The subject invention generally pertains to material handling and more specifically to retrieving individual pieces of lumber stacked at one or more locations and moving the pieces individually to another location.
Various machines and methods have been developed for retrieving individual pieces of lumber or boards stacked at one location and feeding the boards individually to a saw. Examples of such systems are disclosed in U.S. Pat. Nos. 6,379,105 and 6,923,614. Additional lumber handling systems are disclosed in U.S. Pat. Nos. 2,730,144; 3,873,000 and 3,952,883. A lumber processing system for making prefabricated trusses and panels is disclosed in U.S. Pat. No. 7,950,316.
In some examples, lumber handling system 10 is used for retrieving and delivering a board 16 having an elongate length 18, a width 20 less than the elongate length 18, and a thickness 22 less than width 20, wherein elongate length 18 and width 20 define an upward facing surface 24. Board 16 is selectively movable to a stored position 26 (
Lumber handling system 10, in some examples, comprises a track 32 extending in a lengthwise direction 34 (also referred to as retrieval direction 34) and a track follower 36 coupled to track 32. The term, “track follower” means any structure with movement guided by a track or some other elongate member. In some examples, track follower 36 is a structural beam 38 extending laterally from track 32 and being movable in lengthwise direction 34 along track 32 between a retrieval position 40 (e.g., first retrieval position) and a delivery position 42 (e.g., first delivery position 42a, second delivery position 42b, etc.). The term, “structural” as used with reference to a beam means an elongate mechanical member, fabrication or assembly, as opposed to a light beam. Thus a “structural beam” as used throughout this patent includes, but is certainly not limited to standard I-beams, channels, fabricated framework, angles, etc.
Some examples of system 10 also include a lumber support 44 (e.g., rack, cart, multi-size lumber support, shelf, etc.) with a board-supporting surface 46 supporting the weight of board 16 when board 16 is in its stored position. Some examples of system 10 also include a piercing tool 48 coupled to structural beam 38 and being movable therewith along lengthwise direction 34. The term, “piercing tool” means any member adapted to penetrate wood. Examples of piercing tool 48 include, but are not limited to, a screw 48a, a pointed pin 48b (e.g., a nail), a dagger, lance, single point blade, multipoint blade, prong, etc. Piercing tool 48, in some examples, comprises a lower tip 50. In some examples, piercing tool 48 is movable up and down between a release position 52 and a penetrated position 54 relative to upward facing surface 24 of board 16. In some examples, lower tip 50 of piercing tool 48 is appreciably above upper surface 24 and spaced apart from board 16 when piercing tool 48 is in release position 52 while structural beam 38 is in a first retrieval position 40a and board 16 is in stored position 26. In some examples, lower tip 50 is appreciably below upper surface 24 and penetrating upper surface 24 when piercing tool 48 is in penetrated position 54 while structural beam 38 is in first retrieval position 40a and board 16 is in a first stored position 26a. In some examples, lower tip 50 is appreciably below upper surface 24 and penetrating upper surface 24 when piercing tool 48 is in penetrated position 54 while board 16 is in suspended position 28 hanging from piercing tool 48. In some examples, lower tip 50 is appreciably below upper surface 24 and penetrating upper surface 24 when piercing tool 48 is in penetrated position 54 while board 16 is in suspended position 28 hanging from piercing tool 48 and while structural beam 38 is partway between first retrieval position 40a and first delivery position 42a, as shown in
In some examples, system 10 also includes a tool carrier 56 coupling piercing tool 48 to structural beam 38 such that tool carrier 56 is movable up and down between a raised position (
In some examples, system 10 also includes a tool mount 62 coupling piercing tool 48 to tool carrier 56 such that tool mount 62 is movable up and down between a retracted position (
In some examples, particularly in cases where piercing tool 48 is screw 48a, a motor 66 (e.g., pneumatic motor, hydraulic motor, electric motor, etc.) rotatably couples piercing tool 48 to tool mount 62, tool carrier 56, and/or beam 38 so that piercing tool 48 can be rotated relative to beam 38 and board 16. In some examples, motor 66 includes a gear reducer for rotating piercing tool 48 slower than a motor rotor of motor 66. In some examples, motor 66 is reversible for selectively screwing and unscrewing screw 48a.
