This invention is a form of debris-flow control engineering that specifically relates to the design and application of an asymmetric debris-flow drainage channel that is used in special conditions in which the protected objects on both sides of the drainage channel have different design standards. Debris flow is one of the major geological hazards in the world, and the demand for debris-flow control engineering is increasing rapidly. Drainage channels are one of the main types of debris-flow control structures and are widely used in debris-flow hazard mitigation. At present, debris-flow drainage channels are completely symmetrical in terms of both structural design and materials used, a configuration that ignores the differences in the design standards of the objects that are to be protected on either side of the drainage channel. To accommodate the different design and protection standards that can be required on each side of a drainage channel using a symmetrical debris-flow drainage channel can easily result in excessive construction work and material waste. Furthermore, under low frequency debris flows of large-scale and high discharge, the debris-flow depth can exceed the height of the side wall of the drainage channel, overflowing the channel and destroying the area to be protected (settlements, buildings, factories, etc.) on both sides of the drainage channel.
In order to overcome the shortcomings of existing design methods, this invention provides a design method for a new type of asymmetric debris-flow drainage channel. Its design and application are based on the design standards for the protection of objects on both sides of the channel, effectively solving the issue of differing design standards while providing a lower initial cost, higher safety performance, and lower maintenance cost at the operating stage. The proposed design method is especially suitable for protecting areas with limited economic activity and resources.
To achieve this purpose, the technical scheme of the invention is as follows:
The invention provides a design method for an asymmetric debris-flow drainage channel that consists of a main drainage channel for carrying debris flow below the designed discharge and an auxiliary drainage channel to carry the debris flow when it exceeds the design discharge. The main channel can be constructed as a full lining type, Dongchuan-type, or step-pool type channel, among others. The side wall of the auxiliary channel can either be shared with that of the main channel such that the width of the auxiliary channel B2 is equal to the width B1 of the main channel, or the side wall of the auxiliary channel can be located outside of the side wall of the main channel such that the width B2 of the auxiliary channel is wider than the width B1 of the main channel. A portion of the auxiliary channel side wall on the side with the lower design standard is used as a break section, in which the top width b0 of the break section is equal to the top width b of the auxiliary channel side wall.
The building material of the break section is different from that of the side wall of the auxiliary channel. The side wall of the auxiliary channel can be made of conventional reinforced concrete or high-strength concrete. However, the break section can be made of masonry, gabions, or concrete with a lower strength than the auxiliary channel side wall, ensuring that the break section will collapse readily when required to discharge any debris flow in excess of channel design capacity.
The cross section of the break section is rectangular while that of the auxiliary drainage channel can be either trapezoidal or rectangular. The top width of the break section is 0.5-1.5 m, and the thickness of the auxiliary channel wall is 0.5-1.5 m. The building materials of the side wall of the main channel are reinforced concrete or plain concrete with a side wall thickness of 0.5-1.5 m.
The characteristics of the asymmetric debris-flow drainage channel are linked to the asymmetry of the building materials of the auxiliary channel walls, as well as the asymmetry of the objects to be protected on each side of the drainage channel. The main channel is designed to safely discharge a debris flow within the design scale. When the debris-flow discharge in the channels exceeds the design scale, the side wall of the auxiliary channel on the side with the lower design standard is allowed to automatically collapse. The debris flow in excess of the design capacity of the main and auxiliary channels is then discharged into a sediment storage basin or farmland on the side with the lower design standard. As a result, this invention effectively guarantees the safety of the people, property, and infrastructure in the villages and towns on the side with the higher design standard, reducing the damage caused by debris flow.
The design method of the asymmetric debris-flow drainage channel is as follows:
Step 1: Determine the debris-flow density γdebris flow (unit: kN/m3) through field surveying and measurements. Then, determine the debris-flow peak discharge Qtotal (unit: m3/s) under the design standard using the small-watershed hydrologic calculation method. Next, determine the peak flood discharge under the design standard using the same method. Then, determine the critical debris-flow peak discharge Qmain river (unit: m3/s) that will block the river into which the drainage channel discharges. A detailed method for determining Qtotal and Qmain river can be found in “Method of debris flow prevention based on controlling the transport of the main river” (Patent No. ZL 201010617466.8).
