Automated material handling system for semiconductor manufacturing based on a combination of vertical carousels and overhead hoists

Information

  • Patent Grant
  • 10381251
  • Patent Number
    10,381,251
  • Date Filed
    Friday, June 8, 2012
    12 years ago
  • Date Issued
    Tuesday, August 13, 2019
    5 years ago
  • CPC
  • Field of Search
    • US
    • 414 331020
    • 414 331030
    • 414 331140
    • 414 318000
    • 414 935000
    • 414 561000
    • 414 591000
    • 414 659000
    • 414 660000
    • 414 751100
    • 414 785000
    • 414 266000
    • 414 268000
    • 414 269000
    • 414 277000
    • 414 279000
    • 414 282000
    • 414 589000
    • 414 222010
    • 414 940000
    • 414 682000
    • 414 680000
    • 414 560000
    • 414 217000
    • 414 217100
    • 414 222070
    • 414 280000
    • 414 222030
    • 414 225010
    • 294 081540
    • 294 081620
    • 212 168000
    • 212 332000
    • 212 084000
    • 198 468200
    • 198 470100
    • 198 750110
    • 198 803300
    • CPC
    • H01L21/67769
    • H01L21/67775
    • H01L21/67733
    • B65G47/61
    • B65G37/02
    • B65G1/0457
    • B66C1/28
    • B66C11/02
    • B65H67/065
    • B25J5/04
    • B25J5/0093
    • B25J5/026
    • B25J5/02
  • International Classifications
    • H01L21/677
    • B65G1/04
Abstract
An overhead hoist transport vehicle comprising: an overhead hoist; a translating stage; and a gripper coupled to the translating stage, the gripper being configured to grip a material unit; wherein the overhead hoist is configured to transport the material unit to one of a load port and a storage location by performing operations comprising: the overhead hoist being configured to vertically move the gripper to the load port and the storage location; and the translating stage being configured to horizontally move the overhead hoist to the load port and the storage location; and wherein the load port is beneath an overhead rail; and wherein at least a portion of the storage location is disposed lateral to the overhead rail.
Description
BACKGROUND OF THE INVENTION

The present invention relates generally to automated material handling systems, and more specifically to an automated material handling system that allows an overhead hoist to access work-in-process (WIP) parts directly from a WIP storage unit to increase the efficiency of the overall material handling system.


Automated material handling systems are known that employ WIP storage units and overhead hoists to store and transport WIP parts between various workstations and/or processing machines in a product manufacturing environment. For example, such an Automated Material Handling System (AMHS) is commonly employed in the manufacturing of Integrated Circuit (IC) chips. A typical process for fabricating an IC chip comprises various steps including deposition, cleaning, ion implantation, etching, and passivation steps. Further, each of these steps in the IC chip fabrication process is usually performed by a different processing machine such as a chemical vapor deposition chamber, an ion implantation chamber, or an etcher. Accordingly, the WIP parts, e.g., semiconductor wafers, are typically transported between the different workstations and/or processing machines multiple times to perform the various process steps required for fabricating the IC chips.


A conventional AMHS for manufacturing IC chips comprises a plurality of WIP storage units (also known as “stockers”) for storing the semiconductor wafers, and one or more overhead hoist transport vehicles for transporting the wafers between the various workstations and processing machines on the IC chip manufacturing floor. The semiconductor wafers stored in the WIP stockers are typically loaded into cassette pods such as Front Opening Unified Pods (FOUPs), which are subsequently transferred to an overhead transport vehicle configured to travel on a suspended track. In the conventional AMHS, each stocker is typically provided with a plurality of active input/output ports that work in conjunction with an internal robotic arm (which may provide up to three or more axes of movement) for loading and unloading the FOUPs to/from the stocker. The FOUPs are picked and placed from/to the input/output ports by the overhead hoist vehicle.


One drawback of the conventional AMHS is that the efficiency of the overall system is limited by the time required for the robotic arm to access the FOUPs at the WIP stocker's active input/output ports. Because of the generally delicate nature of the semiconductor wafers, strict limits are normally imposed on the acceleration rate of the robotic arm. For this reason, a minimum amount of time is typically required for moving the FOUPs to and from the stocker's input/output ports. This minimum move time generally determines the stocker throughput, which dictates the number of stockers needed to support the desired IC chip production level and thus the total cost of the AMES. Although the material handling efficiency of the AMHS might be improved by increasing the number of active input/output ports on each stocker and by allowing the overhead transport vehicle to access multiple input/output ports simultaneously, providing additional input/output ports can significantly increase the cost of the stocker.


In addition, the combination of a three or more axis internal robot in the stocker with several input/output ports, each having 1-3 axes of motion, means that a typical stocker may have between 5 and 16 axes of motion. This is a very complex, low reliability, and costly solution for storing material.


It would therefore be desirable to have an automated material handling system that provides enhanced material handling efficiency while overcoming the drawbacks of conventional automated material handling systems.


BRIEF SUMMARY OF THE INVENTION

In accordance with the present invention, a highly efficient Automated Material Handling System (AMHS) is provided that allows an overhead hoist to load and unload Work-In-Process (WIP) parts directly to/from one or more WIP storage units included in the system.


In one embodiment, the improved AMHS comprises an overhead hoist transport subsystem and at least one vertical carousel WIP storage unit (“stocker”) including a plurality of storage bins. The overhead hoist transport subsystem includes at least one overhead hoist transport vehicle configured to travel along a suspended track defining at least one predetermined route. The predetermined route passes over the vertical carousel stocker, which is configured to allow the overhead hoist to access one or more WIP parts directly from a selected one of the carousel storage bins. In this first embodiment, the selected carousel storage bin containing the desired WIP lot(s) is positioned at the top of the vertical carousel stocker substantially directly underneath the suspended track. Next, the overhead hoist transport vehicle is moved along the suspended track to a position substantially directly above the selected carousel storage bin. The overhead hoist is then lowered toward the selected storage bin. Finally, the overhead hoist is operated to pick the desired WIP lot directly from the carousel storage bin, or to place one or more WIP lots in the carousel storage bin.


In a second embodiment, the predetermined route defined by the suspended track passes parallel to the vertical carousel WIP stocker, which is configured to allow the overhead hoist to access one or more WIP parts directly from one of the carousel storage bins. The AMHS further includes an extraction mechanism, which works in conjunction with the vertical carousel stocker to suitably position the selected carousel storage bin containing the desired WIP lot(s) relative to the track. For example, the extraction mechanism may be configured to move the selected carousel storage bin (e.g., a movable shelf) along a single servo-controlled axis from a first position adjacent the track to a second position substantially directly underneath the track. In the second embodiment, the overhead transport vehicle is moved along the track to a position substantially directly above the second position. Next, the overhead hoist is lowered toward the second position. In an alternative embodiment, the selected carousel storage bin comprises a shelf positioned alongside the track, and the overhead hoist is mounted to a translating stage for picking and placing one or more WIP lots to the shelf at the side of the overhead transport vehicle. Finally, the overhead hoist is operated to pick the desired WIP lot directly from the selected storage bin, or to place one or more WIP lots in the selected storage bin.


