The invention relates, generally, to the field of construction and temporary work platforms that are erected to access various parts of various structures. Specifically, the invention relates to a unique articulating work platform support system, a work platform system, the various pieces of such systems and methods of using and manufacturing the same.
Current work platform structures suffer from numerous deficiencies and shortcomings. Paramount to all work platforms that are suspended above the ground is the safety of the workers using them. For all work platform systems, in order to be legal, must meet numerous regulations promulgated by the U.S. Department of Labor Occupational Safety and Health Administration (i.e., “OSHA”). Many work platform systems currently used in the marketplace are believed to not meet all of these OSHA regulations.
Additionally, in the construction industry, costs are always of significant importance. Whether the construction project is a public works project (e.g., low bid), or a private project, reducing and/or maintaining costs is critical to the contractor(s) and the owner. Reducing labor, material, and/or equipment costs all help to address the all important cost.
In the area of work platforms and support systems, a significant portion of the cost is for the labor to erect and disassemble.
Some current work platform systems, require full assembly remote from the final installation location (e.g., on the ground; in a construction “yard”, etc.), and then transporting (e.g., jacking, winching, lifting, moving, etc.) the assembled work platform into its requisite final location on the job site. This “build-then-move” aspect of many work platform systems is time consuming and requires significant labor and equipment to complete.
In summary, a need exists to overcome the above stated, and other, deficiencies in the art of work platform and work platform support systems. A need exists for an improved system that clearly meets, and exceeds, all OSHA regulations, while also requiring reduced time, labor, and equipment, to assemble, move, extend and disassemble.
To overcome the aforementioned, and other, deficiencies, the present invention provides a device for use with work platform system, a work platform support system, a work platform system, and a method of manufacturing and installing same.
In a first general aspect, the present invention provides an apparatus comprising: a plurality of joists; and a plurality of hubs pivotally attached to said plurality of joists, wherein said plurality of hubs are adapted to receive a work platform.
In a second general aspect, the present invention provides a work platform support system comprising:
a plurality of joists;
a plurality of hubs, wherein each hub operatively connects to at least two joists; and
further wherein said system is configured to be articulating.
In a third general aspect, the present invention provides a work platform system comprising:
a plurality of joists;
a plurality of hubs, wherein each hub pivotally connects to at least two joists; and
at least one work platform which rests on at least one of said plurality of joists, said plurality of hubs, or a combination thereof.
In a fourth general aspect, the present invention provides a device for interconnecting with at least one joist of a work platform support system comprising:
a first surface with a first set of openings;
a second surface substantially parallel to said first surface, said second surface having a second set of openings; and
a structural element interspersed between said first surface and said second surface, wherein at least one of said first set and said second set of openings is adapted to provide an articulation of said device when interconnected with said at least one joist.
In a fifth general aspect, the present invention provides a work platform system comprising:
at least one hub;
at least one joist interconnected with said at least one hub; and
at least one section formed from said at least one hub and said at least one joist, wherein said at least one section can be articulated from a first position into a second position, further wherein said at least one section is capable of supporting without failure its own weight and at least about four times the maximum intended load applied or transmitted to it.
In a sixth general aspect, the present invention provides a work platform system for suspending a work platform from a structure, said system comprising:
a plurality of joists;
at least one hub for interconnecting at least two of said plurality of joists, wherein said at least two joists may articulate; and
a suspension connector for suspending said system from said structure.
In a seventh general aspect, the present invention provides method comprising: providing a plurality of joists; and
pivotally attaching at least one hub to at least two of said plurality of joists, wherein said at least one hub is adapted to receive a work platform.
In a eighth general aspect, the present invention provides a method of installing a work platform support system to a structure comprising:
providing a plurality of joists;
providing at least one hub;
pivotally attaching at least one hub to said plurality of joists; and
suspending said at least one hub from said structure.
In a ninth general aspect, the present invention provides method of extending a second work platform system from a first, suspended work platform system, said method comprising:
attaching a plurality of joists to said first system;
attaching a plurality of hubs to said plurality of joists;
articulating said plurality of joists and plurality of hubs, thereby forming said extending second work platform system.
