1. Field of the Invention
This invention relates, generally, to blowout preventers for subsea applications, and more specifically, to an autonomous blowout preventer to monitor the material inside the blowout preventer and measure the critical parameters for performance of the blowout preventer.
2. Description of the Prior Art
Formation hydrocarbons (kick) may flow into a well during drilling, thereby “kicking” or displacing the drilling fluids. The rig crew must watch for a kick and shut-in the well before it evolves into a blowout as illustrated in
The Blowout Preventer, also referred to herein as “BOP”, comprises a number of valves and it is placed on top of a well to facilitate daily operations and act as the last line of defense against the uncontrolled flow of hydrocarbons. However, the history of BOP performance during a well blowout and scrutiny of BOP designs reveal that BOP's are designed more as Operation-Aids for a well that is under control; not as Blowout-Arrestors to prevent the uncontrolled flow of hydrocarbons as illustrated in
Therefore, there is a need to define the BOP distinct functions; to correct the BOP design deficiencies; to monitor critical parameters to identify a kick early-on; to track the kick evolution and to optimize the BOP operation and sequencing to arrest the event under the various realistic conditions to bring the well under control. The last line of defense should be a Blowout-Arrestor, not an Operations-Aid. It should be understood that a seaworthy Blowout-Arrestor may function as a seaworthy Operations-Aid, but not the other way around as experience has proven.
Again, BOPs today are designed as Operation-Aids, not as Blowout-Arrestors. It is reasonable then to conclude that the probability that an Operations-Aid would seal off a well during a blowout is very low with luck being the controlling factor. Luck is not a measure of fitness-for-service or seaworthiness, although good luck is always invaluable. The Macondo investigation has accepted the June 2003 successful EDS (a rig crew controlled operation) as proof that the BOP was designed properly and has focused on the Deepwater Horizon BOP maintenance and record keeping, even challenging the maintenance means and methods of the rig owner.
Quoting from the Chief Counsel's Report “MMS regulation 30 C.F.R. §250.446(a) requires that the BOPs be inspected according to API RP 53 . . . and (the manufacturer) would certify that the inspections were completed”. There are multiple fallacies associated with this Code that significantly undermine safety.
First, the Code assumes that “Inspection” and “Seaworthiness” are the same; a failure root-cause. “Inspection” is defined as “to look at something” and it is undefined on its own. “Seaworthiness” on the other hand, is the result of a specific Fitness-For-Service-Engineering-Assessment. “Inspection” is well defined only as a part of a Seaworthiness-Engineering-Assessment where it is required to produce a number of high-quality specific data to facilitate the Seaworthiness-Engineering-Assessment. The Code should be updated to require a Seaworthiness certificate, preferably issued by a qualified third party as it is required for all other seagoing vessels and equipment.
The Code relies on the manufacturer (who made the design assumptions in the first place) for the “Inspection” of the drilling equipment and therefore, the Code guarantees that the design and manufacturing errors and oversights will not be noticed or be corrected. Recently, it was revealed that an auto manufacturer ignition-switch design oversights, errors and omissions disabled the automobile steering and the airbags. It should be noted that the ignition-switch in question was “inspected” to the manufacturer's specifications and standards prior to assembly into a new car, and yet, it was unfit-for-service.
The Code requires the manufacturer to only certify that an “Inspection” was performed. The manufacturer's certificate-of-compliance, herein after referred to as “COC”, certifies that the manufacturer performed an “Inspection”. The COC however, does not include the specifics and the finding of the inspection; does not certify that the equipment is Seaworthy; does not certify that the BOP is Fit-For-Subsea-Service or that the BOP is fit to contain a well blowout under realistic blowout conditions and so on and so forth.
Therefore, there is an additional need to certify that all the drilling equipment is Seaworthy under realistic conditions following a Seaworthiness-Engineering-Assessment that is applicable across the board of subsea products and manufacturers.
Regardless of what a COC certifies, a COC is part of a maintenance program. Maintenance cannot correct design errors and oversights or prevent a misapplication. For example, the Deepwater Horizon BOP shear rams were designed under the EDS assumptions (see
Based on the above fallacies, there are a number of decisions that allocate serious blame to different companies and individuals but not to the root-cause of the failure, the BOP design. However, if the BOP was designed and functioned as a Seaworthy Blowout-Arrestor the rest of the Macondo failures and oversights would have been irrelevant. It would not matter how the cement was mixed; it would not matter how many centralizers were used; it would not matter how the pressure readings were interpreted; it would not matter who send a text to whom; it would not matter how the maintenance was documented and so on and so forth. After all, the primary reason a BOP is deployed is to make all other mistakes irrelevant and prevent a disaster.