As for various methods pertaining to the examples illustrated in
In some examples where piercing tool 48 is screw 48a, driving piercing tool 48a downward 72 through upward facing surface 24 of board 16 and extracting (arrows 92 and 94) piercing tool 48 from board 16 involves turning 104 screw 48a as illustrated by arrows 104 of
In some examples, arrows 108 and 110 provide at least one example of cutting the board into a plurality of smaller pieces 112, 114, 116,118 and 120. Arrows 122 and 124 of
In some examples, as illustrated in
Referring to
In some examples, first-to-pick board 16a and/or 16b is board 16 shown in
Dashed lines provide at least one example of defining a work area 228 and defining a service area 230 laterally offset to work area 228. Arrows 232 of
Arrow 68 of
In some examples, as shown in
In some examples, additional items perhaps worth noting include items 270 in
In some examples, hole 98 having a depth 102 that is at least three times greater than the hole's diameter or average width helps ensure that piercing tool 48, after being driven into the board, will remain stuck in the hole without an external member having to hold the piercing tool in the hole (e.g., the board can hang from piercing tool 48), yet piercing tool 48 can be forcibly extracted later. For greater holding force, in some examples, two piercing tools 48 are driven into board 16 along converging or diverging paths.
In some examples, structural beam 38 is supported in a cantilever manner from track 32. In some examples, structural beam 38 is part of a gantry with vertical support at both ends. In other examples, tool carrier 56 is suspended from an overhead monorail extending along plane 266. In some examples, such a monorail is supported by one or more stationary cantilevers having one end anchored to a wall or floor-mounted vertical post.
In some examples, as shown in
In response to various inputs, controller 162 controls various components of system 10 including, but not limited to, controlling motor 280 via an output 282, controlling board picker 184 and various actuators thereof, controlling a laser unit 284, and controlling digital display 188. Controller 262 is schematically illustrated to present any electrical device able to provide various outputs in response to various inputs. Examples of controller 262 include, but are not limited to, a computer, a PLC (programmable logic controller), etc. A specific example of controller 262 is a model CP6201-0001-0200 industrial computer by Beckhoff of Verl, Germany.
Laser unit 284 is schematically illustrated to present any device that emits a laser beam 156 for sensing a distance between a surface and the laser emitting device. An example of laser unit 284 includes, but is not limited to, a model RF603-260/1250-232-I-IN-AL-CC-3 laser triangulation position sensor provided by Riftek of Minsk, Russia. Input 286 and output 288 schematically represent control communication between controller 282 and laser unit 284. Upon scanning the upper profile of stacks of lumber to identify the first-to-pick board of a particular stack, laser unit 284 also identifies the location of each stack of lumber relative to each other and/or in relation to delivery position 30 because controller 162 being in communication with motor 280 and laser unit 284 can correlate laser scan readings with the position of board picker 184.
Input 290 and output 292 schematically represent control communication between controller 162 and board picker 184 (and its various components), wherein the board picker's various components include sensors 138, motor 66, and actuators 58 and 64. An example of sensor 138 includes, but is not limited to, a model NBB5-18GM60-A2-V1 inductive sensor provided by Pepperi-Fuchs of Mannheim, Germany.
Some examples of the lumber handling system/method are defined as follows:
Example-1) A lumber handling system for retrieving and delivering a board having an elongate length, a width less than the elongate length, and a thickness less than the width, wherein the elongate length and the width define an upward facing surface, the board being selectively in a stored position, a suspended position and a delivered position, the lumber handling system comprising:
a track extending in a lengthwise direction;
a track follower coupled to the track, the track follower being movable in the lengthwise direction along the track between a first retrieval position and a first delivery position;
a lumber support with a board-supporting surface supporting the weight of the board when the board is in the stored position;
a piercing tool coupled to the track follower and being movable therewith along the lengthwise direction, the piercing tool comprising a lower tip, the piercing tool being movable up and down between a release position and a penetrated position relative to the upward facing surface of the board;
the lower tip of the piercing tool being appreciably above the upper surface and spaced apart from the board when the piercing tool is in the release position while the track follower is in the first retrieval position and the board is in the stored position;
the lower tip of the piercing tool being appreciably below the upper surface and penetrating the upper surface of the board when the piercing tool is in the penetrated position while the track follower is in the first retrieval position and the board is in the stored position;
the lower tip of the piercing tool being appreciably below the upper surface and penetrating the upper surface of the board when the piercing tool is in the penetrated position while the board is in the suspended position hanging from the piercing tool;
the lower tip of the piercing tool being appreciably below the upper surface and penetrating the upper surface of the board when the piercing tool is in the penetrated position while the board is in the suspended position hanging from the piercing tool and while the track follower is partway between the first retrieval position and the first delivery position; and
the lower tip of the piercing tool being appreciably above the upper surface and spaced apart from the board when the piercing tool is in the release position.
Example-2) The lumber handling system of example-1, wherein the piercing tool comprises a screw.
