The invention relates to a baling press for baling cotton gin trash and other particulate biomass feedstock—materials which have proven difficult to form into a bale that substantially maintains its shape and density over time. The invention also relates to methods of producing a bale with the baling press and a bale generated by said press and methods.
Particulate biomass waste for example, cotton gin trash, generated in industries such as cotton processing (or “ginning”) is exceptionally difficult to form into bales that can be conveniently transported to facilities for use. In most cases, it is not cost effective or economically feasible to transport unbaled materials (with the exception of perhaps cotton seed which is not baled) due, for example, to the transportation costs and small quantity that can be transported. Gin trash is such a material and is the only material generated from cotton processing (other than cotton seed) that, up until this point, could not be baled with consistent success due in part to the physical characteristics of the material and the constraints of conventional balers.
The application of biomass waste to various agricultural, industrial, and energy uses is a growing field/market and finding economic and efficient methods to transport such materials to consumers is much needed. For example, gin trash has been shown to be exceptionally useful as cattle feed filler, as a biofuel, as a soil additive or compost, in fluidized bed gasification processes, and in conversion to packaging material. If gin trash could be baled and transported in an efficient and economic manner, it is predicted that the market for gin trash would flourish and grow. However, as mentioned above, gin trash has proven difficult to bale and transport and traditionally has been either incinerated on site or buried in pits behind the gin. These disposal methods are not ideal and result in significant costs to the cotton gin owner and the environment. Cotton gin owners are also losing a substantial source of additional revenue when the material is disposed of and not sold.
As mentioned above, prior to Clean Air Acts (1970-1975), gin trash was typically incinerated behind the cotton gins. Since then gin trash, for the most part, has been conveyed to an area behind the gin and, mostly during off season, spread back onto cotton fields. A much smaller percent of the gin trash generated has been buried in land fields, used/sold for composting, and in some parts of the cotton belt, processed and used for livestock roughage even though transport was not efficient. However, due to handling and transport cost of low-density (10-12 lbs./cu/ft.) waste material, profitable markets remain elusive. It would be a great advantage to have a baling press that can generate bales with density at or near 27-30 lbs./cu/ft. at the ginning rate (production rate of gin trash discharge) which are capable of dry storage to prevent spoliation, able to be handled multiple times without disintegration, and able to be transported long distances.
Baling properties differ substantially, especially in cotton gin trash, which is in part determined by factors such as weather during growing season and harvest, processed moisture content, type of harvesting machine, condition of harvesting machine, speed of operation of harvesting machine, soil conditions at the exact location where plants are grown, and the variety or varieties of seed planted. Not only do the baling properties of certain organic waste or biomass materials vary between farmers, they vary within farms and harvesting periods. The same variabilities do not exist with easier-to-bale materials such as shredded paper or stems/sticks/flexible organic materials that compress but have a greater degree of physical memory than cotton gin trash or other particulate biomass material.
Conventional baling mechanisms and baling presses for cotton and another cotton gin waste product, cotton motes, are known in the art, for example, U.S. Pat. No. 5,456,075 (“Baling Press”), U.S. Pat. No. 4,512,252 (“Baling Press”); U.S. Pat. No. 4,161,911 (“Presses for Baling Waste Materials”); U.S. Pat. No. 4,566,380 (“Round Baling Press for Agricultural Products”); U.S. Pat. No. 4,805,528 (“Cotton Bale Recompressing and Retying Machine and Process”); and U.S. Pat. No. 4,548,131 (“Mobile Apparatus for the Infield Handling of Fibrous Material”); U.S. Pat. No. 6,941,740 B2 (“Baler Gate Linkage and Latch Structure”); and U.S. Pat. No. 4,391,186 (“Cotton Press”). The aforementioned patents and mechanisms disclosed therein are herein incorporated by reference. While some of the assemblies and mechanisms described in these references are fairly common to balers, these known baling mechanisms are generally unsuitable for baling gin trash and similar biomass materials
Another weakness of conventional baling presses is the inability to apply plastic strapping in an efficient, cost effective, low man-power manner. Plastic strapping is often required in the agribusiness (e.g., livestock) field and other fields as well. Plastic strapping may be incinerated with the baled material if need be. There are certain other advantages to plastic strapping such as the width of the straps versus wire—straps being less likely to cut through the bale. Plastic strapping may be cut with a knife blade, but wire cannot. Moreover, workers are more prone to injury from wire than from plastic strapping. Finally, traditional auto-tie mechanisms for horizontal balers have used a set of wire spools on both sides of the press and have tied the bale early in the extrusion process. For material, such as cotton gin trash, with less physical memory than other waste material, early tying has proven difficult because the physical size of the bale is reduced and doesn't rebound as with other materials.