Similarly, if the automobile steering was not disabled by a bad ignition-switch design the accidents would not have happened and if the airbags were not disabled at the same time people may have not died. The automobile accidents were not the fault of the imprisoned drivers just like the Macondo was not the fault of the operator, its partners and the subcontractors; all unaware that their last line of defense was a dud. To make things worse, the lengthy Macondo investigation, prosecution and new Codes have further reduced safety because the root-cause of the disaster was missed entirely and it is still deployed dangerously as the last-line of defense.
Therefore, there is a further need for a BOP design to arrest and restraint a well blowout along with an adaptable BOP controller and software that monitors the kick evolution using predictive-intelligence to adjust the BOP response and sequencing. It should be noted that the BOP controller and software would rely on in-depth knowledge of the BOP design and therefore some design and manufacturing errors and oversights will be detected during the BOP analysis to implement the BOP controller software. Again, in-depth knowledge of the BOP (and the other drilling equipment) is also required by API S53 (7.6.11.7.2).
The non-obviousness of the present invention is clearly demonstrated by the Investigation Reports and the Federal Court findings and conclusions associated with the Macondo Well Blowout and the sinking of the Transocean Deepwater Horizon rig.
The following reports are incorporated herein by reference and form a part of the disclosure advanced by Applicant:
Macondo—Deepwater HORIZON Investigation Reports
It is a general purpose of the present invention to provide an improved BOP monitoring system and method.
An object of the present invention is to provide an improved monitoring system that may be utilized in pressure control equipment such as wellheads and BOPs to arrest a well blowout.
Another object of the present invention predictive-intelligence system monitors the BOP and drill pipe to recognize early on a well blowout and to adjust the BOP sequencing and timing to arrest and restrain the well blowout in the early stages.
Accordingly, the present invention provides a system of one or more computers that can be configured to perform particular operations or actions by virtue of having software, firmware, hardware, or a combination of them installed on the system that in operation causes or causes the system to perform the actions. One or more computer programs can be configured to perform particular operations or actions by virtue of including instructions that, when executed by data processing apparatus, cause the apparatus to perform the actions.
One general aspect includes a monitoring system for a subsea BOP, the subsea BOP defining a wellbore through the wellbore, the subsea BOP including at least two BOP rams, the at least two BOP rams including a shear ram, the at least two BOP rams further includes at least two pistons which further include a shear ram piston, at least one accumulator to stroke the shear ram piston associated with the shear ram, a string of pipe moveable within the wellbore, the string of pipe including a plurality of pipe connectors and a plurality of pipe bodies between the pipe connectors, the well monitoring system including: at least one subsea computer, the at least one subsea computer being operatively connected to the at least two BOP rams and the at least one accumulator and the at least one subsea computer; and software operable on the at least one subsea computer to control an activation timing of the at least two BOP rams to control the subsea BOP. Other embodiments of this aspect include corresponding computer systems, apparatus, and computer programs recorded on one or more computer storage devices, each configured to perform the actions of the methods.
Implementations may include one or more of the following features. The system further including: at least one subsea sensor; a sensor subsea interface; a communications link; and where the software further includes a module which monitors a plurality of material parameters of a string of pipe inside the subsea BOP. The system where the plurality of material parameters includes wall thickness. The system where the at least one subsea sensor further includes a plurality of sensors circumferentially spaced around the subsea BOP. The system further including the plurality of sensors being positioned outside of the wellbore through the subsea BOP. The system further including a plurality of groups of the plurality of sensors circumferentially spaced around the subsea BOP, at least two groups of sensors being positioned at different heights of the subsea BOP with respect to the wellbore through the subsea BOP, the sensors being operable to detect relative positions of the string of pipe within the subsea BOP at each of the different heights. The system where software is operable to utilize signals from the at least one subsea sensor to indicate when a pipe body from the plurality of pipe bodies is positioned adjacent the shear ram. The system where the software is operable to control the activation timing to initiate cutting the string of pipe independently of a surface control. The system where the software is operable to control the activation timing to control which of the at least two BOP rams to operate first. The system where the software is operable to utilize signals from the at least one subsea sensor to provide an alert to the surface that well control has been at least potentially compromised. The at least one accumulator further including at least one pressure intensifier operatively connected to vary a force applied to the shear ram piston. The at least one accumulator further including at least one valve controlled by the at least one subsea computer. The monitoring system further including: software for the subsea computer to compute when the pipe body is located at the shear ram. The monitoring system further including: software to determine a force necessary to cut the string of drill pipe with the shear ram where the force varies. The monitoring system further including: the software being operable to control the force to cut the string of drill pipe. The monitoring system further including an intensifier operably connected to selectively increase the force in response to the software. The plurality of parameters further including of wall thickness, imperfections hardness, dimensions, wear, rate of wear, stress concentration, weight, lateral location, angle, similar items and a combination thereof. The one subsea computer further including a surface data acquisition system operable to monitor surface detected operation parameters, the surface data acquisition system being operatively connected to the at least one subsea computer. The plurality of parameters further including of one or more of capacitance, contactivity, current, deflection, density, external pressure, fluid volume, flow rate, frequency, impedance, inductance, internal pressure, length, accumulator pressure, resistance, sound, temperature, vibration, voltage, and combinations thereof. Implementations of the described techniques may include hardware, a method or process, or computer software on a computer-accessible medium.
