The present disclosure is directed to systems, devices, and methods for providing steering instructions for drilling systems. In particular, the present disclosure includes generating automatic steering instructions for directional motor drilling systems.
At the outset of a drilling operation, drillers typically establish a drill plan that includes a steering target (or steering objective location) and a drilling path to the steering objective location. Once drilling commences, the bottom hole assembly (BHA) may be directed or “steered” from a vertical drilling path in any number of directions, to follow the proposed drill plan. For example, to recover an underground hydrocarbon deposit, a drill plan might include a vertical bore to the side of a reservoir containing a deposit, then a directional or horizontal bore that penetrates the deposit. The operator may then follow the plan by steering the BHA through the vertical and horizontal aspects in accordance with the plan.
In slide drilling implementations, such directional drilling requires accurate orientation of a bent housing of the down hole motor. The bent housing is set on surface to a pre-determined angle of bend. The high side of this bend is referred to as the toolface of the BHA. In such slide drilling implementations, rotating the drill string changes the orientation of the bent housing and the BHA, and thus the toolface. To effectively steer the assembly, the operator must first determine the current toolface orientation, such as via measurement-while-drilling (MWD) apparatus. Thereafter, if the drilling direction needs adjustment, the operator must rotate the drill string or alter other surface drilling parameters to change the toolface orientation.
During drilling, a “survey” identifying locational and directional data of a BHA in a well is obtained at various intervals. Each survey yields a measurement of the inclination angle from vertical and azimuth (or compass heading) of the survey probe in a well (typically 40-50 feet behind the total depth at the time of measurement). In directional wellbores, particularly, the position of the wellbore must be known with reasonable accuracy to ensure the correct steering of the wellbore path. The measurements themselves include inclination from vertical and the azimuth of the well bore. In addition to the toolface data, and inclination, and azimuth, the data obtained during each survey may also include hole depth data, pipe rotary data, hook load data, delta pressure data (across the down hole drilling motor), and modeled dogleg data, for example.
These measurements may be taken at discrete points in the well, and the approximate path of the wellbore may be computed from the data obtained at these discrete points. Conventionally, a standard survey is conducted at each drill pipe increment or at each stand length, at approximately every 95 feet, to obtain an accurate measurement of inclination and azimuth for the new survey position.
As a drilling operation proceeds, the operator is required to assess the results of each survey, enter the results into a standalone computer or other calculation device, formulate a visual mental impression of the overall orientation of the drilling BHA, and try to formulate a steering plan for the next 95 feet, based on this mental impression, before steering the system. This can be difficult, time consuming, and complex. Furthermore, this lengthy process can cause delays in drilling. A more efficient, reliable, and intuitive method for steering a BHA in a directional motor drilling system is needed.
The present disclosure is best understood from the following detailed description when read with the accompanying figures. It is emphasized that, in accordance with the standard practice in the industry, various features are not drawn to scale. In fact, the dimensions of the various features may be arbitrarily increased or reduced for clarity of discussion.
It is to be understood that the following disclosure describes many different implementations, or examples, for implementing different features of various implementations. Specific examples of components and arrangements are described below to simplify the present disclosure. These are, of course, merely examples and are not intended to be limiting. In addition, the present disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various implementations and/or configurations discussed.
This disclosure introduces systems and methods to generate directional motor drilling instructions. In particular, the present disclosure includes generating automatic steering instructions for directional motor drilling systems. The present disclosure may reduce decision-making time for a drilling operator, thereby increasing the efficiency and effectiveness of the drilling procedure. In some implementations, the automatic steering instructions may include a number of directional motor drilling instructions that are generated by a controller. These systems and methods may be used to determine an optimized path to navigate a Bottom Hole Assembly (BHA) to a steering target using one or more steering methods, such as straight line projections, rotary drilling projections, True Vertical Depth, Inclination, and Azimuth (TIA) calculations, and three dimensional “J” (3DJ) calculations, and driving the BHA to the steering target using the optimized path.
Referring to
Apparatus 100 includes a mast 105 supporting lifting gear above a rig floor 110. The lifting gear includes a crown block 115 and a traveling block 120. The crown block 115 is coupled at or near the top of the mast 105, and the traveling block 120 hangs from the crown block 115 by a drilling line 125. One end of the drilling line 125 extends from the lifting gear to drawworks 130, which is configured to reel in and out the drilling line 125 to cause the traveling block 120 to be lowered and raised relative to the rig floor 110. The other end of the drilling line 125, known as a dead line anchor, is anchored to a fixed position, possibly near the drawworks 130 or elsewhere on the rig.
A hook 135 is attached to the bottom of the traveling block 120. A top drive 140 is suspended from the hook 135. A quill 145 extending from the top drive 140 is attached to a saver sub 150, which is attached to a drill string 155 suspended within a wellbore 160. Alternatively, the quill 145 may be attached to the drill string 155 directly. The term “quill” as used herein is not limited to a component which directly extends from the top drive, or which is otherwise conventionally referred to as a quill. For example, within the scope of the present disclosure, the “quill” may additionally or alternatively include a main shaft, a drive shaft, an output shaft, and/or another component which transfers torque, position, and/or rotation from the top drive or other rotary driving element to the drill string, at least indirectly. Nonetheless, albeit merely for the sake of clarity and conciseness, these components may be collectively referred to herein as the “quill.”