Example-3) The lumber handling system of example-1, further comprising a tool carrier coupling the piercing tool to the track follower, the tool carrier being movable up and down between a raised position and a lowered position relative to the track follower.
Example-4) The lumber handling system of example-3, further comprising a tool mount coupling the piercing tool to the tool carrier, the tool mount being movable up and down between a retracted position and an extended position relative to the tool carrier.
Example-5) A lumber handling method comprising:
placing a board on a lumber support;
driving a piercing tool downward through an upward facing surface of the board such that the piercing tool penetrates the board to become fastened thereto;
raising the piercing tool with the board fastened thereto, thereby lifting the board from the lumber support while the board hangs suspended from the piercing tool;
while the board hangs from the piercing tool, moving the piercing tool and the board in translation from above the lumber support to a delivery position;
extracting the piercing tool from the board, thereby releasing the board at the delivery position; and
upon extracting the piercing tool from the board, leaving a pierced hole in the board, the pierced hole having an average width at the upward facing surface and a pierced depth, the pierced depth being at least three times greater than the average width.
Example-6) The lumber handling method of example-5, wherein the piercing tool comprises a screw, and driving the piercing tool downward through the upward facing surface of the board and extracting the piercing tool from the board involves turning the screw.
Example-7) The lumber handling method of example-5, wherein the piercing tool comprises a pointed prong.
Example-8) The lumber handling method of example-5, further comprising:
cutting the board into a plurality of smaller pieces;
assembling the plurality of smaller pieces into an assembly, wherein the assembly is at least one of a roof truss and a wall panel; and
leaving the pierced hole exposed in the assembly.
Example-9) The lumber handling method of example-5, wherein the pierced hole defines a longitudinal centerline displaced out of perpendicularity with the upward facing surface.
Example-10) The lumber handling method of example-5, further comprising:
prior to driving the piercing tool downward through the upward facing surface of the board such that the piercing tool penetrates the board to become fastened thereto, failing to effectively fasten the piercing tool to the board, thereby executing a failed attempt at piercing the board;
recognizing the failed attempt;
upon recognizing the failed attempt, shifting the piercing tool horizontally a predetermined offset distance; and
after shifting the piercing tool horizontally the predetermined offset distance, driving the piercing tool downward through the upward facing surface of the board such that the piercing tool penetrates the board to become fastened thereto.
Example-11) A lumber handling method comprising:
stacking a first plurality of boards on a first lumber support to create a first stack of lumber having a first upper contour, the first plurality of boards having a first size;
stacking a second plurality of boards on a second lumber support to create a second stack of lumber having a second upper contour, the second plurality of boards having a second size;
laser scanning the first upper contour and the second upper contour;
creating a first digital profile representing the first upper contour;
creating a second digital profile representing the second upper contour;
based on the first digital profile and the second digital profile, identifying a first-to-pick board of each of the first stack of lumber and the second stack of lumber;
generating a board request of a predetermined size;
determining which of the first size and the second size matches the predetermined size;
depending on which of the first size and the second size matches the predetermined size, directing a board picker to one of the first stack of lumber and the second stack of lumber;
further directing the board picker to the first-to-pick board of one of the first stack of lumber and the second stack of lumber;
the board picker picking up the first-to-pick board; and
transporting the first-to-pick board from one of the first stack of lumber and the second stack of lumber to a delivered position spaced apart from the first stack of lumber and the second stack of lumber.
Example-12) The lumber handling method of example-11, further comprising displaying a digital image of at least one of the first digital profile and the second digital profile on a digital display.
Example-13) The lumber handling method of example-11, wherein the first-to-pick board has an elongate length, a width less than the elongate length, and a thickness less than the width, the width extending between opposite longitudinal edges of the first-to-pick board, the opposite longitudinal edges being substantially parallel to each other, the first-to-pick board also having a wane extending along and interrupting one of the opposite longitudinal edges, the lumber handling method further comprising:
establishing a target location for the board picker to engage the first-to-pick board, the target location being substantially midway between the opposite edges of the first-to-pick board; and
laser scanning the wane but disallowing the wane to alter the target location.
Example-14) The lumber handling method of example-11, further comprising:
the board picker doing at least one of fetching a second board from the second stack of lumber and delivering the second board to the delivered position;
second-pass laser scanning the first upper contour of the first stack of lumber while the board picker is in a process of at least one of fetching the second board from the second stack of lumber and delivering the second board to the delivered position;
updating the first digital profile based on the second-pass laser scanning of the first upper contour of the first stack of lumber. Example-15) The lumber handling method of example-11, wherein first stack of lumber includes a bowed board that bows upward to define an uppermost point of the first upper contour as determined by laser scanning of the first upper contour, the lumber handling method further comprising:
interposing the bowed board laterally between two adjacent boards in the first stack of lumber;
the bowed board protruding upward a bowed distance above the two adjacent boards as determined by laser scanning of the first upper contour;
defining a predetermined distance;
identifying the bowed board as the first-to-pick board of the first stack of lumber if the bowed distance is greater than the predetermined distance; and
identifying another board other than the bowed board as the first-to-pick board of the first stack of lumber if the bowed distance is less than the predetermined distance.