Therefore a baling press for baling biomass feedstock that is difficult to bale, including cotton gin trash, is needed to provide a valuable market and additional source of revenue for the cotton gin owner and a valuable cheap material with multiple uses for consumers. The baling press must generate a bale with sufficient density to hold the material together without disintegration and tie or bind the bale in a manner that promotes this characteristic. The baling press must be able to accommodate in a convenient and efficient manner many if not all of the variables in the physical characteristics of the feedstock material. The bale produced must be capable of efficient and economic stacking, handling, and transport.
One object of the present invention may comprise providing a baling press for baling cotton gin trash and other biomass feedstock. In some embodiments, the baling press may comprise a general baling press unit with one or more subunits or assemblies. In some embodiments, the baling press unit is modular with detachable components.
Another object of the present invention may comprise providing a baling press with an extrusion chamber assembly. In some embodiments, the extrusion chamber assembly may comprise an extrusion chamber chute of a substantially rectangular cuboid shape and an open bale exit end and a feed stock entry end. The extrusion chamber chute may be detachable from the overall baling press unit.
Another object of the present invention may comprise providing a baling press with one or more tension device(s) or elements for monitoring and adjusting extrusion friction and controlling maximum and minimum bale density. The tension devices(s) may be a part of the extrusion chamber assembly.
Another object of the present invention may comprise providing a baling press with a first tension element to set and/or adjust the minimum tension or pressure applied to the bale as it progresses through the extrusion chamber chute. In some embodiments, the first tension element may be adjusted or set manually through mechanical means such as a bolt and nut assembly or alternatively powered, for example, electric or hydraulic means. In some embodiments, the first tension element is attached to the mid-section of the elongated extrusion chamber chute. In other embodiments, the first tension element may be positioned along the extrusion chamber chute closer to the ram and charge chamber. In some embodiments, the first tension element comprises side brackets, as well as top and bottom mounts. The side brackets may be adjustable for control of the predetermined constrictive force applied to the chute exterior side walls and/or to maintain proper pressure on the forming bale.
Another object of the present invention may comprise providing a baling press with a second tension element for controlling and not exceeding the maximum pre-determined bale density. The second tension element may comprise side brackets, as well as top and bottom mounts. In some embodiments, the top mount may further comprise arms and a triangular bridge which support a hydraulic cylinder. In some embodiments, the second tension element may be powered, for example electrical or hydraulic power. In some embodiments, the second tension element is positioned proximate to the bale exit end of the elongated extrusion chamber. In some embodiments, the pre-determined tension force may be modified by the hydraulic cylinder or electrically activated and controlled mechanical device.
Another object of the present invention may comprise providing a baling press comprising a compression ram assembly. In some embodiments, the compression ram assembly may comprise an internal compression ram with a ram platen. In some embodiments, the platen comprises one or more slots designed to receive and guide a strapping inserter rod or shaft which carries plastic strapping material for ultimate bale tying or binding. In some embodiments, the compression ram assembly further comprises a top plate which may be affixed to the top of a frame for covering the charge chamber opening as the ram travels through the charge chamber and into the extrusion chamber chute. This prevents unwanted feedstock from entering the charge chamber from the infeed chute at certain times during the process.
Another object of the present invention may comprise providing a baling press that applies the necessary compression force for baling cotton gin trash and other difficult to bale biomass feedstock.
Another object of the present invention may comprise providing a baling press that applies manageable charges/laminations for better, more uniform compaction and volume control.
Another object of the present invention may comprise providing a baling press that is capable of conveniently and cost effectively applying plastic strapping material to bind a formed bale.
Another object of the present invention may comprise providing a baling press with an infeed chute assembly positioned proximate and, in some embodiments, above a charge chamber. In some embodiments, the chute assembly is attached to or engaged with the top of the baler structure and includes an access door and one or more viewing window(s). In some embodiments, the infeed chute rests above the charge chamber and allows feedstock to flow from the feedstock supply line into the charge chamber. In some embodiments, the infeed chute assembly further comprises one or more sensors for detecting and controlling the feedstock quantity within the charge chamber and infeed chute.