The drill string 155 includes interconnected sections of drill pipe 165, a bottom hole assembly (BHA) 170, and a drill bit 175. The BHA 170 may include stabilizers, drill collars, and/or measurement-while-drilling (MWD) or wireline conveyed instruments, among other components. In some implementations, the BHA 170 includes a bent housing drilling system.
Implementations using bent housing drilling systems may require slide drilling techniques to effect a turn using directional drilling. For the purpose of slide drilling, the bent housing drilling systems may include a down hole motor with a bent housing or other bend component operable to create an off-center departure of the bit from the center line of the wellbore. The direction of this departure from the centerline in a plane normal to the centerline is referred to as the “toolface angle.” The drill bit 175, which may also be referred to herein as a “tool,” may have a “toolface,” connected to the bottom of the BHA 170 or otherwise attached to the drill string 155. One or more pumps 180 may deliver drilling fluid to the drill string 155 through a hose or other conduit, which may be connected to the top drive 140.
The down hole MWD or wireline conveyed instruments may be configured for the evaluation of physical properties such as pressure, temperature, torque, weight-on-bit (WOB), vibration, inclination, azimuth, toolface orientation in three-dimensional space, and/or other down hole parameters. These measurements may be made down hole, stored in memory, such as solid-state memory, for some period of time, and downloaded from the instrument(s) when at the surface and/or transmitted in real-time to the surface. Data transmission methods may include, for example, digitally encoding data and transmitting the encoded data to the surface, possibly as pressure pulses in the drilling fluid or mud system, acoustic transmission through the drill string 155, electronic transmission through a wireline or wired pipe, transmission as electromagnetic pulses, among other methods. The MWD sensors or detectors and/or other portions of the BHA 170 may have the ability to store measurements for later retrieval via wireline and/or when the BHA 170 is tripped out of the wellbore 160.
In an exemplary implementation, the apparatus 100 may also include a rotating blow-out preventer (BOP) 158 that may assist when the well 160 is being drilled utilizing under-balanced or managed-pressure drilling methods. The apparatus 100 may also include a surface casing annular pressure sensor 159 configured to detect the pressure in an annulus defined between, for example, the wellbore 160 (or casing therein) and the drill string 155.
In the exemplary implementation depicted in
The apparatus 100 also includes a controller 190 configured to control or assist in the control of one or more components of the apparatus 100. For example, the controller 190 may be configured to transmit operational control signals to the drawworks 130, the top drive 140, the BHA 170 and/or the pump 180. The controller 190 may be a stand-alone component installed near the mast 105 and/or other components of the apparatus 100. In an exemplary implementation, the controller 190 includes one or more systems located in a control room in communication with the apparatus 100, such as the general purpose shelter often referred to as the “doghouse” serving as a combination tool shed, office, communications center, and general meeting place. The controller 190 may be configured to transmit the operational control signals to the drawworks 130, the top drive 140, the BHA 170, and/or the pump 180 via wired or wireless transmission devices which, for the sake of clarity, are not depicted in
The controller 190 is also configured to receive electronic signals via wired or wireless transmission devices (also not shown in
It is noted that the meaning of the word “detecting,” in the context of the present disclosure, may include detecting, sensing, measuring, calculating, and/or otherwise obtaining data. Similarly, the meaning of the word “detect” in the context of the present disclosure may include detect, sense, measure, calculate, and/or otherwise obtain data.
The apparatus 100 may additionally or alternatively include a shock/vibration sensor 170b that is configured to detect shock and/or vibration in the BHA 170. The apparatus 100 may additionally or alternatively include a mud motor pressure sensor 172a that is configured to detect a pressure differential value or range across one or more motors 172 of the BHA 170. The one or more motors 172 may each be or include a positive displacement drilling motor that uses hydraulic power of the drilling fluid to drive the drill bit 175, also known as a mud motor. One or more torque sensors 172b may also be included in the BHA 170 for sending data to the controller 190 that is indicative of the torque applied to the drill bit 175 by the one or more motors 172.
The apparatus 100 may additionally or alternatively include a toolface sensor 170c configured to detect the current toolface orientation. The toolface sensor 170c may be or include a conventional or future-developed magnetic toolface sensor which detects toolface orientation relative to magnetic north. Alternatively, or additionally, the toolface sensor 170c may be or include a conventional or future-developed gravity toolface sensor which detects toolface orientation relative to the Earth's gravitational field. The toolface sensor 170c may also, or alternatively, be or include a conventional or future-developed gyro sensor. The apparatus 100 may additionally or alternatively include a WOB sensor 170d integral to the BHA 170 and configured to detect WOB at or near the BHA 170.