Step 2: Determine the construction material of the break section through field surveying and measurements. Then, determine the density of the break section γbreak section (unit: kN/m3) according to the selected material. Next, determine the top width of the break section b0 (unit: m) and the height h2 of auxiliary channel (unit: m) according to the results of the field survey.
Step 3: Determine the debris-flow depth hdebris-flow depth (unit: m) in the auxiliary channel using the discharge design standard with the cross-section superposition method for calculating water flow discharge in a compound river channel, or an equation for calculating the debris-flow discharge in a drainage channel. The break section is designed to automatically collapse when the debris-flow depth in the auxiliary channel reaches this design value.
Step 4: The length L0 of the break section can be determined by the following equation:
where:
Step 5: The height h0 of the break section must be smaller than the height of the auxiliary channel h2 (as determined in Step 2), and is otherwise calculated by:
where:
This method for designing the asymmetric debris-flow drainage channel is applicable for the protection of objects with different design protection standards on each side of a drainage channel, and is applicable in gullies with longitudinal slopes between 0.05 and 0.30 and for debris-flow densities between 15 kN/m3 and 21 kN/m3.
Compared with existing technologies, the beneficial effects of the presently proposed asymmetric debris-flow drainage channel are: full consideration of the different design protection standards on each side of the drainage channel, the length of the break section is established considering the selection of building material on the side with the lower protection design standard, and corresponding deposition facilities can be established downstream of the break section. At lower debris flow rates, the asymmetric debris-flow drainage channel break section remains intact, protecting all objects in the debris-flow fan. Because the material of the break section is different from the material of the rest of the auxiliary channel side wall, its construction requires fewer material and financial resources, is less manpower intensive, and effectively disposes of the debris flow on a large scale. Additionally, it is easy to restore and rebuild the break section after collapse, effectively reducing the operating cost of the drainage channel.
Labels in the figures are as follows:
Embodiment 1 of the invented asymmetric debris-flow drainage channel is shown in
According on the topographic conditions of the debris-flow deposition fan and the distribution of villages, towns, and farmlands upon it obtained from field surveys, the length of the drainage channel to be built is 480.0 m. This asymmetric debris-flow drainage channel consists of the main channel (1) to discharge the debris flow within the design standard, and the auxiliary channel (2) to discharge flow in excess of the design standard. The auxiliary channel side walls (4) are located outside of the main channel side walls (3). The height h1 and width B1 of the main channel are 2.5 m and 3.0 m, respectively. The side walls of the main channel are made of reinforced concrete with a thickness of 0.5 m. The height h2 and width B2 of the auxiliary channel are 2.5 m and 7.0 m, respectively. The break section (5) in the side wall of the auxiliary channel is designed to a lower protection standard. The break section (5) is rectangular in section, while that of the auxiliary channel (4) is trapezoidal. The top width, b0, of the break section (5) is 0.5 m, the same as the top width of the auxiliary channel (4), b. The side walls of the auxiliary channel (4) are made of reinforced concrete, while the break section (5) is constructed of M7.5 masonry.
The design procedure of this asymmetric debris-flow drainage channel is as follows:
Step 1: Through field surveys, the debris-flow density γd is determined to be 17 kN/m3. According to the small-watershed hydrologic calculation method, the total peak discharge of the debris flow Qtotal under the design standard for a 5% frequency is 480 m3/s. The peak flood discharge of the main river under the design standard can also be determined using the same method. According to the peak flood discharge of the main river under the design standard, the critical peak debris-flow discharge Qmain river of the drainage channel that will block the main river is determined to be 300 m3/s.
Step 2: Based on the actual site conditions, the material of the break section (5) is selected to be M7.5 masonry with a density of 22 kN/m3 and a top width b0 of 0.5 m. The height of the auxiliary channel h2 is 2.5 m.