One general aspect includes a monitoring system for a subsea BOP defining a wellbore through the subsea BOP in which a string of drill pipe is moveable, the string of drill pipe string including a plurality of drill pipe connectors and a plurality of pipe bodies between the drill pipe connectors, the subsea BOP including a plurality of rams including a pipe ram and a shear ram, including: a subsea computer operatively connected to control opening and closing of the plurality of rams; and a plurality of groups of sensors, each group of sensors being mounted circumferentially around the subsea BOP, at least two groups of sensors being positioned at different heights of the subsea BOP with respect to the wellbore through the subsea BOP, the subsea computer being operable to utilize the plurality of groups of sensors to detect positions of respective of the plurality of pipe bodies and the plurality of drill pipe connectors within the subsea BOP at each of the different heights. Other embodiments of this aspect include corresponding computer systems, apparatus, and computer programs recorded on one or more computer storage devices, each configured to perform the actions of the methods.
Implementations may include one or more of the following features. The monitoring system further including: software for the subsea computer to compute when the pipe body is located at the shear ram. The monitoring system further including: software to determine a force necessary to cut the string of drill pipe with the shear ram where the force varies. The monitoring system further including: the software being operable to control the force to cut the string of drill pipe. The monitoring system further including an intensifier operably connected to selectively increase the force in response to the software. The plurality of parameters further including of wall thickness, imperfections hardness, dimensions, wear, rate of wear, stress concentration, weight, lateral location, angle, similar items and a combination thereof. The at least one subsea computer further including a surface data acquisition system operable to monitor surface detected operation parameters, the surface data acquisition system being operatively connected to the at least one subsea computer. The plurality of parameters further including of one or more of capacitance, contactivity, current, deflection, density, external pressure, fluid volume, flow rate, frequency, impedance, inductance, internal pressure, length, accumulator pressure, resistance, sound, temperature, vibration, voltage, and combinations thereof. Implementations of the described techniques may include hardware, a method or process, or computer software on a computer-accessible medium.
One general aspect includes a monitoring system for a subsea BOP, the subsea BOP defining a wellbore through the wellbore, the subsea BOP including at least two BOP rams, the at least two BOP rams including a shear ram, the at least two BOP rams further includes at least two pistons which further include a shear ram piston, at least one accumulator to stroke the shear ram piston associated with the shear ram, a string of pipe moveable within the wellbore, the string of pipe including a plurality of pipe connectors and a plurality of pipe bodies between the plurality of pipe connectors, the well monitoring system including: at least one subsea computer with at least one sensor to monitor a plurality of parameters of the string of pipe inside the subsea BOP; and a program being executed on the at least one subsea computer to initiate an activation of the shear ram to cut the string of pipe, the activation partially controlled by the plurality of parameters. Other embodiments of this aspect include corresponding computer systems, apparatus, and computer programs recorded on one or more computer storage devices, each configured to perform the actions of the methods.
Implementations may include one or more of the following features. The system the plurality of parameters further including of wall thickness, imperfections hardness, dimensions, wear, rate of wear, stress concentration, weight, lateral location, angle, similar items and a combination thereof. The system the at least one subsea computer further including a surface data acquisition system operable to monitor surface detected operation parameters, the surface data acquisition system being operatively connected to the at least one subsea computer. The system the plurality of parameters further including of one or more of capacitance, contactivity, current, deflection, density, external pressure, fluid volume, flow rate, frequency, impedance, inductance, internal pressure, length, accumulator pressure, resistance, sound, temperature, vibration, voltage, and combinations thereof. Implementations of the described techniques may include hardware, a method or process, or computer software on a computer-accessible medium.