Another object of the present invention may comprise providing a baling press with a strapping material inserting and positioning assembly. In some embodiments, the strapping used in said strapping material inserting and positioning assembly is flat plastic strapping, however, it should be understood that any strapping material known in the art may work for the intended purpose. The strapping material used may be substantially flat or wide plastic strapping material. The strapping material inserting and positioning assembly may comprise an encasing or housing. In some embodiments, the encasing may be detachably engaged to the extrusion chamber chute by bolt, pin or the like. The encasing may further more comprise hinges which allows the encasing to swing open without full detachment. The strapping material inserting and positioning assembly may comprise one or more inserter rods which transport the strapping material through the extrusion chamber chute and beyond the opposite chute sidewall. In other embodiments, the strapping material inserting and positioning assembly may be connected to either of the extrusion chamber chute sidewalls to transport strapping material for bale tying (density securing) through, across, or in close proximity to the ram platen (ram face) and extend the material a sufficient distance beyond the opposite sidewall such that the operator can have easy access to the extended strapping material to pull and then cut the straps to an appropriate length. The inserter shafts may be actuated and powered by hydraulic, electric, or steam power. In some embodiments, the inserter shafts are guided and by tracks and/or posts and actuated by chain/pulley mechanics. The strapping material inserting and positioning assembly, in one embodiment, may be positioned on a single side of the baling press.
Another object of the present invention may comprise one or more integral blades secured to the baling press unit for cutting the strapping. In this embodiment, it is not necessary for the operator to use a cutting implement or tool; rather the operator manually places the strapping material on the strap cutting blade(s) for cutting the strapping material to size. As a charge of material is advanced within the extrusion chamber chute by ram platen motion, the strap cutting blades automatically cut the strapping material to the proper size for securing or binding the forming bale due to the increased tension between strapping material and sharp edge of blade(s). In one embodiment, the blade(s) are positioned at a predetermined distance from the extrusion chamber chute where the inserter shaft presents the strapping material to the operator such that when the operator grabs the strapping material, pulls additional material through the extrusion chamber chute, and positions it on the blades, it is assured that the strapping material is cut to proper length for later bale binding. In one embodiment, the blade(s) are affixed to a vertical support, such as a bar or beam that is itself affixed to the exterior wall of the extrusion chamber chute. In another embodiment, the blade(s) are affixed on the vertical support at positions substantially co-planer with the inserter shafts. In another embodiment, the vertical support is affixed to the wall of the extrusion chamber chute such that the blades are several inches away from the wall providing sufficient clearance for the operator to safely place the strapping material on the blades unencumbered.
Another object of the present invention may comprise providing a baling press with a baling press unit. In some embodiments, the baling press unit may be engaged to one or more of a compression ram assembly, a hydraulic power unit assembly, electrical control enclosures and control switches, an infeed chute assembly over top an infeed opening to the baling chamber, and/or bolt-on legs to support the complete baling press at a convenient height.
In another object of the present invention, the baling press produces and maintains a consistent compression force for bale formation. In one embodiment, the baling press produces and maintains a compression force of at least about 150 lbs/in2. In another embodiment, the amount of compression force is between about 150 to about 250 lbs/in2. In another embodiment, the amount of compression force is about 200 lbs/in2. The amount of compression force necessary will vary depending on the physical properties of the material being baled influenced by geographic region of origin, moisture content, etc.
Another object of the present invention may comprise providing electrical enclosures for motor starters, system electrical disconnect, transformer, electrical wiring, programmable logic controller, operator interface device, push buttons, electrical sensors, electrical switches, photo sensor(s), and other electrical control components necessary to power the baling press.
Another object of the present invention may comprise providing a hydraulic power unit complete with hydraulic systems components and accessories to provide hydraulic power and control components including the compression ram assembly, extrusion chamber tension device(s), and said bale strapping material inserting and positioning assembly.
Another objection of the present invention may comprise providing a finished bale receiving platform with or without a bale bagging accessory and bolt-on legs to support the complete baling press at a convenient height for the baling press operator's comfort, to aid with area housekeeping, and to provide easy access to the bale for bale removal, handling and/or conveying.
Another object of the present invention may comprise providing a baling press with a strapping material storage and dispensing assembly. In some embodiments, the strapping material storage and dispensing assembly may comprise one or more strapping dispenser units that may be freestanding or, alternatively, attached to the baling press unit or the strapping material inserter assembly. The assembly may further comprise one or more strapping guide elements for proper transport and presentation of the strapping to the insertion assembly for insertion through the extrusion chamber chute. Depending on the orientation of the strapping dispenser units, the guide elements may alter the orientation of the strapping material for proper positioning prior to insertion through the extrusion chamber chute. The strapping material storage and dispensing assembly, in one embodiment, may be positioned on a single side of the baling press, for example, on the same side of the baling press as the strapping material insertion assembly.
Representative embodiments of the invention are disclosed in more detail with reference to the following figures.
