The following description generally pertains to a floating drilling unit, and more particularly pertains to disconnection/reconnection of a riser to the drilling unit.
This section is intended to introduce various aspects of the art. This discussion is believed to assist in providing a framework to facilitate a better understanding of particular aspects of the present technological advancement. Accordingly, it should be understood that this section should be read in this light, and not necessarily as admissions of prior art.
A sizable portion of the Arctic Ocean has water depth greater than 100 m (
b shows an example of a Concrete Island Drilling Structure (CIDS). This shallow-water mobile offshore drilling unit (MODU) was designed by Global Marine to withstand about 59,000 tonnes of ice load in around 17 meter deep water (Wetmore, 1984). The boundary at which bottom-founded structures become unfeasible in the high-Arctic is generally accepted at approximately 100 m (Paulin, 2008).
Floating systems, such as Hoover-Diana (
Subsea developments may be a viable concept for arctic deep-water development, but some operations still need to be conducted at the surface: i.e., a drilling vessel drilling a subsea well, a tanker loading crude, etc. With conventional technology, offshore operations would have to rely on open water seasons. In higher arctic regions, the open water season exhibits a scarcity and a variance of weeks over the years. For example, in the Canadian Beaufort Ajurak block, the open water season varies between 0 and 24 weeks, with a median of about 9 weeks (
Open water season, therefore, may simply not be sufficient to drill oil and gas well in deep water arctic regions. Other means, such as ice management, can play a role to extend the operational season, and to protect operations against ice floe intrusions during the open water season itself. Icebreakers would have to manage a threatening ice floe into sizes small enough not to threaten the station-keeping capacity of the floating vessel. Unfortunately, in some cases, unmanageable multi-year ice inclusions may be present in the invading ice floe. The inclusions can be so small to go undetected yet be threatening, hence leading to the possibility of a rapid or even an emergency disconnection of the riser from the floating drill unit.
A system, including: a floating drilling unit; a buoyancy hull plug releasably connected to the floating drilling unit; mooring lines with first ends secured to a seafloor and second ends secured to the buoyancy hull plug; and a riser that is collapsible through a water column, wherein the buoyancy hull plug supports the riser and the mooring lines while disconnected from the floating drilling unit.
In the system, a combination of the riser and buoyancy hull plug, while disconnected from the floating drilling unit, has sufficient buoyancy to descend to a depth that clears at least a keel of the floating drilling unit.
In the system, the riser includes at least one telescoping joint that enables the riser to collapse through the water column.
In the system, at least one telescoping joint is disposed below the buoyancy hull plug
In the system, the riser includes a plurality of flex joints that enable the riser to collapse.
In the system, the flex joints are disposed beneath the buoyancy hull plug.
In the system, the buoyancy hull plug has an adjustable buoyancy.
In the system, the buoyancy hull plug is a variable depth buoyancy hull plug.
In the system, the floating drilling unit is a ship-shaped arctic drilling vessel.
In the system, the floating drilling unit is an axi-symmetric drilling vessel.
In the system, a blowout preventer is disposed on the buoyancy hull plug.
In the system, a second blowout preventer is disposed on a seafloor.
While the present disclosure is susceptible to various modifications and alternative forms, specific example embodiments thereof have been shown in the drawings and are herein described in detail. It should be understood, however, that the description herein of specific example embodiments is not intended to limit the disclosure to the particular forms disclosed herein, but on the contrary, this disclosure is to cover all modifications and equivalents as defined by the appended claims. It should also be understood that the drawings are not necessarily to scale, emphasis instead being placed upon clearly illustrating principles of the exemplary embodiments. Moreover, certain dimensions may be exaggerated to help visually convey such principles.
a is a map that illustrates water depths in the arctic.
b illustrates an example of concrete island drilling structure.
c illustrates the Hoover-Diana floating system.
d illustrates iceberg loads.
e illustrates the length of an open water season.
Non-limiting examples of the present technological advancement are described herein. The invention is not limited to the specific examples described below, but rather, it includes all alternatives, modifications, and equivalents falling within the true spirit and scope of the appended claims.
In waters subjected to inclusion by ice floes, it will be advantageous to quickly move the floating vessel out the area affected by the ice floe. Arctic drilling can be more successful and profitable if the drilling system has the ability to rapidly disconnect the floating vessel 509 from the sea floor and then quickly reestablish that connection at some later time. Such disconnection can be accomplished by disconnecting the riser (501 and 511) from the sea floor, pulling the entire disconnected riser (501 and 511) up to the floating vessel 509, and then maneuvering the floating vessel out of the way of the ice floe. However, the removal of the entire riser (501 and 511) requires a significant investment in time because of the need to raise the entire riser (501 and 511) to the floating vessel 509 and then reestablish the connection at some later time. Given the short duration of the open water season in some arctic regions, removal of the entire riser (501 and 511) will likely end drilling and production operations until the next available open water season.
Another option for disconnection is to use a two-part riser. The riser can be split into a lower part 501 and an upper part 511. A buoyancy can 505 can be disposed at the top of the lower part 501 in order to support the lower part. The upper part 511 has a connector at its lower end, which normally keeps it connected to the lower part. The connector may be released to separate the upper riser section 511 from the lower riser section 501, which allows the upper part of the riser to be retrieved and stowed in the floating vessel. The floating vessel 509 can be disconnected from its mooring buoy 507 and may then drift away without interference between the keel of the floating vessel 509 and the buoy 507 and riser 501. This solution saves part of the time needed to retrieve the entire riser up to the platform.