The foregoing and other features and advantages of the invention will be apparent from the following more particular description of embodiments of the invention. It is to be understood that both the foregoing general description and the following detailed description are exemplary, but are not restrictive, of the invention.
The features of the present invention will best be understood from a detailed description of the invention and an embodiment thereof selected for the purposes of illustration and shown in the accompanying drawings in which:
Although certain preferred embodiments of the present invention will be shown and described in detail, it should be understood that various changes and modifications may be made without departing from the scope of the appended claims. The scope of the present invention will in no way be limited to the number of constituting components, the materials thereof, the shapes thereof, the relative arrangement thereof, etc., and are disclosed simply as an example of an embodiment. The features and advantages of the present invention are illustrated in detail in the accompanying drawings, wherein like reference numerals refer to like elements throughout the drawings.
As a preface to the detailed description, it should be noted that, as used in this specification and the appended claims, the singular forms “a”, “an” and “the” include plural referents, unless the context clearly dictates otherwise.
Referring now to the drawings,
The hub 10 includes a top element 11 and a bottom element 12 spaced at distal ends of a middle section 15. The top element 11 and bottom element 12 may be substantially planar in configuration, as well as, being parallel to each other. The top element 11 and bottom element 12, in the embodiment shown, are octagonal in plan. The middle section 15 may be a cylindrical section wherein a longitudinal axis of the middle section 15 is normal to the planes of the top element 11 and bottom element 12. In the embodiment shown, the middle section 15 is a right circular cylinder. In
There are a plurality of openings 13, 14, extending through both the top element 11 and bottom element 12, respectively. The plurality of openings 13 (e.g., 13A, 13B, 13C, 13D, 13E, 13F, 13G, 13H) are interspersed on the top element 11 so as to offer various locations for connecting to one, or more, joists 30 (see e.g.,
At the center of the top element 11 is a center opening 16 which is configured to receive suspension connector (See e.g.,
The joist 30 includes an upper element 32 and a bottom element 33. Interspersed between elements 32, 33 are a plurality of diagonal support members 38. Each element 32, 33 is made of two L-shaped pieces of angle iron 39A, 39B. Elements 32, 33 typically may be identical in construction, with the exception being upper element 32 includes connector holes 54A, 54B at its midspan (See e.g.,
Interior to each of the connector holes 37A, 37B, 37C, 37D are additional locking holes 360A, 360B, 360C, 360D also located on the connection flanges 35A, 35B, 35C, 35D.
As
A second optional locking pin 40B may be added through the locking holes 360A, 360C, 360C, 360D at the end of joist 30 in order to lock the joist 30 to prevent articulation, if so desired. The locking pin 40B abuts a groove 24 on the hub 10. The grooves are situated on both the upper element 11 and lower element 12. Similarly, the locking pin 40B can include additional two roll pins 42 as does the pin 40.
It should be apparent to one skilled in the art, that while the joist 30 depicted in the figures is made of particular shaped elements, there are other embodiments that provide the aspects of the present invention. For example, the joist 30 in the figures may commonly be called a bar joist, or open-web beam or joist, the joist 30 could also be made of structural tubing. That is the joist 30 could be made of multiple pieces of structural tubing shapes; or, the joist 30 could be one single structural tubing shape. Similarly, the joist 30 could be made of shaped steel (e.g., wide flange elements, narrow flange members, etc.), or other suitable shapes and materials.
As
As stated above, one deficiency of numerous existing work platforms are their inability to be installed in situ and also their inability to be relocated, extended, or removed, while a portion of the work platform is already installed in place. The present invention overcomes this deficiency. That is, the invention allows for a worker, or workers, to add on additional sections of support system 100 while this worker(s) is physically on an existing, installed portion of support system 100. That is the worker(s) can extend, relocate, or remove support system 100 with only the need of hand tools. No mechanical tools, hoists, cranes, or other equipment is required to add to, subtract from, or relocate the support system 100. This advantage, thus, offers savings in labor, time, and equipment.