By configuring the AMHS to allow the overhead hoist to directly load and unload WIP parts to/from the carousel storage bins from a position above the respective storage bin, more efficient AMHS operation can be achieved.


Other features, functions, and aspects of the invention will be evident from the Detailed Description of the Invention that follows.





BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWING

The invention will be more fully understood with reference to the following Detailed Description of the Invention in conjunction with the drawings of which:



FIG. 1 is a perspective view of a conventional automated material handling system;



FIG. 2 is block diagram of a first embodiment of an automated material handling system according to the present invention;



FIG. 3 is a block diagram of a second embodiment of the automated material handling system of FIG. 2;



FIG. 4 is a block diagram of a third embodiment of the automated material handling system of FIG. 2;



FIGS. 5a-5b are block diagrams of a translating hoist vehicle accessing fixed storage positions according to the present invention;



FIG. 6 is a block diagram of the translating hoist vehicle of FIGS. 5a-5b accessing material on a conveyer; and



FIG. 7 is a flow diagram of a method of operating the automated material handling system of FIG. 2.





DETAILED DESCRIPTION OF THE INVENTION

The entire disclosures of U.S. patent application Ser. No. 10/393,526 filed Mar. 20, 2003 entitled AUTOMATED MATERIAL HANDLING SYSTEM FOR SEMICONDUCTOR MANUFACTURING BASED ON A COMBINATION OF VERTICAL CAROUSELS AND OVERHEAD HOISTS, U.S. Provisional Patent Application No. 60/389,993 filed Jun. 19, 2002 entitled AUTOMATED MATERIAL HANDLING SYSTEM FOR SEMICONDUCTOR MANUFACTURING BASED ON A COMBINATION OF VERTICAL CAROUSELS AND OVERHEAD HOISTS, and U.S. Provisional Patent Application No. 60/417,993 filed Oct. 11, 2002 entitled OFFSET ZERO FOOTPRINT STORAGE (ZFS) USING MOVING SHELVES OR A TRANSLATING HOIST PLATFORM, are incorporated herein by reference.


An Automated Material Handling System (AMHS) is disclosed that can load and unload Work-In-Process (WIP) parts to/from a WIP storage unit with increased efficiency. The presently disclosed AMHS achieves such increased material handling efficiency by allowing top-loading/unloading of storage bins in a vertical carousel WIP storage unit by an overhead hoist positioned above the respective storage bin.



FIG. 1 depicts a conventional AMHS 100, which may be employed to automatically store and transport WIP parts between various workstations and/or processing machines in a product manufacturing environment, e.g., a clean environment for manufacturing Integrated Circuit (IC) chips. As shown in FIG. 1, the conventional AMHS 100 comprises a WIP storage unit (“stocker”) 102 and an overhead hoist transport subsystem 104. The WIP stocker 102 includes input and output ports 111-112, and the overhead hoist transport subsystem 104 includes a suspended track 108 and a plurality of overhead hoist transport vehicles 105-106 configured to travel on the track 108. In a typical mode of operation, the WIP parts are transported in a cassette pod 110 such as a Front Opening Unified Pod (FOUP). The first overhead transport vehicle 105 travels along the track 108 and stops at a position suitable for unloading the FOUP 110 into the input port 111 or for loading another FOUP from the output port 112 of the stocker 102. Further, the second overhead transport vehicle 106 waits on the track 108 until the first overhead transport vehicle 105 finishes unloading/loading the FOUP and moves out of the way.


In the conventional AMHS 100, FOUPs are unloaded from the overhead hoist into the input port 111, loaded from the output port 112 into the overhead hoist, or otherwise accessed from within the stocker 102 by a robotic arm 107, which may provide up to three or more axes of movement. Further, the minimum amount of time required to access the FOUPs from the stocker 102 generally determines the stocker throughput, which dictates the number of stockers needed to support the desired production level. Accordingly, complex movements of the multi-axis robotic arm 107 for accessing the FOUPs may cause the minimum move time to increase, thereby increasing both the number of stockers needed in the AMHS 100 and the overall cost of the material handling system.



FIG. 2 depicts an illustrative embodiment of an Automated Material Handling System (AMHS) 200, in accordance with the present invention. In the illustrated embodiment, the AMHS 200 comprises an overhead hoist transport subsystem 204, and at least one vertical carousel WIP storage unit (“stocker”) 202 including a plurality of storage bins such as a carousel storage bin 203. The vertical carousel WIP stocker 202 is configured to allow an overhead hoist in the overhead hoist transport subsystem 204 to access WIP parts directly from a selected one of the carousel storage bins.


It is noted that like the conventional AMHS 100 (see FIG. 1), the AMHS 200 of FIG. 2 may be employed in a clean environment for manufacturing IC chips such as a 200 mm or 300 mm FAB plant, or any other suitable product manufacturing environment. As shown in FIG. 2, the IC chip manufacturing environment includes first and second floors 220 and 226, and a ceiling 214. The first floor 220 typically comprises a waffle slab made of reinforced concrete, and the second floor 226 comprises a raised floor located above the waffle slab 220. The vertical carousel stocker 202 is positioned on the waffle slab 220. Further, workstations and/or processing machines (not shown) configured to perform various process steps for fabricating the IC chips are positioned on the raised floor 226, which is typically covered with an electrically nonconductive material and designed to meet specific loading and seismic requirements. For example, the raised floor 226 may be located a distance 228 (about 0.6 m) above the waffle slab 220 and a distance 224 (greater than or equal to about 4.15 m) below the ceiling 214.


In the presently disclosed embodiment, the vertical carousel stocker 202 includes a housing 252, and first and second pulleys 250-251 and a belt 254 disposed within the housing 252. As shown in FIG. 2, the carousel storage bins (e.g., the storage bin 203) are coupled to the belt 254 at various spaced locations along the belt, and the belt 254 is looped between the first and second pulleys 250-251 to allow the storage bins to be rotatably positioned along the belt path by driving one of the pulleys 250-251. For example, the vertical carousel stocker 202 may have a height 218 (about 3.85 m). The top of the vertical carousel stocker 202 may therefore be a distance 216 (about 3.25 m) above the raised floor 226.