In
The two-part riser presents several disadvantages. A riser with two parts that separate from each other, with a lower part that remains as a free-standing riser in the water column after disconnection, requires special engineering considerations for motion, stability and structural design, different from conventional single-part drilling risers. After the upper part of the two-part riser is disconnected from the lower part and removed, the remaining lower part will be below and disconnected from the mooring buoy. Because the lower part of the riser after disconnection has to be below the mooring buoy (to avoid interference between the buoy and the riser during disconnection), and the buoy has to come to rest at a depth sufficient to avoid contact with keels of the floating vessel, ice ridges and/or icebergs, the length of the upper part of the riser, which is retrieved to the floating vessel, may be a substantial portion of the total length of the riser. Thus, the time savings from partial riser retrieval may not be significant when compared to the time required to remove the entire riser. Even if the resting depth of the buoy is above the top of the lower part of the riser, there is potential for interference between the mooring line and the lower part of the riser during disconnection, when the disconnection occurs with the vessel at a significant offset from the wellhead and riser (such as that may result from increasing ice loads on the drilling platform). This is illustrated in
The present technological advancement can solve the above-noted problems encountered with removing the entire riser or using a two-part riser.
The riser, in
FIGS. 7A/7B shows that blowout preventers 715 and 713 can be disposed on the top of the buoyancy hull plug 703 (which is a variable depth buoyancy hull plug and not a fixed depth buoyancy hull plug) and at the sea floor below the lower end of the riser, respectively (wherein top references the side of the buoyancy hull plug closest to the water surface). While FIGS. 7A/7B show two blowout preventers, both are not required. Two, one or zero blowout preventers may be used with the present technological advancement. However, two blowout preventers provide for additional redundancy and safety.
The blowout preventer 715 disposed at the top of the buoyancy hull plug 703 is essentially a pre-installed capping stack, which is an important advantage for drilling in water depth less than 300 meters. In a blowout situation, the hydrocarbon plume prevents intervention vessels from landing the capping stack from directly above. In shallow water, the angle at which the intervention vessel is forced to land the capping stack may be too shallow and therefore not feasible.
Disposing blowout preventer 715 on variable depth buoyancy hull plug 703 is advantageous when compared blowout preventers disposed on a fixed mid-depth buoy. With the blowout preventer 715 disposed on variable depth buoyancy hull plug 703, there is no need to remove a portion of the riser, whereas the use of the fixed mid-depth buoy necessitates removal of at least an upper portion of the riser.
The buoyancy hull plug 703 can be secured directly or indirectly to the drilling vessel 701 via multiple locking mechanisms.
The locking mechanisms 801 can include a lever arm 803 with a first end 805 pivotably attached to the drilling vessel 701, the first end including an protruding member 807 that engages with a recessed portion 809 of the buoyancy hull plug 703. A second end 811 of the lever arm 803 is connected to a quick release mechanism 813, which can be actuated with a sliding or rotating cam 815/817.
Buoyancy hull plug may be a gas filled canister or a canister filled with a substance less dense than the water. The size of the buoyancy hull plug may be designed to sink to a predetermined depth, given the weight of the riser 705a/b and mooring lines 707. The ballast and/or buoyancy of the hull plug 703 may be adjusted in order for the predetermined depth to be sufficient to clear a keel of any approaching ice floe 711 and the keel of the drilling vessel 701. The canister can be in communication with the water's surface, wherein buoyancy of the canister is controlled by pumping in air, inert gases, or other suitable fluids from the drilling vessel 701. Alternatively, the buoyancy of the hull plug may be fixed, wherein the buoyancy of the hull plug is achieved with a fixed amount of gas, liquid, foam composition, or other material sufficiently less dense than water.
The non-limiting examples of the present technological advancement may provide many advantages when compared to conventional technology. The present technological advancement can minimize disconnect and reconnect time between the riser and the drilling vessel to a bare minimum; can eliminate the need to retrieve the riser or the drilling string; and can eliminate the need to retrieve or redeploy the mooring lines. The savings and advantages provided from the present technological advancement can provide for commercially profitable exploration of arctic deepwater reservoirs.
The following references are hereby incorporated by reference in their entirety:
Maddock, B., Bush, A., Wojahn, T., Kokkinis, T., Younan, A. and Hawkins, J. R. (2011), “Advances in Ice Management for Deepwater Drilling in the Beaufort Sea,” POAC 11-50, Proceedings of the 21st International Conference on Port and Ocean Engineering under Arctic Conditions, Jul. 10-14, 2011, Montreal, Canada;
U.S. Pat. No. 4,234,047;
U.S. Pat. No. 5,657,823;
The present techniques may be susceptible to various modifications and alternative forms, and the exemplary embodiments discussed above have been shown only by way of example. However, the present techniques are not intended to be limited to the particular embodiments disclosed herein, indeed, the present techniques include all alternatives, modifications, and equivalents falling within the spirit and scope of the appended claims,
The present application claims the benefit of U.S. Provisional Application No. 61/891,134, filed Oct. 15, 2013, the entire contents of which are hereby incorporated by reference.
Number | Date | Country | |
---|---|---|---|
61891134 | Oct 2013 | US |