Claims
- 1. An assembly through which multiple subterranean wells can be separately drilled and completed from a common well bore, said assembly comprising:
- a wellhead located at or near the surface of the earth and positioned over said common well bore;
- a first tubular positioned within said common well bore, said first tubular being sized to permit passage of a drill string therethrough during drilling of a first subterranean well bore from said common well bore and to permit production casing to be positioned therethrough when said first subterranean well bore is completed;
- a second tubular positioned within said common well bore, said second tubular being sized to permit passage of a drill string therethrough during drilling of a second subterranean well bore from said common well bore and to permit production casing to be positioned therethrough when said second subterranean well bore is completed; and
- means positioned at said wellhead for segregating and supporting said first and said second tubulars.
- 2. The assembly of claim 1 further comprising:
- second means positioned within said well bore for segregating and supporting said first and said second tubulars.
- 3. The assembly of claim 1 wherein said means positioned at said wellhead for segregating and supporting said first and said second tubulars comprises a body having two bores therethrough which separately receive said first and said second tubulars, said body being supported by said wellhead.
- 4. The assembly of claim 1 further comprising:
- a third tubular positioned within said common well bore, said third tubular being sized to permit passage of a drill string therethrough during drilling of a third subterranean well bore from said common well bore and to permit production casing to be positioned therein when said third well bore is completed, said means positioned at said wellhead segregating and supporting said third tubular in addition to said first and said second tubulars.
- 5. The assembly of claim 1 wherein said first and said second tubulars are cemented within said common well bore.
- 6. The assembly of claim 4 wherein said first, said second and said third tubulars are cemented within said common well bore.
- 7. A wellhead assembly comprising:
- first means for segregating and supporting at least two tubulars which are positioned within a common subterranean well bore; and
- second means for supporting at least two production casings which extend into separate subterranean well bores drilled from said common subterranean well bore, one of said at least two production casings extending through one of said at least two tubulars and another of said at least two production casings extending through another of said at least two tubulars.
- 8. The wellhead assembly of claim 7 wherein a third tubular is positioned within said common subterranean well bore and is segregated and supported by said first means and wherein a third production casing extends into a separate subterranean well bore which is drilled from said common subterranean well bore, said third production casing being supported by said means and extending through said third tubular.
- 9. The wellhead assembly of claim 7 further comprising:
- third means for supporting at least two production tubings, one of said at least two production tubings extending into one of said at least two production casings and another of said at least two production tubings extending into another of said at least two tubulars.
- 10. The wellhead assembly of claim 9 wherein a third tubular is positioned within said common subterranean well bore and is segregated and supported by said first means, wherein a third production casing extends into a separate subterranean well bore which is drilled from said common subterranean well bore, said third production casing being supported by said means and extending through said third tubular, and wherein a third production tubing is supported by said third means and extends into said third production casing.
- 11. The wellhead assembly of claim 9 further comprising:
- a first production tree secured to said third means so as to be in fluid communication with one of said at least two production tubings; and
- a second production tree secured to said third means so as to be in fluid communication with another of said at least two production tubings.
- 12. A process of drilling and completing subterranean wells comprising:
- suspending and separating at least two tubulars from a wellhead of a common well bore, said at least two tubulars being positioned within said common well bore;
- drilling a first subterranean well bore through one of said at least two tubulars and into a subterranean formation; and
- securing a first length of production casing to said wellhead, said first length of production casing extending into said first well bore and being supported at said well head so as to establish fluid communication between the subterranean formation penetrated by said first well bore and the surface of the earth.
- 13. The process of claim 12 further comprising:
- producing hydrocarbons from said subterranean formation penetrated by said first well bore to said surface of the earth via said first length of production casing.
- 14. The process of claim 12 further comprising:
- positioning production tubing through said first length of production casing; and
- sealing the annulus defined between said first length of production casing and said production tubing.
- 15. The process of claim 14 further comprising:
- producing hydrocarbons from said subterranean formation penetrated by said first well bore to said surface of the earth via said production tubing.
- 16. The process of claim 12 further comprising:
- drilling a second subterranean well bore through the other of said at least two tubulars and into a subterranean formation; and
- securing a second length of production casing to said wellhead, said second length of production casing extending into said second well bore and being supported at said well head so as to establish fluid communication between the subterranean formation penetrated by said second well bore and the surface of the earth.