As described above, the vertical carousel stocker 202 is configured to allow an overhead hoist to access WIP parts, e.g., semiconductor wafers, directly from one of the carousel storage bins. In the illustrated embodiment, the portion of the stocker housing 252 near the ceiling 214 is at least partially open to allow top-loading/unloading of the selected carousel storage bin. Further, each carousel storage bin comprises a fixed shelf, and the semiconductor wafers are loaded into cassette pods such as a Front Opening Unified Pod (FOUP) 210 disposed on the shelf 203. For example, each FOUP 210 may hold one or more semiconductor wafer lots, thereby allowing the overhead hoist to access multiple wafer lots in a single carousel storage bin simultaneously.


The overhead hoist transport subsystem 204 includes a suspended track 208 and at least one overhead hoist transport vehicle 205 configured for traveling on the track 208. The suspended track 208 defines at least one predetermined route passing over the vertical carousel stocker 202, thereby allowing the overhead transport vehicle 205 to access a FOUP directly from one of the carousel storage bins positioned approximately at the top of the stocker 202. For example, the overhead transport vehicle 205 may extend a distance 222 (about 0.9 m) from the ceiling 214.


In an illustrative mode of operation, the selected carousel storage bin, e.g., the storage bin 203 containing the FOUP 210, is positioned approximately at the top of the vertical carousel stocker 202 underneath the track 208. The overhead transport vehicle 205 is then moved along the track 208 to a position substantially directly above the storage bin 203. Next, the overhead hoist is lowered from the overhead transport vehicle 205 through the opening in the stocker housing 252 toward the storage bin 203. For example, the overhead hoist may be lowered in a direction parallel to the longitudinal axis L1 of the stocker. The overhead hoist is then operated to pick the FOUP 210 directly from the storage bin 203 for subsequent transport to a workstation or processing machine on the IC chip manufacturing floor. It is understood that the overhead hoist may alternatively be operated to place a FOUP in the carousel storage bin 203.



FIG. 3 depicts an alternative embodiment 300 of the AMHS 200 (see FIG. 2). As shown in FIG. 3, the AMHS 300 comprises an overhead hoist transport system 304, and at least one vertical carousel WIP stocker 302 including a plurality of storage bins such as a slide-mounted storage bin 332. Like the vertical carousel stocker 202, the vertical carousel stocker 302 is configured to allow an overhead hoist in the overhead hoist transport system 304 to access WIP parts, e.g., semiconductor wafers, directly from a selected one of the carousel storage bins.


Specifically, the AMHS 300 may be employed in an IC chip manufacturing environment including a ceiling 314, a waffle slab 320, and a raised floor 326 located above the waffle slab 320. As shown in FIG. 3, the vertical carousel stocker 302 is positioned on the waffle slab 320. For example, the raised floor 326 may be located a distance 328 (about 0.6 m) above the waffle slab 320 and a distance 324 (greater than about 5.4 m) below the ceiling 314. Further, the vertical carousel stocker 302 includes a housing 352, and first and second pulleys 350-351 and a belt 354 disposed within the housing 352. The carousel storage bins (e.g., the slide-mounted storage bin 332) are coupleable to the belt 354 at various spaced locations along the belt, and the belt 354 is looped between the first and second pulleys 350-351 to allow the storage bins to be rotatably positioned along the belt path by driving one of the pulleys 350-351. For example, the vertical carousel stocker 302 may have a height 318 (about 6 m).


As described above, the vertical carousel stocker 302 is configured to allow an overhead hoist to access the semiconductor wafers directly from one of the carousel storage bins. In the illustrated embodiment, at least one side of the housing 352 is at least partially open to allow the selected carousel storage bin to be extracted from within the housing 352, and to allow subsequent top-loading/unloading of the selected storage bin by the overhead hoist. Specifically, the AMHS 300 further includes at least one extraction mechanism 330, which works to extract the semiconductor wafers from within the stocker 302, and to suitably position the material relative to a suspended track 308 included in the overhead hoist transport subsystem 304. It is noted that each storage bin may comprise either a movable or fixed shelf. Further, the semiconductor wafers are loaded into cassette pods such as a FOUP 310 disposed on the shelf 332.


The overhead hoist transport subsystem 304 includes the suspended track 308 and at least one overhead hoist transport vehicle 305 configured to travel on the track 308. The track 308 defines at least one predetermined route passing parallel to the vertical carousel stocker 302, thereby allowing the overhead transport vehicle 305 to access a FOUP directly from a selected one of the slide-mounted storage bins.


In an illustrative mode of operation, the selected slide-mounted storage bin, e.g., the storage bin 332 containing the FOUP 310, is positioned to allow the extraction mechanism 330 to extract the storage bin 332 from within the stocker 302 and to position the storage bin 332 directly underneath the track 308. It is noted that the extraction mechanism 330 may be incorporated into the stocker 302 and configured to move the storage bin 332 along a single servo-controlled axis 398. The overhead transport vehicle 305 is then moved along the track 308 to a position directly above the extracted storage bin 332. Next, the overhead hoist is lowered from the overhead transport vehicle 305 toward the storage bin 332, e.g., in a direction parallel to the longitudinal axis L2 of the stocker. The overhead hoist is then operated to pick the FOUP 310 directly from the storage bin 332 for subsequent transport to a workstation or processing machine on the IC chip manufacturing floor. It is appreciated that the overhead hoist may alternatively be operated to place a FOUP in the carousel storage bin 332.



FIG. 4 depicts a detailed embodiment 400 of the AMHS 300 (see FIG. 3). In the illustrated embodiment, the AMHS 400 comprises an overhead hoist transport system 404 and a vertical carousel stocker 402. The overhead hoist transport system 404 includes a suspended track 408 and an overhead hoist transport vehicle 405 configured for traveling on the track 408. For example, the overhead transport vehicle 405 may extend a distance 436 (about 0.9 m) from the track 408. The vertical carousel stocker 402 includes a plurality of carousel storage bins such as a storage bin 432 disposed within the stocker housing. For example, the storage bin 432 may be a distance 438 (about 2.6 m) above the raised IC chip manufacturing floor.


As described above, a FOUP 410 is extracted from within the stocker housing to allow subsequent top-loading/unloading of the selected storage bin. The overhead transport vehicle 405 further includes an overhead hoist 431 having a gripper 435 configured to top-load/unload the FOUP 410 to/from the storage bin 432. In the preferred embodiment, the hoist gripper 430 is mounted on a translating stage 433 to allow the overhead hoist to pick/place a cassette pod to either side of the overhead transport vehicle 405.



FIGS. 5a-5b depict a translating hoist vehicle subsystem 704 accessing fixed storage positions. In the illustrated embodiment, the translating hoist vehicle subsystem 704 includes a suspended track 708, and an overhead hoist transport vehicle 705 configured to travel on the track. The overhead transport vehicle 705 is configured to pick/place a FOUP 710 to a fixed storage position 732. For example, the overhead transport vehicle 705 may extend a distance 736 (about 0.9 m) below the ceiling 714, and the storage position 732 may be disposed a distance 738 (about 2.6 m) above the raised IC chip manufacturing floor. Further, the ceiling 714 may be a distance 790 (about 3.66 m) above the raised floor.