For as
As
Although the present invention, as discussed, may be installed, and extended, via the aforementioned articulation capability, it should be apparent that this method of use is not the only method available. For example, in lieu of articulating the various modules, or sections, of support system 100 from already installed section of support system 100, the installation may be done, essentially, “in the air”. That is, the system 100 may erected and connected together “in the air”, in a piece-by-piece order via the use of multiple pieces of lifting, or hoisting, equipment. Alternatively, the hubs 10 and joists 30 may be preassembled on the ground, or at a remote location, and then moved and hoisted as a pre-assembled module into the desired location underneath a structure.
With reference to the teachings herein, including at least
19D show various embodiments of a joist 30 and hub 10 configuration. For example,
The suspension connector 80 may be any suitable support mechanism that can support both the work platform system 120, and all its ancillary dead loads, plus any intended live load that is placed upon the work platform system 120. In fact, the work platform system 120 may support its own weight plus at least four times the intended live load that is to be placed on the work platform system 120. Similarly, the suspension connector 80 is also suitable to support its own weight plus at least four times the intended live load placed on it. The suspension connector 80 may be a high-strength chain, cable, or the like. For example, one suitable suspension connector 80 is ⅜″, grade 100, heat-treated alloy chain.
The suspension connector 80 is attached to a beam clamp 82 which is further attached to a plurality of elements 92 on the underside of a structure 90. The structure 90 may be a bridge, viaduct, ceiling structure of a building, or the like. Similarly, the elements 92 which the suspension connector 80 are attached to may be beams, joists, or any other suitable structural element of the structure 90. Instead of beam clamps 82, other suitable structure attachment devices 82 may be used.
An alternative device for connecting a suspension connector 80 to the work platform support system 100 is a an auxiliary suspender mounting bracket 300. The auxiliary mounting bracket 300 is typically used when a particular hub 10 can not be accessed for connection with a suspension connector 80. As the various
For example,
As shown in
Alternatively, should the curvature of the supporting structure 90 be even greater, a configuration such as shown in
As
Load Testing:
The present invention is capable of supporting its own weight and at least four times the intended live load applied, or transmitted, upon the work platform system 120. Various load tests were conducted on the present invention. See e.g.,
For example, one uniform load test was conducted on a 8 foot×8 foot module of a work platform system 120. In this load test, a two (2) 4′×8′ sheets of ¾″ BB OES PLYFORM decking served as the platform 50. The platform 50 (i.e., Plyform) was installed as discussed above. The work platform system 120 included standard hubs 10, joists 30, supports 52, and the like, as discussed above. One of the two sheets of Plyform was uniformly loaded with a plurality of steel plates. Each plate was ½″×12″×30″, and weighed 50 pounds. Twelve (12) plates were arranged per layer on the platform 50. A total of 256 plates were added, producing a total live load of 12,800 pounds, or 400 PSF (i.e., pounds per square foot). Further, the Plyform platform 50 was thoroughly soaked with water while the full weight of the plates on it. The test was witnessed and there was no failure of the Plyform after being loaded for over twenty four hours. In conclusion, by using ¾″ BB OES PLYFORM as the platform 50 in the present invention, when supported on all four sides, the work platform system 120 is capable of supporting a uniform load of 100 PSF at a 4:1 safety factor.
Another load test was conducted on the invention. In this second load test, a nominal 8 foot×8 foot module of a work platform system 120 was erected. The four hubs 10 of this module were supported off the floor and secured to resist uplift. Then, two additional 8 foot×8 foot work platform system 120 modules, or “grids”, were assembled from one side of the original, supported module. This resulted in a 16 foot cantilever, which simulates a scenario that might be encountered during erection of the work platform system 120. The work platform system 120 included standard hubs 10, joists 30, supports 52, and the like, as discussed above. One extreme corner of the cantilever was loaded with weight to simulate a load on a cantilever. A 1,000 weight with a 30″×30″ footprint was placed on the cantilevered corner. Additional 50 pound weights were added, producing a total live load on the corner of 2,200 pounds. The test was witnessed and there was no failure of the work platform system 120 and the maximum deflection at the hub 10 at the loaded corner was 6.5 inches. In conclusion, in a 16 foot cantilever configuration, the present invention is capable of supporting a load of 550 pounds with a 4:1 safety factor.
