Claims
- 1. The method of controlling the timing and limiting of the quantity of submerged material picked up by a crane grab each load including lowering the grab open on a hoist line under its own weight at a predetermined substantially constant rate; passing the lowering grab in open condition through water above the material to lessen and render constant its effective weight upon the hoist line; automatically detecting the moment of initial substantial contact between the grab and work material as indicated by the final reduction of grab weight upon the hoist line; continuing the lowering of the hoist line for a predetermined set period of time after said detection to remove substantially all grab weight from the hoist line and penetrate the work material in depth; arresting movement of the hoist line at the end of said period of time to provide limited slack in the hoist line; limiting the digging depth of the grab by taking up the slack while closing said grab; and, thereafter freeing and raising the closed grab and load by the hoist line.
- 2. The method defined in claim 1 in which the grab hoist line is controlled by hydraulic power means and the effective weight of the grab on the hoist line is measured by hydraulic pressure of the hydraulic power means, reducing the effective hydraulic pressure by submerging the bucket under water for buoyancy and the water opposing downward movement of the grab, said detection of contact with the work material being by the primary change in said reduced hydraulic pressure that is effective while lowering the grab through the water.
- 3. The method defined in claim 2 in which said initial change in the reduced hydraulic pressure includes a momentary increase in pressure.
- 4. The method of controlling the quantity of material picked up by a grab each load on a hoist line including consistently lowering a grab under its own weight at a predetermined substantially constant rate in open condition on the hoist line and substantially decreasing its effective weight upon the hoist line by movement through water above the work material; automatically detecting the moment of initial substantial contact between the grab and work material as indicated by further reduction of the effective underwater weight of the grab on the hoist line; continuing the lowering for a set predetermined period of time after said detection to penetrate the material; stopping said lowering at the end of said period of time; supporting the grab at an adjustably determined depth of penetration while closing said grab within a determined period of time; and, hoisting the closed grab.
- 5. The method defined in claim 4 in which the effective weight of the grab on the hoist line is carried by hydraulic means and measured by hydraulic pressure therein which is reduced by grab buoyancy and water opposing its downward movement, said detection of contact with the work material being by the initial change in the effective lowering pressure from its reduced lowering weight.
- 6. The method of determining the quantity of material picked up by a grab means comprising lowering the grab means open using hydraulic pressure means that is directly responsive to the weight of the grab means; automatically detecting the first contact of the grab means with work as indicated by a primary reduction of hydraulic pressure in said hydraulic pressure means, selectively timing a delayed response to said detected contact and said delayed response including arresting the downward movement of the grab means, closing the grab means and restricting the grab means to digging at and above a predetermined level.
- 7. The method of hydraulically operating to grab crane to excavate work material, comprising:
- lowering an open grab under water by a hydraulic winch means at an ascertainable hydraulic pressure;
- automatically detecting the change in said hydraulic pressure in the winch means occurring when the lowering grab contacts the work material;
- reacting to said detected change by initiating a timed response period for limited grab penetration of said work material and providing a grab digging interval of time and braking said winch means to limit the digging depth of the grab;
- venting said hydraulic pressure at the end of said interval of time and closing said grab to pick up a load of work material, and thereupon, hoisting the loaded grab to an emptying position under a hydraulic pressure greater than said ascertainable hydraulic pressure.
Parent Case Info
This is a division of application Ser. No. 508,274, filed on Sept. 23, 1974, now U.S. Pat. No. 3,967,394.
US Referenced Citations (10)
Divisions (1)
|
Number |
Date |
Country |
Parent |
508274 |
Sep 1974 |
|