The overhead transport vehicle 705 is configured to pick (and place) the FOUP 710 to a position located directly below the suspended track 708. To that end, the overhead hoist vehicle 705 includes a hoist gripper 731 mounted to a translating stage and configured to extend from the vehicle 705, pick up the FOUP 710, and retract back to the vehicle 705, thereby moving the FOUP 710 within the overhead transport vehicle 705 (see FIG. 5b). In the preferred embodiment, the translating stage is configured to allow the overhead hoist to pick/place a cassette pod to either side of the overhead transport vehicle 705. Once the FOUP 710 is held by the hoist gripper 730, the overhead transport vehicle 705 transports it to a workstation or processing machine on the IC chip manufacturing floor.



FIG. 6 depicts a translating hoist vehicle system 800 accessing material either stored or moving on a conveyer 895. Specifically, an overhead hoist transport subsystem 804 is employed to directly pick or place a FOUP 810 to the overhead rail-based conveyer 895. In the illustrated embodiment, the overhead hoist transport subsystem 804 includes a suspended track 808 and an overhead hoist transport vehicle 805 configured to travel on the track 808. For example, the overhead transport vehicle 805 may extend a distance 836 (about 0.9 m) below the track 808 and be disposed a distance 892 (about 0.35 m) above the rail-based conveyer 895. Further, the overhead rail 898 may be a distance 838 (about 2.6 m) above the raised IC manufacturing floor. It should be understood that the rail 898 extends in a direction perpendicular to the plane of the drawing. The translating hoist vehicle system 800 further includes a process tool load port 899.


The overhead transport vehicle 805 may be employed to perform top-loading/unloading of the rail-based conveyer 895. To that end, the overhead transport vehicle 805 includes an overhead hoist 831 having a hoist gripper 835, which is mounted to a translating stage 833 configured to allow both horizontal and vertical motion, as indicated by the directional arrows 870 and 871, respectively. In an illustrative mode of operation, the rail-based conveyer 895 is moved so that the FOUP 810 is positioned directly underneath the overhead hoist 831. The hoist gripper 835 is then lowered via the translating stage 833 toward the FOUP 810, and operated to pick the FOUP 810 directly from the conveyer 895. Next, the hoist gripper 835 carrying the FOUP 810 is raised and retracted via the translating stage 833, thereby moving the FOUP 810 within the overhead transport vehicle 805. The transport vehicle 805 then transports the FOUP 810 to a workstation or processing machine on the IC chip manufacturing floor.


A method of operating the presently disclosed automated material handling system is illustrated by reference to FIG. 7. As depicted in step 902, a selected storage bin containing a FOUP is positioned within a vertical carousel stocker to allow access by an overhead hoist. For example, the selected carousel storage bin may be positioned at the top or at the side of the vertical carousel stocker (see FIGS. 2-3). Next, the overhead hoist transport vehicle is moved along a track, as depicted in step 904, to a position adjacent the selected storage bin. In the event the selected storage bin is positioned at the top of the stocker, the overhead transport vehicle is positioned above the storage bin. In the event the selected storage bin is positioned at the side of the stocker, the overhead transport vehicle is positioned to the side of the storage bin. The overhead hoist is then extended from the transport vehicle and lowered, as depicted in step 906, to allow the hoist gripper to contact the FOUP in the selected storage bin. Next, the hoist gripper is operated, as depicted in step 908, to pick the FOUP directly from the storage bin. The overhead hoist is then raised and retracted, as depicted in step 910, to move the FOUP within the overhead transport vehicle. In this way, the FOUP is top-loaded from the selected storage bin to the overhead transport vehicle. Finally, the overhead transport vehicle transports, as depicted in step 912, the FOUP to a workstation or processing machine on the product manufacturing floor.


It will further be appreciated by those of ordinary skill in the art that modifications to and variations of the above-described automated material handling system may be made without departing from the inventive concepts disclosed herein. Accordingly, the invention should not be viewed as limited except as by the scope and spirit of the appended claims.

Claims
  • 1. An overhead transport vehicle comprising: a body;an overhead hoist; anda translating stage coupled to the overhead hoist and the body, the translating stage configured to extend from a retracted position inside the body along a horizontal axis to a first unretracted position to a first of two sides outside the body, to extend from the retracted position inside the body along the horizontal axis to a second unretracted position to the second of the two sides outside the body, the second side being different from the first side, and to move a gripper, wherein extension of the translating stage is configured to move the gripper from a first position within the body to a second position along the horizontal axis that is exterior to the body and adjacent to a side of the overhead transport vehicle;wherein the gripper is configured to grip a FOUP;wherein the overhead hoist is configured to enable vertical movement of the gripper.
  • 2. The overhead transport vehicle of claim 1, wherein the gripper is further configured to place a FOUP on a load port.
  • 3. The overhead transport vehicle of claim 2, wherein the gripper is further configured to retract to a starting position after placing the FOUP on the load port.
  • 4. The overhead transport vehicle of claim 1, wherein the gripper is further configured to place the FOUP on a storage location.
  • 5. The overhead transport vehicle of claim 4, wherein the gripper is further configured to retract to a starting position after placing the FOUP on the storage location.
  • 6. The overhead transport vehicle of claim 1, wherein a load port is disposed on an integrated circuit chip manufacturing floor.
  • 7. The overhead transport vehicle of claim 1, wherein the overhead transport vehicle is configured to extend a first distance below an integrated circuit chip manufacturing ceiling and a second distance above an integrated circuit chip manufacturing floor, with a load port being substantially disposed at the second distance from the integrated circuit chip manufacturing floor and at the first distance from the integrated circuit chip manufacturing floor ceiling.
  • 8. The overhead transport vehicle of claim 1, wherein when the FOUP is transported to a load port, the gripper is configured to vertically move without horizontally moving the overhead hoist.
  • 9. The overhead transport vehicle of claim 1, wherein when the FOUP is transported to the storage location, the overhead hoist is configured to be horizontally moved to the position above a storage location by the translating stage and the gripper is configured to vertically move.
  • 10. The overhead transport vehicle of claim 1, wherein the gripper is configured to be vertically moved by the overhead hoist.
  • 11. An overhead transport vehicle comprising: a body;an overhead hoist; anda translating stage coupled to the overhead hoist and the body, the translating stage configured to extend from a retracted position inside the body along a horizontal axis to a first unretracted position to a first of two sides outside the body, to extend from the retracted position inside the body along the horizontal axis to a second unretracted position to the second of the two sides, the second side being different from the first side, and move a gripper, wherein extension of the translating stage is configured to move the gripper from a first position within the body to a second position along the horizontal axis that is exterior to the body and adjacent to a side of the overhead transport vehicle;wherein the overhead hoist is configured to enable vertical movement of the gripper;wherein the gripper is configured such that the horizontal movement of the translating stage causes horizontal movement of the gripper and vertical movement of the translating stage causes vertical movement of the gripper; wherein the gripper is configured to pick up a FOUP from either of two sides of the overhead transport vehicle when the translating stage is fully extended beyond the body of the overhead transport vehicle.
  • 12. The overhead transport vehicle of claim 11, wherein the gripper is further configured to place the FOUP on a load port.
  • 13. The overhead transport vehicle of claim 12, wherein the gripper is further configured to retract to a starting position after placing the FOUP on the load port.
  • 14. The overhead transport vehicle of claim 11, wherein the gripper is further configured to place the FOUP on a conveyor.
  • 15. The overhead transport vehicle of claim 14, wherein the gripper is further configured to retract to a starting position after placing the FOUP on the conveyor.
  • 16. The overhead transport vehicle of claim 11, wherein a load port is disposed on an integrated circuit chip manufacturing floor.
CLAIM OF PRIORITY

