This application is a continuation of application Ser. No. 07/942,499, filed Aug. 28, 1992 now abandoned.
The invention described herein was made in the performance of work under a NASA contract, and is subject to the provisions of Public Law 96-517 (35 USC 202) in which the contractor has elected not to retain title.
| Entry |
|---|
| R. J. Popplestone, A. P. Ambler, and I. M. Bellos, "An interpreter for a language for describing assemblies," Artifical Intelligence Journal, 1980, vol. 14, pp. 79-107. |
| L. S. Homem de Mello and A. C. Sanderson, "AND/OR graph representation of assembly plans," IEEE Trans. Robotics Automat., Apr., 1990, vol. 6,No. 2, pp. 188-199. |
| S. Lee, "Disaasembly Planning by Subassembly Extraction," in the Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems, Aug., 1989, (Elsevier Science, MIT, Mass.), pp. 383-388. |
| S. Lee and Y. G. Shin, "Automatic Construction of Assembly Partial-Order Graph," in Proceedings of the 1988 International Conference on Computer Integrated Manufacturing, May, 1988, (RPI, Troy, New York), pp. 383-392. |
| T. L. De Fazio and D. E. Whitney, "Simplified Generation of All Mechanical Assembly Sequences," IEEE J. Robotics Automata, Dec., 1987, RA-3(6), pp. 640-658. Corrections ibid Dec., 1988, RA-4(6), pp. 705-708. |
| D. F. Baldwin et al., "An Integrated Computer Aid for Generating and Evaluating Assembly Sequences for Mechanical Products," IEEE J. Robotics and Automation, RA-7 vol. 1, Feb., 1991, pp. 78-94. |
| H. Ko and K. Lee, "Automatic assembling procedure generation from mating conditions," Computer Aidded Design, vol. 19, No. 1, pp. 3-10, Feb., 1987. |
| R. L. Hoffman, "Automated Assembly Planning for B-rep Products," in IEEE International Conference on systems Engineering, (Pittsburg, Pa.), Aug. 1990, pp. 391-394. |
| S. Lee and Y. G. Shin, "Assembly Planning Based on Geometric Reasoning," Computers and Graphics, an International Journal of Applications in Computer Graphics, 1990, vol. 14, No. 2, pp. 237-250. |
| Y. F. Huang and C. S. G. Lee, "An Automatic Assembly Planning System," Proceeding of the 1990 IEEE Conference on Robotics and Automation, (Cincinnati, Ohio), May, 1990, pp. 1594-1599. |
| A. A. G. Requicha, "Representations for rigid solids: Theory, methods and systems," ACM Computing Surveys, Dec., 1980, vol. 12, No. 4, pp. 437-464. |
| L. De Floriani and G. Nagy, "A graph-based model for face-to-face assembly," in Proceedings IEEE International Conference on Robotics and Automation, (Scottsdale, Ariz.), 1989, pp. 75-78. |
| F. Thomas and C. Torras, "A Group Theoretic Approach to the Computation of Symbolic Part Relations," IEEE Journal of Robotics and Automation, Dec., 1988, vol., 4, No. 6. |
| R. H. Wilson and J. F. Rit, "Maintaining geometric dependencies in an assembly planner," in Proceedings of the IEEE International Conference on Robotics and Automation, 1990, pp. 890-895. |
| R. L. Hoffman, "Automated Assembly in CSG domain," in 1989 IEEE International Conference on Robotics and Automation, (Scottsdale, Ariz.), 1989, pp. 210-215. |
| J. D. Wolter, "On the Automatic Generation of Assembly Plans," in Proceedings of IEEE Conference on Robotics and Automation, 1989, pp. 62-68. |
| S. Lee and Y. G. Shin, "Assembly Planning based on Subassembly Extraction," in Proceedings of the 1990 IEEE Conference on Robotics and Automation, (Cincinnati, Ohio), May, 1990, pp. 1606-1611. |
| S. Lee and Y.G. Shin, "A Cooperative Planning System for Flexible Assembly," in Proceedings of the 2nd International Conference on Computer Integrated Manufacturing, (Troy, N.Y.), May, 1990. |
| L. S. Homem de Mello and A. C. Sanderson, "Evaluation and Selection of Assembly Plans," in Proceedings of the 1990 IEEE Conference on Robotics and Automation, (Cincinnati, Ohio), May 1990. |
| G. Boothroyd and P. Dewhurt, Design for Assembly. Pendon/IPC, Inc., 1984. |
| R. L. Hoekstra, "Design for Automated Assembly: An Axiomatic and Analytical Method," SME Technical Paper, Detroit, Michigan, May, 1989. |
| Y. F. Huang and C. S. G. Lee, "Precedence Knowledge in Feature Mating Operation Assembly Planning," Proceeding of the 1989 IEEE Conference on Robotics and Automation. |
| J. M. Henrioud, F. Bonneville and A. Bourjault, "Evaluation and Selection of Assembly Plans," in APMS '90, (Espoo, Finland), Aug., 1990, pp. 212-219. |
| N. J. Nilsson, Problem-Solving Methods in Artifical Intelligence. McGraw-Hill Inc., 1971. |
| Number | Date | Country | |
|---|---|---|---|
| Parent | 942499 | Aug 1992 |