- 17. The process of claim 16 further comprising:
- producing hydrocarbons from said subterranean formation penetrated by said second well bore to said surface of the earth via said second length of production casing.
- 18. The process of claim 16 further comprising:
- positioning production tubing through said second length of production casing; and
- sealing the annulus defined between said second length of production casing and said production tubing.
- 19. The process of claim 18 further comprising:
- producing hydrocarbons from said subterranean formation penetrated by said second well bore to said surface of the earth via said production tubing.
- 20. The process of claim 13 further comprising:
- drilling a second subterranean well bore through the other of said at least two tubulars and into a subterranean formation; and
- securing a second length of production casing to said wellhead, said second length of production casing extending into said second well bore and being supported at said well head so as to establish fluid communication between the subterranean formation penetrated by said second well bore and the surface of the earth.
- 21. The process of claim 20 further comprising:
- positioning production tubing through said second length of production casing; and
- sealing the annulus defined between said second length of production casing and said production tubing.
- 22. The process of claim 21 further comprising:
- conducting a remedial operation via said second length of production casing; and concurrently,
- producing hydrocarbons from said subterranean formation penetrated by said first well bore to said surface via said production tubing positioned within said first length of production casing.
- 23. The process of claim 21 further comprising:
- injecting a fluid into the subterranean formation penetrated by said second well bore via said second length of production casing; and concurrently,
- producing hydrocarbons from said subterranean formation penetrated by said first well bore to said surface via said production tubing positioned within said first lengths of production casing.
- 24. The process of claim 16 further comprising:
- suspending and separating a third tubular from the wellhead of the common well bore, said third tubular being positioned within the common well bore;
- drilling a third subterranean well bore through said third tubular and into a subterranean formation; and
- securing a third length of production casing to said wellhead, said third length of production casing extending into said third well bore and being supported at said well head so as to establish fluid communication between the subterranean formation penetrated by said third well bore and the surface of the earth.
- 25. The process of claim 24 further comprising:
- producing hydrocarbons from said subterranean formation penetrated by said third well bore to said surface of the earth via said third length of production casing.
- 26. The process of claim 24 further comprising:
- positioning production tubing through said third length of production casing; and
- sealing the annulus defined between said third length of production casing and said production tubing.
- 27. The process of claim 26 further comprising:
- producing hydrocarbons from said subterranean formation penetrated by said third well bore to said surface of the earth via said production tubing.
- 28. The process of claim 16 wherein said subterranean formation penetrated by said first well bore and said subterranean formation penetrated by said second well bore are the same.
- 29. The process of claim 16 wherein said subterranean formation penetrated by said first well bore is distinct from said subterranean formation penetrated by said second well bore.
- 30. The process of claim 12 wherein said common well bore is generally vertical.
- 31. The process of claim 12 wherein said common well bore is deviated.
- 32. A process for drilling at least two subterranean well bores from a common well bore comprising:
- positioning at least two tubulars within said common well bore;
- drilling a first subterranean well bore through one of said at least two tubulars and into a first subterranean formation; and
- drilling a second subterranean well bore through the other of said at least two tubulars and into a second subterranean formation.
- 33. The process of claim 32 wherein said at least two tubulars are suspended from a common wellhead, said process further comprising:
- sealing said other of said at least two tubulars against fluid flow prior to drilling said first subterranean well bore.
- 34. The process of claim 33 further comprising:
- sealing said one of said at least two tubulars against fluid flow prior to drilling said second subterranean well bore.
- 35. The process of claim 32 wherein said first subterranean formation and said second subterranean formation are the same.
- 36. The process of claim 32 wherein said first subterranean formation is distinct from said second subterranean formation.
CROSS-REFERENCE TO RELATED APPLICATIONS
This application is a continuation-in-part of U.S. patent application, Ser. No. 08/080,042 filed Jun. 18, 1993, now No. 5,330,007, which is a continuation-in-part of U.S. patent application, Ser. No. 07/936,972, filed Aug. 28,1992, and now abandoned.
US Referenced Citations (19)
Non-Patent Literature Citations (1)
Entry |
M. E. Teel, "What's Happening In Drilling," pp. 25 and 36, World Oil, Nov. 1993. |
Continuation in Parts (2)
|
Number |
Date |
Country |
Parent |
80042 |
Jun 1993 |
|
Parent |
936972 |
Aug 1992 |
|