23/32
    • G01L7/14
    • G01L7/187
    • G01L1/144
    • G01L1/165
    • G01L23/12
    • G01L1/146
    • G01L1/241
    • G01L7/045
    • G01L1/086
    • G01L7/108
    • G01L9/18
    • G01L13/04
    • G01L17/005
    • G01L5/18
    • G01L1/127
    • G01L1/22
    • G01L1/245
    • G01L21/32
    • G01L1/183
    • G01L1/2218
    • G01L9/0023
    • G01L1/243
    • G01L23/145
    • G01L5/0047
    • G01L9/0088
    • G01L1/106
    • G01L5/0076
    • G01L1/10
    • G01L1/186
    • G01L23/223
    • G01L25/00
    • G01L5/165
    • G01L9/001
    • G01L9/0017
    • G01L1/044
    • G01L3/245
    • G01L5/226
    • G01L1/08
    • G01L21/16
    • G01L3/1485
    • G01L5/0052
    • G01L5/162
    • G01L5/225
    • G01L7/026
    • G01L7/065
    • G01L9/0014
    • G01L1/242
    • G01L21/24
    • G01L3/10
    • G01L5/0004
    • G01L9/005
    • G01L1/00
    • G01L1/04
    • G01L1/103
    • G01L1/2275
    • G01L1/247
    • G01L21/02
    • G01L21/26
    • G01L23/225
    • G01L3/102
    • G01L3/105
    • G01L5/0038
    • G01L5/223
    • G01L5/24
    • G01L7/028
    • G01L7/10
    • G01L9/0011
    • G01L5/243
    • G01L1/083
    • G01L1/12
    • G01L21/36
    • G01L23/04
    • G01L23/14
    • G01L23/30
    • G01L3/103
    • G01L5/00
    • G01L5/0028
    • G01L5/102
    • G01L5/133
    • G01L5/166
    • G01L7/185
    • G01L1/255
    • G01L21/08
    • G01L5/0033
    • G01L5/0057
    • G01L5/161
    • G01L1/042
    • G01L1/122
    • G01L1/2225
    • G01L1/2243
    • G01L1/2256
    • G01L1/248
    • G01L2009/0066
    • G01L2009/0067
    • G01L2009/0069
    • G01L21/06
    • G01L23/06
    • G01L3/00
    • G01L3/06
    • G01L3/1478
    • G01L3/1492
    • G01L3/18
    • G01L3/24
    • G01L3/242
    • G01L5/08
    • G01L5/10
    • G01L5/101
    • G01L5/108
    • G01L5/16
    • G01L5/1627
    • G01L5/167
    • G01L5/22
    • G01L5/28
    • G01L23/085
    • G01L23/20
    • G01L5/0061
    • G01L5/0071
    • G01L5/008
    • G01L5/06
    • G01L5/171
    • G01L7/106
  • International Classifications
    • G01L19/00
    • G01L19/14
    • Term Extension
      5
Abstract
The present disclosure provides an arch bracket for a diaphragm pressure gauge, comprising a bottom, first windows, ribs, second windows and a top arranged in order, the first windows and the second windows being arranged alternately, taking one of the first windows as an example, two sides of the first window being respectively provided with a first fulcrum and a third fulcrum, and a middle of the first window being provided with a second fulcrum, the first fulcrum and the third fulcrum being used to connect the bottom and the ribs, and the second fulcrum being used to connecting the ribs and the top, and the second fulcrum being located on a vertical line between the first fulcrum and the third fulcrum. By setting the pre-punched notches on the pre-punched part, the first windows and the second windows on the formed part are formed by the pre-punched notches.
Description
TECHNICAL FIELD

The present disclosure relates to the technical field of stamping production, in particular to an arch bracket for a diaphragm pressure gauge.


BACKGROUND

A pressure gauge refers to an instrument with an elastic element as a sensitive element which measures and indicates a pressure higher than an ambient pressure. The pressure gauge is widely used in almost all industrial processes and research fields.


A diaphragm pressure gauge often adopts an arch bracket which is a supporting frame for internal members. The arch bracket in the diaphragm pressure gauge in the prior art is made by multi-die pressing and multi-punching, and side debugging windows are all designed with four-hole uniform distribution. The punching process of the bow frame is complicated, and a debugging window allows a tool to extend into a narrow range, which is not conducive to an installation and debugging of the pressure gauge, and leads to a low production efficiency and a high processing cost.


SUMMARY
Technical Problem

In view of the defects of the prior art, the present disclosure provides an arch bracket for a diaphragm pressure gauge, which solves the technical problem that the arch bracket for the pressure gauge in the prior art has a high production cost and is not conducive to a debugging of the pressure gauge.


Technical Solution

In order to achieve that above object, the present disclosure provides the following technical solution: an arch bracket for a diaphragm pressure gauge, comprising a bottom, first windows, ribs, second windows and a top arranged in order, the first windows and the second windows being arranged alternately, taking one of the first windows as an example, two sides of the first window being respectively provided with a first fulcrum and a third fulcrum, and a middle of the first window being provided with a second fulcrum, the first fulcrum and the third fulcrum being used to connect the bottom and the ribs, and the second fulcrum being used to connecting the ribs and the top, and the second fulcrum being located on a vertical line between the first fulcrum and the third fulcrum.


Preferably, an upper end surface of the top is provided with an opening, one side of the opening is provided with through holes, and the through holes comprise two through holes.