The apparatus 100 may additionally or alternatively include a torque sensor 140a coupled to or otherwise associated with the top drive 140. The torque sensor 140a may alternatively be located in or associated with the BHA 170. The torque sensor 140a may be configured to detect a value or range of the torsion of the quill 145 and/or the drill string 155 (e.g., in response to operational forces acting on the drill string). The top drive 140 may additionally or alternatively include or otherwise be associated with a speed sensor 140b configured to detect a value or range of the rotary speed of the quill 145.
The top drive 140, drawworks 130, crown or traveling block, drilling line or dead line anchor may additionally or alternatively include or otherwise be associated with a WOB sensor 140c (WOB calculated from a hook load sensor that can be based on active and static hook load, e.g., one or more sensors installed somewhere in the load path mechanisms to detect and calculate WOB, which can vary from rig to rig) different from the WOB sensor 170d. The WOB sensor 140c may be configured to detect a WOB value or range, where such detection may be performed at the top drive 140, drawworks 130, or other component of the apparatus 100.
The detection performed by the sensors described herein may be performed once, continuously, periodically, and/or at random intervals. The detection may be manually triggered by an operator or other person accessing a human-machine interface (HMI), or automatically triggered by, for example, a triggering characteristic or parameter satisfying a predetermined condition (e.g., expiration of a time period, drilling progress reaching a predetermined depth, drill bit usage reaching a predetermined amount, etc.). Such sensors and/or other detection elements may include one or more interfaces which may be local at the well/rig site or located at another, remote location with a network link to the system.
Referring to
The user interface 260 and the directional planning and monitoring controller 252 may be discrete components that are interconnected via wired or wireless devices. Alternatively, the user interface 260 and the directional planning and monitoring controller 252 may be integral components of a single system or controller 250, as indicated by the dashed lines in
The user interface 260 may include a data input device 266 that permits a user to input one or more toolface set points. This may also include inputting other set points, limits, and other input data. The data input device 266 may include a keypad, voice-recognition apparatus, dial, button, switch, slide selector, toggle, joystick, mouse, data base and/or other conventional or future-developed data input device. Such data input device 266 may support data input from local and/or remote locations. Alternatively, or additionally, the data input device 266 may include one or more devices for providing a user selection of predetermined toolface set point values or ranges, such as via one or more drop-down menus. The toolface set point data may also or alternatively be selected by the directional planning and monitoring controller 252 via the execution of one or more database look-up procedures. In general, the data input device 266 and/or other components within the scope of the present disclosure support operation and/or monitoring from stations on the rig site as well as one or more remote locations with a communications link to the system, network, local area network (LAN), wide area network (WAN), Internet, satellite-link, and/or radio, among other communication types.
The user interface 260 may also include a survey input device 268. The survey input device 268 may include information gathered from sensors regarding the orientation and location of the BHA 210. In some implementations, survey input device 268 is automatically entered into the user interface at regular intervals. The survey input device 268 may be used to determine an initial position of the BHA 210 for generating steering instructions.
The user interface 260 may also include a display device 261 arranged to present visualizations of a down hole environment, such as a two-dimensional visualization and/or a three-dimensional visualization. The display device 261 may be used for visually presenting information to the user in textual, graphic, or video form. Depending on the implementation, the display device 261 may include, for example, an LED or LCD display computer monitor, touchscreen display, television display, a projector, or other display device. Some examples of information that may be shown on the display device 261 will be discussed in further detail with reference to
In some implementations, instructions for driving the BHA may be generated for each stand length of the drill string. In some cases, the set of instructions may be generated during the drilling of a stand length. Alternatively, the set of instructions may be generated after a first stand length has been drilled by the BHA and before the drilling of the next stand length. These instructions may be viewed by an operator and may automatically drive the BHA.
The BHA 210 may include a MWD casing pressure sensor 212 that is configured to detect an annular pressure value or range at or near the MWD portion of the BHA 210, and that may be substantially similar to the down hole annular pressure sensor 170a shown in
The BHA 210 may also include an MWD shock/vibration sensor 214 that is configured to detect shock and/or vibration in the MWD portion of the BHA 210, and that may be substantially similar to the shock/vibration sensor 170b shown in
The BHA 210 may also include a mud motor pressure sensor 216 that is configured to detect a pressure differential value or range across the mud motor of the BHA 210, and that may be substantially similar to the mud motor pressure sensor 172a shown in
The BHA 210 may also include a magnetic toolface sensor 218 and a gravity toolface sensor 220 that are cooperatively configured to detect the current toolface, and that collectively may be substantially similar to the toolface sensor 170c shown in
The BHA 210 may also include an MWD torque sensor 222 that is configured to detect a value or range of values for torque applied to the bit by the motor(s) of the BHA 210, and that may be substantially similar to the torque sensor 172b shown in
The BHA 210 may also include a MWD WOB sensor 224 that is configured to detect a value or range of values for WOB at or near the BHA 210, and that may be substantially similar to the WOB sensor 170d shown in
Depending upon the implementation, the BHA 210 may also include one or more directional drilling components 226 such as bent housing system components. In some implementations, the directional drilling components 226 may include a drilling motor that forms part of the BHA 170.