This application is a continuation of and claims priority under 35 U.S.C. § 120 to U.S. patent application Ser. No. 12/724,194, filed Mar. 15, 2010, which issued as U.S. Pat. No. 8,197,172 and is entitled “AUTOMATED MATERIAL HANDLING SYSTEM FOR SEMICONDUCTOR MANUFACTURING BASED ON A COMBINATION OF VERTICAL CAROUSELS AND OVERHEAD HOISTS, which is a continuation of and claims priority under 35 U.S.C. § 120 to U.S. patent application Ser. No. 11/652,707, filed Jan. 12, 2007 now U.S. Pat. No. 7,771,153 and entitled “AUTOMATED MATERIAL HANDLING SYSTEM FOR SEMICONDUCTOR MANUFACTURING BASED ON A COMBINATION OF VERTICAL CAROUSELS AND OVERHEAD HOISTS,” which is a continuation of and claims priority under 35 U.S.C. § 120 to U.S. patent application Ser. No. 10/393,526, filed Mar. 20, 2003 now U.S. Pat. No. 7,165,927 and entitled “AUTOMATED MATERIAL HANDLING SYSTEM FOR SEMICONDUCTOR MANUFACTURING BASED ON A COMBINATION OF VERTICAL CAROUSELS AND OVERHEAD HOISTS,” which claims priority under 35 U.S.C. § 119(e) to U.S. Provisional Patent Application No. 60/389,993, filed Jun. 19, 2002 and entitled “AUTOMATED MATERIAL HANDLING SYSTEM FOR SEMICONDUCTOR MANUFACTURING BASED ON A COMBINATION OF VERTICAL CAROUSELS AND OVERHEAD HOISTS,” and U.S. Provisional Patent Application No. 60/417,993, filed Oct. 11, 2002 and entitled “OFFSET ZERO FOOTPRINT STORAGE (ZFS) USING MOVING SHELVES OR A TRANSLATING HOIST PLATFORM,” the entire contents of each of which are hereby incorporated by reference.