For a further understanding of the nature and objects of the present invention, reference should be had to the following detailed description, taken in conjunction with the accompanying drawings, in which like elements may be given the same or analogous reference numbers and wherein:
While the present invention will be described in connection with presently preferred embodiments, it will be understood that it is not intended to limit the invention to those embodiments. On the contrary, it is intended to cover all alternatives, modifications, and equivalents included within the spirit of the invention.
Referring now to the drawings and more particularly to
Turning now to
The AutoBOP operation environment is dynamic as is its interaction with the other dynamic machines. The operation environment Problem and the interaction Problem(s) never have a complete description and cannot be thoroughly predicted while they evolve or at the design phase or prior to deployment. Therefore, AutoBOP 4, through software of computer or predictive-controller 20, monitors and stores a sufficient number of parameters to represent the instantaneous real world Problems along with changes and trends in sufficient detail to solve the Problems it encounters. It should be understood that the solution(s) to the Problem(s) would most likely be dynamic, reacting to the environment and interaction changes that redefine the target. Only the target is well defined as the “delivery of successful results”, or stated differently, the sealing of the well to stop the uncontrolled flow of the formation hydrocarbons. Therefore, AutoBOP needs to function on its own in its environment as a stand-alone system.
Subsea AutoBOP 4 may comprise a number of annular preventers 4C, rams 4A and 4B and accumulator systems 10A, 10B, and 10C. The BOP “Class” is the total number of annular preventers (designated as “A”) and rams (designated as “R”), such as, Class 6-A2-R4. API S53 specifies the minimum subsea stack as a Class 5 comprising, at minimum, one annular, two pipe rams and two shear rams. For clarification, it should be noted that it is customary to describe BOP 4 from the bottom upwards and will be described accordingly herein. The
Accumulator systems 10A, 10B, 10C provide the hydraulic power to operate BOP 4, more specifically annular preventers 4C and shear ram 4B and pipe ram 4A. Accumulator system 10C further comprises pressure intensifier 12C, accumulator 11, and valves 13C, 12C, and 15C. Accumulator 11C is precharged at the surface, typically with nitrogen, to 3,000 psi at 20° C. for example. Accumulator 11C is then charged by the subsea hydraulic supply with sufficient volume of fluid to operate annular preventers 4C and rams 4A and 4B. The “Drawdown Test” (API S53 6.5.6.2) verifies that accumulator 11C is able to provide sufficient fluid volume and pressure to secure the well with final accumulator pressure of, at least, 200 psi above precharge pressure.
Valves 13C, 14C and 15C are controlled by computer 20 through peripheral-bus 21. Computer 20 may open or close valves 13C, 14C and 15C, either fully or partially. Computer 20 additionally monitors pistons 5 and the accumulator systems 10 via peripheral-bus 21. In other embodiments, accumulator system 10C may comprise a plurality of accumulator 11C, pressure intensifier 12C, valves 13C, 14C, 15C and similar components. It should further be understood that accumulator systems 10 comprise similar components as further illustrated in
A plurality of non-contact sensors 30 (See
Sensor interface 27 processes the analog signals from sensor 30 and converts said analog signals to a digital format under the control of computer 20. Computer 20 further provides controlled excitation 26 to sensors 30. AutoBOP both stores and transmits through communication link 22 the Problems and solutions for real-time interaction with the rig crew and further examination at a later time. It should be noted that the stored data would advance the knowledge of the designer and the operator. Furthermore, AutoBOP allows for external BOP control through the power and communication subsea connector 23. Computer 20 takes into account all other monitored parameters through data acquisition system 24 and data acquisition sensors 25 to include with the real-time data.
A drill string is a dynamic machine that interacts with AutoBOP 40 and comprises a number of drill pipe joints 7, lengthwise sufficient, to form a slender-column that is elastically unstable. One may push (placed under compression) one drill pipe joint without the drill pipe joint deforming; a behavior consistent with that of a short-column where the material strength is in control. However, as the length of the drill string increases, the end-conditions, its modulus of elasticity and slenderness become the controlling factors, not its strength. Elastic instability will result in the deformation of a 10,000′ drill string when it is pushed upwards by the formation hydrocarbons 9 as illustrated in
The direction of the loads the drill string endures and its behavior under loading define its interaction with BOP 4 and therefore the BOP missions. Another objective of the present invention is to teach how to automatically detect and recognize the drill pipe 7 behavior inside BOP 4 annulus 8, said behavior also been an indication of a well kick, and to formulate a plan to bring the well under control early enough while control is still possible.
An additional benefit of the present invention is that the detection and recognition of drill pipe 7 behaviors inside annulus 8 during operations may prevent damage to drill pipe, BOP 4, the rubber goods and similar items during drilling.
