Claims
- 1. An apparatus of automatically manufacturing ball studs comprising:a cold forging unit for uncoiling and forming a cold coil for ball studs into ball studs shaped at least 50% similar to a desired one; a first cleaning unit for removing burrs or lubricant layers of materials from said cold forged ball studs; an impurity inspection unit for determining whether the burrs or lubricant layers arc properly removed; a unit for rolling a head, a neck and threads with a rolling machine; a second cleaning unit for completely removing impurities from the ball studs; an inspection unit for finding dimensional defects and minute breaks or cracks from said ball studs after the second cleaning; a storage unit for storing said ball studs into a warehouse by an automated transport robot after the inspection; a central control unit for controlling said units to be operated in sequence, performing an emergency stop of said units in response to a defect signal from said inspection unit, and diagnosing abnormal conditions of said units; and an FMS server for storing product data related to said abnormal and operated conditions and amount of production into a database and transmitting the same in the case of necessity.
- 2. The apparatus of automatically manufacturing ball studs according to claim 1, wherein said inspection unit generates different signals according to defected parts of the head, the neck and the threads, respectively; and wherein said central control unit receives the signals to determine which unit is malfunctioning and performs an emergency stop of the malfunctioning unit.
- 3. The method of automatically manufacturing ball studs according to claim 1, wherein said inspecting step generates different signals according to defected parts of the head, the neck and the threads, respectively; and wherein said central controlling step receives the signals to determine which unit is malfunctioning and performs an emergency stop of the malfunctioning unit.
- 4. A method of automatically manufacturing ball studs comprising the steps of:cold forging to uncoil and form a cold coil for ball studs into ball studs shaped at least 50% similar to a desired one; first cleaning to remove burrs or lubricant layers of materials from the cold forged ball studs; a first inspecting step comprising impurity inspecting to determine whether the burrs or lubricant layers are properly removed; rolling a head, a neck and threads with a rolling machine; second cleaning to completely remove impurities from the ball studs; a second inspecting step comprising inspecting dimensional defects and minute breaks or cracks from the ball studs after said second cleaning step; storing said ball studs into a warehouse by an automated transport robot after said second inspecting step; central controlling said steps to be operated in sequence, performing an emergency stop of said steps in response to a defect signal from said inspecting step, and diagnosing abnormal conditions of said steps; and storing product data related to the abnormal and operated conditions and amount of production into a database and transmitting the same in the case of necessity.
Priority Claims (1)
Number |
Date |
Country |
Kind |
98-30949 |
Jul 1998 |
KR |
|
RELATED APPLICATIONS
This application claims the priority of U.S. patent application Ser. No. 09/210,722, filed Dec. 14, 1998 now abandoned, of which this application is a Continuation-In-Part, which claims the benefit of the priority under 35 U.S.C. 119 of Korean Patent Application No. 98-30949, filed Jul. 30, 1998.
US Referenced Citations (22)
Foreign Referenced Citations (6)
Number |
Date |
Country |
4131692 |
Mar 1993 |
DE |
19513168 |
Oct 1996 |
DE |
194594 |
Sep 1986 |
EP |
346816 |
Dec 1989 |
EP |
141681 |
Jun 1996 |
JP |
141682 |
Jun 1996 |
JP |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
09/210722 |
Dec 1998 |
US |
Child |
09/709385 |
|
US |