Step 3: According to the method of cross-section superposition for calculating the discharge in a compound channel, the debris-flow depth in the auxiliary channel hdebris-flow depth=1.5 m when the debris flow reaches the main river under the design standard.
Step 4: When the debris-flow peak discharge exceeds the maximum allowable peak discharge (Qtotal) of the entire drainage channel, the break section (5) of the auxiliary channel side wall (4) automatically breaks and the debris flow in excess of the design standard is then discharged directly onto the side with the lower design protection standard. The length of the break section (5) L0 can be determined by:
The safety factor of the break section (5) be 1.1, so the L0 in the final engineering design should be rounded up to 61.0 m.
Step 5: When the debris-flow depth in the auxiliary channel (2) reaches the design value (hdebris-flow depth), break section (5) automatically breaks. The required height h0 of the break section (5) can be determined by:
Considering that the required height h0 of the break section (5) must be smaller than that of the auxiliary channel (2), h2, namely, 1.5 m<h0<2.5 m, the height of the break section (5) is set to 2.0 m in the final engineering design.
Embodiment 2 of the invented asymmetric debris-flow drainage channel is shown in
According to the topographic conditions of the debris-flow deposition fan and the distribution of villages, towns, and farmlands upon it obtained from field surveys, the length of drainage channel to be built is 980.0 m. This asymmetric debris-flow drainage channel consists of the main channel (1) to discharge the debris flow within the design standard and the auxiliary channel (2) to discharge flow in excess of the design standard. The auxiliary channel side walls (4) are located outside of the main channel side walls (3). The height h1 and width B1 of the main channel are 5.0 m and 8.0 m, respectively. The side walls of the main channel are made of reinforced concrete with a thickness of 1.0 m. The height h2 and width B2 of the auxiliary channel are 3.5 m and 16.0 m, respectively. The break section (5) in the side wall of the auxiliary channel is designed to a lower protection standard. The break section (5) is rectangular in section, while the auxiliary channel (4) section is trapezoidal. The top width, b0, of the break section (5) is 1.0 m, the same as the top width of the auxiliary channel (4), b. The side walls of the auxiliary channel (4) are made of reinforced concrete while the break section (5) is constructed of gabions, which are rock-filled stone cages.
The design procedure of this asymmetric debris-flow drainage channel is as follows:
Step 1: Through field surveys, the debris-flow density γd is determined to be 21 kN/m3. According to the small-watershed hydrologic calculation method, the total peak discharge of the debris flow Qtotal under the design standard for a 2% frequency is 1245 m3/s. The peak flood discharge of the main river under the design standard can also be determined using the same method. According to the peak flood discharge of the main river under the design standard, the critical peak debris-flow discharge Qmain river of the drainage channel that will block the main river is determined to be 834 m3/s.
Step 2: Based on the actual site conditions, the material of the break section (5) is selected to be gabions with a density of 20 kN/m3 and a top width b0 of 1.0 m. The height of auxiliary channel h2 is 3.5 m.
Step 3: According to the method of cross-section superposition for calculating the discharge in a compound channel, the debris-flow depth in the auxiliary channel hdebris-flow depth=2.0 m when the debris flow reaches the main river under the design standard.
Step 4: When the debris-flow peak discharge exceeds the maximum allowable peak discharge (Qtotal) of the entire drainage channel, the break section (5) of the auxiliary channel side wall (4) automatically breaks and the debris flow in excess of the design standard is then discharged directly to the side with the lower design standard. The length of the break section (5) L0 can be determined by:
The safety factor of the break section (5) must be 1.1, so the L0 in the final engineering design should be rounded to 180.0 m.
Step 5: When the debris-flow depth in the auxiliary channel reaches the design value (that is hdebris-flow depth), the break section (5) automatically breaks. The height h0 of the break section (5) can be determined by:
Considering that the required height h0 of the break section (5) must be smaller than that of the auxiliary channel (2), h2, namely, 2.0 m<h0<2.8 m, the height of the break section 5 is set to 2.2 m in the final engineering design.