The present invention now will be described more fully hereinafter with reference to the accompanying drawings, which form a part hereof, and which show, by way of illustration, specific exemplary embodiments by which the invention may be practiced. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that this disclosure will be thorough and complete and convey the scope of the invention to those skilled in the art. Among other things, the present invention may be embodied as methods or devices. The following detailed description is, therefore, not to be taken in a limiting sense.
Throughout the specification and claims, the following terms take the meanings explicitly associated herein, unless the context clearly dictates otherwise. The phrase “in one embodiment” or “in some embodiments” or “in a preferred embodiment” as used herein does not necessarily refer to the same embodiment, though it may. Furthermore, the phrase “in another embodiment” as used herein does not necessarily refer to a different embodiment, although it may. Thus, as described below, various embodiments of the invention may be readily combined, without departing from the scope or spirit of the invention. In addition the phrase “present invention” or “object of the present invention” does not necessarily refer to nor is intended to limit the invention to the specific embodiment or feature described.
In addition, as used herein, the term “or” is an inclusive “or” operator, and is equivalent to the term “and/or,” unless the context clearly dictates otherwise. The term “based on” is not exclusive and allows for being based on additional factors not described, unless the context clearly dictates otherwise. In addition, throughout the specification, the meaning of “a,” “an,” and “the” include plural references. The meaning of “in” includes “in” and “on.”
It should be noted that although the discussions herein may refer to a specific order and composition of method steps, it is understood that the order of these steps may differ from what is described. For example, two or more steps may be performed concurrently or with partial concurrence. Also, some method steps that are performed as discrete steps may be combined, steps being performed as a combined step may be separated into discrete steps, the sequence of certain processes may be reversed or otherwise varied, and the nature or number of discrete processes may be altered or varied. The order or sequence of any element or apparatus may be varied or substituted according to alternative embodiments. Accordingly, all such modifications are intended to be included within the scope of the present invention. Such variations will depend on designer choice and it is understood that all such variations are within the scope of the invention.
Referring now to
The overall baling press unit 101 is preferably built to absorb and withstand the powerful forces exerted by a connected (e.g., double-acting) cylinder and piston as the piston extends under pressure and pushes the compression ram past the charge chamber and into the connected extrusion chamber assembly 102 and then retracts back to home/resting position toward the rear of the baling press unit 101. The cylinder may include a piston (not shown) for advancing the compression ram (described more fully below) toward the feedstock charge and forming bale. The compression ram's motion is generally along the horizontal plane in relation to the floor surface and potentuated by powered cylinders, such as for example the double acting hydraulic or steam actuated cylinders.
The baling press unit 101 is designed to receive loose cotton gin trash or other small or processed biomass feedstock through an infeed chute assembly and into a charge chamber (or “baling chamber”) 103 (best illustrated in
In some embodiments, the baling press unit 101 may further comprise a compression ram assembly 104, a hydraulic power unit assembly 105, electrical controls 106 (generally also shown in Figures as Control Panels 115) including enclosures and control switches, an infeed chute assembly 107 proximate an infeed opening 108 to the charge chamber 103, and legs 109 (e.g. bolt on) to support the entire baling press unit 101 at proper height for the baling press operator's comfort, to aid with area housekeeping, and to provide easy access under the baling press to connect, if needed, dust remediation venting or ducts.
Referring now to
With continued reference to
In some embodiments, and as best illustrated in
Referring now to
Referring now to
Referring now to
Side brackets 126a-b may comprise an interior surface 128 (nearest the extrusion chamber chute 117) and an exterior surface 129. However, in some embodiments, the side brackets 126 of the first tension element 123, while vertically oriented to the floor surface and positioned substantially parallel to the extrusion chamber chute's side wall exterior surface, may not be in contact with the extrusion chamber chute's exterior surface while the baling press is at rest and not in operation. The distance between the interior surface 128 of the side brackets 126a-b and the extrusion chamber chute's exterior surface is a predetermined distance and is used to help achieve a minimum preferred bale density by preventing flex of the extrusion chamber chute's side walls (e.g. slats) beyond a certain point during bale formation. This helps to maintain sufficient pressure on the forming bale which is essential for materials that are known to be difficult to bale, such as cotton gin trash. In some embodiments, the side brackets 126 are adjustable whereby the distance between the interior surface 128 of the side brackets and the extrusion chamber chute's exterior surface 119a is either reduced or increased depending on the desired minimum bale density and/or the physical characteristics of the biomass feedstock material. In other embodiments, however, the side brackets are fixed and cannot be adjusted. The side brackets may be engaged or affixed to the top and bottom mounts with a heavy nut and bolt assembly for ease of removal and disassembly.
