Claims
- 1. In a baling method, the improvement of:
- in alternating steps, stuffing successive charges of predetermind size and density into a baling chamber and compacting the same within said chamber;
- temporarily interrupting at least said stuffing if the charge to be stuffed and compacted is less than said predetermined size and density;
- resuming said alternate stuffing and compacting when the deficiency in the charge is eliminated,
- said steps being carried out while the baling chamber is advancing; and
- the additional step of continuously picking up material from the ground for charging the chamber as the latter advances.
- 2. In a baling method as claimed in claim 1, continuously feeding the material into an accumulating chamber as the material is picked up from the ground; and collecting the material in said accumulating chamber to form the charge which is stuffed into the baling chamber.
- 3. In a baling method as claimed in claim 2, wherein said picking up and feeding of the material include packing the same into the accumulating chamber.
- 4. In a baling method as claimed in claim 3, wherein said stuffing step includes introducing the charge into the baling chamber from below the same and distributing the charge across the entire cross-section of the baling chamber.
- 5. In a baling method as claimed in claim 4, wherein said stuffing step is automatically initiated in response to sensing that said predetermined density has been obtained.
- 6. In a baling method as claimed in claim 4, wherein said collecting step includes obtaining a charge having a greater volume of material adjacent the end thereof destined to be stuffed to the top of the baling chamber than the end destined for the bottom of the baling chamber.
- 7. In a baling method as claimed in claim 3, wherein said stuffing step is automatically initiated in response to sensing that the charge collecting in the accumulating chamber has reached said predetermined density.
- 8. In a baling method as claimed in claim 1, wherein said stuffing step includes lifting the charge into the baling chamber from below the same.
- 9. In a baling method as claimed in claim 1, wherein both said stuffing and compacting are interrupted if the charge to be stuffed and compacted is less than said predetermined size and density.
Parent Case Info
This is a division of application Ser. No. 675,529, filed on Apr. 9, 1976.
US Referenced Citations (4)
Divisions (1)
|
Number |
Date |
Country |
| Parent |
675529 |
Apr 1976 |
|