A third load test that was conducted, and witnessed, on an embodiment of the present invention, entailed the live loading of a 16 foot span with 45 PSF×4 Safety Factor (i.e., 180 PSF). In this test, as depicted in
A fourth load test conducted, and witnessed, on a portion of the present invention entailed a chain load test. In this test, a chain 80 was attached to a hub 10. The chain 80, which was a Grade 100 chain, was connected to one of the slots 17 of the hub 10, similar to the methods discussed above. The chain 80 and hub 10 assembly then was setup on a hydraulic test stand wherein a 30.6 Kip load was applied to the chain 80. There was no failure of either the hub 10 or chain 80. In conclusion, a typical hub 10 and chain 80 can withstand at least a 7.4 Kip load with a 4:1 factor of safety.
Thus, depending on spacing of the suspension connectors 80 that attach to the work platform system 120, various loading capabilities are created with the present invention. If the suspension connectors 80 are spaced in a 8 foot×8 foot grid configuration, the system 120 can be termed a heavy duty support system that can support 75 PSF. If the suspension connectors 80 are spaced at a 8 foot×16 foot grid, the system 120 can be termed a medium duty support system that can support 50 PSF. Similarly, if the suspension connectors 80 are spaced at 16 foot×16 foot grid, the system 120 can be termed a light duty support system that can support 25 PSF.
The foregoing description of the present invention has been presented for purposes of illustration and description. It is not intended to be exhaustive or to limit the invention to the precise form disclosed or to the materials in which the form may be embodied, and many modifications and variations are possible in light of the above teaching.
This continuation application claims the benefit of pending U.S. patent application Ser. No. 14/598,994, filed Jan. 16, 2015, which is a divisional of pending U.S. application Ser. No. 13/106,958 filed May 13, 2011, which is a continuation of U.S. application Ser. No. 12/853,921, filed Aug. 10, 2010, now U.S. Pat. No. 7,941,986, which is a divisional of U.S. application Ser. No. 10/814,945, filed Mar. 31, 2004, now U.S. Pat. No. 7,779,599, each titled “Articulating Work Platform Support System, Work Platform System and Methods of Use Thereof,” which are hereby incorporated by reference herein.
Number | Name | Date | Kind |
---|---|---|---|
748962 | Lewis | Jan 1904 | A |
1819032 | Kuhlman | Aug 1931 | A |
2303428 | Black | Dec 1942 | A |
2882099 | Symons | Apr 1959 | A |
2903282 | Wright | Sep 1959 | A |
2987148 | Millard | Jun 1961 | A |
2994402 | Tyler | Aug 1961 | A |
3420011 | Takahaski | Jan 1969 | A |
3425179 | Haroldson | Feb 1969 | A |
3635509 | Birkemeier et al. | Jan 1972 | A |
4058184 | Stuart et al. | Nov 1977 | A |
4244152 | Harper, Jr. | Jan 1981 | A |
4445307 | Puccinelli et al. | May 1984 | A |
4566245 | Ruter | Jan 1986 | A |
4574535 | Pabsch | Mar 1986 | A |
4624374 | Murtaugh | Nov 1986 | A |
4660680 | Potin | Apr 1987 | A |
4671382 | D'Alessio et al. | Jun 1987 | A |
4685535 | Bush et al. | Aug 1987 | A |
4815563 | Puccinelli et al. | Mar 1989 | A |
4922669 | DePas et al. | May 1990 | A |
4958845 | Parks | Sep 1990 | A |
5028164 | Williams | Jul 1991 | A |
5078532 | Williams | Jan 1992 | A |
5203428 | Beeche | Apr 1993 | A |