Referring to
The relative position of the first tension element 123 on the extrusion chamber chute 117 is important to desired bale density control. The position may also depend on the length of extrusion chamber chute 117. In some embodiments, the first tension element is positioned at or near the mid-section of the extrusion chamber chute 117. In some embodiments, the position of the first tension element is biased toward the compression ram assembly 104. In some embodiments, the first tension element 123 may be used to maintain the minimum ram face pressure near the center point of the extrusion chamber chute 117 by, for example, adding structural integrity to the walls at that early position. Maintaining the pressure at this position permits release of the higher pressures toward the end of the extrusion chamber chute 117 due to the growing size of the bale via second tension element (described below) without diminishing the minimum force necessary to achieve the target minimum bale density. As discussed above, depending on the desired minimum bale density, the first tension element's lateral elements or side brackets 126 which are positioned substantially parallel to the extrusion chamber side walls may be set at a predetermined width for controlling and retaining the minimum desired bale density which in turn could affect total final extrusion chamber bale density. The tension element 123, in essence, restricts the degree of flex experienced by the side walls of the extrusion chamber chute 117 due to forces exerted by the forming bale. This pre-setting may be performed and powered manually, electrically, and/or hydraulically. For example, manual presetting may be accomplished by heavy duty, industrial quality nuts and bolts 133 as depicted in
The extrusion chamber assembly 102 may comprise a second tension element 134 engaged at a predetermined position about the exterior of the extrusion chamber chute 117, preferably proximate to the bale exit end 120 of the extrusion chamber chute 117. The second tension element 134 may comprise top mounts 135, bottom mounts 136, and side brackets 137. Said top mounts may comprise four arms 138a-d extending at an angle up to a triangular bridge 139. The triangular bridge 139 may further support a hydraulic cylinder 140 which when activated moves arms 138a-d causing side brackets 137 to move toward the chute's exterior side wall surface 119a applying pressure to the same. This process is explained in more detail below. Said arms 138a-d may be engaged to the bridge 139 in a manner that allows movement between the arms 138 and the bridge 139. Similar to the bottom mounts of the first tension element 123, the bottom mounts 136 of the second tension element 134 may further comprise slots 141 for receipt of a bolt or pin assembly for side bracket adjustment at the bottom only.
In some embodiments, the second tension element 134 is automatically activated and is designed to control and restrict the maximum pre-determined bale density, which, if exceeded, might potentially utilize excessive energy, require larger and more costly structures, or damage the extrusion chamber chute 117 or baling press unit 101. In one embodiment, the predetermined tension force of the second tension element 134 may be modified by hydraulic cylinder(s) or other electrically activated and controlled mechanical device(s). In one embodiment, the force applied by the tension cylinder 140 or electrically activated mechanical device is that which is necessary to maintain but not exceed a desired compression force necessary for successful bale formation and density. In some embodiments, in operation, as the hydraulic cylinder 140 is activated, the side brackets 137 are forced inward applying pressure on the extrusion chamber chute's exterior surface 119a and thus the bale within the chute 117. If it becomes necessary, due to choking of the extrusion chamber by the bale being extruded, the force exerted by the second tension element 134 may be deactivated, released, or adjusted (manually or automatically) such that friction on the bale is minimized thereby allowing the bale to advance and proceed through chamber opening.
As discussed above, in some embodiments, it is important that an actual delivered compression force ranging between about 150 to about 250 pounds per square inch (“PSI”) is maintained to produce bales of cotton gin trash and some biomass feedstock to a final density that can be easily handled, handled repeatedly, stored, or economically shipped to remote destinations on flatbed trailers, inside van trailers, or inside sea containers. As mentioned in the Background section, gin trash and other particulate biomass feedstock is difficult to bale and, without the proper bale density, the bales will disintegrate. The above described combination of design features of the extrusion chamber assembly provides sufficient resistance/friction to achieve and maintain 150 to 250 PSI of force by the compression ram on the bale. The actual delivered compression force will vary due to physical differences in ever changing lots of gin trash and must be adjusted depending on the lot. When properly adjusted, the ram face compression force may fluctuate between about 150 PSI and 250 PSI to compensate for the frequently changing baling properties associated with this type of materials. In some embodiments, the desired actual delivered compression force produced by the compression ram is 200 PSI. It has been observed under certain conditions, that when ram face exceeds about 250 PSI, the baling extrusion chamber is prone to choking (ram does not have enough power to move forward) when exerting the maximum required compression force of about 200 PSI (compression force required to achieve up to ˜30 lbs./cu bale density). Therefore, in some embodiments, the desired actual delivered compression force by the compression ram is an average of about 200 PSI. Depending on the material characteristics and other factors, a forward ram hydraulic system pressure of (e.g., 1750 PSI) may be used as an indicator of targeted minimum ram face pressure along with, for example, actual extruded completed bale characteristics. For example, 1750 PSI hydraulic system pressure may equal approximately 150 PSI of ram face force.