US Referenced Citations (162)
Number Name Date Kind
328408 Isbell Oct 1885 A
343293 Bowen Jun 1886 A
1352947 Fiske Sep 1920 A
2317689 Medenwald Apr 1943 A
2827189 Knudstrup Mar 1958 A
3042227 Tantlinger Jul 1962 A
3049247 Lemelson Aug 1962 A
3119501 Lemelson Jan 1964 A
3422967 Aron Jan 1969 A
3467264 Boytz et al. Sep 1969 A
3499554 Davis et al. Mar 1970 A
3531002 Lemelson Sep 1970 A
3583584 Iacco Jun 1971 A
3700121 McManus Oct 1972 A
3701442 Dunning et al. Oct 1972 A
3750804 Lemelson Aug 1973 A
3762531 Lee Oct 1973 A
3770137 Slutsky et al. Nov 1973 A
3883203 Lexe May 1975 A
3968885 Hassan et al. Jul 1976 A
4088232 Lilly May 1978 A
4190013 Otis et al. Feb 1980 A
4243147 Twitchell et al. Jan 1981 A
4311427 Coad et al. Jan 1982 A
4398630 Brems Aug 1983 A
4457661 Flint et al. Jul 1984 A
4540326 Southworth et al. Sep 1985 A
4541769 Clemens Sep 1985 A
4642017 Fenn Feb 1987 A
4668484 Elliot May 1987 A
4676560 Schmitz et al. Jun 1987 A
4682927 Southworth et al. Jul 1987 A
4697239 Sicard et al. Sep 1987 A
4756657 Kinney Jul 1988 A
4775281 Prentakis Oct 1988 A
4776744 Stonestreet et al. Nov 1988 A
4801236 Katzenschwanz Jan 1989 A
4816116 Davis et al. Mar 1989 A
4886412 Wooding et al. Dec 1989 A
4903610 Matsumoto et al. Feb 1990 A
4934767 Hoyt et al. Jun 1990 A
4979360 Kallmann et al. Dec 1990 A
5064337 Asakawa et al. Nov 1991 A
5083262 Haff Jan 1992 A
5096357 Galbani Mar 1992 A
5128912 Hug et al. Jul 1992 A
5324155 Goodwin et al. Jun 1994 A
5380139 Pohjonen et al. Jan 1995 A
5417537 Miller May 1995 A
5536128 Shimoyashiro et al. Jul 1996 A
5570990 Bonora et al. Nov 1996 A
5603777 Ohashi Feb 1997 A
5615988 Wiesler et al. Apr 1997 A
5628604 Murata et al. May 1997 A
5630692 Hanaya May 1997 A
5647718 Wiesler et al. Jul 1997 A
5655870 Yasuhara et al. Aug 1997 A
5741109 Wiesler et al. Apr 1998 A
5751581 Tau et al. May 1998 A
5836662 Robey Nov 1998 A
5893795 Perlov et al. Apr 1999 A
5909997 Liljengren et al. Jun 1999 A
5947802 Zhang et al. Sep 1999 A
5980183 Fosnight Nov 1999 A
5993148 Brown Nov 1999 A
6002840 Hofmeister Dec 1999 A
6035245 Conboy et al. Mar 2000 A
6050768 Iwasaki et al. Apr 2000 A
6068437 Boje et al. May 2000 A
6078845 Friedman Jun 2000 A
6086457 Perlov et al. Jul 2000 A
6092678 Kawano et al. Jul 2000 A
6095054 Kawano et al. Aug 2000 A
6102647 Yap Aug 2000 A
6113341 Fukushima Sep 2000 A
6129496 Iwasaki et al. Oct 2000 A
6134482 Iwasaki Oct 2000 A
6169935 Iwasaki et al. Jan 2001 B1
6183184 Shiwaku Feb 2001 B1
6240335 Wehrung et al. May 2001 B1
6251155 Fukushima Jun 2001 B1
6303398 Goerigk Oct 2001 B1
6308818 Bonora et al. Oct 2001 B1
6315512 Tabrizi et al. Nov 2001 B1
6336546 Lorenz Jan 2002 B1
6356256 Leftwich Mar 2002 B1
6356804 Conboy et al. Mar 2002 B1
6361422 Ettinger et al. Mar 2002 B1
6364593 Hofmeister et al. Apr 2002 B1
6398476 Ando Jun 2002 B1
6439822 Kimura et al. Aug 2002 B1
6450318 Minardi Sep 2002 B1
6453574 Chen Sep 2002 B1
6460711 Kato et al. Oct 2002 B1
6504144 Murata Jan 2003 B1
6519502 Chao Feb 2003 B2
6530735 Trammell Mar 2003 B1
6564120 Richard et al. May 2003 B1
6579052 Bonora et al. Jun 2003 B1
6604624 Hirata et al. Aug 2003 B2
6695120 Trammell Feb 2004 B1
6715978 Lin et al. Apr 2004 B2
6726429 Sackett Apr 2004 B2
6748282 Lin Jun 2004 B2
6758647 Kaji et al. Jul 2004 B2
6775918 Tseng et al. Aug 2004 B2
6812926 Rugge Nov 2004 B1
6881020 Chang et al. Apr 2005 B2
7023440 Havekost et al. Apr 2006 B1
7165927 Doherty et al. Jan 2007 B2
7292245 Goggin Nov 2007 B2
7441999 Nakao et al. Oct 2008 B2
7570262 Landau et al. Aug 2009 B2
7686176 Murata Mar 2010 B2
7771153 Doherty et al. Aug 2010 B2
7907140 Landau et al. Mar 2011 B2
8113844 Huang et al. Feb 2012 B2
8197172 Doherty et al. Jun 2012 B2
8224953 Childers Jul 2012 B2
8269620 Bullemer et al. Sep 2012 B2
8271892 Duncker et al. Sep 2012 B2
9620397 Doherty et al. Apr 2017 B2
9881823 Doherty et al. Jan 2018 B2
10141212 Doherty et al. Nov 2018 B2
10147627 Doherty et al. Dec 2018 B2
20010014268 Bryson, III et al. Aug 2001 A1
20020025244 Kim Feb 2002 A1
20020105236 Fosnight et al. Aug 2002 A1
20020143426 Chao Oct 2002 A1
20020143427 Chao Oct 2002 A1
20020182037 Kimoto et al. Dec 2002 A1
20020182040 Kimura et al. Dec 2002 A1
20020187024 Nulman Dec 2002 A1
20020197136 Huang et al. Dec 2002 A1
20030014699 Kallela Jan 2003 A1
20030023518 Spriggs Jan 2003 A1
20030156928 Sackett et al. Aug 2003 A1
20030190223 Peiter Oct 2003 A1
20030198540 Lin et al. Oct 2003 A1
20030235486 Doherty et al. Dec 2003 A1
20040027349 Landau et al. Feb 2004 A1
20040101386 Robey May 2004 A1
20040109746 Suzuki Jun 2004 A1
20040126208 Tawyer et al. Jul 2004 A1
20040191032 Foulke et al. Sep 2004 A1
20050097471 Faraday et al. May 2005 A1
20050162423 Goggin Jul 2005 A1
20050177790 Molander et al. Aug 2005 A1
20050261999 Rowady Nov 2005 A1
20060074598 Emigholz et al. Apr 2006 A1
20070018984 Sauvageau Jan 2007 A1
20070110547 Doherty et al. May 2007 A1
20070242688 McFarland Oct 2007 A1
20080313560 Dalal Dec 2008 A1
20090088534 Scheie et al. Apr 2009 A1
20090183095 Deitsch et al. Jul 2009 A1
20100174405 Doherty et al. Jul 2010 A1
20120288348 Doherty et al. Nov 2012 A1
20140119857 Doherty et al. May 2014 A1
20150303087 Doherty et al. Oct 2015 A1
20150303088 Doherty et al. Oct 2015 A1
20150303089 Doherty et al. Oct 2015 A1
Foreign Referenced Citations (71)
Number Date Country
3825401 Jan 1990 DE
3825401 Jan 1990 DE
3825401 Jul 1990 DE
1063056 Dec 2000 EP
1 202 325 May 2002 EP
1 202 325 May 2002 EP
62-297050 Dec 1987 JP
63-37626 Feb 1988 JP
01-285512 Nov 1989 JP
H 0227838 Feb 1990 JP
2-117506 May 1990 JP
03-177205 Aug 1991 JP
H03177205 Aug 1991 JP
3-225847 Oct 1991 JP
5-186050 Jul 1993 JP
5-77183 Oct 1993 JP
5-278853 Oct 1993 JP
6-20388 Mar 1994 JP
06053578 Jul 1994 JP
H06053578 Jul 1994 JP
H06053835 Jul 1994 JP
H 0661487 Aug 1994 JP
2548081 May 1997 JP
09-315521 Sep 1997 JP