5207527 | Duncan et al. | May 1993 | A |
5214899 | Beeche et al. | Jun 1993 | A |
5274980 | Zeigler | Jan 1994 | A |
5301770 | Regan et al. | Apr 1994 | A |
5343978 | VanAmburg | Sep 1994 | A |
D366531 | Wedge | Jan 1996 | S |
5771655 | Strickland et al. | Jun 1998 | A |
6223482 | Zohar | May 2001 | B1 |
6386319 | Apostolopoulos | May 2002 | B2 |
6892502 | Hubbell | May 2005 | B1 |
7726447 | Kawaguchi et al. | Jun 2010 | B2 |
7971686 | Hayman | Jul 2011 | B1 |
8123001 | Apostolopoulos et al. | Feb 2012 | B1 |
8206052 | Hayman | Jun 2012 | B1 |
8303207 | Thacker | Nov 2012 | B2 |
8393439 | Thacker | Mar 2013 | B2 |
9347230 | Hayman | May 2016 | B1 |
9783939 | Jolicoeur | Oct 2017 | B2 |
20020059770 | Fritsche et al. | May 2002 | A1 |
20040020138 | Grearson | Feb 2004 | A1 |
20040128492 | Wang | Jul 2004 | A1 |
20040211147 | Vanagan | Oct 2004 | A1 |
20070187179 | Simoes | Aug 2007 | A1 |
20090052980 | Williams | Feb 2009 | A1 |
20100175951 | Winson et al. | Jul 2010 | A1 |
20110180350 | Thacker | Jul 2011 | A1 |
20110262215 | Thacker | Oct 2011 | A1 |
20120186910 | Thacker et al. | Jul 2012 | A1 |
20120186911 | Thacker et al. | Jul 2012 | A1 |
20130043095 | Thacker | Feb 2013 | A1 |
20130142564 | Thacker | Jun 2013 | A1 |
20160177581 | Hayman et al. | Jun 2016 | A1 |
20160201341 | Hayman et al. | Jul 2016 | A1 |
Number | Date | Country |
---|---|---|
200138987 | Nov 2001 | AU |
2824872 | May 2013 | CA |
19714996 | Oct 1998 | DE |
202012008975 | Feb 2014 | DE |
0606807 | Jul 1994 | EP |
1785549 | May 2007 | EP |
1921222 | Jun 2007 | EP |
1978180 | Aug 2008 | EP |
2031150 | Mar 2009 | EP |
2354336 | Mar 2011 | EP |
2354375 | Aug 2011 | EP |
2618818 | Feb 1989 | FR |
2022647 | Dec 1979 | GB |
S63-066989 | Dec 1988 | JP |
04-53808 | May 1992 | JP |
9158468 | Jun 1997 | JP |
11-013275 | Jan 1999 | JP |
11013276 | Jan 1999 | JP |
2002129741 | May 2002 | JP |
2003097046 | Apr 2003 | JP |
58770 | Mar 2012 | NZ |
2009123567 | Oct 2009 | WO |
2010045963 | Apr 2010 | WO |
2011094351 | Aug 2011 | WO |
2012102881 | Aug 2012 | WO |
2013066859 | May 2013 | WO |
Entry |
---|
Office action dated Mar. 14, 2011 for Canadian Patent Appln. No. 2,561,444, 3 pages. |
Itochu Construction Machinery Co., Ltd. SK Panel Platform System brochure. |
Saf-West—Scaffold Constructors & Designers; scafwest.com; circa 2002; 5 pages. |
Project: Houghton/Hancock Vertical Lift Bridge: Hancock, MI; circa 1984; 1 page. |
First Office Action dated Dec. 8, 2005 Taiwan Intellectual Property Office (TIPO), 3 pages. |
Second Office Action dated Sep. 7, 2006 from Taiwan Intellectual Property Office (TIPO), 3 pages. |
Written Opinion of International Searching Authority for International Appln. No. PCT/US2005/10165, dated Nov. 22, 2006. |
International Search Report dated Nov. 22, 2006 for International Appln. No. PCT/US2005/10165. |
First office action dated Jun. 28, 2008 for Chinese Patent Appln. No. 200580017769.3. |
Second office action dated Dec. 26, 2008 for Chinese Patent Appln. No. 200580017769.3. |
Third office action dated Jun. 26, 2009 for Chinese Patent Appln. No. 200580017769.3. |
Supplementary European Search Report for European Appln. No. 0573074 dated 25, 2010, 2 pages. |
First office action dated Nov. 15, 2011 for Japanese Patent Appln. No. 2007-506401, 6 pages. |