Example-16) A lumber handling method involving the use of lumber, a board picker movable horizontally along a board retrieval direction to and from a delivered position, a plurality of lumber supports movable horizontally in a lateral direction traversing the board retrieval direction, a material handling vehicle and a board receiving area, the lumber handling method comprising:
defining a work area;
defining a service area laterally offset to the work area;
segregating the lumber by board size to create a plurality of lumber stacks that are distinguishable by board size;
loading the plurality of lumber stacks on the plurality of lumber supports such that each lumber support of the plurality of lumber supports holds one of the plurality of lumber stacks;
defining a plurality of shuttle paths extending in the lateral direction between the work area and the service area, the plurality of shuttle paths corresponding to the plurality of lumber supports;
via the plurality of shuttle paths, selectively translating the plurality of lumber supports individually between the work area and the service area;
the board picker repeatedly translating in the board retrieval direction over the work area, thereby transporting a plurality of boards individually from the plurality of lumber stacks in the work area to the delivered position; and
the material handling vehicle replenishing a chosen lumber support of the plurality of lumber supports by:
a) moving one lumber support of the plurality of lumber supports from the work area to the service area, wherein the one lumber support travels along one shuttle path of the plurality of shuttle paths;
b) the material handling vehicle traveling in the board retrieval direction to deliver an additional set of boards to the chosen lumber support, wherein the chosen lumber support is in one of the work area and the service area; and
c) moving the one lumber support of the plurality of lumber supports from the service area back to the work area, wherein the one lumber support travels along the one shuttle path.
Example-17) The lumber handling method of example-16, wherein the one lumber support is the chosen lumber support, and the material handling vehicle traveling in the board retrieval direction to deliver the additional set of boards to the chosen lumber support travels into the service area.
Example-18) The lumber handling method of example-16, wherein the one lumber support and the chosen lumber support are two separate lumber supports, and the material handling vehicle traveling in the board retrieval direction to deliver the additional set of boards to the chosen lumber support travels into the work area.
Example-19) The lumber handling method of example-16, wherein the plurality of lumber supports are a plurality of wheeled carts, and selectively translating the plurality of lumber supports individually between the work area and the service area is done manually.
Example-20) A lumber handling method comprising:
placing a board on a lumber support such that an upward facing surface of the board is tilted at an incline;
driving a piercing tool in a downward direction through the upward facing surface of the board such that the piercing tool penetrates the board to become fastened thereto;
raising the piercing tool with the board fastened thereto, thereby lifting the board from the lumber support while the board hangs suspended from the piercing tool;
while the board hangs from the piercing tool, moving the piercing tool and the board in translation from above the lumber support to a delivery position; and
extracting the piercing tool from the board, thereby releasing the board at the delivery position.
Example-21) The lumber handling method of example-20, wherein the downward direction is angularly displaced out of perpendicularity with the upward facing surface.
Example-22) The lumber handling method of example-20, wherein the board is part of a plurality of boards stacked on the lumber support, the plurality of boards each being tilted at the incline of the upward facing surface of the board, the method further comprising:
laser scanning an upper contour of the plurality of boards;
creating a digital profile representing the upper contour; and
displaying a digital image of the digital profile, but displaying the digital image such that the plurality of boards appear to be level rather than tilted.
Example-23) A lumber handling method involving the use of lumber, a board picker movable horizontally along a board retrieval direction to and from a delivered position, a plurality of separate lumber supports, and a multi-size magazine, the lumber handling method comprising:
defining a work area;
segregating the lumber by board size to create a plurality of lumber stacks that are distinguishable by board size, wherein board length and board width are two characteristics of board size;
loading the plurality of lumber stacks on the plurality of separate lumber supports such that each separate lumber support of the plurality of separate lumber supports holds one of the plurality of lumber stacks of a given board size;
defining an imaginary vertical plane extending along the board retrieval direction;
positioning the plurality of lumber stacks in the work area such that a plurality of boards of the plurality of lumber stacks lie substantially perpendicular to the imaginary plane and are substantially centrally justified relative to the imaginary plane even while some boards of the plurality of boards are longer than other boards of the plurality of boards;
storing a supplemental plurality of boards in the multi-size magazine disposed in the work area, the supplemental plurality of boards having an assortment of board lengths that differ from that of the lumber on the plurality of separate lumber supports;
generating a board request for a set of boards of various sizes, wherein the set of boards of various sizes includes a supplemental board from the multi-size magazine and at least one board from the plurality of boards stacked on the plurality of separate lumber supports; and
the board picker repeatedly translating in the board retrieval direction over the work area, thereby transporting the set of boards individually from the plurality of lumber stacks and the multi-size magazine in the work area to the delivered position.