10-45213 Feb 1998 JP
10045213 Feb 1998 JP
A 10-045213 Feb 1998 JP
H10045213 Feb 1998 JP
10250835 Sep 1998 JP
11-016981 Jan 1999 JP
11-100120 Apr 1999 JP
H11180505 Jul 1999 JP
2000-053237 Feb 2000 JP
2000-53237 Feb 2000 JP
2000-150622 May 2000 JP
2000-161457 Jun 2000 JP
2000-188316 Jul 2000 JP
2000-255710 Sep 2000 JP
2000-289975 Oct 2000 JP
2001-31216 Feb 2001 JP
2001-031216 Feb 2001 JP
2001-093957 Apr 2001 JP
2001-144169 May 2001 JP
2001-158506 Jun 2001 JP
2001-171970 Jun 2001 JP
2001-242978 Sep 2001 JP
2001-354302 Dec 2001 JP
2004-512692 Apr 2004 JP
4626302 Feb 2011 JP
2011-115010 Jun 2011 JP
2011-231707 Nov 2011 JP
4831521 Dec 2011 JP
2014-003564 Jan 2014 JP
05-435414 Mar 2014 JP
524799 Oct 2004 SE
1326512 Mar 1986 SU
WO 9846503 Mar 1998 WO
WO 199846503 Oct 1998 WO
WO 9902436 Jan 1999 WO
WO 199902436 Jan 1999 WO
1999013495 Mar 1999 WO
200033355 Jun 2000 WO
WO 0037338 Jun 2000 WO
WO 200037338 Jun 2000 WO
WO 0113408 Feb 2001 WO
WO 200113408 Feb 2001 WO
WO 200155805 Aug 2001 WO
WO 0196884 Dec 2001 WO
WO 200196884 Dec 2001 WO
WO 2002035583 May 2002 WO
WO2002035583 May 2002 WO
Non-Patent Literature Citations (84)
Entry
Campbell, “Overhead Intrabay Automation and Microstocking—a virtual fab case study,” IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 368-372 (1997).
Kaempf , “Automated Wafer Transport in the Wafer Fab,” IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 356-361 (1997).
Kuo, “Modelling and Performance Evaluation of an Overhead Hoist Trasnport System in a 300 mm Fabrication Plant,” Int. J. Adv. Manuf. Technol., vol. 20, pp. 153-161 (2002).
Sikich, “Development and Implementation of an Automated Wafer Transport System,” IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 400-404 (1998).
Office Action from Patent Application No. JP 2004-515615, dated Mar. 22, 2011.
Office Action dated Dec. 29, 2004, for U.S. Appl. No. 10/393,526.
Response to Office Action dated Dec. 29, 2004, filed Mar. 28, 2005 for U.S. Appl. No. 10/393,526.
Final Office Action dated Jul. 5, 2005, for U.S. Appl. No. 10/393,526.
Response to Office Action dated Jul. 5, 2005, filed Sep. 1, 2005 for U.S. Appl. No. 10/393,526.
Non-Final Office Action dated May 9, 2006, for U.S. Appl. No. 10/393,526.
Response to Office Action dated May 9, 2006, filed Aug. 9, 2006 for U.S. Appl. No. 10/393,526.
Non-Final Office Action dated Apr. 24, 2007, for U.S. Appl. No. 11/652,707.
Response to Office Action dated Apr. 24, 2007, filed Aug. 16, 2007 for U.S. Appl. No. 11/652,707.
Non-Final Office Action dated Oct. 19, 2007, for U.S. Appl. No. 11/652,707.
Response to Office Action dated Oct. 19, 2007, filed Jan. 17, 2008 for U.S. Appl. No. 11/652,707.
Final Office Action dated May 2, 2008, for U.S. Appl. No. 11/652,707.
Response to Office Action dated May 2, 2008, filed Aug. 1, 2008 for U.S. Appl. No. 11/652,707.
Response to Office Action dated May 2, 2008, filed Apr. 3, 2009 for U.S. Appl. No. 11/652,707.
Non-Final Office Action dated Jun. 22, 2009, for U.S. Appl. No. 11/652,707.
Response to Office Action dated Jun. 22, 2009, filed Sep. 22, 2009 for U.S. Appl. No. 11/652,707.
Non-Final Office Action dated Nov. 3, 2011, for U.S. Appl. No. 12/724,194.
Response to Office Action dated Nov. 3, 2011, filed Feb. 3, 2012 for U.S. Appl. No. 12/724,194.
English Translation of Japanese office action from Japanese application No. 2011-115010 dated Nov. 11, 2013 (7 pages).
English Translation of Japanese office action from Japanese application No. 2011-231707 dated Nov. 11, 2013 (6 pages).
USPTO, Patent Trial and Appeal Board, Daifuku Co., LTD and Daifuku America Corp., Petitioner, v. Murata Machinery, Ltd., Patent Owner, Case IPR2015-00087, U.S. Pat. No. 7,165,927, Oct. 17, 2014 (664 pages).
USPTO, Patent Trial and Appeal Board, Daifuku Co., LTD and Daifuku America Corp., Petitioner, v. Murata Machinery, Ltd., Patent Owner, Case IPR2015-00088, U.S. Pat. No. 7,165,927, Oct. 17, 2014 (671 pages).
USPTO, Patent Trial and Appeal Board, Daifuku Co., LTD and Daifuku America Corp., Petitioner, v. Murata Machinery, Ltd., Patent Owner, Case IPR2015-00085, U.S. Pat. No. 7,771,153, Oct. 17, 2014 (643 pages).
USPTO, Patent Trial and Appeal Board, Daifuku Co., LTD and Daifuku America Corp., Petitioner, v. Murata Machinery, Ltd., Patent Owner, Case IPR2015-00084, U.S. Pat. No. 7,771,153, Oct. 17, 2014 (632 pages).
Declaration of Dr. Robert Sturges Regarding Patentability of U.S. Pat. No. 7,165,927, Oct. 14, Petition for Inter Partes Review of U.S. Pat. No. 8,457,228 (146 pages).
European Communication dated Jul. 16, 2014 from European application No. 03761012.8 (5 pages).
The 2nd Preliminary Statement of a Defendant, Murata Machinery, Ltd. V Daifuku Co., Ltd., Japanese Patent No. 4831521, No. 10253, Jun. 18, 2015 (12 pages).
Court Decision, Murata Machinery, Ltd. vs Patent Office Commissioner Hitoshi Ito, Certified in State of New York, Judgement Rendered May 27, 2015, Court Clerk 2014 (Gyo-Ke) No. 10149, Case of Request to Overturn Trial Decision, Appeal Case No. 2013-7294 (114 pages).
Court Decision, Murata Machinery, Ltd. vs Patent Office Commissioner Hitoshi Ito, Certified in State of New York, Judgement Rendered May 27, 2015, Court Clerk 2014 (Gyo-Ke) No. 10150, Case of Request to Overturn Trial Decision, Appeal Case No. 2013-7295 (92 pages).
Judgment, Murata Machinery, Ltd. vs Daifuku Co., Ltd., Certified in State of New York, Rendition of Judgment Jul. 9, 2015, Court Clerk 2014, (Gyo Ke) No. 10253, Request to annul trial decision, Japanese Patent No. 4831521 (150 pages).
Non Final Office action issued in U.S. Appl. No. 14/788,464 dated Aug. 17, 2015.
USPTO Non Final Office Action in U.S. Appl. No. 10/682,809, dated Jun. 4, 2015, 10 pages.
Description of Evidence (3), Murata Machinery, Ltd. V. Daifuku Co., Ltd., Invalidity No. 2012-800048, Apr. 1, 2015 (2 pages).