Referring to
Also in some embodiments, the extrusion chamber assembly may comprise one or more supports engaged to the underside of the assembly, such as for example, bolt-on legs 109 to support the complete extrusion chamber assembly at a convenient height for the baling press operator's comfort, to aid with area housekeeping, and to provide easy access under the extrusion chamber assembly to connect, if needed, dust remediation collection chambers, venting or ducts.
For particulate material such as gin trash it is of notable importance to proper bale formation (e.g. proper density and size) to ensure that a full charge of material is delivered with each cycle of the ram. This helps to ensure that the top section of the bale of consistent density (top and bottom) is formed rather than a bottom heavy bale. Referring now to
Referring to
Referring now to
With continued reference to
As discussed briefly above, in some embodiments, the strapping storage and dispensing assembly 145 may be affixed to the overall baling press unit 101. For example, the strapping material storage and dispensing assembly may be affixed to the rear of the encasing or frame for the strapping insertion assembly (described below). In said embodiment, legs may be unnecessary as long as the spools are positioned such that the strapping is dispensed at the proper elevation for delivery to the corresponding inserter shafts and through the extrusion chamber chute 117. In some embodiments, all strapping rolls or spools may be stacked together or they may be separated and placed upon different dispensing assembly units, for example, as illustrated in
With reference to
In one embodiment, the bale strapping inserter assembly comprises three strapping inserter shafts 154a-c housed within a standing frame or encasing 158 and arranged in parallel along a central longitudinal axis running lengthwise down the shaft and substantially horizontal to the floor surface. The frame or encasing 159 may be detachably engaged to the first side wall 119a of the extrusion chamber chute 117 and may comprise a drive assembly 159 for driving the shafts through the extrusion chamber chute 117 as well as a guide assembly 160 (e.g., track 163 and posts 177) for ensuring substantially consistent, planar and linear motion of the shafts 154 housed in the encasing 158 into and through the extrusion chamber chute 117. Failure to achieve this consistent and precise motion may result in damage to the mechanism including the encasing 158, inserter shafts 154, and/or ram platen 111. In some embodiments, the drive assembly is hydraulically powered or electrically powered. The shafts may be driven by rack and pinion mechanics or other means. With reference to
Referring now to
With continued reference to
Referring to
Referring now to
In another embodiment (see e.g.,
In one embodiment, the integral blades 178a-c are positioned at a predetermined distance from the side wall aperture 155b where the inserter shaft 154 presents the strapping material to the operator such that when the operator grabs the strapping material (e.g., loop 157), pulls additional material through the extrusion chamber chute 117, and positions the loop 157 on the blades, it is assured that the strapping material is cut to proper length for later bale binding. In another embodiment, the one or more integral blade 178a-c are affixed to the baling press unit at positions substantially co-planer with the inserter shafts 154. In another embodiment, the vertical support 179 or other support structure is affixed to the side wall of the baling press unit such that the blades are several inches away from the wall providing sufficient clearance for the operator to safely place the strapping material on the blades unencumbered.
As illustrated in
In operation once inserter shaft 154 presents the loop 157 through aperture 155b such that operator can safely grip it, the operator may then grab the loop and pull extending the strapping rearward a predetermined and adjustable distance away from aperture 155b in the direction of vertical support 179. Operators may adjust the length of the strapping depending on the desired length of the bale being formed. Operator may then place the loop 157 over one of the integral blades 178a-c such that the strapping material is in contact with the sharp edge 183 of the blade. At this point, the operator provides power to the ram to advance the baling material charge forward. As the charge advances forward, the tension between the strapping material increases until the strapping material is cut.
Functions of the bale strapping insertion assembly 153 include, but are not limited to reducing the work effort required to manually, or with power, insert plastic or metal strapping material through the baling chamber via, in some embodiments, slots 114a-c on the face of the ram platen 111; reducing manual activities thus enabling operators to perform other essential activities, such as preparing and fixing (applying) straps; consistently extending and placing the straps to exactly the same distance and location; in some embodiments, allowing the strapping inserter elements to first insert and then be retracted a short and equal distance (few inches), which, with use of the strapping retention members, creates open loops at the ends of the inserted strapping material (aids the operator in manually extending/pulling the strapping material to the correct length for cutting & thereby reducing wasted strapping material, and decreases the time required to prepare the individual bale straps; eliminating twisting of strapping material as it is pressed/inserted through the platen slots (twisting complicates the decision as to the correct location to cut the strapping material and twisting can allow one end of a strap to be secured to the incorrect bale); and/or establishing loops at the end of the inserted strapping material at a consistent location, which will greatly aid the development of automatic or semi-automatic extending/pulling and cutting of the strapping material to form the actual bale straps (straps used to secure/retain the compressed bale density).