Example-24) The lumber handling method of example-23, wherein the delivered position is one of two delivered positions, and the lumber handling method further comprises the board picker selectively delivering to each of the two delivered positions, wherein the two delivered positions feed two separate saws.
Although certain example methods, apparatus and articles of manufacture have been described herein, the scope of the coverage of this patent is not limited thereto. On the contrary, this patent covers all methods, apparatus and articles of manufacture fairly falling within the scope of the appended claims either literally or under the doctrine of equivalents.
This application is a continuation of co-pending patent application Ser. No. 14/577,779 filed on Dec. 19, 2014; which is a division of patent application Ser. No. 13/136,922 filed on Aug. 15, 2011 now U.S. Pat. No. 8,960,244 issued on Feb. 24, 2015; which claims the benefit of provisional patent application Ser. No. 61/402,654 filed on Sep. 2, 2010. All of the foregoing applications are hereby incorporated herein by reference in their entirety.
Number | Name | Date | Kind |
---|---|---|---|
561715 | Lynch | Jun 1896 | A |
2730144 | Joa | Jan 1956 | A |
3116835 | Brandon | Jan 1964 | A |
3254764 | Boyle | Jul 1966 | A |
3272044 | Obenshain | Sep 1966 | A |
3873000 | Eaton et al. | Mar 1975 | A |
3894625 | Boyle et al. | Jul 1975 | A |
3952883 | Phillips | Apr 1976 | A |
4185672 | Vit et al. | Jan 1980 | A |
4560456 | Heil et al. | Dec 1985 | A |
4610360 | Forslund | Sep 1986 | A |
4640655 | Jacobsen | Feb 1987 | A |
4838748 | Johnson | Jun 1989 | A |
5096090 | Schwartz et al. | Mar 1992 | A |
5249915 | Ritola | Oct 1993 | A |
5806868 | Collins | Sep 1998 | A |
5879129 | Newnes et al. | Mar 1999 | A |
5893468 | Holmes | Apr 1999 | A |
5899659 | Beilsmith | May 1999 | A |
6065927 | Baron et al. | May 2000 | A |
6379105 | Aylsworth | Apr 2002 | B1 |
6923614 | Aylsworth | Aug 2005 | B2 |
7736120 | Pierson et al. | Jun 2010 | B2 |
7746481 | Kranz et al. | Jun 2010 | B2 |
7950316 | Koskovich | May 2011 | B2 |
8348287 | Smith | Jan 2013 | B1 |
20030006586 | Comilla | Jan 2003 | A1 |
20170050334 | Aylsworth | Feb 2017 | A1 |
Number | Date | Country |
---|---|---|
2501012 | Jul 1976 | DE |
4317767 | Dec 1994 | DE |
19617818 | Nov 1997 | DE |
2673923 | Sep 1992 | FR |
2675493 | Oct 1992 | FR |
Entry |
---|
Stiles, Weinmann Robotic Saw System and Material Handling Portal, sales advertisement in SBC magazine; 1 page; Madison, WI; published Sep. 2008. |
SBC; SBC Magazine; 33 pages; Madison, WI; Sep. 2008. |
Miser; Automated Wood Processing System; Koskovich brochure; 5 pgs.; Rochester, MN; copyright 2007. |
Omni; Automated Lumber Processing System; CAD drawings; 2 pgs.; published 2008 or earlier. |
Wood Truss Systems; 2006 Weinmann WBZ 100 Linear Saw; sales advertisement; 2 pgs.; equipment itself in public domain in 2006 or earlier. |
Handling Portal WHP; Weinmann sales specs.; one page; published 2008 or earlier. |
Stiles; Weinmann Robotic Saw System; sales literature and equipment specs.; 6 pgs.; equipment itself in public domain in 2008 or earlier. |
Number | Date | Country | |
---|---|---|---|
20170113882 A1 | Apr 2017 | US |
Number | Date | Country | |
---|---|---|---|
61402654 | Sep 2010 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 13136922 | Aug 2011 | US |
Child | 14577779 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 14577779 | Dec 2014 | US |
Child | 15401293 | US |