The drawworks 240 may include a controller 242 and/or other devices for controlling feed-out and/or feed-in of a drilling line (such as the drilling line 125 shown in
The drive system 230 may include a surface torque sensor 232 that is configured to detect a value or range of the reactive torsion of the quill or drill string, much the same as the torque sensor 140a shown in
The directional planning and monitoring controller 252 may be configured to receive data from the user interface 260, the BHA 210, the drawworks 240, and/or the drive system 230, and utilize such data to continuously, periodically, or otherwise determine the current toolface orientation. The directional planning and monitoring controller 252 may be further configured to generate a control signal, such as via intelligent adaptive control, and provide the control signal to the drive system 230 and/or the drawworks 240 to adjust and/or maintain the toolface orientation. For example, the directional planning and monitoring controller 252 may provide one or more signals to the drive system 230 and/or the drawworks 240 to increase or decrease WOB and/or quill position, such as may be required to accurately “steer” the drilling operation.
The directional planning and monitoring controller 252 may also be used to generate optimized paths based on projections or slides to meeting steering targets down hole. These optimized paths may be generated to provide an efficient drilling solution that minimizes planning and drilling time and effort.
In some implementations, a drilling window 502 is placed around a portion of the drill plan 410 or modified drill plan 510. In some implementations, a modified drill plan 510 is established during the drilling operation representing a change in response to updated data related to geology or equipment. For example, the modified drill plan 510 is shifted slightly to the left of the drill plan 410. Although a single drilling window 502 is shown in
The drilling windows 502 may be generated with boundaries that define acceptable deviation from a drill plan or a modified drill plan. As such, the drilling windows 502 may correspond with the drilling tolerance at a particular place on the drill plan 410. For example, the width w1 may correspond with a tolerance in the x-direction (with respect to the drill plan 410) and the height h1 may correspond with tolerance in the y-direction. Some factors that may dictate the size or shape of the drilling window 502 may include proximity to other wellbores, whether planned or already drilled, geological formations including formations targeted and formations to be avoided, geological layers generally, the size of any deposits, and other factors. In the example of
The orientation, position, and size of each drilling window 502 may be varied independently. In some implementations, the drilling windows 502 are centered on the drill plan 410, while in other implementations, one or more drilling windows 502 are offset from the drill plan 410. The drilling windows 502 may be placed at regular intervals along the drill plan 410, such as about every 10 feet or 3 meters. In other implementations, drilling windows 502 are placed at about every 1 foot, at about every 20 feet, or at about every 50 feet. Some implementations include drilling windows spaced apart by a distance equivalent to a drill string stand. In one example, a drill string stand has a length between about 90 and 110 feet. The intervals between drilling windows 502 may be varied. For example, in difficult sections of the drill plan 410, the drilling windows 502 may be placed closer together to help an operator more easily visualize the correct route. In the example of
The three-dimensional HMI 500 of
In some implementations, the drill string 608 is made up of a number of tubulars. The BHA 606 and drill string 608 correspond to the BHA 170 and drill string 155, and may form a portion of the drilling apparatus 100 as described with reference to
In some implementations, the directional planning and monitoring controller 252 may determine the location of the BHA 606 and bore end 604 by conducting a survey each time a new tubular or stand is introduced to the drill string. Accordingly, when stands having a length of approximately 95 feet are introduced to the drill string, the survey may be taken every 95 feet. The results of this survey, identifying the location and orientation of the BHA 606, may be compared with a drill plan stored in the controller 252 to determine whether the path of the BHA 606 conforms to the drill plan and/or is within a given tolerance distance, or an acceptable deviation, from the drill plan. The acceptable deviation may be a predetermined value that may form part of the drill plan. With the survey known, the directional planning and monitoring controller 252 may use the survey to generate a steering target 610 (or a steering objective) to which the BHA should be steered to follow the well plan. In some implementations, the steering target 610 is surrounded by a tolerance area 611. The tolerance area 611 may represent a zone of acceptable tolerance for the BHA around the steering target 610. In some implementations, the tolerance area 611 has a circular or elliptical shape that is centered on the steering target 610. In other implementations, the tolerance area 611 is offset from the steering target 610 and/or has different shapes, such as rectangular, polygonal, etc. In some implementations, the steering target 610 and tolerance area 611 are represented by a drilling window 502 as shown in
The steering target 610 may be located along the drill plan or may be generated to steer the BHA 606 closer to the drill plan. The steering target 610 may also correspond to the expected position of the next survey. For example, when surveys are taken at every 95 feet of drilling, the steering target may be calculated to be about 95 feet from the bore end 604 after the most recent survey. In this manner, the drilling direction may be updated while drilling in 95 feet increments. This may help ensure that the actual drilled bore corresponds at least generally to the drill plan. Although 95 foot increments are used as an example, it should be apparent that any incremental length could be used, and that the incremental length may correspond to the length of a tubular or stand introduced into the drill string.
The steering target 610 location may be located a certain distance from the BHA 606. For example, a steering target 610 may be placed at a distance of 200-300 feet, 240-260 feet, 300-500 feet, 400-500 feet, or 440-460 feet from the BHA 606, as well as other distances. Multiple steering targets 610 may be identified by the controller 252, such as 2, 3, 4, 5, or other numbers.