Preferably, a processing technology for processing an arch bracket for a diaphragm pressure gauge, comprising the following steps:


S1. blanking: pre-punching a raw material to form through holes, an opening and pre-punched notches to obtain a pre-punched part; and


S2. forming: forming: stamping the pre-punched part by placing the pre-punched part in a conical die, increasing a height between a bottom and a top, so that the pre-punched notches form first windows and second windows to obtain a formed part.


Preferably, a side surface formed by the ribs of the formed part is a conical surface or a cylindrical surface.


Advantageous Effects

The present disclosure provides an arch bracket for a diaphragm pressure gauge and has the following advantageous effects:


In the present disclosure, a pre-punching notch is provided, and after stamping and forming, debugging windows are formed. Compared with the processing of traditional debugging windows, the present disclosure can not only reduce consumption of materials, but also reduce steps of production process and production cost.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a schematic view of the present disclosure before molding; and



FIG. 2 is a schematic view of the present disclosure after molding.





In which, 1. bottom; 2. rib; 3. pre-punched notch; 4. top; 5. through hole; 6. opening; 7. first window; 8. first fulcrum; 9. second fulcrum; 10. third fulcrum; 11. second window.


DESCRIPTION OF THE EMBODIMENTS

The technical solution in embodiments of the present disclosure will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present disclosure. It is obvious that the described embodiments are only a part of the embodiments of the present disclosure and not all of the embodiments. Based on the embodiments of the present disclosure, all other embodiments obtained by a person skilled in the art without creative labor fall within the scope of protection of the present disclosure.


Embodiment 1

As shown in FIG. 2, an embodiment of the present disclosure provides an arch bracket for a diaphragm pressure gauge which includes a bottom 1, first windows 7, ribs 2, second windows 11 and a top 4, arranged in order. The first windows 7 and the second windows 11 are arranged alternately, and when assembling the pressure gauge, a tool is passed through the first windows 7 or the second windows 11 to debug the pressure gauge. Taking one of the first windows 7 as an example, two sides of the first window 7 are respectively provided with a first fulcrum 8 and a third fulcrum 10, and a middle of the first window 7 is provided with a second fulcrum 9. The first fulcrum 8 and the third fulcrum 10 are used to connect the bottom 1 and the ribs 2, and the second fulcrum 9 is used to connecting the ribs 2 and the top 4. The second fulcrum 9 is located on a vertical line between the first fulcrum 8 and the third fulcrum 10.


An upper end surface of the top 4 is provided with an opening 6 for mounting a viewing window for viewing an indication of the pressure gauge, one side of the opening 6 is provided with through holes 5, and the through holes 5 include two through holes and are used for mounting buttons or knobs for zero calibrations of the pressure gauge.


Embodiment 2

The present disclosure also provides a processing technology for processing an arch bracket for a diaphragm pressure gauge, which includes the following steps:


S1. blanking: pre-punching a raw material to form through holes 5, an opening 6 and pre-punched notches 3 to obtain a pre-punched part. The specific structure is shown in FIG. 1;


S2. forming: stamping the pre-punched part by placing the pre-punched part in a conical die, increasing a height between a bottom 1 and a top 4, so that the pre-punched notches 3 form first windows 7 and second windows 11 to obtain a formed part. The specific structure is shown in FIG. 2.


A side surface formed by the ribs 2 of the formed part is a conical surface or a cylindrical surface.


Although embodiments of the present disclosure have been shown and described, those ordinary skilled in the art can understand that various changes, variations, substitutions and modifications may be made to these embodiments without departing from the principle and spirit of the present disclosure, and the scope of present disclosure is defined by the appended claims and their equivalents.

Claims
  • 1. An arch bracket for a diaphragm pressure gauge, wherein comprising a bottom (1), first windows (7), ribs (2), second windows (11) and a top (4) arranged in order, the first windows (7) and the second windows (11) being arranged alternately, taking one of the first windows (7) as an example, two sides of the first window (7) being respectively provided with a first fulcrum (8) and a third fulcrum (10), and a middle of the first window (7) being provided with a second fulcrum (9), the first fulcrum (8) and the third fulcrum (10) being used to connect the bottom (1) and the ribs (2), and the second fulcrum (9) being used to connecting the ribs (2) and the top (4), and the second fulcrum (9) being located on a vertical line between the first fulcrum (8) and the third fulcrum (10).
  • 2. The arch bracket for a diaphragm pressure gauge according to claim 1, wherein an upper end surface of the top (4) is provided with an opening (6), one side of the opening (6) is provided with through holes (5), and the through holes (5) comprise two through holes.
  • 3. A processing technology for processing an arch bracket for a diaphragm pressure gauge, wherein comprising the following steps: S1. blanking: pre-punching a raw material to form through holes (5), an opening (6) and pre-punched notches (3) to obtain a pre-punched part; andS2. forming: forming: stamping the pre-punched part by placing the pre-punched part in a conical die, increasing a height between a bottom (1) and a top (4), so that the pre-punched notches (3) form first windows (7) and second windows (11) to obtain a formed part.
  • 4. The processing technology for processing an arch bracket for a diaphragm pressure gauge according to claim 3, wherein a side surface formed by the ribs (2) of the formed part is a conical surface or a cylindrical surface.
Priority Claims (1)
Number Date Country Kind
202110629597.6 Jun 2021 CN national
US Referenced Citations (2)
Number Name Date Kind
4685336 Lee Aug 1987 A
4838090 Hestich Jun 1989 A
Foreign Referenced Citations (1)
Number Date Country
212932221 Apr 2021 CN
Related Publications (1)
Number Date Country
20220390312 A1 Dec 2022 US