Prior art BOPs are designed to function in a static, designer-specified environment, not in a real-world environment; the root-cause of the BOP failures. When the designer defines the BOP environment, the designer defines an event-space static convenient condition. For example, the BOPs today are designed to shear drill pipe nominal body-wall that is static, under tension and near the center of the shear rams without any feedback if any of the assumptions are valid (see
the rig crew is in control;
the rig is functioning;
the rig provides the drill pipe controlling force;
the drill string is under tension;
the drill pipe is near the center of the BOP;
the rig crew may position a drill pipe body-wall inside the shear rams;
the drill string is static (the rig crew can take a long time to perform the task);
the well flow is under the control of the rig crew;
the BOP sequencing, like the EDS sequence, may be programmed and carried-out after the rig crew has optimized the “space-time” for the “event” to succeed;
nominal shearing force is required to complete the task in the optimized environment; and
there is no life-threatening urgency to complete the task.
The Deepwater Horizon BOP functioned as-designed and successfully completed an EDS in June of 2003 under the above controlled conditions proving that the Deepwater Horizon BOP was maintained properly all along. This, however, is assumed erroneously to be adequate proof that BOP 4 could also arrest and control a well blowout.
Transition from Operation to Blowout
The transition from operation to blowout is not sudden (for a computer) and may be divided, at least, into two stages: Alert and Alarm. For example, an Alert stage may be triggered by one or more of computer 20 monitored parameters exceeding an Alert threshold, such as, changes in pump speed, excess annulus flow resulting in increased pit volume, lateral motion of the drill pipe (illustrated in
At time T3, drill pipe 7 starts moving again toward another location and returns to the center of BOP 4 at time T4. This lateral motion of drill pipe 7 may trigger an Alert if it is not corresponding to an activity on rig 1. At time T5 tool-joint 7A goes through the center of sensor 30 resulting in a signal increase in all four quadrants. The signals may be combined to a single trace for display to the rig crew as shown in
An Alarm stage may be triggered by one or more of monitored parameters exceeding an Alarm threshold while the rig crew is still in control and the rig is still functional (which can be verified through feedback). A surface computer may display the prescribed steps to deal with the Alarm. It should be noted that there may be a life-threatening urgency to identify the source of the Alarm and act upon it rapidly as it may evolve into a blowout before the rig crew has time to react. For example, if the rig is not tripping out the drill pipe and the drill string starts traveling upwards as illustrated in
Referring back to
The controlled conditions of the well-operations are no longer valid during a blowout. Instead, they are replaced by the random and erratic conditions imposed by an unpredictable forceful dynamic event, the well blowout. It should be noted that the well blowout parameters may change rapidly and an accurate rapid response is crucial to control the situation. Drill pipe 7 behaviors inside BOP 4 may progress from
It should also be noted that not all well blowouts behave identically. The unpredictability of a well blowout makes it impossible to program a fixed automatic sequence of BOP 4 to arrest and restrain the blowout. In fact, a fixed automatic sequencing, like the EDS sequence, may worsen the problem. However, prior art BOP's still rely on the fixed EDS sequence to arrest and restrain a blowout (see Macondo reports)—another root-cause of the Macondo and other disaster.
Generally, one or more of the following situation is true during a blowout:
the rig crew may not be in control and may be incapacitated which the AutoBOP can ascertain;
the rig may no longer be functional which the AutoBOP can ascertain;
the upward flow of hydrocarbons provides the drill pipe controlling force, not the rig, which the AutoBOP can ascertain;
the drill string may be deformed and under compression which the AutoBOP monitors;
the drill pipe may be resting on the BOP wall that limits the degree of its deformation which the AutoBOP monitors;
it is unknown what is inside the BOP shear rams and it varies with time. The AutoBOP knows continuously what-is, how-is and where-is including its critical parameters;
the drill string is traveling as it is ejected by the blowout fluids and gases which the AutoBOP monitors and calculates a velocity and an acceleration;
the well is flowing under the control of the formation which the AutoBOP monitors;
the Blowout-Arrestor sequence can only be formulated by monitoring the blowout evolution;
shearing force above nominal is required to complete the task; and
there is a life-threatening urgency to seal the well in the shortest possible time.
Although the Deepwater Horizon BOP was maintained properly all along, it failed to control the Macondo well blowout in April 2010 because it was designed as an Operations-Aid not a Blowout-Arrestor and therefore, it was not fit-for-purpose and not seaworthy.
BOP manufacturers use distortion energy theory to estimate a shearing-force. Some use the yield strength of the drill pipe and others use the ultimate strength in their calculations; the later providing higher shearing-force estimates. However, neither provides a high enough estimate to cover the worst case scenario as detailed below—yet another root-cause of the Macondo and other disasters.