In practice, in some embodiments, when it is time to insert the strapping via the strapping insertion assembly, the compression ram stroke first will be extended by a pre-determined amount to push the bale forward a small distance. The compression ram may then be reversed a short distance creating a gap or cavity between the ram platen and the bale. At this point, the strapping insertion assembly may insert the inserter rods carrying the strapping material through the slots in the ram platen and both side walls of the extrusion chamber. It should be recognized that the compression ram positions (tie and fully extended) are adjustable. For example, in some embodiments, the maximum possible distance that the ram may extend beyond the leading edge of the charge chamber is about 24″. However, the ram may be set such that it will only extend inside the extrusion chamber 18″ from the leading edge of the charge chamber in a normal stroke. The ram may then be reversed approximately 4″ (14″ from the leading edge of the charging chamber) to create the cavity. This position may be referred to as the “tie position.” The various ram positions in this process largely depends on the material being baled and the amount of memory it has. One advantage to this system is that the degree of compression ram penetration into the extrusion chamber may be minimized.
It was discovered unexpectedly that connecting and tightening of the strapping material early in the bale formation process (as is conventional) may not be suitable for biomass feedstock (e.g. cotton gin trash) since the material had very little physical memory, and thus would not expand or rebound to the spatial limits imposed by the straps. It was discovered that delaying the final connecting and tightening of the straps until the cotton gin trash or other biomass material had travelled nearer the end of the extrusion chamber or to the general location where the extrusion is at the maximum density resulted in a more effective strapping or binding process. The conventional practice had been to connect the binding material while the bale or extruded material remains in contact with the ram platen or at the location where the straps are first inserted. In some embodiments, on final charge of material for each bale, the inserter shafts insert additional strapping such that strapping is positioned on the back side of the prior bale and the front side of the next bale being formed for eventual attachment.
As mentioned previously, in some embodiments, the strapping material is stored, dispensed, and inserted from a single side of the baling press unit. A loop of strapping material is formed on the opposite side of the baling press, the strapping material may then be extended to proper length, and then the strapping material may be cut into two sections to connect strap ends on bales further down the extrusion chamber nearer the bale exit end. For example, the end of the cut strap nearest the bale exit end provides strapping the proper length to connect to the rear (last section of bale formed) of the leading bale, and the end of the strap cut nearest the compression ram (or rear of the baling press) provides the strap the proper length to connect to the front (leading edge of next bale to be formed within the extrusion chamber), or the trailing bale. Said procedure allows connecting the straps to secure bale density of a single bale even though strap was inserted on two occasions for each bale, once for leading end of bale and once for trailing end of bale. The advantages of this method include securing strapping 360-degrees around the entire bale perimeter (circumference), permitting strapping dispensing and insertion from only one side of the baling press, presenting only one location of overlapping straps to be connected, and allowing the baling press operator to work on only one side of the baling press.
The invention now will be illustrated by the following examples which, while describing procedures and mechanics associated with the baling press within the “broad ambit of this invention”, are not to be construed as limiting. Appropriate changes may be made in the manner normally employed by those possessing the usual skill of this art.
The following is a non-limiting description of tests involving an early model or prototype of a horizontal baling press. The tests were performed using mote trash feedstock. Dimensions, targets, procedures and mechanical references may have been modified since the test was performed, but broad, general principles discussed below are applicable.
Pre-bale feedstock sample density=10.96 lbs/ft3
Box of feedstock was 27 lbs (loaded level) minus 2 lbs for box=25 lbs of gin trash
Box size 22″×13″×15″=4290 square inches/1728=2.48 lbs/ft3
Baling charging chamber for Extrusion Baler 10 ft3
Target maximum bale weight=600 lbs.
Target minimum bale weight=500 lbs.
Target bale length=60 inches or 20 ft3 (24″×24″×60″=34,560 divided by 1728=20.0 ft3)
Prior to the experiment it was predicted that the experiment would generate a bale 20 ft3 bale that weighed 550-600 lbs had a density of 27-30 lbs/ft3.
Prior to feedstock loading, the charge chamber was prepacked with feedstock to determine how to “choke down” the chamber. The tension bolts on the first tension element were opened about 0.5″ on both sides of the extrusion chamber chute to release the compacted feedstock within the extrusion chamber chute. Once the chamber was free of the dense feedstock, additional feedstock was loaded into the baler.