PERI Formwork Systems Inc., PERI UP Scaffold Units, product page, url: http://peri-usa.com/products.cfm/fuseaction/diashow/product_ID/138/currentimage/6/, printed Jul. 2, 2014, 1 page; PERI UP Scaffold Units believed to be publicly and/or commercially available and/or sold circa 1995. |
DSS Direct Scaffold Supply Product Catalog, updated Mar. 5, 2012, 96 pages, product on cover page of catalog believed to be publicly and/or commercially available and/or sold circa 1996. |
Safway Group Saflock System Scaffold Technical Manual, revised Nov. 2014, 72 pages; Saflock product believed to be publicly and/or commercially available and/or sold circa 2003. |
Safway Systems Scaffold Product Selection Guide, revised Nov. 2012, 20 pages; Systems Scaffold product believed to be publicly and/or commercially available and/or sold circa 1983. |
Safway Tube & Clamp Scaffold Product Selection Guide, revised Nov. 2012, 10 pages; Tube & Clamp Scaffold product believed to be publicly and/or commercially available and/or sold circa 1960's. |
Layher Allround Scaffolding brochure, Layher Allround Technology, 10 pages; Layher Allround Scaffolding believed to be publicly and/or commercially available and/or sold circa 1974; retreived from url: http://www.layher.co.uk/brochures.aspx. |
Layher Allround Scaffolding brochure, for All-Round Use in Building Work, 6 pages; Layher Allround Scaffolding believed to be publicly and/or commercially available and/or sold circa 1974; retreived from url: http://www.layher.co.uk/brochures.aspx. |
QES Simplicity is the Key product sheet; QES believed to be publicly and/or commercially available and/or sold circa 1983. |
WACO Scaffolding & Equipment, System Scaffolding brochure dated 2010, WACO system scaffolding shown on first page believed to be publicly and/or commercially available and/or sold circa 1983. |
Layher Allround Scaffolding System Catalogue 2008; Layher Allround Scaffolding believed to be publicly and/or commercially available and/or sold circa 1974. |
Patent Construction Systems, Safety Rules and Instructions #910 for QES Quick Erect Scaffold, 1993. |
Next Generation Products Information Page, SafeDeck:http://www.nextgenscaffold.com/index.php?option=com_content&view=article&id=18&Itemid=35, 1 page, printed Oct. 31, 2014. |
SafeDeck Motor YouTube video: http://www.youtube.com/watch?v=Alqe-uGcnel posted on Feb. 28, 2014. |
Runback Component Identification Engineering Drawings, Safway Services, Inc., dated May 19, 2013, 1 page. |
Runback Development Engineering Drawings, Safway Services, Inc., dated Aug. 10, 2003, 1 page. |
Next Generation Products Information Page, SafeDeck: http://www.nextgenscaffold.com/index.php?option=com_content&view=article&id=18&Itemid=35. |
SafeDeck Motor YouTube video: http:www.youtube.com/watch?v=Alqe-uGcnel. |
Examination Report for Canadian Patent Appln. No. 2,821,556 dated Jun. 25, 2014, 3 pages. |
Examination Report for European Patent Appln. No. 05730794.4 dated Jul. 25, 2012, 5 pages. |
Examination Report for Canadian Patent Appln. No. 2,561,444 dated Feb. 16, 2012, 2 pages. |
Number | Date | Country | |
---|---|---|---|
20180030679 A1 | Feb 2018 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 13106958 | May 2011 | US |
Child | 14598994 | US | |
Parent | 10814945 | Mar 2004 | US |
Child | 12853921 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 14598994 | Jan 2015 | US |
Child | 15728223 | US | |
Parent | 12853921 | Aug 2010 | US |
Child | 13106958 | US |