For the following analysis it is assumed that an Operations-Aid requires a nominal shearing-force (100%) to shear a high-ductility drill pipe body-wall 7B (See
It should be understood that the above estimates are cumulative and, again, apply only when the nominal body-wall 7B of the drill pipe 7 is in the shear rams. Therefore, under the conditions detailed above, the Blowout-Arrestor may require 400% the nominal shearing-force of an Operations-Aid for the same drill pipe. It should also be understood that the early intervention of the present invention would reduce the maximum shearing force required. Furthermore, per API S53 (7.6.11.7.5), the maximum shearing pressure should be less than 90% of the maximum operating pressure of the shear ram actuator 5. Therefore, the present invention would incorporate shear rams and actuators 5 to match the cumulative maximum calculated shearing force, not just an estimated nominal. Existing BOPs will be modified accordingly.
There are multiple videos and pictures where a well blowout is ejecting the drill string at high speed above the derrick before gravity bends it into a loop as illustrated in
The time interval from the beginning of the kick until the rig crew recognizes the kick and activates BOP 4 defines the severity of the collision and its repercussion. It is therefore desirable to recognize a kick early on and to react rapidly. The drill pipe upward motion without corresponding rig activity, a sudden off centering (illustrated in
As discussed previously herein, Sensor interface 27 processes Sensor 30 analog signals and converts said analog signals to a digital format under the control of computer 20. Computer 20 further provides controlled excitation 26. Assuming that sensor 30 comprises of N individual sensors, computer 20 may process said digital signals into N traces around BOP 4 circumference or may combine the signals into eight or four traces as illustrated in
Referring to
Referring to
It should be understood that calculations may be performed using different sensor combinations along sensor 30 plane (x-y) and among different sensors (z). Furthermore, it should be understood that each sensor 30 may comprise similar or different types of individual sensors that may be mounted on an x-y plane perpendicular to BOP 4 vertical axis or be stacked in the z axis or any combination thereof. Different types of sensors may require different excitation 26 and therefore, each sensor 30 may further comprise one or more excitation inducers or the excitation inducers may be mounted separately or any combination thereof.
Computer 20 may transmit the results to the surface and receive data and commands from the surface or a remote operator through communication link 22. Power and communication subsea connector 23 allows an ROV to restore BOP power, both electrical and hydraulic and operate computer 20 and the peripherals through peripheral-bus 21.
Computer 20 also processes and assimilates information from a number of Data Acquisition sensors 25 through the data acquisition system 24. Data Acquisition Sensors 25 are disposed around Rig 1 and BOP 4 and may measure capacitance, contactivity, current, deflection, density, external pressure, fluid volume, flow rate, frequency, impedance, inductance, internal pressure, length, rate, accumulator pressure, pressure, resistance, sound, temperature, vibration, voltage, similar items and combinations thereof.
It should be understood that although
Again, BOP 4 is a complex machine that can be operated in multiple ways to achieve a goal while enduring a compendium of (variable) forces and interactions that, most likely, are redefining the goal. However, most often complexity is of low utility. For example, a human does not study all the details of a train before recognizing that it is a train or that the train is moving or not. Instead, humans reduce the myriad of complex train patterns to a simple unique pattern that is a property of trains, as opposed to trucks or airplanes.
AutoBOP 4 uses the same approach to define the predictive-software whereby, the complex BOP 4 operational states are reduced to a sequence(s) of simple patterns that may be interconnected through an equation or a system of equations (numerical, logic, fuzzy), tables (numerical, logic or fuzzy), other relational operators, similar items and combinations thereof, thus preserving and accounting for the dynamic properties and interactions. It should be noted that AutoBOP 4 operates in a limited space, within limited time (when needed) and has limited resources to solve the Problem.
For example, during normal operations, computer 20 may scan each drill pipe joint 7 and store in database critical information in a drill string lengthwise format comprising of wall thickness, imperfections, hardness, dimensions, wear, stress concentration, weight, similar items and combination thereof. Computer 20 may then use the stored critical information to calculate a required nominal shearing force FH along the length of the drill string and may notify the rig crew when it detects drill pipe 7 that exceeds the shearing specifications. It should be understood that computer 20 updates the lengthwise drill string critical information in subsequent scans so that the database comprises of the latest data.