When the bore end 604 and the steering target 610 are known, the directional planning and monitoring controller 252 may determine a desired drill path to move the BHA 606 from the current bore end 604 to the tolerance area 611 or steering target 610. The monitoring controller 252 may generate one or more sets of directional motor instructions to steer the BHA 606 to the tolerance area 611 or steering target 610.
In the example of
In some implementations, the steering instructions are calculated by using a measured bit position. This may be the position of the BHA 606. The bit position may be a starting point for the optimized path calculated by the controller. The bit position may be determined using survey data, drilling data (such as a curvature limit and a toolface orientation), and data from one or more sensors on the drilling rig, for example, sensors located downhole.
In some implementations, the steering instructions take into account all adjustments which have been made to the drill plan 702. The steering instructions may also conform to operator best practices for directional drilling. For example, the steering instructions may take into account “no slide zones” (zones where sliding the BHA is not recommended), slide length limitations related to depth, dogleg severity limitations by depth, etc. For example, at a certain depth, a dogleg severity limitation may be 4.5 degrees per hundred feet. This may represent the limit for curvature of the drilled wellbore. The steering instructions may take these limitations into account such that no optimized path produced by the controller 252 includes curvature of over 4.5 degrees per hundred feet.
In some implementations, the controller 252 may be used to calculate a projected bit position 712 which may be compared the one or more steering targets 704, 706. In some implementations, the projected bit position 712 is calculated using the determined bit position of the BHA 606, as well as modeling of previous projections. For example, the steering instructions may take into account slide drilling intervals as well as rotary drilling intervals between the last survey station and the calculated bit location. In some implementations, the projected bit position 712 maybe calculated 40-60 feet ahead of the survey locations. In other implementations, the projected bit position 712 is 90-100 feet, 30-50 feet, 100-200 feet, 200-300 feet, 400-500 feet, or other distances ahead of the survey locations.
In some implementations, the controller 252 may be used to calculate a straight line projection 612 of the BHA 606. The straight line projection 612 may be configured to not include curvature, as shown in
If the controller 252 determines that the projected bit location 712 does not fall within the outer boundaries of the one or more steering targets 704, 706, the controller 252 may be used to calculate rotary drilling trends based on previous drilling data. These rotary drilling trends may account for the natural “drift” or curvature of the drill bit based on the lithology as well as the equipment itself. The rotary drilling trends may be measured as a rate of change in inclination and a rate of change in azimuth. The rate of change in inclination may be referred to as “build” and the rate of change in azimuth may be referred to as “walk.” For example, a specific BHA 606 may have a rotary drilling build trend of ½ degree per hundred feet. The controller 252 may be used to calculate a rotary drilling projection 710 based on the rotary drilling trends. This rotary drilling projection 710 may show the potential route of the BHA 606 if the drill string is rotated without any change in the toolface orientation. The controller 252 may compare a projected bit location 712 on the rotary drilling projection 710 to the one or more steering targets 704, 706 to determine if the rotary drilling projection 710 is a good fit. In the example of
If the controller 252 determines that the straight line projection and the rotary drilling projection 710 are not good fits for the one or more steering targets 704, 706, the controller 252 may calculate one or more slides to the one or more steering targets 704, 706, as show in
The TIA calculations may be vector-based, and may be further based on inclination and azimuth coordinates. In some implementations, TIA calculations may involve a smaller amount of curvature than corresponding 3DJ calculations (i.e., may not meet the steering target 704 as quickly), but TIA calculations may have more of a tendency to match up with the drill plan 702.
In some implementations, the controller 252 may be used to generate a first optimized path 820 using a TIA calculation first if a slide is found to be necessary. The controller 252 may then be used to compare a projected bit location 712 on the optimized path 820 to determine if the projected bit location 712 falls within the steering target 704. If not, the controller 252 may be used to calculate a second optimized path 830 to a second steering target 706, as shown in
If the controller 252 determines that the second optimized path is not a good fit, the controller 252 may then calculate a first optimized path 820 to the first steering target 704 using a 3DJ calculation. If the first optimized path 820 using the 3DJ calculation is not found to be a good fit, the controller 252 may be used to calculate a second optimized path 830 to the second steering target 706 using the 3DJ calculation.
Once the controller 252 determines which projection or optimized path is the best fit, the controller 252 may be used to transmit instructions to drive the BHA 606 based on the best fit. For example, the controller 252 may display the projection to an operator on a display device. If an optimized path using a curve is found to be the best fit, the controller 252 may be used to determine an optimal toolface angle and distance to slide and transmit this data to an operator. The toolface angle may be determined by the controller 252 as the optimized path is calculated. In some implementations, the distance to slide is calculated based on the curvature limit of the BHA 606. The curvature limit of the BHA 606 may be the maximum amount of curvature that the BHA 606 can accomplish in drilling a wellbore. In some implementations, the curvature limit may be calculated by removing outliers from previous slides (such as slides with a large amount of curvature) and analyzing the dogleg severity (or curve) of the remaining slides. Once the curvature limit of the BHA 606 is determined, this value may be compared to the curvature (or “dogleg severity”) of the optimized path. By comparing this curvature the curvature limit of the BHA 606, the distance to slide may be calculated. For example, the curvature of an optimized path may be 4 degrees. If the controller 252 determines that the curvature limit of the BHA 606 is 12 degrees per hundred feet, the distance to slide could be calculated as 32 feet (i.e., the distance required to achieve the curvature of the optimized path= 12/4×95 ft). The distance to slide and the toolface angle may be displayed to an operator on a display device.