The first four bales produced had the following measurements:
It was observed that the compression pressure decreased from 1300 PSI to 900 PSI, which led to reduced density. The bolts in the first tension element were tightened and the feedstock extruded without strapping. Compression pressure slowly increased to about 1200 PSI. Since the density was increasing with the compression pressure, a final bale number 5 was produced with straps. Bale No. 5 required 1500 PSI to extrude and weighed 611 lbs. The pallet weighed 36 lbs and the density was 29.74 lbs/ft3. Converted to the target bale length of 60″, the bale weight would have been 595 lbs.
The bale density continued to increase after the tension bolts on the first tension member were tightened with each ram cycle. In other words, bale density was holding and gaining. There remained additional adjustment capacity to narrow the extrusion chamber via tightening the tension element bolts even more which, it is suspected, would have increased density and weight even more. All five bales that were strapped weighed over 500 lbs and were within 10-20% of the target maximum weight.
It was further noted that a bale with straps in place early in the procedure offered more chamber resistance than loose material not strapped.
It was also observed that due to the amount of material packed into the three slots in the ram platen, the inserter rod had to be forced through the slots to clear the material prior to inserting a strap. It was observed that slightly reversing the ram face to insert the straps helped that process.
During testing 5/8″ 0.04 PET straps were used to secure with a hand-held tensioning and welding device. The PET straps have a break-strength of 1500 lbs. In this experiment, the straps or wires were inserted through the ram face slots once the target weight has been compressed to form a bale, but tensioning the straps was delayed until the unsecured bale had moved toward the end of the extrusion chamber.
It was observed during this experiment that the baler ram will cycle in about 12-seconds (a 36″ stroke) using a 40 HP power unit. Approximately 100 lbs of gin trash was compressed into the baling chamber each ram cycle if the infeed box is full. Therefore, it was estimated that no more than 7 ram cycles should be required to form a bale (plus or minus). Allowing 3 seconds of time delays and an extra 15 seconds for insurance, 2 minutes was calculated as the maximum time required to form a complete bale if gin trash is consistently loaded into the feed chute. Then allowing up to 3 minutes to insert straps, a bale should be strapped each 5 minutes or a minimum of 12 bales per hour might be possible. With modifications to the system, the rate may be increased to 15 to 16 BPH or more.
Below is a non-limiting example of an early operation protocol. Procedures may have been modified since the test was performed but broad, general principles discussed below are applicable. When the operator's control is set to run in manual mode the ram can be run forward and reversed bypassing all switches. When the press is in automatic mode, once the photo eyes are blocked, the ram will leave the Home Switch (LS1) stroke forward to the Reverse Switch (LS3) the number of strokes indicated in the thumb wheel. Once the strokes are complete the ram will stop on the Reverse Switch (LS3), the light and buzzer will alert the operator that the bale is ready to tie. The operator will switch the baler to TIE position; the ram will stroke forward to the Full Forward Switch (LS5), and then reverse to the Tie Switch (LS4). Once the bale straps are in place the operator will switch the baler back to AUTO then press the Start Button. The ram will then return to the Home Switch (LS1) and the cycle will repeat.
When the Pressure Switch (PS1) is made the alarm will sound 1 second. The Amber Light on the panel will flash for 1 minute then turn off. Each time the preset pressure is reached the timer will reset itself and the Amber light will flash for 1 minute.
It should be noted that in the above operations protocol example, the baling press used a conventional thumb wheel to select the proper number of ram cycles. It was later determined that the thumb wheel with manual settings required persistent adjustment of the extrusion chamber tension to recover for low density or avoid too high a density (jams). The development of an extrusion chamber with two “different purposed” tension elements (e.g. first tension element and second tension element) combined with heavier construction materials ameliorated the need for major adjustment/corrections during runs.
While the present invention has been described herein with respect to the exemplary embodiments, it will become apparent to one of ordinary skill in the art that many modifications, improvements and sub-combinations of the various embodiments, adaptations and variations can be made to the invention without departing from the spirit and scope thereof.
This application is a divisional of pending U.S. application Ser. No. 16/385,584, filed 16 Apr. 2019, which is a continuation in part of U.S. application Ser. No. 14/672,179, filed 29 Mar. 2015, which is a non-provisional application of U.S. Provisional Application Ser. No. 61/972,250 filed Mar. 29, 2014. The disclosures of application Ser. Nos. 14/672,179 and 61/972,250 are incorporated by reference herein in their entirety.
Number | Date | Country | |
---|---|---|---|
61972250 | Mar 2014 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 16385584 | Apr 2019 | US |
Child | 17334915 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 14672179 | Mar 2015 | US |
Child | 16385584 | US |