Computer predictive-software 28 therefore knows in some detail the nominal shearing force required for each drill pipe joint 7 and may translate it to a horizontal force FH acting on shear ram 4SH through piston 5B and thus, the minimum pressure to drive piston 5B. Computer 20 also knows each drill pipe joint 7 below the shear rams and the location of each drill pipe joint 7 in the string; knows the flow rate through communication link 22 and may calculate a Force FV; knows the temperature through the data acquisition system 24 and Data Acquisition sensor 25; knows the drill pipe 7 internal pressure from a surface pressure monitor through communication link 22 and knows the location and angle of the drill pipe 7 through sensors 30 and thus computer 20 may rapidly calculate a corrected shearing force and a minimum pressure to drive piston 5B.
When a blowout is detected, predictive software 28 of computer 20 may rapidly decide how to drive piston 5B. When the drill pipe joint 7 enters the shear rams SH, computer 20 only needs to detect a significant deviation from the stored drill pipe joint 7 parameters, its location and any deformation to correct the required shearing force. Since the AutoBOP acts early on, it is not expected that any drill pipe joint 7 will be significantly deformed and thus requiring a lower shearing force. Computer 20 would then select how to drive piston 5B.
For each selection, there is an associated equation or table or graph that defines the pressure (time) function that drives piston 5B. Drill pipe 7 known dimensions may be translated to piston 5B length travel and therefore, the horizontal Force FH acting upon the drill pipe 7 wall. If computer 20 determines that the accumulator 11B pressure is not adequate to shear the drill pipe 7, computer 20 may switch the shear rams 4SH piston 5B to pressure intensifier 12B. Computer 20 will close valve 14B and open valves 13B and 15B. Computer 20 may do so in advance in anticipation of the next drill pipe joint 7.
The time interval between tool joints 7A of
Again, an EDS/Deadman sequence will activate annular preventer 4C first resulting in a collision with a tool-joint 7A and trapping the results of the collision inside BOP 4 below annular preventer 4C. Instead, for example, properly timed rapid sequencing of pipe ram 4A followed by annular preventer 4C and then by shear ram 4B would place drill pipe wall 7B inside shear rams 4B and the results of tool-joint 7A collision with pipe ram 4A below BOP 4. In addition, the momentum of the traveling drill string above pipe ram 4A may temporarily place the drill pipe inside shear ram 4B under tension. It should also be understood that AutoBOP 40 reaction would take place at the initial stages of a blowout where forces and momentum is still low enough to control. It should be noted that an estimation of the drill string momentum may be easily calculated from the string weight by adding the weight of each drill pipe joint 7 and the speed of the drill string.
The above calculations however ignore the absence of the beneficial tension that makes certain BOP actions ineffective [see API S53 (7.6.11.7.11)]. The Blowout-Arrestor of the present invention increases the shearing-force and adds a tearing-force to drill pipe 7. During a blowout, shear ram 4B may be driven by pressure intensifier(s) 12B and pipe ram 4A may be driven to a lateral oscillation to aid the tearing of the drill pipe inside shear ram 4B through cumulative fatigue. Even a small-magnitude oscillation would focus on the stress-concentrator that was created by shear ram 4B. Pipe ram 4A surface may utilize a pipe gripper to prevent slippage and may incorporate an actuator with extended reach. The lateral oscillation will also require higher actuator pressure and volume. It should be understood that the lateral oscillation of pipe ram 4A may undermine the shearing force of shear ram 4B and therefore, the AutoBOP would apply corrective pressure or a locking mechanism to shear ram 4B.
Notice that shearing is not possible if a tool-joint or heavy wall OCTG is in the shear rams although the need to seal-off the well is still the same. This may be overcome by: the use of two shear rams, also specified in API S53 (7.1.3.1.6). In the present invention, two shear rams would be spaced further apart than the [(longest tool-joint length)+(upset area length)] to assure that there is no tool joint in at least one of the shear rams. The AutoBOP would then activate only the shear ram to cut the body wall. In the event that nonshearable equipment is inside the shear rams, the AutoBOP adds a hammer operation to the operation of shear ram 4B. The hammer operation may be carried out through control of the hydraulic supply or through a motor or a combination thereof. It should be understood that the hammer operation will also require an actuator with higher operational pressure.
The corrective steps 1 through 4 may be implemented through computer 20 or through external control (such as an ROV) and may be carried out using the existing electrical and hydraulic connections of rig 1, BOP 4 batteries and accumulators, subsea connectors, similar items and combinations thereof.
In other embodiments, a system to arrest and control an elastically unstable slender column of material is provided that may comprise components such as but not limited to at least one computer with a sensor interface, at least one sensor to monitor parameters of the material inside the system,
at least one ram with an accumulator, and/or a program being executed on the at least one computer to activate the at least one ram to control the column of material, the activation been partially controlled by the monitored parameters.