In some implementations, multiple slides may be used during a drilling operation. These slides may include both TIA and 3DJ calculations. In some implementations, an operator may alternate between using curves calculated with TIA calculations and curves calculated using 3DJ calculations. In some implementations, a certain ratio of slides with TIA calculations as compared with slides with 3DJ calculations may be used to effectively match the wellbore to the drill plan. For example, a ratio of 2:1 for iterations of TIA calculations as compared to iterations of 3DJ calculations may be used. Other ratios of iterations may also be used, such as 1:1, 3:1, 1:2, and 1:3.
At step 1002, the method 1000 may include inputting a drill plan into a drilling system with a BHA. This may be accomplished by entering location and orientation coordinates into a controller such as the directional planning and monitoring controller 252 discussed with reference to
At step 1004, the method 1000 may include determining the location of the BHA. The determination of location of the BHA may include receiving, with the directional planning and monitoring controller 252, positional data of the BHA. The positional data may be generated from various sources, including a survey conducted by the BHA at the end of a drilling increment as well as sensors on the drilling rig. In some implementations, positional data is gathered throughout the drilling operation by sensors disposed on the BHA or various other locations on the drilling rig, such as the drawworks. The positional data may be used to determine the location of the BHA at a given moment in time, such as at the end of a drilling increment. In some implementations, inclination data is received by the controller 252 continuously. In this case, the steering instructions generated by the controller 252 (including the steps of methods 1000 and 1100) may be continuously updated to account for variations or tendencies in inclination. With the location of the BHA known, the method proceeds to step 1006.
At step 1006, the method 1000 may include calculating the current curvature limit of the BHA. The curvature limit may be calculated by determining the maximum amount of curvature that the BHA is able to achieve by drilling. The curvature limit may be stored memory and used in subsequent steps.
At step 1008, the method 1000 may include establishing a first steering target. The first steering target may be any of the steering targets 610, 704, 706 as discussed in reference to
At step 1010, the method 1000 may include generating a first optimized path to the first steering target using a straight line projection and a second optimized path to the first steering target using a rotary trend projection. In some implementations, the straight line projection is similar to the straight line projection 612 as shown in
At step 1012, the method 1000 may include determining if the first optimized path will place the BHA within the first steering target. In some implementations, this step 1012 may include determining if the first optimized path passes through an outer boundary of the first steering target. In other implementations, this step may include determining if the first optimized path will contact any point of a first steering target. If the first optimized will place the BHA within the first steering target, the method 1000 may proceed to step 1022 and the BHA may be steered to the target using the first optimized path. Step 1022 may also include transmitting instructions to the drive system 230, the drawworks 240, and/or the BHA 210 as shown in
At step 1014, the method 1000 may include determining whether the second optimized path will place the BHA within the first steering target. If so, the method 1000 may proceed to step 1022. If not, the method 1000 may proceed to step 1016.
At step 1016, the method 1000 may include generating a second steering target further from the BHA than the first steering target. In some implementations, the second steering target is placed further down the drill plan than the first steering target. The second steering target may be placed approximately 450 feet from the BHA. In other implementations, the second steering target is placed 400-500, 300-600, 180-600, or 440-460 feet from the BHA, as well as other distances. In some implementations, the first steering target may be placed the distance of a single typical stand length from the BHA and the second steering target may be placed the distance of two typical stand lengths from the BHA.
At step 1018, the method 1000 may include determining whether the first optimized path will place the BHA within the second steering target. This step may help to minimize time and effort on the drilling rig because it may help an operator avoid performing one or more slides. Since slides may take more time to calculate and perform than simply rotating the drill string, the method 1000 may include steps 1018 and 1020 to determine if simply lengthening the optimized path with the projections will place the BHA along drill plan. If the first optimized path is determined to place the BHA within the second steering target, the method 1000 proceeds to step 1022. If not, the method proceeds to step 1020.
At step 1020, the method 1000 may include determining whether the second optimized path will place the BHA within the second steering target. If so, the method 1000 may proceed to step 1022. If not, the method may proceed to step 1102 of method 1100.
At step 1102, the method 1100 may include using a TIA calculation to generate a third optimized path to the first steering target. The TIA calculation may be vector-based and may be used to produce a curve with an endpoint that is near the first steering target. In some implementations, the TIA calculation is also based on inclination and azimuth coordinates. Both TIA calculations and 3DJ calculations may be referred to as slide models.