Embodiment 3 of the invented asymmetric debris-flow drainage channel is shown in
According to the topographic conditions of debris-flow deposition fan and the distribution of villages, towns, and farmlands upon it obtained from field surveys, the length of the drainage channel to be built is 580.0 m. This asymmetric debris-flow drainage channel consists of the main channel (1) to discharge the debris flow within the design standard, and the auxiliary channel (2) to discharge flow in excess of the design standard. The auxiliary channel side walls (4) are located outside of the main channel side walls (3). The height h1 and width B1 of the main channel are 1.0 m and 8.0 m, respectively. The side walls of the main channel are made of high-grade C30 concrete with a thickness of 1.5 m. The height h2 and width B2 of the auxiliary channel are 6.0 m and 8.0 m, respectively. The break section (5) in the side wall of the auxiliary channel is designed to a lower protection standard. The break section (5) is rectangular in section, as is the auxiliary channel (4). The top width, b0, of the break section (5) is 0.5 m, which is the same as the top width of the auxiliary channel (4), b. The side walls of the auxiliary channel (4) are made of high-grade C30 concrete, while the break section (5) is constructed of low-grade C20 concrete.
The design procedure of this asymmetric debris-flow drainage channel is as follows:
Step 1: Through field surveys, the debris-flow density γd is determined to be 15 kN/m3. According to the small-watershed hydrologic calculation method, the total peak discharge of the debris flow Qtotal under the design standard for a 2% frequency is 975 m3/s. The peak flood discharge of the main river under the design standard can also be determined using the same method. According to the peak flood discharge of the main river under the design standard, the critical peak debris-flow discharge Qmain river of the drainage channel that will block the main river is determined to be 360 m3/s.
Step 2: Based on the site actual conditions, the material of the break section (5) is selected to be C20 concrete with a density of 23 kN/m3 and a top width b0 of 1.5 m. The height of the auxiliary channel h2 is 6.0 m.
Step 3: According to the method of cross-section superposition for calculating the discharge in a compound channel, the debris-flow depth in the auxiliary channel hdebris-flow depth=4.5 m when the debris flow reaches the main river under the design standard.
Step 4: When the debris-flow peak discharge exceeds the maximum allowable peak discharge (Qtotal) of the entire drainage channel, the break section (5) of the auxiliary channel side wall (4) automatically breaks and the debris flow in excess of the design standard is then be discharged directly onto the side with the lower design protection standard. The length L0 of the break section (5) can be determined by:
The safety factor of the break section (5) must be 1.1, so the L0 in the final engineering design should be rounded up to 32.0 m.
Step 5: When the debris-flow depth in the auxiliary channel (2) reaches the design value (hdebris-flow depth), the break section (5) automatically breaks. The required height h0 of the break section (5) can be determined by:
Considering that the height h0 of the break section (5) must be smaller than that of the auxiliary channel (2), h2, namely, 4.5 m<h0<6.0 m, the height of the break section (5) is set to 5.0 m in the final engineering design.
Number | Date | Country | Kind |
---|---|---|---|
2016 1 0321178 | May 2016 | CN | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2016/083443 | 5/26/2016 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2017/193422 | 11/16/2017 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
6079903 | Wagner | Jun 2000 | A |
8517633 | Cui et al. | Aug 2013 | B2 |
Number | Date | Country |
---|---|---|
102002927 | Apr 2011 | CN |
102086635 | Jan 2012 | CN |
104794362 | Jul 2015 | CN |
104848825 | Aug 2015 | CN |
105256768 | Jan 2016 | CN |
2006 115 861 | Nov 2001 | RU |
2 188 892 | Sep 2002 | RU |
Entry |
---|
International Search Report issued in corresponding International application No. PCT/CN2016/083443 dated Feb. 17, 2017. |
Number | Date | Country | |
---|---|---|---|
20190161929 A1 | May 2019 | US |