The parameters may comprise of wall thickness, imperfections, hardness, dimensions, wear, rate of wear, stress concentration, weight, lateral location, angle, similar items and a combination thereof.
The at least one computer may further comprise of a data acquisition system to monitor operation parameters of the system.
The operation parameters may comprise of one or more of capacitance, contactivity, current, deflection, density, external pressure, fluid volume, flow rate, frequency, impedance, inductance, internal pressure, length, accumulator pressure, resistance, sound, temperature, vibration, voltage, similar items and combinations thereof.
The activation may be partially controlled responsively to the monitored operation parameters.
Another embodiment may comprise a system to arrest and control an elastically unstable slender column of OCTG. The system may comprise of but is not limited to at least one computer, a data acquisition system to monitor operational parameters of the system, at least one ram with a accumulator, and/or a program being executed on the at least one computer to activate the at least one ram to control the column of OCTG. The activation may be partially controlled in response to the monitored operational parameters.
The operation parameters may comprise of one or more of capacitance, contactivity, current, deflection, density, external pressure, fluid volume, flow rate, frequency, impedance, inductance, internal pressure, length, accumulator pressure, resistance, sound, temperature, vibration, voltage, similar items and combinations thereof.
The at least one computer of may further comprise of a sensor interface to monitor parameters of the material inside the system.
The material parameters may comprise of wall thickness, imperfections, hardness, dimensions, wear, rate of wear, stress concentration, weight, lateral location, angle, similar items and/or a combination thereof.
The activation may be partially controlled responsively to the monitored material parameters.
In another embodiment, a constant-vigilance well-monitoring system may comprise of but is not limited to at least one computer, at least one sensor operable by the at least one computer to monitor at least one operational parameter of the well and a program being executed on the at least one computer to process the at least one operational parameter to determine a status of the well.
The operation parameters may comprise of one or more of acceleration, angle, capacitance, contactivity, current, deflection, deformation, density, dimension, field, flow rate, fluid volume, frequency, GPS, hardness, impedance, imperfection, inductance, intensity, length, light, location, motion, pressure, resistance, sound, speed, temperature, vibration, voltage, wall thickness, imperfections, weight, similar items and combinations thereof.
The at least one computer may further control excitation for the at least one sensor, which may or may not also comprise pipe magnetization.
The well-monitoring system may further comprise of at least one valve under the control of the at least one computer. The at least one valve may be capable of reducing the cross-sectional-area of the annulus of the well. The at least one valve may be capable of diverting the flow of the well.
The system whereby the activation may be partially controlled responsively to the monitored material parameters.
In yet another embodiment, a system to monitor hydrocarbon well conditions may comprise various status features comprising the rig crew is in control; the rig is functioning; the rig provides the drill pipe controlling force; the drill string is straight and under tension; the drill pipe is near the center of the BOP; the rig crew may position a drill pipe body-wall inside the shear rams; the drill string is static; the well is not flowing or the flow is under the control of the rig crew; the BOP sequencing, like the EDS sequence, may be programmed and carried-out automatically; and there is no life-threatening urgency to complete the task.
The parameters may comprise of wall thickness, imperfections, hardness, dimensions, wear, rate of wear, stress concentration, weight, lateral location, angle, similar items and a combination thereof.
In general, it will be understood that such terms as “up,” “down,” “vertical,” “upper”, “lower”, “above”, “below”, and the like, are made with reference to the drawings and/or the earth and that the devices may not be arranged in such positions at all times depending on variations in operation, transportation, mounting, and the like. As well, the drawings are intended to describe the concepts of the invention so that the presently preferred embodiments of the invention will be plainly disclosed to one of skill in the art but are not intended to be manufacturing level drawings or renditions of final products and may include simplified conceptual views as desired for easier and quicker understanding or explanation of the invention. One of skill in the art upon reviewing this specification will understand that the relative size and shape of the components may be greatly different from that shown and the invention can still operate in accord with the novel principals taught herein. While inner and outer seals are created as shown above, only an inner or outer seal might be created in accord with the present invention.
Accordingly, because many varying and different embodiments may be made within the scope of the inventive concept(s) herein taught, and because many modifications may be made in the embodiment herein detailed in accordance with the descriptive requirements of the law, it is to be understood that the details herein are to be interpreted as illustrative of a presently preferred embodiment and not in a limiting sense.
This application claims benefit of U.S. Provisional patent application Ser. No. 62/151,627 filed Apr. 23, 2015 and is hereby incorporated by reference.
Number | Date | Country | |
---|---|---|---|
62151627 | Apr 2015 | US |