At step 1104, the method 1100 may include determining if the third optimized path with place the BHA within the first steering target. If so, the method 1100 may proceed to step 1112. If not, the method 1100 may proceed to step 1106.
At step 1106, the method 1100 may include using the TIA calculation to generate a fourth optimized path to the second steering target. As discussed above, the second steering target may be placed further away from the BHA than the first steering target.
At step 1108, the method 1100 may include determining whether the fourth optimized path will place the BHA within the second steering target. If so, the method 1100 may proceed to step 1112. If not, the method 1100 may proceed to step 1110.
At step 1110, the method 1100 may include using a 3DJ calculation to generate a fifth optimized path to the second steering target. In some implementations, the 3DJ calculation is based on an endpoint with Cartesian coordinates (x, y, z). In some implementations, the 3DJ calculation may not be vector based. In some implementations, first, second, third, and fourth optimized paths may include a lesser amount of curvature (including no curvature) than an optimized path based on the 3DJ calculation. Thus, the 3DJ calculation may be used after other options are analyzed to minimize the amount of curvature in the selected optimized path.
At step 1112, the method 1100 may include using the selected optimized path to determine toolface angle and dogleg severity. In the case that the first or second optimized path is selected, the toolface angle is not changed from the current location of the BHA and dogleg severity is nominal. In the case that the third, fourth, or fifth optimized path is selected, the toolface angle and dogleg severity is calculated based on the TIA or 3DJ calculation.
At step 1114, the method 1100 may include analyzing the selected optimized path and the possibility of alternating the method for generating optimized paths. This step 1114 may include determining the previous methods for generating optimized paths, such as accessing records of optimized paths used from a memory module. The method for generating optimized paths (such as using a TIA or 3DJ calculation) may be alternated. For example, if a 3DJ calculation was used to generate the optimized path used to create the last slide, a TIA calculation may attempted for the current slide. Alternating the type of optimized path generation may lead to drilling operations that more closely follow a drill plan. In some implementations, the ideal ratio of optimized paths using TIA calculations compared to optimized paths using 3DJ calculations is 2:1. In other implementations, the ratio may be 1:1, 1:2, or other ratios.
At step 1116, the method 1100 may include converting the dogleg severity of the curve of the selected optimized path into a distance to slide based on the determined curvature limit. This conversion may include comparing the angle of the dogleg severity to the angle over distance of the curvature limit. The distance to slide may be displayed to an operator with the determined toolface angle of step 1112.
At step 1118, the method 1100 may include steering the BHA to the selected steering target using the determined distance to slide and toolface angle.
In an exemplary implementation within the scope of the present disclosure, the methods 1000 and 1100 repeat after step 1022 or 1118, such that method flow goes back to step 1004 and begins again. Iteration of methods 1000 and 1100 may be utilized to carry out a drilling operation including a number of increments.
In view of all of the above and the figures, one of ordinary skill in the art will readily recognize that the present disclosure introduces a drilling apparatus including: a drill string comprising a plurality of tubulars; a bottom hole assembly (BHA) disposed at a distal end of the drill string; a controller in communication with the BHA, wherein the controller is configured to: identify a first steering target; calculate a curvature limit of the BHA; determine whether the BHA can be driven to the first steering target using one of a straight line projection or a rotary drilling projection; calculate a first optimized steering path to the first steering target using one or more calculation using a slide model if the BHA cannot be driven to the first steering target using the one of the straight line projection or the rotary drilling projection; and determine a toolface angle and a distance to slide if the BHA cannot be driven to the first steering target using the one of the straight line projection or the rotary drilling projection.
In some implementations, the drilling apparatus further includes a display device configured to display the determined toolface angle and distance to slide to a user. The drilling apparatus may include a sensor system connected to the drill string and configured to detect one or more measureable parameters of the BHA, the one or more measureable parameters indicative of a position and an orientation of the BHA. The controller may be further configured to: calculate the first optimized steering path to the first steering target using a TIA calculation; determine whether the BHA can be driven to the first steering target along the first optimized steering path; and calculate a second optimized steering path to the first steering target using a 3DJ calculation if the BHA cannot be driven to the first steering target along the first optimized steering path. The controller may be further configured to determine the distance to slide using the calculated curvature limit. In some implementations, a distance between the first steering target and the BHA is between 200 and 300 feet.
The controller may be further configured to identify a second steering target if the BHA cannot be driven to the first steering target using the one of the straight line projection or the rotary drilling projection, wherein a distance between the second steering target and the BHA is greater than a distance between the first steering target and the BHA. The controller may be further configured to determine whether the BHA can be driven to the second steering target using the one of the straight line projection or the rotary drilling projection. The distance between the second steering target and the BHA may be between 300 and 500 feet.
The controller may be further configured to identify a third steering target, wherein a distance between the third steering target and the BHA is greater than the distance between the second steering target and the BHA. The controller may be further configured to calculate a third optimized steering path to a third steering target using a ratio of 2:1 for iterations of TIA calculations compared to iterations of 3DJ calculations.