Description of Evidence (4), Murata Machinery, Ltd. V. Daifuku Co., Ltd., Invalidity No. 2012-800048, Japanese Patent No. 48315241, May 28, 2015 (2 pages).
Judgment, the shell No. 25 certificate, Murata Machinery, Ltd. V. Daifuku Co., Ltd., Invalidity No. 2012-800048, May 27, 2015 (56 pages).
Judgment, the shell No. 26 certificate, Murata Machinery, Ltd. V. Daifuku Co., Ltd., Invalidity No. 2012-800048, May 27, 2015 (46 pages).
Plaintiff Preliminary Statement (3), Murata Machinery, Ltd. V. Daifuku Co., Ltd., Apr. 1, 2015 (34 pages).
The 1st Preliminary Statement of a defendant, Murata Machinery, Ltd. V. Daifuku Co., Ltd., Mar. 2, 2015 (33 pages).
Decision Denying Institution of Inter Partes Review 37 C.F.R. §42.108, Murata Machinery, Ltd. V. Daifuku Co., Ltd., May 4, 2015 (18 pages).
Description of Evidence (5), Murata Machinery, Ltd. V. Daifuku Co., Ltd., Invalidity No. 2012-800048, Japanese Patent No. 48315241, Jun. 10, 2015 (2 pages).
Technical Explanation Data, Evidence No. 27, Murata Machinery, Ltd. V. Daifuku Co., Ltd., Invalidity No. 2012-800048, Japanese Patent No. 48315241, Jun. 10, 2015 (12 pages).
Written Statement, Murata Machinery, Ltd. V. Daifuku Co., Ltd., Invalidity No. 2012-800048, Japanese Patent No. 48315241, Jun. 10, 2015 (1 page).
Judgement, Murata Machinery, Ltd. V Daifuku Co., Ltd., Japanese Patent No. 4831521, No. 10253, Invalidity No. 800061, Jun. 25, 2015 (57 pages).
Non Final Office action issued in U.S. Appl. No. 14/080,590 dated Sep. 23, 2015.
Non Final Office action issued in U.S. Appl. No. 14/755,928 dated Oct. 16, 2015.
Non Final Office action issued in U.S. Appl. No. 14/788,173 dated Oct. 15, 2015.
The Trial Decision, Murata Machinery, Ltd. V Daifuku Co., Ltd., Dispatch No. 105297, Invalidity 2013-800061, Japanese Patent No. 4831521, No. 10253, Jan. 7, 2016 (42 pages).
European Communication issued in European application 13162984.2 dated Feb. 2, 2015 (24 pages).
Final Written Decision, Daifuku Co., Ltd. and Daifuku America Corp. v Murata Machinery, Ltd., Case IPR2015-00088, U.S. Pat. No. 7,165,927B2, May 3, 2016 (27 pages).
Decision: Final Written Decision, Daifuku Co., Ltd. and Daifuku America Corp. v Murata Machinery, Ltd., Case IPR2015-00085, U.S. Pat. No. 7,771,153B2, May 3, 2016 (32 pages).
Record of Oral Hearing, Daifuku Co., Ltd. and Daifuku America Corp. v Murata Machinery, Ltd., Case No. IPR2015-00083 (U.S. Pat. No. 8,197,172), Case No. IPR2015-00085 (U.S. Pat. No. 7,771,153), Case No. IPR2015-00088 (U.S. Pat. No. 7,165,927), Mar. 8, 2016 (90 pages).
Non Final office action from U.S. Appl. No. 14/755,928 dated Apr. 13, 2016.
Final office action from U.S. Appl. No. 14/080,590 dated Apr. 27, 2016.
Notice of allowance from U.S. Appl. No. 14/788,173 dated Apr. 19, 2016.
Final office action from U.S. Appl. No. 14/788,464 dated Feb. 18, 2016.
Non Final office action from U.S. Appl. No. 10/682,809 dated Jul. 1, 2016.
Notice of allowance from U.S. Appl. No. 14/788,173 dated Aug. 24, 2016.
Notice of allowance from U.S. Appl. No. 14/788,173 dated Oct. 6, 2016.
European communication from EP Application No. 03761012.8 dated Jul. 24, 2017 (5 pages).
Office action issued in Japanese Application No. 2004-543686 dated Jul. 20, 2010.
Search Report from corresponding EP Application No./Patent No. 03 776281.2-2222 / 1573778 PCT/US0332200, dated Sep. 13, 2011.
USPTO, Patent Trial and Appeal Board, Daifuku Co., Ltd and Daifuku America Corp., Petitioner, v. Murata Machinery, Ltd., Patent Owner, Case IPR2015-00083, U.S. Pat. No. 8,197,172, Oct. 17, 2014 (642 pages).
Complaint filed Sep. 23, 2013; Murata Machinery USA, Inc. et al. v Daifuku Co., Ltd. Et al., No. 2:13-cv-00866, D. Utah Sep. 23, 2013 (9 pages).
Dictionary.com, retrieved from the Internet, http://dictionary.reference.com/browse/translate?s=t[Oct. 8, 2014 2:45:57 PM], visited Oct. 8, 2014 (8 pages).
Amendment dated Aug. 9, 2006, U.S. Appl. No. 10/393,526 (31 pages).
Notice of Allowance and Notice of Allowability dated Oct. 26, 2006, U.S. Appl. No. 10/393,526 (6 pages).
Office Action dated Nov. 3, 2011, U.S. Appl. No. 12/724,194 (6 pages).
Amendment dated Feb. 3, 2012, U.S. Appl. No. 12/724,194 (18 pages).
Notice of Allowance and Notice of Allowability dated Feb. 28, 2012, U.S. Appl. No. 12/724,194 (9 pages).
Preliminary Amendment dated Mar. 15, 2010, U.S. Appl. No. 12/724,194 (8 pages).
Original Application Claim 1 dated Jan. 12, 2007, U.S. Appl. No. 11/652,707 (34 pages).
Amendment dated Apr. 3, 2009, U.S. Appl. No. 11/652,707 (14 pages).
Amendment dated Sep. 22, 2009, U.S. Appl. No. 11/652,707 (13 pages).
Office Action dated Jun. 22, 2009, U.S. Appl. No. 11/652,707 (6 pages).
Notice of Allowance and Notice of Allowability dated Nov. 18, 2009, U.S. Appl. No. 11/652,707 (6 pages).
Notice of Allowance and Notice of Allowability dated May 5, 2010, U.S. Appl. No. 11/652,707 (6 pages).
Declaration of Dr. Robert Sturges Regarding Patentability of U.S. Pat. No. 7,165,927, Oct. 14, 2014, Petition for Inter Partes Review of U.S. Pat. No. 8,457,228 (146 pages).
Notification of conclusion of appeal examination document, Invalidity 2013-800061, U.S. Pat. No. 4,831,521, Intellectual Property High Court of Japan, Oct. 2, 2014 (17 pages).
Trial Decision, Invalidity 2013-800061, U.S. Pat. No. 4,831,521, Intellectual Property High Court of Japan, Oct. 23, 2014 (35 pages).
Complaint, Invalidity 2013-800061, U.S. Pat. No. 4,831,521, Intellectual Property High Court of Japan, Nov. 19, 2014 (5 pages).
Related Publications (1)
Number Date Country
20120288348 A1 Nov 2012 US
Provisional Applications (2)
Number Date Country
60389993 Jun 2002 US
60417993 Oct 2002 US
Continuations (3)
Number Date Country
Parent 12724194 Mar 2010 US
Child 13492341 US
Parent 11652707 Jan 2007 US
Child 12724194 US
Parent 10393526 Mar 2003 US
Child 11652707 US