A method of directing operation of a drilling system is also provided, which may include: identifying, with a controller in communication with the drilling system, a first steering target; calculating, with the controller, a curvature limit of a bottom hole assembly (BHA) of the drilling system; determining, with the controller, whether the BHA can be driven to the first steering target using one of a straight line projection or a rotary drilling projection; calculating, with the controller, a first optimized steering path to the first steering target using one or more slide models if the BHA cannot be driven to the first steering target using the one of the straight line projection or the rotary drilling projection; determining, with the controller, a toolface angle and a distance to slide if the BHA cannot be driven to the first steering target using the one of the straight line projection or the rotary drilling projection; and driving the BHA to the first steering target using the straight line projection, the rotary drilling projection, or the determined toolface angle and distance to slide.
The method may further include calculating, with the controller, a first optimized steering path to the first steering target using a TIA calculation; determining, with the controller, whether the BHA can be driven to the first steering target along the first optimized steering path; and calculating, with the controller, a second optimized steering path to the first steering target using a 3DJ calculation if the BHA cannot be driven to the first steering target along the first optimized steering path. The method may include determining the distance to slide using the calculated curvature limit.
In some implementations, the method includes identifying, with the controller, a second steering target if the BHA cannot be driven to the first steering target using the one of a straight line projection or the rotary drilling projection, wherein a distance between the second steering target and the BHA is greater than a distance between the first steering target and the BHA.
The method may include determining, with the controller, whether the BHA can be driven to the second steering target using one of a straight line projection or a rotary drilling projection. The method may include identifying, with the controller, a third steering target, wherein a distance between the third steering target and the BHA is greater than the distance between the second steering target and the BHA. The method may include calculating, with the controller, a third optimized steering path to the third steering target using a ratio of 2:1 for iterations of TIA calculations compared to iterations of 3DJ calculations.
A method of directing operation of a drilling system is also provided, which may include: identifying, with a controller in communication with the drilling system, a first steering target; determining, with the controller, a maximum possible curvature of a bottom hole assembly (BHA) of the drilling system; calculating, with the controller, a first optimized steering path to the first steering target using first slide model calculation; driving the BHA along the first optimized steering path if the first optimized steering path is determined to have a curvature less than the maximum possible curvature; calculating, with the controller, a second optimized steering path to the first steering target using second slide model calculation different than the first slide model calculation if the first optimized steering path is determined to have a curvature greater than the maximum possible curvature; and driving the BHA along the second optimized steering path if the first optimized steering path is determined to be have a curvature greater than the maximum possible curvature.
In some implementations, the method further includes: identifying, with the controller, a second steering target; calculating, with the controller, a third optimized steering path to the second steering target using a TIA calculation; driving the BHA along the third optimized steering path if the third optimized steering path is determined to have a curvature less than the maximum possible curvature; calculating, with the controller, a fourth optimized steering path to the second steering target using a 3DJ calculation if the third optimized steering path is determined to have a curvature greater than the maximum possible curvature; and driving the BHA along the fourth optimized steering path if the third optimized steering path is determined to be have a curvature greater than the maximum possible curvature.
The foregoing outlines features of several implementations so that a person of ordinary skill in the art may better understand the aspects of the present disclosure. Such features may be replaced by any one of numerous equivalent alternatives, only some of which are disclosed herein. One of ordinary skill in the art should appreciate that they may readily use the present disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the implementations introduced herein. One of ordinary skill in the art should also realize that such equivalent constructions do not depart from the spirit and scope of the present disclosure, and that they may make various changes, substitutions and alterations herein without departing from the spirit and scope of the present disclosure.
The Abstract at the end of this disclosure is provided to comply with 37 C.F.R. § 1.72(b) to allow the reader to quickly ascertain the nature of the technical disclosure. It is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims.
Moreover, it is the express intention of the applicant not to invoke 35 U.S.C. § 112(f) for any limitations of any of the claims herein, except for those in which the claim expressly uses the word “means” together with an associated function.
Number | Name | Date | Kind |
---|---|---|---|
8301382 | Herrera | Oct 2012 | B2 |
20030024738 | Schuh | Feb 2003 | A1 |
20030120427 | Chapman | Jun 2003 | A1 |
20050194185 | Gleitman | Sep 2005 | A1 |
20080275648 | Illfelder | Nov 2008 | A1 |
20100243328 | Rodriguez Herrera | Sep 2010 | A1 |
20130048383 | Panchal | Feb 2013 | A1 |
20140196950 | Bayliss | Jul 2014 | A1 |
20140374159 | McElhinney | Dec 2014 | A1 |
20150006227 | Benson | Jan 2015 | A1 |
20150186567 | Wu | Jul 2015 | A1 |
20150330209 | Panchal | Nov 2015 | A1 |
20160003008 | Uribe | Jan 2016 | A1 |
20160024847 | Benson | Jan 2016 | A1 |
20170306702 | Summers | Oct 2017 | A1 |
20180051552 | Li | Feb 2018 | A1 |
20190345771 | Zalluhoglu | Nov 2019 | A1 |
Number | Date | Country | |
---|---|---|---|
20190120039 A1 | Apr 2019 | US |